Calibration Procedure

Similar documents
Calibration Procedure

Calibration Procedure

Calibration Procedure

DeFelsko PosiTector CMM IS Probe

PosiTector UTG, UTG-STD & UTG-ME

DeFelsko PosiTector Dew Point Meter DPM & DPMD Probes

Calibration Procedure. PosiTest DFT Combo

Calibration Procedure

Mate ULTRA IMT Multi Tool Assembly Tooling Installation Instructions

Troubleshooting Guide: 640 Pediatric Exam Table with Midmark Scale

Section 3- Repair and Calibration Procedures

TECHNICAL DATA CAUTION

Anti-flood device Model B-1

Installation Instructions

Installation Instructions

2018 ACCESSORY ATTACHMENTS OWNER S MANUAL

CCPaSEC. Procedure for the Quality Control Yearly Equipment Check. July 2018 CCPaSEC Quality Control Team

Installation Instructions

Misaligned Folds Paper Feed Problems Double Feeds Won t Feed FLYER Won t Run iii

Warnings: Notes: Revised: October 5, 2015

Manual Weighingblock VB2 series and Uniscale

DX2/DXX Operating Instructions

ECHO MANUAL WARNING. L B A ltim e te rs. ECHO is a trademark of LB Altimeters, Denmark

Title: Xactix XeF2 Etcher Semiconductor & Microsystems Fabrication Laboratory Revision: A Rev Date: 03/23/2016

TECHNICAL DATA. Page 1 of 12

TECHNICAL DATA. Pressure Regulation 531a. April 24, 2009

Speed control assembly model A-1

PR4 Installation, Operation & Maintenance Instructions (DOT Certification Included)

PROPORTIONING VALVE. Model 150 INSTRUCTION MANUAL. March 2017 IMS Company Stafford Road

TECHNICAL DATA CAUTION

Bante810 Benchtop Dissolved Oxygen Meter Instruction Manual

Technical Procedure for Instrument Calibration and Maintenance

NOVALYNX CORPORATION MODEL RAIN GAUGE CALIBRATOR INSTRUCTION MANUAL

Table of Contents. Sensor Calibration and Troubleshooting CDS4000 CO 2. Introduction 1. Handling Information. Calibration 2.

Certificate of Accreditation

Deploying the TCM-1 Tilt Current Meter in an Inverted (Hanging) Orientation By: Nick Lowell, Founder & President

TECHNICAL MANUAL CALIBRATION INSTRUCTIONS FUEL PRESSURIZING & DUMP VALVE TEST STAND 1TL

Liquid Handling Systems

TECHNICAL DATA ANTI-FLOOD DEVICE MODEL B-1 1. DESCRIPTION

SERVICE BULLETIN. TOPIC: Cylinder NUMBER: SUPERSEDES: NEW DATE: May 15, Indexing Basic Cylinder Height On CFR F-1/F-2 Rating Units

Psyclone TM. Protimeter Thermo-Hygrometer. GE Sensing. Operating Manual. INS7800, Rev. A (September 2007)

Troubleshooting & Repair Procedures

Tex-914-K, Calibrating Motorized Gyratory-Shear Molding Asphalt Press

Installation Procedure for your Disco Double Kit, by Airgun Lab, LLC.

Warnings: Notes: Revised: January 8,

TECHNICAL DATA ACCELERATOR MODEL E-1

PTC INSTRUMENTS 2301 Federal Ave Los Angeles CA Phone: Model 500 Automatic Operating Stand Type 3

MODEL SWH10 1,000 LB CAPACITY SWIVEL HOIST

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005

Using the UltraRAE. Firmware 2.35

GE Measurement & Control

SCALE / SORTER OPERATORS MANUAL (DATED 2004 PRESENT)

SPLIT HOPKINSON PRESSURE BAR OPERATIONS MANUAL 5/9/2014

INSTRUCTION MANUAL. CVS P37 LP Gas Reducing Regulator

Discontinued. Powers Controls. Technical Instructions Document No P25 RV Rev. 1, May, RV 201 Pressure Reducing Valves.

