Welcome. If you have any questions or comments on the project, please contact:

Similar documents
CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division

Dowling/Beaty Cycling Route

Sixth Line Development - Transit Facilities Plan

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

Welcome to the Quebec Alternatives Analysis Public Meeting

Public Works and Infrastructure Committee. General Manager, Transportation Services

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

102 Avenue Corridor Review

Cycle Track Design Best Practices Cycle Track Sections

Prepared For: Shieldbay Developments Inc. c/o Matson, McConnell Ltd. 2430A Bloor Street West Toronto, Ontario M6S 1P9.

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

Cyclists and Bikeways: What s your match? A guide to bikeway options for a variety of cyclists

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

2.0 LANE WIDTHS GUIDELINE

MASTER BICYCLE AND PEDESTRIAN PLAN

Major Bike Routes 102 Avenue Workshop April 21, 2015

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

City of Waterloo Complete Streets Policy

Bellevue Downtown Association Downtown Bike Series

Background Report: Street (One- to Two-Way) Conversions

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

1. Provide a dedicated westbound approach bus lane at the intersection;

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Harbord Street and Hoskin Avenue Bicycle Lane Upgrades

Bike Routes Assessment: 95 Ave, 106 St & 40 Ave. Replace with appropriate image in View > Master.

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Transportation Master Plan Advisory Task Force

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015

2. Context. Existing framework. The context. The challenge. Transport Strategy

Item No Halifax Regional Council March 6, 2018

El Centro Mobility Hub

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

Public Consultation Centre

Richmond-Adelaide Cycle Tracks

MAYFIELD ROAD CORRIDOR MULTIMODAL TRANSPORTATION PLAN. Public Workshop

WELCOME! To the Centennial Neighbourhoods Secondary Plan and Transportation Management Plan Information Centre. City of Hamilton

Coquitlam Cross-town Bike Route Improving Bicycle Facilities in a Mature Suburban Environment

Chapter 3 BUS IMPROVEMENT CONCEPTS

Implementing Complete Streets in Ottawa. Project Delivery Process and Tools Complete Streets Forum 2015 October 1, 2015

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

North Shore Transportation Improvement Strategy

Classification Criteria

LANCASTER CITY BICYCLE NETWORK

Providence Downtown Transit Connector STAKEHOLDER MEETING #2. Stakeholder Meeting #1 October 24, 2016

City of Seattle Edward B. Murray, Mayor

C C C

STONY PLAIN ROAD STREETSCAPE

Bicycle Traffic Control Signal - St. Clair Avenue West and Poplar Plains Road

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Public Open House #2. THE CITY OF NORTH VANCOUVER CHESTERFIELD AVENUE CYCLING IMPROVEMENTS (4th - 13th STREET) JULY 2013

CITY OF LOMITA CITY COUNCIL REPORT

Protected Bike Lanes in San Francisco Mike Sallaberry SFMTA NACTO Workshop - Chicago IL

Victoria Transit Priority Corridor Plan

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

REPORT CONCURRENCE. City Manager. The General Manager concurs with the recommendation of this report.

Welcome! San Jose Avenue Open House August 25, 2015

122 Avenue: 107 Street to Fort Road

Bicycle Facilities Planning

S T A T I O N A R E A P L A N

Potential Bicycle Facility on Bayou Street Mobile, Alabama

Moving Forward with Winnipeg's Downtown Protected Cycling Network

City of Ottawa s Complete Streets Approach to Transportation Projects

9/25/2018. Multi-Modal Level of Service (MMLOS) Bianca Popescu, Transportation Planner

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

Cycling Facilities on Woodbine Avenue and Corley Avenue

David DiPierro, John Amberson. Steering Committee Meeting #4 Overview

CHAPTER 7.0 IMPLEMENTATION

Road Alterations - Wellington Street East, Church Street, and Front Street Intersection

Short-Term Enhancements Improvements to keep Austin moving. MetroRapid

Addendum to Mitigated Negative Declaration

Active Transportation Infrastructure Investment A Business Case

Downtown BRT Corridor Alternatives Review: 1 st, 2 nd, 3 rd and 4 th Avenue. Bus Rapid and Conventional Transit Planning and Design Services

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Sacramento Grid 2.0. The Downtown Transportation Study

Glebe Neighbourhood Cycling Plan

Transportation Assessment

Bike Planning: A New Day

Complete Streets. Designing Streets for Everyone. Sarnia

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Welcome to the Open House

Station Plan: Penn & 43rd Avenue

Hamilton Transportation Master Plan Public Consultation. Public Information Centre One Summary

Ajax: The Road to Complete Streets

COASTAL RAIL TRAIL ROSE CREEK BIKEWAY PROJECT COMMUNITY WORKSHOP #2 AUGUST 15, 2013

Frome Street Bicycle Route

TRANSPORTATION NEEDS ASSESSMENT

Complete Streets: Policy Framework Complete Streets: Implementation Plans A more Complete Street: Laurier Bike Lane Pilot Project

