Important Lane Closures for Jan , 2012

Similar documents
Capital Beltway HOT Lanes Project

McLEAN CITIZENS ASSOCIATION

Capital Beltway HOT Lanes Project

MCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017

FDOT Treasure Coast Traffic Impact Report

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

FDOT Treasure Coast Traffic Report

APPENDIX D COST SUMMARY TABLES

FDOT Treasure Coast Traffic Report

EXHIBIT U THE SCOPE DOCUMENT

FDOT Treasure Coast Traffic Impact Report

Capital Beltway HOT Lanes Project

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT

DOUG s CORNER CONTRACTOR S WEEKLY UPDATE COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE. February 2nd, 2015 Volume 2, Issue 107.

Department of Transportation 1500 Monroe Street. FortMyers,FL (239) (239) Fax ROAD WATCH UPDATE. July 19 - July 25, 2018

FDOT Treasure Coast Traffic Impact Report

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

WEEKLY HIGHWAY ALERT RICHMOND DISTRICT

TRAFFIC ALERT FOR FEBRUARY 26 to MARCH 2, 2018 Highway Work Zones in the Staunton District

^ Lee County So^mst <T:[oV1]^ Lee County

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Route 1 and Harrison Road Intersection Improvements

Rock Road Transit. Northwest Plaza. Charles Rock Rd. Shopping Center Woodson & St. Center

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

El Dorado County / Tahoe Roadwork Schedule

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Doug s Corner. Contractor s Weekly Update. In this issue: NORTHWEST EXTENSION-19TH AVENUE-BETHANY HOME TO DUNLAP SSWJV SAFETY QUALITY COURTEOUS

PERFORMANCE ACTIVITY 613 IMPACT ATTENUATOR WORK DESCRIPTION 3

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission

DOUG s CORNER CONTRACTOR S WEEKLY UPDATE NORTHWEST EXTENSION-19TH AVENUE-BETHANY HOME TO DUNLAP COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE

County of Fairfax, Virginia. Department of Transportation

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

Florida Department of Transportation Daniels Parkway Fort Myers, FL 33913

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

IL Route 71 Construction Update

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

DOUG s CORNER CONTRACTOR S WEEKLY UPDATE NORTHWEST EXTENSION-19TH AVENUE-BETHANY HOME TO DUNLAP COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

PERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 4

Palm Beach County Traffic Report November 16 through November 23, 2018

Rio Intersection Traffic Restrictions Begin Monday

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Purpose: Financial Implications and Impact Statement: It is estimated that the cost to implement:

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

Legislative Update Williamsburg Residency

Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10

^Lee County Jt Sotft^West T:foH^a Lee County

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax. ROAD WATCH UPDATE June 15, 2018

Update January 4, 2016

PUBLIC INFORMATION MEETING

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

09/28/2011 NEW/UPDATED ROAD CONSTRUCTION AND RESTRICTIONS:

FDOT Broward County Traffic Impact Report November 24 through December 1, 2017

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Hospital Link Project Project Update September 2017

ITEM # 29 DATE: COUNCIL ACTION FORM ROAD CLOSURES FOR RAGBRAI ROUTE BACKGROUND:

Northern Virginia Express Lanes Design Challenges and Solutions. IBTTA Maintenance and Roadway Operations Workshop June 25, 2018

VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations

Managing Dulles Rail Construction in Tysons Corner

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

Doug s Corner. Contractor s Weekly Update. In this issue: NORTHWEST EXTENSION-19TH AVENUE-BETHANY HOME TO DUNLAP SSWJV SAFETY QUALITY COURTEOUS

Access Routes from US 101 to the Richmond San Rafael Bridge

2017 Temporary traffic control guidelines for pedestrians. v.2

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study

^ Lee County ^OU fewest T:foH^ Lee County

CITY OF LANCASTER PROPOSED NEW PROJECTS

PERFORMANCE ACTIVITY 405 LIMB MANAGEMENT

Mandan Commission Meeting August 2, 2016 Mandan City Hall

Route 79/Davol Street Corridor Study

Dulles Area Transportation Association. October 11, Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

Traffic Signal Phasing Study Summary & Staff Recommendations

Design Criteria. Design Criteria

ICBC invests $738,000 to make Surrey, White Rock and Delta roads safer

Palm Beach County Traffic Report January 11 through January 18, 2019

FDOT Broward County Traffic Report August 31, 2018 through September 7, Interstate 95

Florida Department of Transportation District Six Project FM # Public Information Meeting Tuesday, July 24, 2018

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

Everyone is a Pedestrian

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

Planned Improvements from Sector & Area Plans that have been added to the MTP

Florida Department of Transportation MIKE DEW SECRETARY

Palm Beach County Traffic Report October 26 through November 2, 2018

CITY OF KINGSTON REPORT TO COUNCIL. Report No.:

