SH&EWMS No: F-C-QLD-23 Revision Date: July 2018 Revision Due: July Brief Description of Work Activity: Use Petrol Hand Saw / Ring Saw

Similar documents
SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH M ABN

SH&EWMS No.: F-C-QLD-10 Revision Date: July 2018 Revision Due: July 2019

SH&EWMS No.: F-C-QLD-14 Revision Date: July 2018 Revision Due: July 2019

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt St, GEEBUNG QLD 4031 ph ABN:

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt St, GEEBUNG QLD 4031 ph ABN:

SH&EWMS No.: FC-QLD-017 Revision Date: July 2017 Revision Due: July 2018

WORK METHOD STATEMENT STRUCTURAL STEEL

JOB SAFETY ANALYSIS. How to use the Risk Assessment Charts. Likelihood A (Almost Certain) B (Likely) C (Possible)

Safe Work Method Statement LRB TREE SERVICES 6 Behland St, Kearneys Spring QLD, 4350 ABN

SAFE WORK METHOD STATEMENT Part B

How severely could the risk hurt someone?

FLYING OBJECTS MANUAL HANDLING EXCESSIVE NOISE

WH&S Act 2011 & Regulations 2011, Environmental Protection Act and Regulations

WORK METHOD STATEMENT CARPET LAYING

How severely could the risk hurt someone? Low/Insignificant First aid

Safe Work Method Statement

How severely could the risk hurt someone? Low/Insignificant First aid

The Sample Company Pty Ltd

How severely could the risk hurt someone? Low/Insignificant First aid

SAFE WORK METHOD STATEMENT SWMS No Version

JOB SAFETY ENVIRONMENT ANALYSIS (JSEA) Working With In Situ Testing Rigs

Safe Work Method Statement

SAFE WORK METHOD STATEMENT

WORK METHOD STATEMENT TERMITE PROTECTION

Safe Work Method Statement

WORK METHOD STATEMENT ALUMINIUM WINDOWS AND DOORS

Temporary load-bearing support for structural alterations or repairs

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT CARPENTER

WORK METHOD STATEMENT ELECTRICAL

SWMS No 012 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 6

SAFE WORK METHOD STATEMENT WORKING IN CONFINED SPACE HSE NET NAT SWMS APAND00030

WHS OHS HAZARD REGISTER (SITE AND OFFICE OPERATIONS)

Specific Safety Legislation/Codes of Practice/Australian Standards applicable to this JSA (Tick those applicable).

Accident/Incident Reporting and Investigation Procedures

Section J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS

Accident /Incident/Injury Report & Investigation Form

Safe Work Method Statement (SWMS)

Job Safety and Environmental Analysis (JSEA)/Safe Work Method Statement (SWMS)

SAFE WORK METHOD STATEMENT Part 1. Company Details. Company Name: Contact Name, Position and Phone number: Address: Project details.

Safety Guidelines for Live Entertainment and Events I Part 2. Hazard Identification and Risk Management 1

THE CONTROLLED COPY OF THIS DOCUMENT IS ON THE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR THE DATE AT THE BOTTOM OF THE PAGE.

Work Activity (e.g. Road Work): Work Location:.

SAFETY MANAGEMENT SYSTEM

SWMS No 009 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 4

SAFE WORK METHOD STATEMENT Part 1

Safe Work Method Statement

SWMS documented by: Feb Bo Ceprnja Date Feb Feb Feb 2018

Contractor OHS Induction. AOHS-05-GUI September 2016

Appendix 4C - Sample SWMS Trenching

SAFE WORK METHOD STATEMENT (SWMS) All Trades Abseiling ABN: Ph:

Wheeler Cranes 6 McIntyre Rd Tomago NSW 2324

SAFE WORK METHOD STATEMENT Part 1 CONCRETE SAWING

Safe work method statements

Procedure: Work health and safety hazard management

RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager

WORK METHOD STATEMENT RENDERING

SAFE WORK METHOD STATEMENT

Telco Antennas SWMS Working At Height Above 2m

WINDMILL (pre-start) HAZARD INSPECTION CHECKLIST

SAFE WORK METHOD STATEMENT

Wheeler Cranes 6 McIntyre Rd Tomago NSW 2324

SWMS No 001 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 5

SAFE WORK METHOD STATEMENT (SWMS) GENERAL GARDENING with Blowers, Hedge Trimmers, Whipper Snippers, Pruners, Spray Units

SAFE WORK METHOD STATEMENT 0005 (Hang-On Platform) Part 1 (To be used in conjunction with SWMS 0001 General Site Activities)

HAZARD MANAGEMENT PROCEDURE

Health & Safety Policy & Plan. Rightway Roofing.

