FUNDING OPTIONS FOR COMPLETE STREETS PROJECTS. Dean Ledbetter, PE Senior Planning Engineer NCDOT Division Eleven

Similar documents
CTDOT Pedestrian and Bicycle Safety Initiatives

Purpose. Process. Recommendations

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Project Team. Refined Pedestrian Crossing Toolbox. Problem Statement. Aerial of Study Corridor. Crossing Accommodations and Pedestrian Fatalities

CURBSIDE ACTIVITY DESIGN

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

C/CAG. Sunnybrae Elementary School Walking and Bicycling Audit. San Mateo-Foster City School District JUNE 2013

Route Segment Descriptions

Physical Implications of Complete Streets Policies

Omaha s Complete Streets Policy

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Retrofitting Urban Arterials into Complete Streets

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

2014 FHWA Aging Road User Handbook. Recommendations to Accommodate Aging Pedestrians. Lifesaver National Conference. What is the Handbook?

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

PEDESTRIAN SAFETY IMPROVEMENT EVALUATION GUIDELINE FOR UNCONTROLLED CROSSINGS

Bay to Bay Boulevard Complete Streets Project

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Oakland Pedestrian Master Plan Oakland Pedestrian Plan Draft Recommendations Chapter Outline

Controlled. Semi-Controlled PAGE 01 CHAPTER 12 INTERSECTIONS

Chapter 4: Funding and Implementation

Bicycle Boulevards and Neighborhood Greenways

Montco 2040 Implementation Grant Program Award Summary

GIS Based Data Collection / Network Planning On a City Scale. Healthy Communities Active Transportation Workshop, Cleveland, Ohio May 10, 2011

West Capitol Avenue Road Rehabilitation and Safety Enhancement Project

Route 29 Solutions Projects

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue

Enhancing Downtown

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

Lynchburg District Update

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Town of Mooresville, North Carolina Neighborhood Traffic Calming and Control Device Policy

NJDOT Complete Streets Checklist

Walkable Community Workshops

Addendum to SDDCTEA Pamphlet 55 17: Better Military Traffic Engineering Revision 1 Effective: 24 Aug Crosswalk Guidelines

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Windy Ridge Elementary School

Active Transportation Facility Glossary

CML s 91 st Annual Conference June 18 21, 2013 Vail, Colorado. Why a Campaign? Learn More. City of Brush! 6/13/2013

Road Diets FDOT Process

Bicycle Facilities Planning

Hidden Oaks Elementary School

2018 Transportation Survey October 17, Prepared by:

ACTIVE TRANSPORTATION

CHAPTER 7.0 IMPLEMENTATION

Walk Friendly Communities Engineering Strategies. Carl Sundstrom Walk Friendly Communities Workshop Grandview, MO June 2015

Telegraph Avenue Complete Streets DRAFT Recommendations. Oakland Public Works Department September 11 and 13, 2014 Open Houses

Appendix A. Knoxville TPO Greenway Signage Guidelines. Appendix A: Knoxville TPO Greenway Signage Guidelines Knox to Oak Ridge Greenway Master Plan

Montclair s Complete Streets Experience

Chapter 5: Crossing the Street

Non-Motorized Transportation 7-1

San Jose Transportation Policy

Microscale Audit of Pedestrian Streetscapes (MAPS), Mini Version

MARTIN LUTHER KING JR. WAY

Prince George s County plans, policies, and projects

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Downtown Signals Traffic Analysis

Guidelines for Pedestrian Treatments at Uncontrolled Locations

1 To provide direction to Administration when determining the appropriate Pedestrian Crossing Control Device for a particular location.

Chicago Safe Routes to School Safe Routes to High School (SRTS/SRTHS)

Guidelines for Pedestrian Treatments at Uncontrolled Locations January 18, 2018

Plant City Walk-Bike Plan

Intersection Improvement: Sturgeon Road, Silver Avenue and Murray Park Road Roundabout. Welcome. Public Information Session

Project Goal and Description. Why Broadway? Broadway SFMTA.COM/BROADWAY. The goal of the Broadway Safety Improvement

CHAPTER 3: Vision Statement and Goals

STONY PLAIN ROAD STREETSCAPE

Irondale on the Move Public Outreach Summary to Date. July 8, 2015

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

Bicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)

Project Narrative Old Durham Road/Old Chapel Hill Road Complete Streets Project

FHWA Bikeway Selection Guide

PEDESTRIAN CROSSING SOLUTIONS ANDREA HARTH, PE, PTOE TEC ENGINEERING, INC.

GIS Based Non-Motorized Transportation Planning APA Ohio Statewide Planning Conference. GIS Assisted Non-Motorized Transportation Planning

Military Road Safety Improvements

TRANSPORTATION TRAINING TOPICS. April 6, 2010

Figure 4-10: Pedestrian Improvements Types of Potential Station Area Improvements - Place-Making Improvements

Franklin Parking Analysis

complete streets design and construction standards public primer City of Edmonton

Table #6 VISION CHARACTERISTICS

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

PEDESTRIAN CROSSING TREATMENTS

Designing for Pedestrian Safety

WELCOME. to the meeting for the. Westside Avenue Action Plan Gateway to Revitalization

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

Bicycle + Pedestrian Connectivity Gap Analysis

NEWMARKET UPHAM S CORNER

Polk Streetscape Project

COMPLETE STREETS PLANNER S PORTFOLIO

Pedestrian & Bicycle Safety Innovations & Applications

Pedestrian Safety Guide for Transit Agencies

Bicycle Network. Vision Zero San Francisco The City and County of San

Establishing Procedures and Guidelines for Pedestrian Treatments at Uncontrolled Locations

