CHAPTER 15: PLAN RECOMMENDATIONS

Similar documents
CHAPTER 2: PUBLIC PARTICIPATION PROCESS

IMPLEMENTATION OF CHARTING PROGRESS TO 2040: Guiding the Boston Region s Transportation Investments MPO Outreach FFY 2016

CITY OF PORTSMOUTH PLANNING DEPARTMENT

DES MOINES AREA MPO. Presentation to Iowa Commercial Real Estate Association. April 6, 2017

Basalt Creek Transportation Refinement Plan Recommendations

Non-Motorized Transportation 7-1

SUMMARY OF TRANSPORTATION INVESTMENTS

Phone: Fax: Project Reference No. (to be filled out by MassHighway):

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY 2006 TRANSPORTATION CAPITAL PROGRAM

Transportation in Washoe County. Lee Gibson, Executive Director February 15, 2011

Town of Bethlehem. Planning Assessment. Bethlehem Town Board

Re: SWAP comments on the draft FFY Transportation Improvement Program

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

2040 Long Range Plan Projects Draft October 2011

Engineering - Bicycle and Pedestrian

Moving Together Conference Complete Streets from the MassDOT District 5 Perspective

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

Traffic and Flood Control Improvements in the Transit Oriented Development District Project Updates Tuesday, November 29, 2016 Meriden Public Library

TRANSPORTATION TRAINING TOPICS. April 6, 2010

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

Building Great Neighbourhoods BONNIE DOON

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

Hennepin County Bicycle and Pedestrian Planning

Chapter 5 Future Transportation

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

Bridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment

ITEM 3 ATTACHMENT A RESOLUTION NO

Project Status Update

Building Great Neighbourhoods QUEEN ALEXANDRA

Multi Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Bus Rapid Transit Plans

County of Fairfax, Virginia. Department of Transportation

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

STUDY ADVISORY COMMITTEE. October 8, 2015

NEED FOR ADDITIONAL FUNDING

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN

City of Madison: 2017 Capital Budget Capital Improvement Plan

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

2012 PRIORITY TRANSPORTATION PROJECTS

PEDESTRIAN ACTION PLAN

Transportation Improvement Program (TIP) for Fiscal Years Presentation to Chittenden County Regional Planning Commission July 18, 2018

Bicycle and Pedestrian Connectivity Study Phase 2

FUNDING SOURCES CHAPTER 6

TRASBURG RANSPORTATION

Bicycle Lanes Planning, Design, Funding South Mountain Partnership Trails Workshop Roy Gothie PennDOT Statewide Bicycle Pedestrian Coordinator

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

Highway 217 Corridor Study. Phase I Overview Report

Complete Streets Needs. Complete Streets Project Origin (planning documentation or supporting analysis)

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

TRANSPORTATION & MOBILITY

City of Atlanta-MARTA Sales Tax Referendum Draft Project List. Atlanta City Council Work Session May 19, 2016

Plant City Walk-Bike Plan

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners

Welcome! San Jose Avenue Open House August 25, 2015

Bicycle and Pedestrian Plan. Chelmsford, Massachusetts

Living Streets Policy

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

Portland International Airport Bicycle and Pedestrian Plan (October 2003) Staff Acknowledgements

DRAFT. Table of Contents. Background

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Bicycle Master Plan Goals, Strategies, and Policies

Chapter 4: Funding and Implementation

2017 (FY 21,22,23) Ohio CMAQ Project Selection

Roadway Project Recommendations:

US 19 Pedestrian and Bicycle Safe Access to Transit Corridor Study

Welcome to the Sellwood Bridge Project Open House!

Welcome to the Quebec Alternatives Analysis Public Meeting

2017 (FY 21,22,23) Ohio CMAQ Prioritization

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

WELCOME TO OPEN HOUSE # 1 June 14, 2017

Attachment One. Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program

San Jose Transportation Policy

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

San Tomas Expressway

City Avenue Projects

4.1 Evaluation Criteria

Board of Supervisors February 27, 2017

This page intentionally left blank.