FDOT Broward County Traffic Report March 2 through March 9, 2018

Culpeper District. Albemarle County Monthly Report September, 2011

RM 620/RM 2222 CONNECTOR (BYPASS) STATUS REPORT RM 620/2222 STATUS

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

Hospital Link Project Project Update November 2017

Transcription:

Jan. 19, 2011 CONTACT: Marcia McAllister T: 703-572-0506 C: 571-730-9117 marcia.mcallister@dullesmetro.com Important Lane Closures for Jan. 22-28, 2012 Bridge Construction along Median of Route 7 Continues, Two Major Intersections to Be Closed Overnights Next Week Construction of the aerial guideway in the median of Leesburg Pike (Route 7) in Tysons Corner will continue overnight Sunday, Jan. 22 through Friday, Jan. 27, resulting in the closures of the middle of both the Tyco Road/Westwood Center Drive and Westpark Drive/Gosnell Road intersections. Thru traffic along both directions of Route 7 will not be affected, but thru traffic on Tyco Road/Westwood Center Drive and Westpark Drive/Gosnell Road will not be permitted. Detour information is as follows: Tyco Road/Westwood Center Drive Closures 9 p.m. to 5 a.m. Southbound Tyco Road thru traffic and drivers wishing to turn left on to eastbound Route 7 will be directed to turn right on westbound Route 7, U-turn at Jarrett Valley Drive to access both eastbound Route 7 and Westwood Center Drive. As a courtesy to the neighborhood, please do not use Jarrett Valley Drive or private property as a turnaround; Northbound Westwood Center Drive thru traffic and drivers wishing to turn left on to westbound Route 7 will be directed to turn right on eastbound Route 7, U-turn at Spring Hill Road to access both westbound Route 7 and Tyco Road. Westpark Drive/Gosnell Road Closures 11 p.m. to 5 a.m. Southbound Westpark Drive thru traffic and drivers wishing to turn left on to eastbound Route 7 will be directed to turn right on westbound Route 7, U-turn at Spring Hill Road to access both eastbound Route 7 and Gosnell Road; Northbound Gosnell Road thru traffic and drivers wishing to turn left on to westbound Route 7 will be directed to turn right on eastbound Route 7, left on International Drive, left on Route 123, then exit to Route 7, to access both westbound Route 7 and Westpark Drive. Right Lane of Southbound Route 123, Ramp to Northbound I-495 to Close Overnights Southbound Route 123 in Tysons Corner will be closed between Capital One Drive and the east side of I- 495 from 9 p.m. to 5 a.m. Sunday, Jan. 22 to Friday, Jan. 27 for overhead bridge construction.

In addition, the on-ramp from southbound Route 123 to northbound I-495 also will be closed on those nights from 9:30 p.m. to 5 a.m. To access I-495 North, traffic will be detoured to continue on southbound Route 123, right on International Drive, right on Galleria Drive, right on Tysons Boulevard, then left on to northbound Route 123 to the second exit on to northbound I-495. Eastbound Tysons Boulevard to Close Sunday through Friday Nights The eastbound lanes of Tysons Boulevard will be closed between Chain Bridge Road (Route 123) and Galleria Drive Monday through Friday nights, Jan. 23-27, for overhead bridge, pier and station work near the future Tysons Central 123 station. This also will require the closures of the turn lanes on to eastbound Tysons Boulevard from northbound Chain Bridge Road (Route 123), and northbound and southbound Galleria Drive. Generally, these lane closures will begin to be implemented at 9:30 p.m. each night, and will be lifted between 5 a.m. each following morning. Detours around this closure will be in place. Please use extreme caution, pay attention to signage, and obey police direction if traveling around this intersection. <><><><><> The following lane, ramp and shoulder closures have been approved for the week of Jan. 22, 2012. All closures are weather pending and subject to change. I-495 North Ramp to Southbound Route 123 Night Work When: Monday, Jan. 23 Wednesday, Jan. 25, 9:30 p.m. to 5 a.m. What: Ramp closed (Detour: Exit on to northbound Route 123, right on Old Meadow Road, left on Colshire Meadow Drive, left on Colshire Drive to access southbound Route 123) Where: Ramp from northbound I-495 to southbound Route 123 Dulles Connector Road (Route 267) West Day Work Where: From the Idylwood Road overpass to the Pimmit Run bridge Why: Bridge construction Dulles Connector Road (Route 267) East Day and Night Work When: Monday, Jan. 23 Thursday, Jan. 26, 10:30 a.m. to 3:30 p.m.

