Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. Project Type Capital Improvement

Similar documents
Bluffdale South (SR140) Bicycle/Shoulder Lanes Project Type Bicycle

CONNECTING PEOPLE TO PLACES

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

5 CIRCULATION AND STREET DESIGN

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

Sharrows and Elephants and Bike Boxes!, s, Oh My!

Hennepin County Transportation Department

Non-Motorized Transportation 7-1

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

ACTION TRANSMITTAL No

Transportation Improvement Plan SECTION2

What Is a Complete Street?

EXECUTIVE SUMMARY. Vision

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Connecting cyclists to work. Syracuse Metropolitan Transportation Council

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Eliminate on-street parking where it will allow for a dedicated bus only lane %

Omaha s Complete Streets Policy

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m.

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

Appendix 3 Roadway and Bike/Ped Design Standards

Chapter 3 DESIGN SPECIFICATIONS

TRANSPORTATION & MOBILITY

Duwamish Way-finding and CTR Report

Appendix D: Planning Level Cost Calculator

4 MOBILITY PLAN. Mobility Plan Objectives. Mobility Context. 1. Integrate with Local and Regional Transit Improvements

APPENDIX 9: TOP 25 PROJECT AREAS INFORMATION SHEETS

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

Table #6 VISION CHARACTERISTICS

CPC Parking Lot Riverside Drive. Transportation Rationale

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Bicycle and Pedestrian Plans and Improvements

West Village Mobility & Integration

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

NJDOT Complete Streets Checklist

Transportation Corridor Studies: Summary of Recommendations

Chapter 7 Nonmotorized Facilities

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013

Chapter 5 Future Transportation

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Bicycle Facilities Planning

Peterborough Council on Aging

US287 Asset Inventory Loveland. Figure 6-1 Loveland Bridges and Traffic Signals

2012 PRIORITY TRANSPORTATION PROJECTS

2016 I-30 CROSSING ARKANSAS BOULEVARD KEY IDEAS OF PLAN B:

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

Approximately 360 trail users cross during a typical summer weekday and 420 cross during a typical summer

TRANSPORTATION TRAINING TOPICS. April 6, 2010

Applications for Funding

MAKE YOUR PLACE IN CHANNELSIDE

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING

Route 7 Corridor Study

MPO Staff Report Technical Advisory Committee: May 10, 2017 MPO Executive Board: May 17, 2017

Prince George s County plans, policies, and projects

Complete Streets. Designing Streets for Everyone. Sarnia

Hennepin County Bicycle and Pedestrian Planning

Rochester Downtown Bicycle Study 2009

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

State Highway 44/State Street High Capacity Corridor

STREET AND HIGHWAY PLAN

SOLANA BEACH BICYCLE TRANSPORTATION PLAN SECOND ADDENDUM

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

Sixth Line Development - Transit Facilities Plan

2.0 Existing Conditions

KEARNY MESA COMMUNITY PLAN UPDATE

Designing Streets for Transit. Presentation to NACTO Designing Cities Kevin O Malley Managing Deputy Commissioner 10/24/2014

TRANSPORTATION & ACCESS

12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)

Cycle Track Design Best Practices Cycle Track Sections

ACTION TRANSMITTAL No

See Figure 38, Existing Nonmotorized Connections.

About the Wilmington Downtown Circulation Study

COMPLETE STREETS A STEP FORWARD ITE District 10/FSITE Annual Meeting November 3, 2015

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

NEWMARKET UPHAM S CORNER

5/7/2013 VIA . RE: University Village Safeway Expansion (P13-019)

US287 Asset Inventory Fort Collins. Figure 5-1 Fort Collins Bridges and Traffic Signals

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Employment 8,881 17,975 9,094. Households 18,990 31,936 12,946

TRANSPORTATION COMMISSION Agenda Staff Report

Active Transportation Access to Transit

Goodlettsville Bicycle and Pedestrian Plan Executive Summary

This page intentionally left blank.