July 5, Arthur R. Ware, Jr. Elementary School 2017 Safe Routes to School Walkabout Report

By: Bill Baranowski, PE TRAFFIC CALMING EXAMPLES IN SUGARHOUSE, DAYBREAK, AND WEST JORDAN CITY

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

Transcription:

FUNDING OPTIONS FOR COMPLETE STREETS PROJECTS Dean Ledbetter, PE Senior Planning Engineer NCDOT Division Eleven

DIVISION ELEVEN

PRESENTATION OVERVIEW Sample Complete Streets Projects in Division Eleven Where What Description of the Improvement Why Benefits of the Improvements How Discussion of Funding Sources

LENOIR DOWNTOWN IMPROVEMENTS

LENOIR DOWNTOWN IMPROVEMENTS Reintroduced Two-Way Traffic, Added On-Street Parking, and Streetscaping Downtown Revitalization Resurfacing, Restriping, Signing, and Traffic Signal Revisions Funded by NCDOT Streets were removed from State System Other Construction Funded by City of Lenoir

BANNER ELK STREETSCAPE Streetscape, Sidewalks, and Pedestrian Signals Funded by Town and Transportation Enhancement Program

DOBSON ROAD DIET WITH NEW BIKE LANE IN ONE DIRECTION Before After

DOBSON ROAD DIET Converted 4-Lane Roadway to 3-Lane Roadway with New Bike Lane in One Direction Narrow Lanes History of Crashes in Left Lanes Restriped and Signed during Resurfacing Project

NEWLAND RIVERWALK AND STREETSCAPE Funded through Transportation Enhancement Program

PILOT MOUNTAIN CURB EXTENSIONS AND CROSSWALKS

PILOT MOUNTAIN Constructed Curb Extensions and Added Midblock Crosswalks Enhance Pedestrian Safety and Awareness Town Funds Supplemented with Division Sidewalk and Maintenance Funds

BLOWING ROCK STREETSCAPE Funded by Town

BOONE HAWK SIGNALS

BOONE NCDOT s First HAWK Signals Installed to Address Urgent Safety Need New Apartment Complex with No Bus Service on their Side of Four-Lane Roadway NCDOT Installed HAWK Signals with Spot Safety Funds Town of Boone Constructed Wheelchair Ramps and Landing for Bus Stop Second Location Converted from Standard Pedestrian Signal to HAWK Signal with Traffic Signal Operational Funds

BOONE U-4020 BICYCLE LANES

BOONE U-4020 BICYCLE LANES

BOONE Bicycle Lanes Added to TIP Project U-4020 Result of FHWA Training Coordinated with Town and Area Cyclists Boone Bike and Touring Moved Its Store to this Location Funded TIP Project

WEST JEFFERSON

WEST JEFFERSON Remove Traffic Signals and Install All-Way Stops Paint Curb Extensions and Crosswalks Construct Curb Extensions and Streetscape Later Desire to Reduce Traffic Speed and Noise Desire to Enhance Pedestrian Safety Desire to Improve Appearance of Downtown

WEST JEFFERSON

WEST JEFFERSON

WEST JEFFERSON NCDOT Provided $250,000 in Small Construction Funds Appalachian Regional Health District Provided Funds for Design Town Funded Amenities New River Power and Light Removed Poles and Overhead Lines Within Two Years, Ten New Businesses Opened $500,000 in Building Renovations 53 New Employees

WEST JEFFERSON

WEST JEFFERSON Two Traffic Signals Removed Initially Nine Additional Traffic Signals Removed in Division Eleven Eight Traffic Signals Scheduled for Removal Maintenance Cost Savings of Approximately $2,300 per Signal Per Year Reduced Labor, Utility, Travel, and Equipment Costs Created an Inventory of Spare Parts More Efficient Use of Resources

NORTH WILKESBORO

NORTH WILKESBORO Downtown Improvements Converted Main Street and CBD Loop to Two-Way Traffic Added Bicycle Lanes on CBD Loop Replaced Traffic Signals with All-Way Stops Painted Curb Extensions Added High-Visibility Crosswalks Town Added New Roadways and Desired Two-Way Traffic Funded with Maintenance Allocation, Small Construction Funds, and Signal Operation Program Town Paid for Traffic Signal Upgrade for New Development

GRANITE FALLS Downtown Improvements Replaced Traffic Signal with All-Way Stop Used Painted Islands to Narrow Road Funded with Traffic Services Maintenance Funds Lakeside Drive Sidewalk Serves Middle School, Residential Development, and Park Constructed with Safe Routes to Schools Funds

WILKESBORO 2014 Wilkes Journal-Patriot

WILKESBORO Meadowview Drive Sidewalk Installation Curve and Embankment Limited Sight Distance Serves Community College, Neighborhood, Greenway, and Park Funded with Statewide Contingency Funds Traffic Signal at Tyson Foods Pedestrians Cross Four-Lane Undivided Roadway with Little Driver Compliance Traffic Signal Will Benefit Pedestrians and Motorists Funded with Small Construction Funds

PEDESTRIAN SIGNALS Dobson / Downtown / Developer Funded Granite Falls / Recreation Center School / Small Construction Funds Lenoir / Recreation Center Neighborhood / Small Construction Funds Mount Airy / Downtown / Traffic Signal Operation Funding North Wilkesboro / Greenway Social Agency Shopping / Small Construction Funds Pilot Mountain / Downtown School / Safe Routes to Schools Small Construction Funds Wilkesboro / Greenways / Small Construction Funds

FUTURE PROJECTS

BEECH MOUNTAIN 2014 Google

CROSSNORE

ELKIN

SPARTA Image courtesy of Destination by Design Planning

WILKESBORO 2014 Wilkes Journal-Patriot