Friday, Jan. 27, 10:30 a.m. to noon What: Left lane closed Where: From 200 feet west of the Magarity Road bridge to the Idylwood Road bridge Why: Bridge conduit installation Dulles International Airport Access Highway (DIAAH) West Day Work When: Sunday, Jan. 22 Saturday, Jan. 28, 8 a.m. to 2 p.m. Where: Between mile markers 7.9 and 6.9 Why: Utility work Dulles International Airport Access Highway (DIAAH) East Day Work When: Sunday, Jan. 22 Saturday, Jan. 28, 9:30 a.m. to 3:30 p.m. Where: Between mile markers 8.9 and 8.6 Why: Utility work When: Monday, Jan. 23 Friday, Jan. 27, 9:30 a.m. to 3:30 p.m. Where: Between mile markers 9.2 and 9.6 Why: Shoulder widening, then mill and overlay Dulles Toll Road (Route 267) West Day Work When: Monday, Jan. 23 Friday, Jan. 27, 9:30 a.m. to 3 p.m. What: Right lane closed Where: Between mile markers 8.0 and 7.5 Why: Manhole installation Dulles Toll Road (Route 267) East Day Work When: Monday, Jan. 23 Tuesday, Jan. 24, 10 a.m. to 3:30 p.m. What: Left lane closed Where: Between mile markers 11.4 and 11.7 Why: Paving When: Wednesday, Jan. 25 Friday, Jan. 27, 10 a.m. to 3:30 p.m. What: Right lane closed Where: Between mile markers 11.4 and 11.7 Why: Paving When: Thursday, Jan. 26 Friday, Jan. 27, 10 a.m. to 3:30 p.m.

What: Right lane closed Where: Between mile markers 6.3 and 6.9 (W&OD Trail) Why: Stormwater pond construction Chain Bridge Road (Route 123) North Night Work When: Monday, Jan. 23 Friday, Jan. 27, 9:30 p.m. to 5 a.m. What: Left turn lane closed (Detour: Right on Ring Road (Tysons Corner Center), right on International Drive, right on Galleria Drive to access Tysons Boulevard) Where: At Tysons Boulevard Why: Overhead bridge and station construction Colshire Drive East Day Work Where: From Dolley Madison Boulevard (Route 123) to Colshire Meadow Drive Why: Storm drain installation Dolley Madison Boulevard North (Route 123) Day and Night Work When: Sunday, Jan. 22, 9 p.m. to 5 a.m. What: Left turn lane closed (Detour: Continue on northbound Route 123, turn left on Scotts Scrossing Road to access alternate entrance to Capital One) Where: At Capital One Drive Where: From Anderson Road to the Dulles Connector Road (Route 267) overpass Why: Pavement restoration, grading When: Monday, Jan. 23 Thursday, Jan. 26, 9 p.m. to 1 a.m. Friday, Jan. 27, 9:30 p.m. to 1 a.m. Where: From Anderson Road to the Dulles Connector Road (Route 267) overpass Why: Pavement restoration, grading When: Monday, Jan. 23 Thursday, Jan. 26, 1 a.m. to 5 a.m.

Friday, Jan. 27, 1 a.m. to 7 a.m. Where: From Anderson Road to the Dulles Connector Road (Route 267) overpass Why: Pavement restoration, grading Dolley Madison Boulevard South (Route 123) Day and Night Work When: Sunday, Jan. 22 Friday, Jan. 27, 9:30 p.m. to 5 a.m. What: Ramp closed (Detour: Continue on southbound Route 123, right on International Drive, right on Galleria Drive, right on Tysons Boulevard, left on northbound Route 123 to right exit on to northbound I-495) Where: Ramp from southbound Route 123 to northbound I-495 When: Sunday, Jan. 22 Thursday, Jan. 26, 9 p.m. to 5 a.m. Friday, Jan. 27, 9 p.m. to 9 a.m. What: Right lane closed Where: From Scotts Crossing Road to the ramp to I-495 North Why: Overhead bridge and station construction Where: From the Dulles Connector Road (Route 267) overpass to Anderson Road Why: Barrier wall installation, pavement restoration Galleria Drive North Night Work When: Monday, Jan. 23 Friday, Jan. 27, 11 p.m. to 5 a.m. What: Right turn lane closed (Detour: Continue on Galleria Drive/Westpark Drive, left on Westbranch Drive, right on Tysons Boulevard, left on International Drive to access Route 123) Where: At Tysons Boulevard Why: Overhead bridge and station construction Galleria Drive South Night Work When: Monday, Jan. 23 Friday, Jan. 27, 11 p.m. to 5 a.m. What: Three left turn lanes closed (Detour: Right on Tysons Boulevard, left on International Drive to access Route 123) Where: From Jones Branch Drive to Tysons Boulevard

