Installation Manual. BC Box Modification with Port Isolation

Similar documents
TRAINING TASK 1- for regional heat skill competition

INSTRUMENTATION TUBING

Installation Instructions for NP100 Series Nitrogen Control Panels

Section 2 Safety, Tools and Equipment, Shop Practices Unit 4 General Safety Practices. Unit Objectives. Pressure Vessels and Piping (1 of 2)

1 Exam Prep NFPA 99 Health Care Facilities Questions and Answers (Plumbing Contractor)

General Precautions for handling compressed gases

PRESSURE REDUCING STATION INSTALLATION, OPERATIONS & MAINTENANCE MANUAL

PV4 and PV6 Piston Valves

WELDING, CUTTING AND BRAZING

HEALTH AND SAFETY METHOD STATEMENT AIR CONDITIONING/REFRIGERATION MAINTENANCE/SERVICE. 2. Clean filters and screens when necessary

M03 WUNDATRADE. Heat Pump Manifold. Before you start: Check the contents. Optional. ...a division of WUNDA GROUP PLC

Cryogenics is the science of ultra low temperatures. Low temperatures are achieved by the liquefaction of gases.

Installation Operating Instructions for Duplex Manual Manifolds PX-TMD Series

V-24 OXYGEN LANCE VALVE

CAST IRON SAFETY VALVE TYPE 6301

DUPLEX PRESSURE REDUCING SET

Cal/OSHA T8 CCR 1536 Cal/OSHA T8 CCR 4799 Cal/OSHA T8 CCR 4845 Cal/OSHA T8 CCR 4848

Bulletin TCR-104 & 109 Filling and adding to the Glycol pressure system

REFRIGERATION THE OXYACETYLENE PLANT

Tri-Tech Medical Inc.

BlazeMaster Fire Protection Fittings Standard

Quadratec Delrin Door Hinge Pin Bushings for Jeep Wrangler YJ & TJ 94-06

Auto-Rewind Hose Reels INSTRUCTION MANUAL FOR OXY-LPG MODEL

accidents which arise due to non-observance of these instructions and the safety information herein. SPECIFICATIONS

TWC Services, Inc. Structured On-The-Job Training for JT- 1, 2, 3

MODULE 3 THE BRAZING PROCESS

Dri-Line Mk2 Spirax-Monnier Compressed Air Drain Trap

OPERATING INSTRUCTIONS

Tri-Safem Model I1 Regulator. INSTRUCTIONS and PARTS

Section 3- Repair and Calibration Procedures

WELDING AND OTHER HOT WORK

CITY AND COUNTY OF DENVER CR&CF RISK UNIT Compressed Gas Safety Standard

Operating Instructions in compliance with Pressure Equipment Directive 2014/68/EU. FAS Brass Check Valve RDL

TURBO SET 1000 E D $'9 5(9

For use with select HPC Fire Pits ONLY- refer to product catalog or website. 100K BTU Maximum WARNING: FOR OUTDOOR USE ONLY

Safe Work Instructions For Oxygen Acetylene Equipment

accidents which arise due to non-observance of these instructions and the safety information herein. SPECIFICATIONS

RS(H)10,15 USER MANUAL. Read the complete manual before installing and using the regulator.

MAINTENANCE MECHANIC RCF

Hotspotter. Model WB-100 Professional Series. Assembly, Testing & Operating Instructions. Safety Information:

Welding and Cutting With Oxygen-Fuel Gas

Manual Actuated Boiler Blowdown Valves

Wilkins Safety Group

Crab and Lobster Live Holding System Part II (Water Pumps, Air Pumps and Pipework)

S1, S2, S3, S5, S6, S7, S8, S12 and S13 Separators

CP10 Sensor Installation and Maintenance Instructions

Solstice Liquid Blowing Agent (LBA) and Solstice Gas Blowing Agent (GBA)

SSFU SUPER SPRAYFAST UNIVERSAL ADHESIVE APPLICATOR

Hot Work Program. University of Wisconsin-Platteville Reviewed 4/2016

Compressed Gases Storage and Handling Safety Policy. Individual Unit Function: Safety Procedure No.: SOP-0103 Page: 1 of 6

FLANGED MULTI-PORT BALL VALVES

INSTRUCTION MANUAL FOR UNDERWATER OPERATION

Air Operated Hydraulic Pumping Systems to 50,000 psi

Liquid Gas Cylinder (LGC)

PROPYLENE HEATING, BRAZING & WELDING

PLUMBING, FIRE SAFETY, AND RADIANT HEATING AND COOLING SYSTEMS INSTRUCTIONAL GUIDE. Making ProPEX Connections

Savard Labor & Marine Staffing, Inc. Compressed Gas Safety Program Rev3/14

Needle valve. Contents. User s Manual. (1) Be sure to read the following warranty clauses of our product 1. (2) General operating instructions 2

Installation, Operation & Maintenance Manual

TA10A and TA10P Steam Tracing Temperature Control Valves Installation and Maintenance Instructions

SA Control Valve types: BM, BMF, BX, SB, NS, KA, KB, KC (Normally open) BMRA, BMFRA, BXRA, SBRA, NSRA, KX, KY (Normally closed)

COATINGS SPRAY GUIDE Acrylics (210, 211, 211HT, and 212)

Compressed Gases and Cryogens

FLANGED TWO-PIECE BALL VALVES

COMPRESSOR REPLACEMENT PROCEDURE (R-134A)

CONTRACTOR REQUEST FOR COMMISSIONING

Operating Instructions in compliance with Pressure Equipment Directive 2014/68/EU. FAS Manual Brass Shut-Off Valve DN10 through DN22

