Oakland Pedestrian Master Plan Oakland Pedestrian Plan Draft Recommendations Chapter Outline

Similar documents
Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

PEDESTRIAN ACTION PLAN

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Bicycle Master Plan Goals, Strategies, and Policies

CHAPTER 7.0 IMPLEMENTATION

Living Streets Policy

Omaha s Complete Streets Policy

Pedestrian Project List and Prioritization

Pinellas County Safety Initiatives

Pedestrian and Bicycle Improvements in Balboa Park Station Area

Transportation Planning Division

EMPHASIS AREA 1: PEDESTRIANS

Designing Complete Streets: What you need to know

Appendix A: Crosswalk Policy

Closing Plenary Session

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

2. Vision & Goals. Vision. Santa Rosa is a community where walking and bicycling are comfortable and convenient for people of all ages and abilities.

Hennepin County Pedestrian Plan Public Comment Report

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

BD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1

F L E T C H E R A V E N U E

FOLSOM-HOWARD STREETSCAPE OVERVIEW

PEDESTRIAN ACTION PLAN

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Telegraph Avenue Complete Streets DRAFT Recommendations. Oakland Public Works Department September 11 and 13, 2014 Open Houses

BALBOA AREA: TRANSPORTATION PROJECTS & PLANNING

Memo. Introduction. Memphis STP Pedestrian Sidewalk Project

Bridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment

Broad Street Bicycle Boulevard Design Guidelines

City of Novi Non-Motorized Master Plan 2011 Executive Summary

City of Birmingham Draft Multi-modal Transportation Plan

Existing Pedestrian Conditions. PSAC February 8, 2011

Geary Corridor Bus Rapid Transit

City of San Diego Vision Zero Draft Strategic Plan FY 2017

Welcome! San Jose Avenue Open House August 25, 2015

NJDOT Complete Streets Checklist

Vision Zero Priority Projects (March 2017)

Chapter 7: Six-Step Implementation Process

Freeway ramp intersection study

Chapter 4 TOOLBOX AND SAMPLE BIKE BOULEVARD LAYOUT

EXECUTIVE SUMMARY. Vision

STATUS OF 2009 PEDESTRIAN MASTER PLAN (AS OF DECEMBER 2013)

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

5. RUNNINGWAY GUIDELINES

Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014

Active Transportation Facility Glossary

MEMORANDUM. Charlotte Fleetwood, Transportation Planner

ADA Transition Plan. City of Gainesville FY19-FY28. Date: November 5, Prepared by: City Of Gainesville Department of Mobility

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

San Jose Transportation Policy

MEETING OF THE CITY OF CONCORD BICYCLE, PEDESTRIAN AND SAFE ROUTES TO TRANSIT PLAN ADVISORY COMMITTEE AGENDA

Pedestrian Crosswalk Audit

Chapter 4: Funding and Implementation

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

The DC Pedestrian Master Plan

About the Studio. Edward J. Bloustein School of Planning and Public Policy - Rutgers University

Retrofitting Urban Arterials into Complete Streets

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

Cycle Track Design Best Practices Cycle Track Sections

Transportation Assessment

INTERSECTION CRASH COUNTERMEASURES

COMPLETE STREETS FUNDING PROGRAM

ACTIVE TRANSPORTATION

Complete Streets. Designing Streets for Everyone. Sarnia

IMPLEMENTATION CHAPTER Identifying Priorities 7.2 Maintenance 7.3 Funding 7.4 Education and Enforcement IMPLEMENTATION

10/8/2014 VIA . RE: CVS Pharmacy (P13-002) Revised August 2014

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010

May 12, 2016 Metro Potential Ballot Measure Issue Brief: Local Return

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

Working Group Meeting

Citywide Sidewalk and Crosswalk Programs

City of Vallejo Traffic Calming Toolbox

Chapter 2: Standards for Access, Non-Motorized, and Transit

Tonight is for you. Learn everything you can. Share all your ideas.

Lincoln Neighborhood Corridor Plan The LiNC

KEARNY MESA COMMUNITY PLAN UPDATE

Washington County SW Beaverton-Hillsdale Hwy. & SW Scholls Ferry Rd.