Clackamas County Comprehensive Plan

Paoli Road Improvement Feasibility Study

Transportation Corridor Studies: Summary of Recommendations

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

Bicycle and Pedestrian Plan. Chelmsford, Massachusetts. Prepared by The Chelmsford Bicycle and Pedestrian Advisory Committee (BPAC)

Legislative Update Williamsburg Residency

North Shore Transportation Improvement Strategy

Transcription:

CHAPTER 15: PLAN RECOMMENDATIONS The recommendations outlined this Plan have been developed utilizing the goals and objectives, identified needs, and input received during the public participation process. Most of the short range project recommendations are being advanced through the Transportation Improvement Program (TIP), and reflect the priorities of the NMMPO and the local communities. Intermediate and longterm project recommendations reflect future needs uncovered through the planning process, including the input gathered through public meetings, surveys, and input sessions held throughout the region. NMMPO staff also analyzed transportation data and trends to identify transportation needs. Implementation of the recommendations will assist the NMMPO in meeting future goals and objectives by improving operating conditions, reducing delay and congestion, enhancing safety, and increasing the level of service currently provided to area residents on our existing transportation network. Figure 15.1 below shows the percentage of recommended projects that address each of the goals of the Regional Transportation Plan: Figure 15.1: Percentage of RTP Recommended Projects by Goals Addressed Congestion/ System Reliability, 17% Economic Vitality, 11% Environmental Sustainability and Livability, 13% Transportation Equity and Accessibility, 8% Infrastructure/ State of Good Repair, 35% Safety, 16% 367 P age

Recommendations are categorized as follows: Ongoing Project Recommendations include annual routine maintenance and operating costs. Current and Short Range Project Recommendations contain those projects anticipated to be implemented by 2020. Many of these projects are programmed in the 2016-2019 Transportation Improvement Program. Intermediate Project Recommendations are comprised of those projects anticipated to be implemented during fiscal years 2021 through 2030. Long-term Project Recommendations include projects that are anticipated to be implemented in 2031and beyond. Further study of these projects is needed as most are conceptual at this time. This category also serves as a funding placeholder for projects that have not yet been identified but will be needed in the future to ensure adequate maintenance and rehabilitation of the existing transportation infrastructure. Projects funded outside of the Regional Target are also identified. Such projects include those funded with Bridge funding or through other discretionary or state programs. Table 15.1 on the following page contains a list of the recommended projects from the 2012-2035 Regional Transportation Plan that have either been constructed or are now under construction. The thirteen projects reflect approximately $51 million in investment in the region s transportation infrastructure and are listed by federal fiscal year. MassDOT oversees ongoing maintenance, repair and replacement projects for infrastructure on the federal aid system. Many of these projects are funded with statewide, district-wide, federal and state funding. Such projects include the following: Pavement resurfacing and rehabilitation; Guardrail repair, replacement and upgrade; Sign repair, replacement and upgrade; Bridge repair and rehabilitation; Signal maintenance and upgrades; Right-of-way maintenance; and Safety improvements. 368 P age