! Warning, refer to accompanying documents.

User's Manual. Heavy Duty Dissolved Oxygen Meter. Model

TMArrayer Users Guide

MP15 Jockey Pump Controller

RADROVER REAR RACK INSTALLATION MANUAL

NOTES TABLE OF CONTENTS

Digital Vacuum Regulator

Durometer. SHT Series. Instruction Manual SHTD. Valid as of: Please keep the manual for future reference!

Simrad GD10P Extended On-site Maintenance

SL G3 - Fuel Conversion to Propane (NG to LP) P-Kit 302

PRODUCT SHEET. Order probe only as RXPROBE02

SL G3. Warning

WARNING NOTES TABLE OF CONTENTS

SPECIFICATIONS APCEPH1

Operating Instructions for BAIR22-6 AIR-POWERED CRIMPING TOOL

P-5215 Differential Pressure Transmitter

BI-680 Online Dissolved Oxygen Controller Instruction Manual

MASTER TRUING STAND TS-3. Optional Dial indicator set with brackets Dial indicator bracket set only

Standard Recommended Practice. Field Measurement of Surface Profile of Abrasive Blast-Cleaned Steel Surfaces Using a Replica Tape

PARK AVENUE 7' POOL TABLE WITH TABLE TENNIS & BENCHES ASSEMBLY INSTRUCTIONS

Agilent ICP-MS Interactive Troubleshooting tool for Low sensitivity

Un-Pressurized Orefice Fittings FIO EZ. Parts List and Operation Instructions TECHNICAL MANUAL. Dn 2-6 Class Lbs

Portable Gas Monitor GX User Maintenance Manual (H4-0050)

DOscan10 Pocket Dissolved Oxygen Tester Instruction Manual

Simple, Robust, Reliable Measures ph Doses either acid (lower) or alkali (raise) Displays ph, Total Dose Count (DCT) and Dose Count per hour (DC/h)

1)! DO NOT PROCEED BEYOND THIS MARK

Installation, Operation, and Maintenance Manual

Chromat Calibration Updated October 27th, 2017

QUICK START GUIDE TO DRINKING WATER MONITORING

I N N O V A T I O N C O N T I N U E S... International Patent Filed in 45 Leading Countries

HST-3000 VDSL QUICK CARD

2014 Programme of Training Courses in Measurement & Calibration

FOR SAFE AND CORRECT USE

Introduction. The Shearwater Petrel is an advanced technical diving computer for open and closed circuit divers.

Copyright 2004 by the Thomas G. Faria Corporation, Uncasville CT No part of this publication may by reproduced in any form, in an electronic

750 Cable Cutter INSTRUCTION MANUAL

FOOD INTAKE MONITOR. Hardware and Software User s Manual DOC-047 Rev 3.0. Copyright 2009 All Rights Reserved

Water Quality Monitoring Using a Handheld Sonde for in situ Measurements Date Prepared: 11/17/2017

Operator s Manual 701 Test Kit for Static Control Surfaces (Megohmmeter)

Caliber Sled Wheels Assembly Instructions for PN and 13579

TECHNICAL DATA Q = C. v P S. 2 Model G-2000 Dry valve. Page 1 of 13

PRESSURE-TEMPERATURE RELATIONSHIP IN GASES

G92 Series BASOTROL Automatic Pilot Gas Valve

Nuclear Associates

Operation Manual Piston Sensed Gas Pressure Regulators

Transcription:

Management Procedure 2555 Revision: B Date Issued: June 17, 2016 Date Revised: August 22, 2017 Calibration Procedure PosiTector SHD-A and SHD-D Shore Hardness Durometer Gages Table of Contents 1 Introduction and UUC Performance Requirements... 2 Table 1-1... 2 2 Measurement Standards and Support Equipment Performance Requirements... 2 Table 2-1 UUC Accuracy Requirements and Description... 2 Table 2-2 Minimum Use Specification... 2 Table 2-3 Actual Equipment Specification... 3 Table 2-4 Calibration Environmental and Warm-up Requirements... 3 3 Preliminary Operations... 3 Figure 3-1... 4 Figure 3-2... 4 Figure 3-3... 5 Figure 3-4... 5 4 Calibration Process... 5 5 Performance Requirements... 7 Table 5-1 Performance Requirements and Calibration Data... 7 for PosiTector SHD-A and SHD-D... 7 Management Procedure 2555 Rev B Page 1 of 8

1 Introduction and UUC Performance Requirements 1.1 This procedure describes the calibration of DeFelsko Corporation PosiTector SHD-A and SHD-D probes and gages. Table 1-1 Models Measurement Range SHD-A 0 100 Shore A SHD-D 0 100 Shore D 1.2 The unit being calibrated will be referred to as the UUC (unit-under-calibration). 2 Measurement Standards and Support Equipment Performance Requirements 2.1 The UUC accuracy requirements are based upon the published UUC performance specifications. 2.2 The test uncertainty ratio applied in this Calibration Procedure is 4:1 unless otherwise stated. 2.3 The Minimum-Use-Specifications are the minimum test equipment specifications required to meet all the UUC accuracy requirements and the test uncertainty ratio applied. Table 2-1 UUC Accuracy Requirements and Description Performance Specifications Model Range (Spring Force) Test Method SHD-A 0 100 Shore A ± 1 (± 75 mn) SHD-D 0 100 Shore D ± 1 (± 444.5 mn) * (± 0.100 lb) Based on ASTM D2240-15 (± 0.017 lb) Compared to Reference Standards Table 2-2 Minimum Use Specification Parameter Range Accuracy Shore A Spring Force 0 100 (550 8050 mn) (0.124 1.810 lb) ± ¼ Duro (± 18.75 mn) (± 0.004 lb) Shore D Spring Force 0 100 (0 44,450 mn) * (0 9.993 lb) ± ¼ Duro (± 111.13 mn) ( ± 0.025lb) Management Procedure 2555 Rev B Page 2 of 8

Table 2-3 Actual Equipment Specification Manufacturer/Model Parameter Range Accuracy # s Applicable Shore A Spring Force 0 100 (550 8050 mn) (0.124 1.810 lb) ± 1/4 (± 17.8 mn) (± 0.004 lb) DeFelsko SHD Verifier Shore D Spring Force 0 100 (0 44,482 mn) (0 10.000 ± 1/25 (± 17.8 mn) (± 0.004 lb) DeFelsko SHD Verifier Caution: The instructions in this Calibration Procedure relate specifically to the equipment and conditions listed in Section 2. If other equipment is substituted, the information and instructions must be interpreted accordingly. Table 2-4 Calibration Environmental and Warm-up Requirements Measurement Standards & Support Equipment Temperature: 23 ± 2 C. Environmental Requirements: Relative Humidity: 40-60% Measurement Standards & Support Equipment Warm-up and Stabilization Requirements: Not Required 3 Preliminary Operations Note: Review the entire document before starting the calibration process. 3.1 Visual Inspection 3.1.1 Visually inspect the UUC for, but not limited to: Sticky or rough probe motion probe tip wear or damage (use a microscope with at least 20x magnification) Dirty or damaged probe base plate 3.1.2 Damage or excess wear shall be repaired prior to beginning the calibration process. Note: When using a Type D durometer do not measure on hard surfaces, such as glass, or you will damage the tip. 3.2 For product returned for service, ensure the gage has been updated with the most recent firmware. 3.3 Gage Set-up 3.3.1 Gage Reset: When the unit is powered down, simultaneously hold the + and middle buttons until the reset symbol (2 arrows) appears. Caution: Be sure to keep the probe off any surface during the RESET process. Management Procedure 2555 Rev B Page 3 of 8