CONSTRUCTION HEALTH AND SAFETY MANAGEMENT SYSTEM BASELINE HIRA

To comply with the OHS Act, the responsible manager must carry out and document the following:

Work Health and Safety Risk Management Procedures

Hazard Management Making your workplace safer

SAFETY MANAGEMENT SYSTEM

METHODOLOGY RISK TABLES TABLE 1 - QUALITATIVE MEASURES OF CONSEQUENCE OR IMPACT TABLE 2 - QUALITATIVE MEASURES OF LIKELIHOOD

Job Safety & Environment Analysis

SAFETY MANAGEMENT SYSTEM

EVENT SAFETY RISK ASSESSMENT - (SMALL TO MEDIUM SIZED COMMUNITY EVENTS) 1

University College Dublin Machinery/Equipment Risk Assessment Template

B S Glass Ltd Safety procedures- outsourced Workplaces

SWMS No 007 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 6

Management of risk. Definition of terms. Managing risks. Risk

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading

Site-Specific Safety Plan

SAFE WORK METHOD STATEMENTS

Hazard & Risk Management

Conducting An Effective. Welcome!

SAFETY MANAGEMENT SYSTEM

Our commitment to safety

CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS

1. Silica Identifying and managing crystalline silica dust exposure

SAFE WORK METHOD STATEMENT (SWMS)

Confined Spaces. This procedure applies to all workers of the Diocese of Maitland Newcastle (DoMN).

Safe Work Method Statements (SWMS)

Safe Work Method Statement Tasks

CONTRACTOR SAFETY INDUCTION HANDBOOK

Guidance: HSW Risk Assessment Methodology HSW-PR09-WI01. Objective. Implementation

Risk Assessment Form (Qualitative)

HS329 Risk Management Procedure

SAFE WORK METHOD STATEMENT 0003 (Perimeter and Balcony Fallguard) Part 1 (To be used in conjunction with SWMS 0001 General Site Activities)

Transcription:

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt St, GEEBUNG 4034 ABN 45 081 359 613 Phone: 07 3265 6537 Mobile: 0411 756 719 OHS-FRM-100 Rev 11 (07/18) Page 1 SH&EWMS No: F-C-QLD-23 Revision Date: July 2018 Revision Due: July 2019 Work Activity: Concrete Cutting Brief Description of Work Activity: Use Petrol Hand Saw / Ring Saw Personnel responsible for monitoring this activity: Rob East Ph: (07) 3265 6537 Codes of Practice/Standards Consulted: Work Health and Safety Act 2011, Work Health and Safety Regulation of 2011, How to Manage Work Health and Safety s Code of Practice 2011, Hazardous Manual Tasks Code of Practice 2011, Managing Noise and Preventing Hearing Loss at Work Code of Practice 2011, Plant Code of Practice 2005, Hazardous Chemicals Code of Practice 2003, Managing the of Falls at Workplaces Code of Practice 2011,Managing the Work Environment and Facilities Code of Practice 2011, Code of Practice stated in Control Measures. Equipment, refer to the operator manual Plant, PPE and Equipment required for this activity: Hydraulic Hand Saw/ Ring Saw, Safety glasses, Hard hat, Hi Vis, steel capped boots, Long sleeves, hearing protection, dust mask. Details of Maintenance Checks Required for this activity: Plant Assessment, Daily Pre-start Checklist, monthly equipment servicing by operator, scheduled servicing by mechanic. Electrical tool tested and tagged. Project / Site: Client: High Construction Work (Please circle all that apply): Working on, or adjacent to a road, Work that is carried out on or near energised electrical installations or services, the movement of powered mobile plant. Materials Used: MSDS Required: If poisoning occurs contact POISONS INFORMATION CENTRE on 13 11 26 Personnel Qualifications Required for this activity: General safety induction, competency based assessments. Review and corrective actions: To be reviewed daily by personnel responsible for monitoring this activity, to be reviewed weekly with formal audit. Hazard report to be completed to address corrective action required. Minor: Complete incident form. Major: Complete incident form with an investigation. Specific training required for this activity: Site specific Induction, SH&EWMS moving plant, SH&EWMS Hazardous Substances. 023 Petrol Hand and Petrol Ring Saw Version 11 Created on July 2018 Review Date July 2019 Page 1 of 11