Table 15.1: Projects Implemented Since Completion of the 2012 RTP Community Project Year Complete/ Type/ Project Description Estimated Year Project ID of Completion # Tewksbury 606937 River Rd Reconstruction from Rte 133 to Trull Brook $4,412,896 2013 Dunstable 606042 Route 113 Retaining Wall $779,712 2014 Reconstruction at McGovern's Farm Chelmsford/ 606174 I-495 Resurfacing $12,988,685 2014 Lowell/Tewksbury Lowell 606092 Lowell Connector Lighting Upgrades $2,800,000 2014 Westford 604809 Route 110/Boston Rd traffic and safety $3,863,035 2015 improvements from Minot s corner to Nixon Rd Dunstable 606302 Main Street over Salmon Brook Bridge $1,287,122 2015 Replacement Lowell NA Wood St at Middlesex St Intersection $635,000 2015 Improvements* Lowell 602139 Route 113 Resurfacing $2,134,717 2015 Tewksbury 606238 Route 38 Resurfacing from Lowell T.L. $2,079,843 2015 to Astle/Pike St Tewksbury 606298 East St/Dascomb Rd at Shawsheen St $1,531,236 2016 Intersection Improvements including new Traffic Signal and bike/ped facilities Billerica 29491 Allen Rd Reconstruction from Webb $6,688,616 2016 Brook to Boston Rd Dracut 604907 Arlington St Reconstruction $6,630,763 2016 Lowell 604964 VFW Highway at Bridge St and $3,209,218 2016 Lakeview Ave traffic and safety Improvements Lowell 604537 Bridge Replacement Market St over Western Canal $3,166,017 2016 Source: 2012 Northern Middlesex Regional Transportation Plan and MassDOT Advertising Program *Project constructed with City funds Tables 15.2 to 15.6 on the following pages outline the recommended highway projects for the Northern Middlesex region from 2016 through 2040. It should be noted that the time frame in which a project is listed is simply an estimate, based on the current project readiness and anticipated available funding. Should a project progress through the project development and design process sooner than anticipated, or if a project is delayed for any reason, the NMMPO may amend the RTP and TIP as needed. Most projects in the first time frame are included in the 2016-2019 TIP. The outer year projects have been prioritized using input from community surveys, municipal officials, 369 P age

business and residential stakeholder meetings, and public input sessions. Other projects have been derived from UPWP Studies (ie.i-495, Rourke Bridge) and the Congestion Management Process (i.e., Drum Hill project). Table 15.7 includes a number of projects anticipated for implementation through 2040 for which the funding source falls outside of the regional target, as previously explained. The RTP outlines projects and strategies that the region hopes to implement over the next twentyfive years with limited financial resources. Because the RTP is a fiscally constrained document, the project listings reflect the funding targets that were provided to the NMMPO by MassDOT, through a consultative process with FHWA. Total transportation expenditure levels identified within the RTP must not exceed the total revenues reasonably expected to be available for the region over the life of the plan; this includes existing revenues and new revenue sources that are reasonably anticipated. The project cost estimates were developed with the best available information and it anticipated that the costs will need to be adjusted in the future, as each project advances through the project development and design process. estimates have been provided by the local communities, MassDOT, and NMMPO staff. For projects that have not advanced through a design or cost estimating process, estimates were based on projects costs for previous projects with similar scopes. 370 P age

Table 15.2: Highway Projects Recommended for 2016 2020 Community Project Type/ Project ID # Project Description Year of Expenditure * Bedford/Billerica 29492 Middlesex Turnpike Improvements $1,000,000 Billerica 608181 Allen Rd Phase II Route 3A intersection $3,037,133 Billerica 601426 Reconstruction of Allen Rd (year 2) $2,976,437 Billerica 602945 Middlesex Canal Phase I $3,694,123 Chelmsford 607401 Traffic Signal Installation at Rte. 110 and I-495 $1,219,400 Chelmsford 607421 Traffic Signal installation at I-495 and Rte. 4 $799,497 Chelmsford Intersection Improvements to the intersection of Billerica Rd. (Rt. $2,089,367 129) and Riverneck Rd. Dracut Roadway Nashua Rd. Improvements between Lakeview $2,313,835 Reconstruction Avenue and Tyngsborough Town Line Dunstable Reconstruction Route 113 Retaining Wall Phase II Reconstruction $787,405 Lowell 606189 Improvement to 4 intersections of Rt. 38 $2,745,600 Lowell 604694 Intersection improvements at Gorham St. and the $1,560,000 Lowell Connector Lowell 605966 Resurfacing of VFW Highway (plus phase II of Pawtucket Falls Overlook Project) $6,219,200 Lowell 607752 Intersection improvements at VFW and Aiken and Rte $996,067 113 and Mammoth Tewksbury Corridor Route 38 roadway and intersection Improvements $2,339,717 Phase I Westford 607251 Intersection improvements to Rte 110 and Tadmuck Rd $3,271,140 Westford 608036 Traffic Signal Installation and Intersection Improvements at Rte 40 and Oak Hill Rd $1,456,000 Westford 608037 Traffic Signal Installation and Intersection $1,730,560 Improvements at Rte 40 and Dunstable Rd Estimated s $38,432,568 Regional Target $40,185,801 Difference $1,753,233 * Year of expenditure include a 4% annual cost increase to account for inflation Figure 15.2 on the following page breaks out the 2016-2020 projects by project type and shows that 76% of the resources are dedicated to intersection improvements, safety improvements and bicycle/pedestrian projects. 371 P age