3.3.2 Use the menu button and navigation keys to navigate to the Setup menu then select Cont. Reading. Once continuous reading mode is activated the symbol will show on the gage screen. Figure 3-1 3.4 Test Set-Up Figure 3-2 3.5 Confirm the appropriate target is on the SHD Verifier, aluminum for type A and brass for Type D. 3.6 Make sure the micrometer adjustment is turned so it is set between 1 and 2. Management Procedure 2555 Rev B Page 4 of 8

Figure 3-3 3.7 Place the UUC into the probe holder so that the tip is near but not touching the target and tighten the screws using a 3/16 Hex wrench. Do not overtighten the screws. Figure 3-4 3.8 Turn on the SHD Verifier display unit and verify it reads zero. Press the Tare/Reset button if the display doesn t show zero. 4 Calibration Process Note: Whenever the test requirement is not met, verify the results of each test and take corrective action before proceeding. 4.1 Review the Performance Requirements Table 5-1. Management Procedure 2555 Rev B Page 5 of 8

4.2 Turn the micrometer adjustment to lower the UUC into contact with the target. Continue to lower the UUC until the desired load is displayed on the SHD Verifier as indicated in the tables below. Record the UUC reading at each of the loads. Note: For best accuracy record the reading displayed when you are not touching the SHD Verifier Figure 4-1 Shore A 10 20 30 40 50 60 70 80 90 SHD Verifier Display lbs (N) 0.292 (1.30) 0.461 (2.05) 0.629 (2.80) 0.798 (3.55) 0.967 (4.30) 1.135 (5.05) 1.304 (5.80) 1.472 (6.55) 1.641 (7.30) Shore D * 10 20 30 40 50 60 70 80 90 SHD Verifier Display lbs (N) 0.999 (4.45) 1.999 (8.90) 2.998 (13.35) 3.997 (17.80) 4.996 (22.25) 5.996 (26.70) 6.995 (31.15) 7.994 (35.60) 8.994 (40.05) * Based on ASTM D2240-15, 0.4445 N/durometer. ISO 18898 indicates 0.4450 N/durometer. Alternatively any SHD Verifier value can be converted to a durometer reading using the following formulas: Shore A = (F - 0.1236 lbs) / 0.0169 lbs Shore D * = F / 0.0999 lbs Where F is the SHD Verifier reading in pounds. For example: A SHD Verifier reading of 1.205 lbs is: (1.205-0.1236) / 0.0169 = 63.988 shore A (1.205 / 0.0999) = 12.062 shore D 4.3 Once you reach the highest value, raise the UUC until it is no longer in contact with the target and repeat step 4.2. Continue this process to achieve three readings for each shore value. 4.4 Average the 3 readings and verify they are within the tolerance listed in table 5-1. 4.5 Loosen the screws on the probe holder to remove the probe. Management Procedure 2555 Rev B Page 6 of 8

5 Performance Requirements Table 5-1 Performance Requirements and Calibration Data for PosiTector SHD-A and SHD-D Shore Value Tolerance 10 ±1 20 ±1 30 ±1 40 ±1 50 ±1 60 ±1 70 ±1 80 ±1 90 ±1 Note: Do not write in this procedure. UUC Reading 1 2 3 Average Management Procedure 2555 Rev B Page 7 of 8

Management Procedure Change Notice Procedure Number: MP 2555 Revision Level: B Date of Change: August 22, 2017 Title: Calibration Procedure, PosiTector SHD-A and SHD-D Shore Hardness Durometer Gages Reason for Change: Implemented SHD Verifier Description of Change: Changed uncertainty ration in 2.2 from 2:1 to 4:1 Updated tables 2-2 and 2-3 Re-wrote sections 3 and 4 I confirm I have read and understand the procedure and the change described above. Printed Name Signature Date Management Form 0010.02-05/1998 Management Procedure 2555 Rev B Page 8 of 8