PART 1: Fast Cut Pty Ltd - Analysis by: Fast Cut Pty Ltd ABN: 45 081 359 613 Issue No. Eleven Copy No. 11 Revision due date : July 2019 Document No. JSA-Fast Cut 023 Doc. Controller Approved: Draft 11 TASK: Using a Petrol Hand Saw/ Ring Saw JSA-Fast Cut 23 Description of any Relevant Interfaces with Other Trades & Other Activities: Please reference PC s daily pre-start meeting PART 2: JSEA/SWMS PROCEDURES 1. The JSEA/SWMS must be specific to the site environment and the particular work-crew, equipment and materials. It must identify plant and equipment to be used, hazardous materials, qualifications/licences of personnel, permits and authorisations required. 2. The JSEA/SWMS must comply with the Principal Contractors Safe Work Instructions, General Safety Instructions Booklet and environmental control plans. It must also comply with and specify relevant codes of Practice, legislation and contract requirements. 3. The workers and supervisors involved in carrying out the work activity must be consulted in identifying the safety and environmental hazards and determining the work methods. 4. Any significant changes to the work process or sequence or to the type of plant or materials used is to trigger a review of this JSEA/SWMS. The need to review/amend the JSEA/SWMS is to be assessed in the event of a LTI/MTI, Near Miss, Environmental Breach, or notice served by a regulatory authority. 5. Changes are not to be made to the Work Methods, Plant or Materials prescribed in this JSEA/SWMS without first consulting with the work team. Changes are to be documented, reviewed and approved. All workers are to be inducted into the changes and a record maintained. PART 3: CHECKLIST & SIGN OFF CHECKLIST - In preparing and reviewing this JSEA/SWMS, the following considerations have been taken into account: Tick if Applicable Manufacturers/Suppliers Recommendations Experience/competency/licensing of workers/operators/supervisors Previous (similar work) injuries/incidents Hazardous material safeguards Engineering/Client approvals Safety Alerts Site Safety Plan Environmental Management Plan Workcover Codes/Guides Plant/Equipment Suitability Revision 8 Date: 10/07/2015 Prepared: Tayla Roberts Reviewed: Rob East Approved: 10/07/2015 Description of Changes: Reviewed and signed off Revision 9 Date: 05/07/2016 Prepared: Tayla Roberts Reviewed: Rob East Approved: 05/07/2016 Description of Changes: Reviewed and signed off Sign: Sign: 023 Petrol Hand and Petrol Ring Saw Version 11 Created on July 2018 Review Date July 2019 Page 2 of 11

Revision 10 Revision 11 Date: 05/07/2017 Prepared: Tayla Roberts Reviewed: Rob East Approved: 05/07/2017 Sign: Description of Changes: Reviewed and signed off Date: 02/07/2018 Prepared: Tayla Roberts Reviewed: Rob East Approved: 02/07/2018 Sign: Description of Changes: Reviewed and signed off PART 4: SAFETY AND ENVIRONMENTAL ANALYSIS & DETERMINATION OF WORK METHODS Project / Site: Principal Contractors Safe Work Method Instructions to be complied with: ALL Requirements of Principal Contractors Safety Instructions Booklet to be complied with: ALL Codes/Standards to be complied with: How to Manage Work Health and Safety s Code of Practice 2011, Managing Noise and Preventing Hearing Loss at Work Code of Practice 2011, Plant Code of Practice 2005, Hazardous Manual Tasks Code of Practice 2011, Hazardous Chemicals Code of Practice 2003 Legislation to be complied with: WH&S Act of 2011, WH&S Regulation of 2011 Permits/Licences/Approvals required: Competent plant operator, Truck driver, Hot work Permit (if required) Summary of Assessed Hazards Working at Height Yes Exposure to hazardous material Yes Human factors Yes Hot work Yes Confined space entry No Release of stored energy Yes Excavation & collapse No Heat stress Yes Manual handling Yes Slip, trips and falls Yes Underground services Yes Working with plant Yes Use of tools Yes Environmental considerations Yes 023 Petrol Hand and Petrol Ring Saw Version 11 Created on July 2018 Review Date July 2019 Page 3 of 11