TRAFFIC ACTION PLAN. North Central Neighborhood CITY OF SAN MATEO

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701

Better Market Street. Engineering, Maintenance & Safety Committee (EMSC) February 28, 2018

6/22/2018 VIA . Darcy Goulart, Planning Manager City of Rancho Cordova Planning Department 2729 Prospect Park Drive Rancho Cordova, CA 95670

11/3/2014 VIA . WALKSacramento has reviewed the Stockton and T Mixed-Use project at 3675 T Street in the

TABLE OF CONTENTS. Executive Summary

Guidance. ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

CITY OF OAK CREEK SAFE ROUTES TO SCHOOL ACTION PLAN. East Middle School

Pedestrian and Bicycle Conditions

CURBSIDE ACTIVITY DESIGN

5/31/2016 VIA . Arwen Wacht City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Prince George s County plans, policies, and projects

PEDESTRIAN ACTION PLAN

CURB EXTENSIONS BULB OUTS DPS 201 NECKDOWNS

Lynchburg District Update

Transcription:

EISEN LETUNIC T R A N S P O R T A T I O N, ENVIRO N M E N TA L A N D URBAN PLANNIN G MEMORANDUM To Oakland Pedestrian Plan Technical Advisory Committee & Pedestrian Advisory Group From Victoria Eisen Date November 25, 2015 Project Subject Oakland Pedestrian Master Plan Oakland Pedestrian Plan Draft Recommendations Chapter Outline Overview This memo provides an outline and explanation for the proposed Recommendations chapter of the Oakland Pedestrian Plan. The document lists five categories of investments the City could make to best accomplish the Plan s goals and objectives 1, with three or so recommended Programs in each. Rather than being specific capital projects and non-capital programs, the recommendations are a set of five strategies, each including particular types of capital projects or non-capital programs. These strategies emanated from the Plan s two advisory committees, other adopted Oakland plans, survey responses, community meeting comments, and pedestrian plans in other large U.S. cities. Recommendations Given the five-year horizon of this planning effort, these recommendations are limited to those considered to be most effective at accomplishing the Plan s goals and objectives within the next five years and those for which the City is likely to have sufficient resources to carry out within this timeframe. Most will require more staff resources than are currently allocated to pedestrian planning in Oakland at this time. Once the plan s Technical Advisory Committee and Pedestrian Advisory Group (formerly CAC) have reviewed and commented on these materials, the final recommendations will be transformed into a plan chapter that will provide more detail about each of the recommended Strategies. The summary table on Page 3 of this memo lists the five recommended Strategies, a list of the investments recommended under each and the Plan objectives each is expected to help accomplish 1 Plan Goals and Objectives (from Vision & Goals chapter): SAFETY: Make walking safe and secure 1. Reduce collisions involving people walking. 2. Reduce crime against people walking. EQUITY: Improve walking conditions citywide 3. Create equal walking environments citywide. 4. Encourage walking by vulnerable populations. WALKABILITY: Provide universal walk access 5. Make walking the most attractive mode for short trips. 46 Shattuck Sq, Ste 18 Berkeley, CA 94704 ph 415.552.2468 www.eisenletunic.com

Oakland Pedestrian Master Plan Recommendations chapter outline Page 2 (see numbered list in footnote below). These objectives were developed at your last committee meeting, in the context of the Visions & Goals chapter. The rest of this document provides more detail on these recommendations and shows other measures that were considered but not recommended for this five-year plan. At your upcoming meeting, you will be asked if your priorities are in line with this draft list and, if not, what sort of investments you think would be more effective at meeting the Plan s goals and objectives. Staff will use the final set of recommended Programs to guide the investment of available resources to improve Oakland s walking environment over the next five years. Next Steps The Implementation chapter, the next one we ll develop, will provide cost estimates for each recommended Strategy and identify which are expected to be covered with expected funding and which will require obtaining outside grants. This chapter will also recommend prioritization criteria staff can use to select projects and programs (and their locations) to be delivered under each Strategy, as well as performance measures the City can use to monitor progress toward delivering these Strategies and achieving the Plan s vision, goals and objectives. You will have an opportunity to review the Implementation chapter in the context of the draft Pedestrian Plan at your next and final meeting, expected to be in February 2016.

Oakland Pedestrian Master Plan Recommendations chapter outline Page 3 Becoming a More Walkable City DRAFT 5-year Recommendations Recommended Strategies Safe Crossings & Speed Reduction Low-cost & quick improvements More intensive, higher cost improvements Maintenance (of measures that make crossings safer and reduce speeds) Objectives* 1,3,4,5 Walkability Continuous sidewalks (including curb ramps) Pedestrian-level lighting Trees Maintenance (of measures that improve walkability) 1,3,4,5 Programs Enforcement of traffic laws Education o People driving o People walking o People biking School crosswalk and Safe Walk monitors Data Collection for Decision-making Counts of people walking Crime against people when they re walking Before/after project and program evaluations Inventory of facilities for people walking Policies Practices: Ensure existing policies are systematically implemented Existing Policies: Review and update existing policies. New Policies: Adopt new policies to achieve Pedestrian Plan goals. 1,2,3,4,5 1,2,3,4 1,2,3,4,5 * Plan Goals and Objectives (from Vision & Goals chapter): SAFETY: Make walking safe and secure 1. Reduce collisions involving people walking. 2. Reduce crime against people walking. EQUITY: Improve walking conditions citywide 3. Create equal walking environments citywide. 4. Encourage walking by vulnerable populations. WALKABILITY: Provide universal walk access 5. Make walking the most attractive mode for short trips.