Bike San Mateo County San Mateo County Bicycle Plan Recommendations August 30, 2010

TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

Regional Transportation Update REGIONAL LEADERS RETREAT

Monroe Street Reconstruction Business Focus Group Notes July 18, 2016, HotelRED

MULTIMODAL NEEDS ASSESSMENT

Tunnel Reconstruction Brooklyn CB 1 August 14, 2018

Chapter 13 ORANGE COVE

DON MILLS-EGLINTON Mobility Hub Profile

Transcription:

Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. At West Side of Mountview Park Entrance (Approx. 1600 East) $ 206,800 $ 192,800 Install a HAWK Pedestrian Crossing System on Fort Union Boulevard, west of the Mountview Park entrance (approx. 1600 East); including ADA accessible ramps on each side of street, traffic signs, and painted crosswalk.

Draper City Vista Station Trails s Jordan River Parkway Train to Draper UTA FrontRunner Station $ 504,900 $ 470,718 The project will consist of two 1/2 mile multi-use trails which will provide a critical access loop from the Jordan River Parkway Trail to the new Frontrunner station, the recently completed ebay campus, Galena Hills Park, and the future high density development planned in the area.

UTA/Salt Lake City Salt Lake Central Station Area Bike/Ped Improvements Enhance Walkability and Bike ability $ 278,800 $ 259,925 The SL Central Station is a major transit hub connecting riders to TRAX, FrontRunner, Amtrak, and local & intercity bus service. Bike & pedestrian activity is concentrated in this area, as riders access the station from areas near downtown. Improvements could be made to enhance walkability and bike-ability at this location.

Salt Lake City Bike Share Program 600 West to 700 East/North Temple to 400 South $ 2,001,200 $ 248,178 The Bike share program provides high-quality bicycles for commuters to link local destinations with regional transit. A network of bike share stations within a dense urban area provides a fast, flexible, and affordable transit option for the last mile of regional transit trips.

Salt Lake City Complete Street & Bike Connection Project Type Planning/Study North Temple at 400 West to 3 rd Ave at Canyon Road $ 50,000 $ 37,500 Develop a corridor plan for a complete street and separated family-friendly bikeway on North Temple through the heart of downtown Salt Lake connecting west to the Grand Boulevard and east to Memory Grove/Avenues. The plan will also improve pedestrian crossings, bus stops, & bus shelters and consider a separate bus lane.

Sandy Sandy Canal Trail s 11400 South 880 East $ 199,800 $ 186,274 Install HAWK signal for crossing major arterial (11400 S).

Sandy Dry Creek Trail s 10200 South to 10000 South $ 77,300 $ 72,067 Install 544 feet of trail to complete the trial between 10200 South to 10000 South

South Jordan City Welby Jacob Canal Trail 10400 South to 10200 South $ 89,200 $ 81,297 The purpose and need of the trail is to connect to two street terminus on 10200 South and 10400 South. It is anticipated that the trail will accommodate all types of uses such as jogging, running, walking, and biking. The trail improvements include but not limited to asphalt pavement, untreated base course, grading, and signs.

South Salt Lake 300 West Parley s Trail Haven Avenue to Andy Avenue $ 239,135 $ 160,100 This project will allow trail users to safely cross 300 West as part of the Parley s Trail regional trail system by installing pedestrian activated beacons on 300 West at Haven Ave., bike lanes from east of the existing TRAX crossing at Haven Ave. to 300 West, and installing a 10 foot wide trail along the west side of 300 West from Haven Ave. to Andy Avenue.

West Jordan 7800 South Gardner Village Bridge North-side of 7800 South - East Bank Jordan River to West Bank Jordan River $ 668,200 $ 622,963 The current Jordan River Bridge at 7800 South does not accommodate pedestrian or bicycle traffic, and the need for this link to the TRAX station and Gardner Village, a regular tourist attraction in the Salt Lake Valley, is needed. Recent development has surrounded the area, and continues to increase. Also, at some point in the future, the vehicle bridge will need replacement, and having this alternative in place will help the public during the reconstruction of that facility.

West Valley Cross Towne Trail Extension 2700 West to 3200 West $ 450,700 $ 402,474 The Cross Towne Trail is an important transportation alternative in the central part of the Salt Lake Valley. The trail ultimately will run from the east boundary of the city to the west boundary. The facility provides critical connections to existing trails and transportation centers.

Salt Lake County Parley s Trail 2300 East Tunnel Crossing s Under the 2300 East Off-ramp from I-80 $ 1,224,600 $ 250,000 Provide a grade separated crossing to prevent conflicts between high speed freeway off ramp and slower pedestrian and cycling traffic.