Task Description Hazards Likelihood x Consequenc e Step 1 Pre-Start checks Step 1 Refuelling Control Measures Manual handling P x S 2 Ensure loads are lifted / carried using the appropriate methods Cuts abrasions, slips, trips and falls P x S 2 Ensure personnel are trained in the use of equipment. Use correct PPE. Keep work are clear, clean and free of debris and rubbish. Attach blade and check rotation Make sure all personnel are well clear before starting motor Nearby personnel must be wearing ear muffs or leave the area. Make sure hand saw is operating efficiently before commencing. Electrical shock P x S 2 Check leads for any damage Check all leads for current test tag. Test earth leakage device Chemical burns / fire L x S 2 Ensure equipment is stopped prior to refuelling Do not have any lit ignition sources near plant while refuelling Wear correct PPE (Hard hat, ear muffs, glasses, steel cap boots, long pants & shirts(hi VIS) Use a funnel when filling Check you have MSDS prior to departing Responsible Person Likelihood x New Supervisor U x MI 3 Supervisor U x MI 3 Operator R x MO 3 023 Petrol Hand and Petrol Ring Saw Version 11 Created on July 2018 Review Date July 2019 Page 4 of 11

Task Description Hazards Likelihood x Consequenc e Step 2 Load / Unload stores/ equipment Step 3 Movements around plant and vehicles Step 4 Site Setup Control Measures Manual handling P x S 2 Ensure loads are lifted / carried using the appropriate methods Struck/crushed by moving vehicles or plant. Live power sources and electrocution or electric shock. P x S 2 Road work signs to be erected. Safety induction conducted on site. Traffic controllers to be used by contractor. Work zone and separation distances to be delineated. Appropriate PPE to be worn. Control measures to be monitored and reviewed regularly during the undertaking of works. P x 1 1 Ensure that pre assessments have been undertaken by the contractor if original plans have not been consulted by a qualified engineer. If no consultation has taken place, works are not to be undertaken by Fastcut employee. Trips, slips & falls U x S 2 Ensure work site is kept clean and all rubbish removed and stores placed away Injury to others L x S 2 Barricades & warning signs to be in position to be in place prior to cutting All staff to keep a look out Responsible Person Likelihood x New Supervisor U x MI 3 Supervisor U x MI 3 Operator All Staff U x MI 3 R x MI 3 023 Petrol Hand and Petrol Ring Saw Version 11 Created on July 2018 Review Date July 2019 Page 5 of 11

Task Description Hazards Likelihood x Step 5 Cutting Step 6 Cutting Cont Excess Noise Hearing Loss Control Measures AC x MA 1 Wear approved hearing protection. Require others to wear ear muffs or vacate area L x MA 1 All personnel to wear double eye protection Dust /Flying Particles eye damage Dust lung damage L x MA 1 All personnel to wear approved dust masks if required Environmental risk L x MA 1 Dam storm water and pick up with Slurry wetvac or CCS EPU Skin Irritation Wear rubber gloves if slurry causes irritation to skin, or use barrier cream Fumes P x MA 2 Use only in well ventilated area Supply extra ventilation (extractor fans/blower fans) Use hydraulic or pneumatic hand saws. Contact office if any doubt about ventilation Cutting of Services L x CA 1 Make sure client has located services and has signed work form for service locations, especially electricity Equipment Failure P x S 2 Conduct pre start check. Report all damage to supervisor Operate the equipment as per the manufactures recommendations Regular maintenance as per manufactures requirements Cuts / muscle strain changing positions P x MA 2 Ensure equipment is stopped when changing grip to move between horizontal and vertical cuts Responsible Person Likelihood x New U x MI 3 Operator Operator R x MI 3 Operator R x MI 3 Operator U x MO 3 Operator R x MI 3 023 Petrol Hand and Petrol Ring Saw Version 11 Created on July 2018 Review Date July 2019 Page 6 of 11