Oakland Pedestrian Master Plan Recommendations chapter outline Page 4 Safe Crossings & Speed Reduction Recommendations in this category will be drawn from Kittelson & Associates, Inc s (KAI s) Safety Treatment Toolbox (see Appendix XX). This resource documents a range of treatments that can be used to help reduce the risk of collisions involving people walking. Oakland Department of Transportation professionals will use the toolbox to select the appropriate measures for a given context. Therefore, all three sub-categories are recommended for inclusion in the Pedestrian Plan. 1. Low-cost & quick improvements (see bulleted examples below) High-visibility crosswalks Painted safety zones (i.e., bulbouts created with paint & bollards) Signal modifications (e.g., pedestrian scramble, leading pedestrian interval)* In-street Yield to Pedestrians sign Advance yield or stop lines Restrict parking at intersections ( daylighting ) * Actual cost depends on vintage of existing signal controller. For instance, newer models can be adjusted to create a pedestrian-only phase ( scramble ) and leading pedestrian interval, while older ones would require costly upgrades in order to provide these options. 2. More intensive, higher cost improvements (see bulleted examples below) Pedestrian signal heads and countdown timers Pedestrian signal HAWK signal (pedestrian-activated signal that is unlit when not in use) Rectangular Rapid Flash Beacons Pedestrian refuge islands Concrete bulb-outs Eliminate slip lanes (i.e., free right turn lanes) Road diets 3. Maintenance of existing facilities (see bulleted examples below) Crosswalks Bollards Traffic signals

Oakland Pedestrian Master Plan Recommendations chapter outline Page 5 Walkability Recommended Walkability improvements 1. Continuous sidewalks (including curb ramps) 2. Pedestrian-level street lighting 3. Trees 4. Maintenance (e.g., sidewalk condition, sidewalk cleanliness, trees, trash collection) Walkability improvements that are not recommended for the 5-year plan 5. Crosswalks on all intersection approaches 6. Wider sidewalks 7. Implement AC Transit Major Corridor Study findings (TBD) 8. Trees and other landscaping (not priority throughout Oakland) 9. Off-street pathways (e.g., Lake Merritt, Bay Trail) 10. Benches/resting spots 11. Streetscape improvements that reflect local character (incorporate in other projects) 12. Converting 1-way streets to 2-way 13. Public art 14. Active streets (e.g., ground floor retail) 15. Repurposing roadway space for people walking (e.g., parklets, plazas) 16. Wayfinding signs 17. Bike facilities to encourage cyclists to stay off sidewalk (Note for upcoming bicycle plan implementation.) Programs Recommended Programs 1. Enforcement of traffic laws People driving, people walking, people biking 2. Education People driving, people walking, people biking Health value of walking 3. More school crosswalk and Safe Walk monitors Programs that are not recommended for the 5-year plan 4. Enforcement of crime against people walking 5. Ambassadors in commercial districts to clean up trash, greet passersby, and be eyes on the street 6. Encouragement programs

Oakland Pedestrian Master Plan Recommendations chapter outline Page 6 Data Collection for Decision-Making Recommended Data to Collect 1. Counts of people walking 2. Crime against people walking 3. Before/after evaluations 4. Inventory of facilities for people walking Sidewalk gaps Tripping hazards Data that is not recommended to be collected in the 5-year plan 5. Surveys of people walking Origin/destination (including shared mobility) Trip purpose Demographics 6. Roadway characteristics inventory in GIS 7. Speed survey data in GIS 8. Broaden collision data using emergency room statistics (for #s, not locations etc.) 9. Use See-Click-Fix reports to ID projects & program areas

Oakland Pedestrian Master Plan Recommendations chapter outline Page 7 Policies All three sub-categories are recommended for inclusion in the Pedestrian Plan. 1. Practices: Ensure practices systematically implement existing policies (see bulleted examples below) Coordination with resurfacing and sidewalk projects Minimum sidewalk (clear) widths, sidewalk smoothness No parking in the pedestrian right-of-way Pedestrian signal timing, stop sign use Crosswalk markings and controls Utility and landscape placement Sidewalk encroachments Minimize number and width of driveways along key walking streets (e.g., in commercial districts). Locate off-street parking behind businesses when possible, accessible from side streets Proactively coordinate with utilities. 2. Existing Policies: Review and update existing policies (see bulleted examples below) Signal timing policy (e.g., reduce below 3.5 ft/sec in certain locations; automatic pedestrian recall) Crosswalk striping and location 3. New Policies: Adopt new policies to achieve Pedestrian Plan goals (see bulleted examples below) Initiate Vision Zero o Establish committee of transportation, planning, police, fire and school staff representatives to identify next steps to pursue a Vision Zero policy and to pursue opportunities to improve conditions for people walking. Adopt policies as needed to implement strategies recommended in this plan (e.g., painted safety zones, midblock crossing treatments)