Figure 15.2: RTP Recommendations by Project Type, 2016-2020 Pavement 14% Safety 22% Intersection 32% Bicycle/Ped 22% ITS 5% Other 5% Table 15.3: Highway Projects Recommended for 2021 2025 Community Project Type Project Description Year of Expenditure * Billerica Off Rd Multi-use Trail Yankee Doodle Bike Path, Design and $7,187,012 Construction Billerica Roadway Reconstruction of Route 3A from Floyd St to $6,579,659 Reconstruction River Rd Billerica Intersection Intersection Improvements to Boston Rd/ Glad $1,423,312 Valley Dr/ Lexington Rd Chelmsford Pedestrian Walkway Brook Walk Pathway in Chelmsford Center $6,404,903 Chelmsford Safety and traffic Traffic and Safety improvements along Steadman $1,897,979 improvements St/Golden Cove Road Chelmsford Intersection Intersection improvements at Concord Rd/ $1,423,312 Parker Rd/ and Boston Rd Dracut Intersection Intersection improvements at Lakeview Avenue $2,846,624 and Mammoth Rd. - Signal upgrades and reconfiguration of approaches Dracut Intersection Intersection Improvements at Route 113 (Pleasant $1,915,997 St) at Route 38 (Bridge St.) and Aiken Avenue Lowell Intersection Westford St. and Wilder St. Intersection Improvements $426,994 Lowell Signalization Installation of Traffic Signals at I -495 Ramps at $2,134,968 Woburn St. Westford Roadway Reconstruction Main Street roadway reconstruction between Depot Street and Tadmuck Rd. $3,421,423 Estimated s $41,715,467 Regional Target $42,298,641 Difference $583,174 * Year of expenditure include 4% annual cost increase 372 P age

Figure 15.3 below breaks out the 2021-2025 projects by project type and shows that 86% of the resources are dedicated to intersection improvements, safety improvements and bicycle/pedestrian projects. Figure 15.3: RTP Recommendations by Project Type, 2021-2025 Pavement 14% Bicycle/Ped 24% ITS 0% Other 0% Safety 29% Intersection 33% 373 P age

Table 15.4: Highway Projects Recommended for 2026 2030 Community Project Type Project Description Year of Expenditure * Chelmsford Sidewalks Installation/Improvement of Sidewalks on Billerica Road (Rt. $1,316,074 129) Chelmsford Roadway Reconstruct Westford Street $1,308,536 Reconstruction Chelmsford/ Safety and Traffic Safety and traffic flow improvements on Drum Hill Rd./Wood $3,078,908 Lowell improvements St. Dracut Signals Traffic signalization at Loon Hill Rd. and Broadway Rd. $3,386,799 Dracut Intersection Intersection improvements at Pleasant St. and Lakeview Ave. $2,771,017 Dracut Intersection Signal and intersection improvements at Rte. 113 (Pleasant St.) at Hildreth St. $1,539,454 Lowell Signals Upgrade hardware/interconnect signals throughout the CBD $9,236,724 Lowell Signals Dutton St. Corridor coordination $108,057 Lowell Intersection Central St./Middlesex St., Appleton /Gorham, Central /Church St. Intersection improvements Lowell/ Tewksbury/ Billerica Pepperell Pepperell Tewksbury Tewksbury Corridor Improvements Roadway Reconstruction Safety and Traffic improvements Corridor Improvements Corridor Improvements Roadway improvements along Woburn St./Billerica Ave. including sidewalks and pavement markings 1.75 miles $108,057 $2,960,489 Route 113 (Townsend St.) Roadway reconstruction $4,995,221 Traffic and Safety Improvements in Railroad Square $3,463,353 Route 38 roadway and intersection Improvements Phase III $4,502,359 Route 38 roadway and intersection Improvements Phase II $3,202,064 Tewksbury Intersection Route 133 at River Rd. Intersection signalization and $1,039,006 reconstruction Tyngsborough Corridor Sherburne Avenue Improvements $4,618,362 Improvements Westford Westford Town Westford Town Center Improvements $3,330,147 Center Westford Intersection Rte. 225/Carlisle Rd. intersection Improvements $1,800,944 Estimated s $52,765,570 Regional Target $52,856,555 Difference $90,985 * Year of expenditure include 4% annual cost increase 374 P age