2. NORTEL CARLING CAMPUS EXPANSION - PROPOSED MODIFICATIONS TO MOODIE DRIVE (REGIONAL ROAD 59) AND HIGHWAY 417 INTERCHANGE

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

Broad Street Bicycle Boulevard Design Guidelines

Transit boulevard: A new road type for Sydney s Growth Centres

Durham Region Long Term Transit Strategy

Bay to Bay Boulevard Complete Streets Project

PEDESTRIAN ACTION PLAN

TRANSPORTATION STUDY REPORT DRAFT - APRIL 2015 A BLUEPRINT FOR HOW WE CAN GET AROUND GREATER SUDBURY, FROM NOW UNTIL 2031

Transcription:

Welcome This drop-in public open house is intended to provide information about the Bay Street bike lanes project. This project proposes a dedicated cycling facility along Bay Street between Aberdeen Avenue in the south and Stuart Street in the north. If you have any questions or comments on the project, please contact: Daryl Bender, City of Hamilton Project Manager, Alternative Transportation Public Works, City of Hamilton Daryl.Bender@hamilton.ca 905-546-2424 x 2066

Concept Please take some time to review the plan on the table showing the proposed layout. Cycling facilities are proposed in the following configurations: Between Aberdeen Avenue and Hunter Street, the bike lanes are planned to be similar to the facilities on Hunter Street, with two-way bike lanes along the west side of the street. Between Hunter Street and York Boulevard, the bike lanes are planned to be similar to the facilities on Cannon Street, with protected two-way bike lanes along the west side of the street. At York Boulevard, the bike lanes will transition from two-way bicycle traffic on the west side of the street to conventional bike lanes with northbound cyclists along the east curb and southbound cyclists along the west curb - like existing bike lanes on Dundurn Street. The southbound lane will be contra-flow of auto traffic between Cannon Street and York Boulevard.

History The City s Cycling Master Plan (2009) identifies the need for an on-street cycling facility in this corridor to provide an efficient and safe network to encourage cycling. Bike lanes on Bay Street will create a convenient cycling connection between the Durand neighbourhood, the downtown core, the Central neighbourhood, the new West Harbour GO Station, Bayfront Park, and the North End neighbourhood. In April 2016, MTO announced $295,000 in capital funding for this project through the Ontario Municipal Cycling Infrastructure Program. Based on the application to MTO, this project is intended to incorporate three key elements: 1 The project is intended to be a demonstration project, incorporating various types of facilities, appropriate for the street context. 2 The project will incorporate extensive data collection, including SoBi ridership, to explore the impacts and benefits of the cycling facility. 3 The project will incorporate intersection treatments to facilitate connections to existing cycling infrastructure.

Outcome The level of service (LOS) for cyclists will improve substantially as a result of the new cycling facilities. For example, the section of Bay between King and York currently The overall environment for pedestrians would be enhanced with cycling facilities, as the bike lanes will buffer the auto traffic along Bay Street. provides a LOS F for cyclists. With the protected bike lane installed, and the provision of intersection treatments, the cycling level of service will increase to B. The overall impacts to motor traffic are relatively minor. At certain intersections, some movements approach capacity during the peak hour but overall intersection level of service stays within a reasonable range. More detailed traffic analysis results are summarized on the The lane widths along Bay Street are intended to comfortably accommodate transit buses between Hunter and York, where transit currently operates. No bus stops would conflict with any segments of contra-flow bike lanes. following board.

Traffic Analysis A preliminary analysis of the major intersections along Bay Street was carried out to assess the impacts of the lane reconfiguration. The design aims to have only slight increases to delays for auto traffic. Delay is typically described as Level of Service (LOS). The City regards LOS A, B, or C to be good, and LOS D to be acceptable. The diagram on the right shows the existing traffic conditions.

Parking Impacts Existing on-street parking is planned to be maintained between Barton Street and Herkimer Street. South of Herkimer Street, onstreet parking is proposed to be consolidated to the east side of the street only. Between Barton Street and Stuart Street, on-street parking is proposed to be removed to create space for the bike lanes. The City would assist residents in these blocks with parking alternatives On-street parking utilization data was collected to understand the level of demand in the blocks where parking would be consolidated or removed: Between Aberdeen and Herkimer, existing demand can be accommodated on the east side of the street Between Barton and Stuart, parking demand can be accommodated in the adjacent blocks during evenings, but office-hour demand is higher

Hamilton s Strategic Plan Our Vision To be the best place to raise a child and age successfully. Our Mission To provide high quality cost conscious public services that contribute to a healthy, safe and prosperous community, in a sustainable manner. How the support the Strategic Plan: The bike lanes provide environmentally sustainable transport and aim to create a healthy balance of natural and urban spaces. The project implementation fosters community engagement & participation. The bike lanes will expand transport options for the community. The bike lanes will create a safer cycling environment. Please submit completed forms in the box provided or e-mail comments to Daryl.Bender@Hamilton.ca