Why: Overhead bridge and station construction Gosnell Road North Night Work When: Sunday, Jan. 22 Monday, Jan. 23, and Friday, Jan. 27, 11 p.m. to 5 a.m. What: Left turn lane and thru lane closed (Detour: Right on Route 7, left on International Drive, left on southbound Route 123, exit on to westbound Route 7 to access Westpark Drive) Where: At Leesburg Pike (Route 7) Hunter Mill Road North/South Day Work What: Flagging operation Where: At the Dulles Toll Road (Route 267) Leesburg Pike (Route 7) West Night Work When: Sunday, Jan. 22 Friday, Jan. 27, 11 p.m. to 7 a.m. What: Left turn lane closed (Detour: Continue on westbound Route 7, U-turn at Jarrett Valley Drive to eastbound Route 7 to right turn on to Westwood Center Drive) Where: At Westwood Center Drive When: Sunday, Jan. 22 Monday, Jan. 23, and Friday, Jan. 27, 11 p.m. to 5 a.m. What: Left turn lane closed (Detour: Continue on westbound Route 7, U-turn at Spring Hill Road OR Tyco Road on to eastbound Route 7, right on Gosnell Road) Where: At Westpark Drive/Gosnell Road When: Monday, Jan. 23 to Thursday, Jan. 26, 9 p.m. to 5 a.m. Friday, Jan. 27, 9:30 p.m. to 9 a.m. Where: From Route 123 to F-773 Frontage Road Why: Station construction Leesburg Pike (Route 7) East Day and Night Work

When: Sunday, Jan. 22 Friday, Jan. 27, 11 p.m. to 7 a.m. What: Left turn lane closed (Detour: Continue on eastbound Route 7, U-turn at Spring Hill Road to eastbound Route 7 to right turn on to Tyco Road) Where: At Tyco Road What: Far left turn lane closed Where: At Spring Hill Road Why: Overhead station work Where: From Spring Hill Road to Gosnell Road Why: Utility work Where: From 200 feet east of Gosnell Road to 100 feet east of Marshalls Drive Why: Pavement repair When: Sunday, Jan. 22 Monday, Jan. 23, and Friday, Jan. 27, 11 p.m. to 5 a.m. What: Left turn lanes closed (Detour: Continue on eastbound Route 7, left on International Drive, left on Greensboro Drive to access Westpark Drive) Where: At Westpark Drive/Gosnell Road When: Tuesday, Jan. 24 Thursday, Jan. 26, 10 p.m. to 5 a.m. What: Two left thru lanes closed Where: From Spring Hill Road to Gosnell Road Why: Punchlist items for manholes Magarity Road North/South Day Work What: Flagging operation Where: At the Dulles Connector Road (Route 267) overpass

Why: Bridge construction Spring Hill Road South Day Work What: Right turn lane closed Where: For a 250-foot stretch north of Leesburg Pike (Route 7) Why: Drainage and curb installation Note: Turns will be permitted at intersection Tyco Road South Night Work When: Sunday, Jan. 22 Friday, Jan. 27, 11 p.m. to 5 a.m. What: Left turn lane and thru lane closed (Detour: Right on westbound Route 7, U-turn at Jarrett Valley Drive on to eastbound Route 7 to access Westwood Center Drive) Where: At Leesburg Pike (Route 7) Tysons Boulevard East Night Work When: Monday, Jan. 23 Friday, Jan. 27, 11 p.m. to 5 a.m. What: Two thru lanes closed (Detour: Left on Galleria Drive/Westpark Drive, left on Westbranch Drive, right on Tysons Boulevard, left on International Drive to access Route 123) Where: From 1,100 feet west of Galleria Drive to Chain Bridge Road (Route 123) Why: Overhead bridge and station construction Westpark Drive South Night Work When: Sunday, Jan. 22 Monday, Jan. 23, and Friday, Jan. 27, 11 p.m. to 5 a.m. What: Left turn lane and thru lane closed (Detour: Right on Route 7, U-turn at Spring Hill Road on to eastbound Route 7, right on Gosnell Road) Where: At Leesburg Pike (Route 7) Westwood Center Drive North Night Work When: Sunday, Jan. 22 Friday, Jan. 27, 11 p.m. to 5 a.m. What: Left turn lane and thru lane closed (Detour: Right on eastbound Route 7, U-turn at Spring Hill Road on to westbound Route 7 to access Tyco Road) Where: At Leesburg Pike (Route 7)

Access to all businesses in the construction areas along Routes 7 and 123 is maintained throughout the work periods. Motorists should stay alert, use extreme caution, and be prepared to allow extra time or alter their travel along these roads. A 24/7 emergency hotline is available for construction-related issues: 877-585-6789. For general project information: www.dullesmetro.com or 703-572-0506.