Figure 15.4 on the following page breaks out the 2026-2030 projects by project type and shows that 89% of the resources are dedicated to intersection improvements, safety improvements, pavement upgrade and bicycle/pedestrian projects. Figure 15.4: RTP Recommendations by Project Type, 2026-2030 Pavement 20% Bicycle/Ped 22% Safety 19% ITS 12% Other 0% Intersection 27% Table 15.5: Highway Projects Recommended for 2031 2035 Community Project Type Project Description Year of Expenditure * Chelmsford Road Corridor Traffic and Safety improvements along Littleton Road $2,025,817 Chelmsford Vinal Square Vinal Square streetscape Improvements $936,491 Chelmsford Bridge Meadowbrook Rd. culvert over Stony Brook $2,766,019 Dracut Intersection Pine Valley and Mammoth Rd. Intersection improvements $1,418,072 Dracut Intersection Mammoth Rd. at Passaconway Dr. Intersection $1,363,530 improvements Dracut Intersection Improve safety at the intersection of Salem Rd. and Rt. 113 $779,160 Dracut Intersection Intersection improvements at Hildreth St. and Old Rd. $1,053,425 Dunstable Sidewalks Main Street Pathway Project $973,950 Lowell Intersection Pawtucket St. at School St. Intersection improvements $3,038,725 Lowell Intersection Riverside St. at University Ave. Intersection improvements $2,106,849 Lowell Bridge Broadway St. Bridge Modifications $1,947,900 Lowell Intersection Hamilton Canal District Offsite Improvements $1,843,493 Lowell Signals Merrimack St. Corridor Signal coordination $202,582 Tewksbury Intersection Salem St. at South St. Intersection improvements $2,106,849 375 P age

Table 15.5 Highway Projects Recommended for 2031-2035, Continued Community Project Type Project Description Year of Expenditure * Westford Roadway Bridge St. Roadway and drainage reconstruction $1,872,981 Reconstruction Westford Roadway Widening Route 110 Roadway Widening $7,491,925 Westford Roadway Boston Rd. Roadway Reconstruction $6,320,548 Reconstruction Westford Intersection Westford Schools Intersection Improvements $4,213,698 Westford Roadway Plain Rd. from Oak Hill Rd. to Moore Rd. Reconstruction $4,213,698 Reconstruction with new sidewalks Westford Bridge Rte. 40 improvements - Keyes Culvert $3,476,301 Westford Roadway Forge Village Rd. roadway and drainage reconstruction $3,160,274 Reconstruction (Graniteville to Flagg Rd.) Westford Intersection Plain Rd./Depot St. Intersection Improvements $2,106,849 Westford Intersection Rte. 225/Griffin Rd. Intersection Improvements $2,106,849 Westford Intersection Abbot Rd./Town Farm Rd. Intersection Improvements $1,264,110 Westford Signal Rte. 27 and Rte. 225 Intersection Signal Upgrade $1,012,908 Estimated s $59,803,003 Regional $59,850,863 Target Difference $47,860 * Year of expenditure include 4% annual cost increase Figure 15.5 breaks out the 2031-2035 projects by project type and shows that 87% of the resources are dedicated to intersection improvements, safety improvements, pavement enhancements and bicycle/pedestrian projects. Figure 15.5: RTP Recommendations by Project Type, 2031-2035 Safety 14% Pavement 14% Intersection 45% Other 9% Bicycle/Ped 14% ITS 4% 376 P age

