Public Open House #2. THE CITY OF NORTH VANCOUVER CHESTERFIELD AVENUE CYCLING IMPROVEMENTS (4th - 13th STREET) JULY 2013

Similar documents
Potential Bicycle Facility on Bayou Street Mobile, Alabama

NORTH DOWNTOWN N EAST WEST

Major Bike Routes 102 Avenue Workshop April 21, 2015

Classification Criteria

Welcome. If you have any questions or comments on the project, please contact:

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Downtown BRT Corridor Alternatives Review: 1 st, 2 nd, 3 rd and 4 th Avenue. Bus Rapid and Conventional Transit Planning and Design Services

North Avenue Corridor Study

Sharrows and Elephants and Bike Boxes!, s, Oh My!

What Is a Complete Street?

» Draft Recommendations» Discussion» Next Steps. Plan for Walking and Biking

Why invest in the 1 Street S.W. Corridor?

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

PROJECT OVERVIEW. 20th Avenue Project Limits (Lincoln Way to Wawona St)

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Board of Supervisors February 27, 2017

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Polk Streetscape Project

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Complete Streets. Designing Streets for Everyone. Sarnia

Tonight is for you. Learn everything you can. Share all your ideas.

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Bay to Bay Boulevard Complete Streets Project

Appendix A Guiding Principles for Cycling Safety in Work Zones

RZC Appendix 8A Marymoor Subarea Street Requirements

122 Avenue: 107 Street to Fort Road

Presentation Starts at 5:30 PM

Bellevue Downtown Association Downtown Bike Series

Appendix 3 Roadway and Bike/Ped Design Standards

Chapter 3 BUS IMPROVEMENT CONCEPTS

Multi-Modal Traffic Analysis. Parisi and Associates

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Dowling/Beaty Cycling Route

MASONIC AVENUE STREET DESIGN STUDY Community Workshop 2. Masonic Ave Street Design Study Community Workshop 2 August 10, 2010

Safe Routes to School Action Plan Aberdeen, Idaho

APPENDIX 1 CIMA RECOMMENDED TREATMENTS

Giles Run Connector Road

Public Works and Infrastructure Committee. General Manager, Transportation Services

Functional, Preliminary Design and Detailed Design

Chelmsford City Growth Package

Intersection Improvement: Sturgeon Road, Silver Avenue and Murray Park Road Roundabout. Welcome. Public Information Session

Mark Malone, P.E. SD DOT

Terwillegar Drive Expressway Draft Concept Plan

North Avenue Corridor Study

Bicycle Facilities Planning

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

City of Wausau Wausau Center Urban Design and Transportation Master Plan. Design Workshop // October 18, 2018

N. Frederick Street to N. Manchester Street

Raymond Avenue: Rightsizing Improved Safety and Pedestrian Experience

CITY OF VANCOUVER ADMINISTRATIVE REPORT

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Chapter 2: Standards for Access, Non-Motorized, and Transit

STANLEY STREET December 19, 2017

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Active Transportation Facility Glossary

CITY OF SLO SEEKS INPUT ON PREFERRED ALTERNATIVE FOR BROAD STREET BICYCLE BOULEVARD PROJECT

Cycle Track Design Best Practices Cycle Track Sections

STREETSCAPE CONCEPTS

CLOSED. Highlights of the Final Concept Design:

Station 1: Street & Sidewalk Upgrades

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

Street Design Workshop. Existing cross section Traffic volumes Examine adjacent land uses You design future improvements

6.4 RECOMMENDED IMPROVEMENTS

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

City of Seattle Edward B. Murray, Mayor

Washington St. Corridor Study

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

102 Avenue Corridor Review

Memorandum. 1 Introduction. James Hinkamp Tony Coe. Michael Iswalt Vanessa Peers

Copenhagen Cycling Map. Red Lines Cycling facilities

MARKET/JFK VISION ZERO PILOT PROJECT FEBRUARY 2019 EVALUATION REPORT

Bridges and Arizona Crossings

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Building Great Neighbourhoods BONNIE DOON

Thank you for attending

INNER LOOP EAST. AIA Rochester Annual Meeting November 13, 2013 TRANSFORMATION PROJECT. Bret Garwood, NBD Erik Frisch, DES

Tonight is an opportunity to learn about the Study and ask questions of the Study Team members.

Pre-Construction Meeting

Rebuilding Highway 7 Town Centre Boulevard to Sciberras Road

INDEX. Geometric Design Guide for Canadian Roads INDEX

Construction Staging Area Vaughan Road

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

10.0 CURB EXTENSIONS GUIDELINE

DRAFT. Scholls Ferry Road Conceptual Design Plan Technical Memorandum Multi-Modal Examples. Multnomah County 1600 SE 190th Avenue Portland, OR 97233

TANGIBLE CAPITAL ASSET (TCA) Reporting Guidelines for Land Development Projects

Hospital Link Project Project Update September 2017

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010

Off-road Trails. Guidance

Protected Bike Lanes in San Francisco Mike Sallaberry SFMTA NACTO Workshop - Chicago IL

Downey Road. Transportation Improvement Study

TORONTO VISION ZERO Improving Safety for Pedestrians and Cyclists Roger Browne, Manager Traffic Safety Unit October 11, 2018

Meade Street Bridge Design Alternative Study

PROJECT KEY TYPICAL SECTION 1 =60

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

Transcription:

CHESTERFIELD AVENUE CYCLING IMPROVEMENTS (4th - 13th Street) Public Open House #2 1

Chesterfield Avenue provides an important north/south connection between Lonsdale Quay and West 23rd Street Purpose of the Project Develop a road and streetscape that: CONTEXT Addresses the pedestrian experience and connectivity Improves the bicycle experience and connectivity Provides a safe and efficient road for all users Provides parking for a wide range of users Anticipated Improvements Road design that caters for current and future cyclist, pedestrian, vehicle and parking needs: Improvements to bike facilities Maintain as many vehicle parking spots as possible Create a safe and efficient transportation corridor environment Road Design Elements Travel lanes Bicycle facilities Sidewalks On-street parking Pedestrian crossings Corridor Design Considerations Utilities - water, sewer, stormwater, telecommunications Fire hydrants Environmental - gradient, vegetation, landscaping, built form Vehicles using and crossing the corridor Corridor widths 2

TIMELINE THE CITY OF NORTH VANCOUVER CHESTERFIELD AVENUE CYCLING IMPROVEMENTS (4th - 13th 3

ISSUES & CONSTRAINTS 4

GENERAL STATISTICS Vehicles Per Day (Chesterfield Ave 4th-13th) March, 2013 Accident Data 2007-2011 (Chesterfield Avenue 4th-13th) 7000 25 6000 5000 4000 3000 2000 1000 4th Street West Keith Road 8th Street 20 15 10 5 Total (4th-13th Street) Property Damage Injury Incident 0 0 2007 2008 2009 2010 2011 NOTE: Only 2% of accidents involved a cyclist One at West Keith Road roundabout, and one at 5 th Street intersections. 5

Existing confi guration - shared vehicle/ bicycle facility All road users share the space within the existing cross section Minimal change from existing situation No loss of parking or road space Low cost It provides 1 vehicle lane in each direction along with on-street parking within the existing curb-line No improvement for cyclist safety Wide lanes encourage fast vehicle speeds 6

OPTION 1A: Parking removal on a single side The provision of a northbound and southbound bike lane resulting from parking removal on one side of the street. Improved facilities and safety for cyclists No loss of parking on the eastern side The curb does not OPTIONS require re-alignment Low cost Cyclists are exposed to the vehicle traffi c Parking needs to be removed on one side of This option provides uphill and downhill bike lanes. The safety of downhill cyclists is improved by the removal of parking. The curb does not need to be re-aligned to get this confi guration - minimal cost, however greater impact to the on-street parking provision. the road Cost Estimate: ~$85,000 7

OPTION 1B: Indented parking bays on a single side The provision of a northbound and southbound bike lane resulting from Improved facilities and safety for cyclists Minimal loss of parking OPTIONS the indentation of parking on one side of the street. The western side is preferred as there are fewer obstacles and more parking spaces can be retained. on the western side The curb does not require re-alignment Medium cost Minor parking removals Downhill cyclist safety issues due to parked vehicles Cyclists are exposed to vehicle traffi c Reduction of boulevard space Cost Estimate: ~$225,000 8

OPTION 2: 3-metre wide off-road shared path Create a 3m-wide shared pedestrian and cycle asphalt path up one side of the road to reduce confl ict between slow Improved facilities for uphill cyclists No loss of parking Medium cost OPTIONS moving uphill cyclists and faster moving vehicles. Provides separation between cyclists and vehicles moving uphill. More space can be allocated to the downhill shared lane. Potential safety issues by mixing cyclists with pedestrians on a slope Potential confl ict with trees and landscapes Potential safety issues with cyclists riding downhill on path Reduced boulevard and frontage at some locations Cost Estimate: ~$220,000 9

OPTION 3A: Uphill bike lane (downhill sharrow) OPTIONS The provision of a northbound bike lane and southbound sharrow resulting from a curb realignment on one side of the street. Provides more space for uphill cyclists. Downhill cyclists will be travelling at similar speeds to vehicles, therefore can share the lane. Improved facilities for uphill cyclists Potential for new sidewalks in specific locations Minimal reduction of onstreet parking Curb needs to be realigned to fi t in all the facilities High Cost Potential confl ict with trees and streetscape Reduced boulevard and frontage at some Cost Estimate: ~$450,000 locations 10

OPTION 3B: Bike lanes Improved facilities for The provision of a northbound and southbound bike lane resulting from a curb realignment on one uphill and downhill cyclists Potential for new sidewalk at trees in specific locations OPTIONS side of the street. Provides designated space for cyclists in both directions. All modes of transportation have designated space within the corridor. No loss of parking High Cost Curb needs to be realigned to fit in all the facilities Potential safety issues for downhill cyclists adjacent to parked cars Potential conflict with trees and streetscape Reduced boulevard and frontage at some locations Cost Estimate: ~$500,000 11

OPTION 3C: Separated bike facility OPTIONS The provision of a separated bike facility resulting from a curb realignment on one side of the street. Provides separated space for cyclists to improve safety and encourage users of all ages and abilities. All modes of transportation have separated Improved facilities and safety for cyclists of all ages and abilities Potential for new sidewalk and street trees Minimal loss of on-streetparking High Cost Curb needs to be realigned to fit in all the provisions within the right-of-way Potential safety issues for cyclists at intersections with cross streets space within the corridor. Impacts with street trees Reduced boulevard and Cost Estimate: ~$800,000 frontage at some locations 12

Next Steps 13