Task Description Hazards Likelihood x Step 7 Cutting Walls Control Measures Fall injury L x MA 1 Make sure scaffold erected by qualified competent person Received training in working at heights if over 2m Rescue procedure required if over 2m Falling object injury L x MA 1 Barricades & warning signs to be in position prior to cutting Personnel not to walk / work under cutting area, wear hard hut if working near All staff to keep a look out Responsible Person Likelihood x New Supervisor U x MI 3 All Staff R x MI 3 Cutting Wall Penetration Step 8 Cutting floors Penetration Dislodging L x MA 1 Procedure for saw cutting to prevent blade jam. Step 1. Saw cut horizontal bottom cut. Step 2. Saw cut top horizontal. Step 3. Secure hold down brackets. Step 4. Saw cut verticals. Falling Object L x MA 1 Barricades & warning signs to be in position prior to cutting Personnel not to walk / work under cutting area, wear hard hat if working near. All staff to keep a look out May require a spotter All Staff All Staff R x MI 3 R x MI 3 023 Petrol Hand and Petrol Ring Saw Version 11 Created on July 2018 Review Date July 2019 Page 7 of 11

Task Description Hazards Likelihood x Step 9 Load / unload stores/ equipment Control Measures Manual handling P x S 2 Ensure loads are lifted / carried using the appropriate methods Responsible Person Supervisor/ All Likelihood x New U x MI 3 Cuts P x S 2 Correct PPE to be worn All U x MI 3 Step 10 Housekeeping Slips, trips P x S 2 Clean site area as required Supervisor R x MI 3 Equipment damage L x S 2 Ensure equipment is correctly secured prior to leaving Driver R X MI 3 Step 11 Site Specific Hazards & Controls (To be filled out on site) The qualitative risk analysis matrix has been taken from AS/NZS 4360:1999 Management Standard. This matrix is used to arrive at the Level of score throughout the risk analysis and is presented here for reference. 023 Petrol Hand and Petrol Ring Saw Version 11 Created on July 2018 Review Date July 2019 Page 8 of 11

PART 5: SUPERVISORS SIGN-OFF I understand and will comply with the requirements of this JSEA/SWMS. I will monitor the implementation of this JSEA/SWMS, and take action in the event of any noncompliance. I will consult with the work crew and amend this JSEA/SWMS as necessary in the event of any changes to the work method, equipment, sequence, materials or the like and in the event of any safety or environmental breaches, incidents or near misses. Supervisor 1: Name: Rob East Signature: Date: 02.07.18 Supervisor 2 As applicable Name: Signature: Date: PART 6: JSEA/SWMS RECORD OF CONSULTATION AND INDUCTION INTO WORK METHODS I, the worker, acknowledge and understand the requirements of this JSEA/SWMS. I have had the opportunity at monthly Toolbox meetings to provide feedback on the development and review of this document. NOTE: DO NOT SIGN THIS RECORD IF YOU DO NOT UNDERSTAND THE SAFE WORK METHODS PRESCRIBED ASK THE SUPERVISOR TO EXPLAIN Ref # Last Name First Name Job Description (Trade Classification) 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 Employed By 023 Petrol Hand and Petrol Ring Saw Version 11 Created on July 2018 Review Date July 2019 Page 9 of 11 JSEA/ SWMS Rev# Signature Date of Induction Induction Verified by:

INSTRUCTIONS - RISK ASSESSMENT BY HAZARD SWMS PREPARATION Select appropriate person(s) to develop the SWMS. Person preparing SWMS is to complete all pages. Column A Identify Activity Steps (consult all parties involved). Column B Identify hazards associated with each Activity Step. Column C Use Assessment Table to determine consequences and likelihood of occurrence. Insert the Alpha abbreviation into SWMS under Column C Sub-columns L & C. Column D - Use Matrix to determine Class of. Insert the numeric rating under R. Column E - Determine appropriate control measures to eliminate the risk or reduce it to as low as practicable. Column F - Allocate responsibility for implementing required control under Who By. Column G - Reassess the risk of each control and insert the Alpha and Numeric rating chart following the controls Column H - Use Matrix to determine Class of. Insert the numeric rating under R. Assess items in the Part B Evaluation/Review Checklist to ensure relevant to the SWMS and amend if necessary. Train all persons involved in activities covered by SWMS using specific training meeting or toolbox talk and have them sign the last page of SWMS to confirm training complete. Submit SWMS to relevant Site Management Team member. Relevant Site Management Team members evaluate SWMS using Part B - Evaluation/Review Checklist. Nominated person completes SWMS Evaluation/Review Checklist and amended SWMS when necessary and forwards a copy to Project Safety Supervisor. Communicate all SWMS amendments via toolbox talks to all persons involved in SWMS activities. NB. Use the following tables to determine the risk class for each activity step. RISK CLASS OR RATING (R) High 1 Medium 2 Low 3 RISK ASSESSMENT TABLE Likelihood (L) (C) Almost Certain Expected To Occur In Most Catastrophic Permanent Disability/Death (AC) Circumstances (CA) Likely Major Extensive Injuries/ Serious LTI (L) Probably Occur In Most Circumstances (MA) Possible Significant Disabling/Short-Term LTI (P) Probably Occur At Some Time (S) Unlikely Moderate Medical Treatment (U) Could Occur At Some Time (MO) Rare (R) May Occur In Exceptional Circumstances Minor (MI) First Aid Treatment Multiply by Likelihood to determine Rating. RISK MATRIX (C) Likelihood (L) Catastrophic (CA) Major (MA) Significant (S) Moderate (MO) Minor (MI) Almost certain (AC) 1 1 1 2 2 Likely (L) 1 1 2 2 2 Possible (P) 1 2 2 2 3 Unlikely (U) 2 2 2 3 3 Rare (R) 2 3 3 3 3 Hierarchy of Control Elimination. Modify the process method or material to eliminate the hazard completely Substitution. Redesign/Engineering Isolate Administration PPE. Replace the material, substance or process with a less hazardous one Controls Redesign or modify the plant or process to reduce or eliminate the risk Separate the hazard from the person by safeguarding or by space or time. Adjust the exposure time or conditions or process by training, procedure, signs etc Use appropriately designed and properly fitted equipment where other controls are not practicable or are accepted Monitoring as per WH&S Reg 168. 023 Petrol Hand and Petrol Ring Saw Version 11 Created on July 2018 Review Date July 2019 Page 10 of 11

PART 7: JSEA/SWMS SUMMARY REPORT JSEA/SWMS CHECKLIST ITEM CHECKLIST CRITERIA COMPLIES Yes or No 01 Does the JSEA/SWMS set out step-by-step all of the activities? Y/N 02 Does the JSEA/SWMS describe how each activity will be carried out? Y/N 03 Does the JSEA/SWMS consider the environment within which the activities are to be undertaken including interfaces with other trades? Y/N 04 Does the JSEA/SWMS identify safety, health and environmental hazards that will/may arise at each stage of the work? Y/N 05 Does the JSEA/SWMS clearly document control measures to be put in place for each hazard that is identified? Y/N 06 Does the JSEA/SWMS describe all plant and equipment that will be used? Y/N 07 Does the JSEA/SWMS identify relevant Standards and Codes of Practice that must be complied with? Y/N 08 Does the JSEA/SWMS identify any pre-start and in process certifications/authorisations/permits? Y/N 09 Does the JSEA/SWMS specify licensing and qualifications required for personnel (including specific qualifications for specific roles/tasks)? Y/N 10 Does the JSEA/SWMS specify training and/or trialling required to enable the work to be done safely? Y/N Employee Undertaking Work: Signature: Date: Reviewed By: Rob East Signature: Date: 2 nd July 2018 Signed by the Management Representative of Fast Cut QLD Pty Ltd PRINCIPAL CONTRACTORS COMMENTS: JSEA/SWMS has been reviewed with no comments JSEA/SWMS has been reviewed with issues raised with Fast Cut Qld: Summary of details of issues/comments/rectifications required: Reviewed by Principal Contractor: Signature: Date: 023 Petrol Hand and Petrol Ring Saw Version 11 Created on July 2018 Review Date July 2019 Page 11 of 11