Table 15.6: Highway Projects Recommended for 2036 2040 Community Project Name Project Description Year of Expenditure * Chelmsford Chelmsford Bicycle and Pedestrian safety improvements in $422,945 Center Chelmsford Center Chelmsford Senior Center Sidewalks in North Chelmsford at the Senior $740,600 Sidewalks Center Chelmsford Maple St Sidewalks on Maple St. at the Byam school $478,541 Sidewalks Dracut Intersection Intersection improvements at Primrose Hill $985,886 Rd. and New Boston Rd. Dracut Intersection Intersection improvements at Crosby Rd., $710,976 Cross Rd. and Colburn Rd. Lowell Intersection Father Morrissette Blvd. and Cabot St. $710,976 intersection improvements Tewksbury Lowell Junction Lowell Junction Interchange Construction on $60,387,354 I-93 Estimated s $64,437,277 Regional Target $64,476,378 Difference $39,101 * Year of expenditure include 4% annual cost increase Figure 15.6 below breaks out the 2036-2040 projects by project type and shows that 86% of the resources are dedicated to intersection improvements and bicycle/pedestrian projects. Figure 15.6: RTP Recommendations by Project Type, 2036-2040 Pavement 0% Safety 0% Intersection 43% Bicycle/Ped 43% Other 14% ITS 0% 377 P age

Table 15.7: Recommended Highway Projects Outside of Targets Community Project ID # Project Description Anticipated Funding Source Current Estimate Billerica 607326 Reconstruction of Rte. 3A at Charnstaffe Lane MassWorks $2,232,000 Grant Chelmsford 607123 Hunt Road Bridge Superstructure replacement over Bridge $6,337,442 I-495 FFY 2015 Chelmsford 607681 Route 3A (Gorham St.) Bridge Replacement over I- Bridge $14,301,345 495 Chelmsford 605645 Westford Street Bridge Betterment over I-495 Bridge $12,851,020 Chelmsford School St. bridge over Stony Brook Bridge $3,000,000 Chelmsford 607506 Route 4 (North Road) Bridge Superstructure Bridge $2,469,917 Replacement over I-495 Lowell 602932 VFW Highway over Beaver Brook Bridge $20,031,350 Lowell NA Market Street Bridge rehabilitation over Western Bridge $3,500,000 Canal Lowell NA Northbound Lowell Connector over Industrial Bridge $4,500,000 Avenue Bridge Replacement Lowell NA Lawrence Street bridge repairs over Concord River Bridge $3,500,000 Lowell 607862 Lord Overpass Reconstruction Special State $13,287,504 Allocation Lowell NA Construction of Concord River Greenway through Foundation $940,800 Lowell Grant Lowell 607885 Pedestrian and Bicycle walkway at Pawtucket Falls Statewide $2,510,921 Overlook from Vandenberg Esplanade to School Street CMAQ Lowell 604541 Bridge replacement Bridge St. over Eastern Canal Bridge $2,937,000 Lowell NA Beaver Street over Beaver Brook Bridge replacement Bridge $1,000,000 Tewksbury 607534 Mill Street Bridge over the Shawsheen River Bridge $1,167,285 Westford NA Bridge St. bridge over Stony Brook Bridge $1,500,000 378 P age

Table 15.8 below shows recommended highway projects without a known funding source at this time. These projects are likely to be funded through competitive grants, but the grant awards have not been announced. The NHDOT is the proponent of the Exit 36 and Commuter Rail Extension projects. Table 15.8: Recommended Highway Projects with no Current Funding Source Current Community Project ID # Project Description Estimate Lowell NA Jackson St. Extension to Dutton St. $4,600,000 Lowell 607887 Wood Street Extension Bridge (New Rourke Bridge) Lowell NA Trolley Extension Project Phase 1a from Gallagher Terminal to Dutton Street Lowell NA Trolley Extension Project Phase 1b from the intersection of Father Morrisette Blvd. to Pawtucket Street Lowell NA Trolley Extension Project Phase 1c from University Avenue to the intersection of Pawtucket Street and Broadway Lowell NA Rehabilitation of 6 Lowell bridges over Canals (TIGER Grant Application Pending) Tyngsborough NA Route 3 Exit 36 SB Ramp and Middlesex Rd improvements Tyngsborough NA Extension of Commuter Rail to Nashua with new station and area roadway improvements Westford/ NA I-495 mainline widening from Westford to Chelmsford/ Lowell/ Tewksbury Tewksbury $69,000,000 $20,000,000 $20,000,000 $20,000,000 $16,737,188 $16,000,000 $120,000,000 $100,000,000 379 P age

Table 15.9 below outlines the LRTA transit capital project recommendations for the time period 2016-2040, categorized into five year increments. This information was generated in consultation with the Lowell Regional Transit Authority and MassDOT. Table 15.9: LRTA Capital Project Recommendations Description 2016-2020 2021-2025 2026-2030 2031-2035 2036-2040 Replacement of $5,520,000 $6,716,000 $8,172,000 $9,942,000 $10,190,550 Fixed Route Buses Paratransit $1,679,000 $1,950,000 $2,257,000 $2,616,000 $2,642,160 Support Vehicles $198,000 $241,000 $293,000 $356,000 $356,000 Preventive $14,244,000 $17,330,000 $21,084,000 $25,653,000 $26,294,325 Maintenance Gallagher Parking $551,000 $573,000 $596,000 $620,000 $635,500 Garage Upgrades 100 Hale Street $250,000 $430,000 $447,000 $465,000 $476,625 Maintenance Facility Upgrades Robert B. Kennedy $250,000 $250,000 $250,000 $250,000 $250,000 Intermodal Center Upgrade and maintenance Robert Maguire $276,000 $287,000 $289,000 $310,000 $317,750 Facility Spare parts, $560,000 $681,000 $829,000 $1,009,000 $1,034,225 equipment and miscellaneous Fareboxes and $500,000 $500,000 $500,000 $750,000 $768,750 communications Total $24,028,000 $28,958,000 $34,717,000 $41,971,000 $42,965,885 380 P age

Table 15.10 below identifies the LRTA operational project recommendations for the time period 2016-2040, categorized in five-year increments. The LRTA operation improvements were developed as part of the 2015 Transit Service Study. A three-phase implementation schedule is anticipated, as detailed in Chapter 6 of this document, entitled Regional Transit System. The phase one projects are anticipated to be cost neutral. Phases two and three will require additional funding, and the projected cost estimates are displayed in Table 15.11 below. Table 15.10: LRTA Operations Improvement Recommendations Description 2016-2020 2021-2025 2026-2030 2031-2035 2036-2040 Realign Rte 01 Implementation Neutral Realign Rte 02 Implementation Combine Rte 03 and Rte 15 Combine Rte 06 and Rte 09 and Realign (Begins in 2021) Realign Rte 16 and Rte 17 Establish Rte 20 Neutral Implementation Neutral Implementation Neutral Implementation Neutral Implantation Neutral Table 15.11: LRTA Operation Improvements without an Identified Funding Source Description 2016-2021-2025 2026-2030 2031-2035 2036-2040 2020 Initiate Sunday Bus Service (Begins in 2021) NA $6,100,000 $7,413,000 $9,019,000 $10,972,000 Initiate Route 19: Middlesex Road, Tyngsborough & Discontinue Rte 20 (Begins in 2021) NA $305,000 $371,000 $451,000 $549,000 381 P age

This page intentionally left blank. 382 P age