HEAT EXCHANGE AND TRANSFER, INC. 500 Superior Street Carnegie, PA (412) Fax: (412)

BRAZING EQUIPMENT PORTAPAK KIT

INSTRUCTION MANUAL FOR UNDERWATER OPERATION

COATINGS SPRAY GUIDE Urethane 520

OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply

Crosby style JCE Safety Valve Installation, Maintenance and Adjustment Instructions CROSBY

Pure-Flo Handwheel Operated Valves (903, 913, 963) Instruction Manual

Portable Electric Tools

INFLATION STATION. Cordless OWNER S MANUAL MODEL NO: RCP-C65B

INSTRUCTION MANUAL MST AFTERCOOLER SYSTEM MODEL

Compact Ball Valves ASAHI AV VALVES. Contents. User s Manual. (Page) (1) Be sure to read the following warranty clauses of our product 1

3M Liqui-Cel EXF-4x13 and 4x28 Series Membrane Contactors

REFRIGERATION SYSTEM COMPONENTS

GAS BBQ 4 burner. instructions for. model no: BBQ10

AND OPERATION INSTRUCTIONS

453 Series Steam Heated Vaporizing Regulator

Spiratec ST14, ST16 and ST17 Sensor Chambers and sensors

Welding, Cutting, and Brazing

BUTTERFLY VALVES Series 800

DS MB, MBF THREE PORT VALVES

Installation, Operating and Maintenance Instructions. V914 Cast Iron Flanged Swing Check Valve V914

HEAD PRESSURE CONTROL VALVES

POWER FLUSH KIT INSTRUCTIONS

SAFETY FEATURES OF PORTABLE CRYOGENIC LIQUID CONTAINERS FOR INDUSTRIAL AND MEDICAL GASES

OVERVIEW pg 3. Major Points to Consider pg 3 Minor Points to Consider pg 3. INSTRUCTIONS pg 4

XIAMETER RSN-0997 Resin

SA121, SA122, SA123, SA128 and SA1219 Self-acting Temperature Control Systems (Knob Adjustment)

OXYGEN ACETYLENE WELDING & CUTTING EQUIPMENT

EHS Laboratory Guidance: Cryogenic Material

PKP Prozessmesstechnik GmbH. Borsigstrasse 24. D Wiesbaden-Nordenstadt. Tel: / Fax: / Operating Instructions

COMPANY HEALTH & SAFETY PROGRAM. Title: Welding & Cutting Section No: 45

MAPP Gas. Material Safety Data Sheet

GAS FRYER Instruction Manual Model #5099NS

Transcription:

Issue 2 BC Box Modification with Port Isolation Installation Manual Instructions for :- BC Box Modification with Port Isolation Models : KS8-CMB-P-V-G1 / KS8-CMB-P-V-GB1 / KS8-CMB-P-V-GA1 / KS8-CMB-P-V-HA1 / KS8-CMB-P-V-HB1 For safe and correct use please read this installation manual and use in conjunction with the BC Box installation manual supplied by Mitsubishi Electric. Modified for MITSUBISHI ELECTRIC UK

Contents BC Box with Port Isolation Page 3 Safety Precautions 4 Ball valves installation instructions 5 Connecting to unused isolation valves on an existing system 6 Ball Valve Insulation 7 Disclaimer / Warranty The Mitsubishi Electric BC box should be installed in accordance with the installation instructions supplied with the unit. Care should be taken, when installing the BC box with port isolation, to protect the fitted ball valves from damage. DO NOT use the ball valves as handles for lifting or as mechanical support for the BC box. BC box with port isolation 2

Safety Precautions BC Box with Port Isolation The below is a risk assessment taken out for installation of the BC Box Modification with Port Isolation: Hazard Mitsubishi BC Box Valve Bracket Splinter from Wood Manual Handling Installation of BC Box Cut Tube Brazing Pipes Brazing Alloy Pressure Test Cold / Hot Pipes Action taken Advisory - Wear gloves Advisory - Wear gloves Advisory - Wear gloves Do not lift without assistance, use fork lift / pallet truck to transport to site location Lift with hoist into ceiling, follow guidelines in Mitsi City Multi Manual, wearing site PPE Advisory - Wear gloves Wear gloves, glasses, use wet cloth around brazing area Wear gloves, glasses, use wet cloth around brazing area Wear glasses, follow guidelines in Mitsi City Multi Manual Recommendation of 1" 1/2 foam lagging around pipe/valve Risk Assessment Conclusion Acceptable - No further action, but ensure controls are maintaining The above safety precautions need to be taken into consideration when installing the BC Box Modification with Port Isolation. Site PPE is to be worn as advised along with the recommendations set out above. Also take into consideration the Mitsubishi Electric BC Box City Multi Manual installation guide for further instructions. 3

BC Box with Port Isolation - Installation Instructions BC Box with Port Isolation When installing ball valves it is very important to note that when applying heat it should only be for a matter of seconds, not minutes. For soft soldering - For Silver Brazing - Use oxygen-acetylene or equivalent type heating torches. ONLY use an oxygen-acetylene heating torch capable of raising the temperature of the tube socket to the required brazing temperature within a time period of approximately one minute. New Installation IMPORTANT : Before installing the valve in the line, remove the schrader valve and turn the stem to the open position. Recommended procedure for silver brazing to copper tubing Cut tube ends square. Remove burrs. Remove all grease and oil from joint area and clean the outside of the tube with emery cloth. Insert tube to full depth of connection socket to ensure proper fit. Withdraw tube half way out of the socket, apply brazing flux evenly over the tube and outside of the socket and reinsert tube. Wrap a wet cloth around the valve body and bonnet, but away from the socket to be brazed. With the torch adjusted to a reducing flame apply heat to the entire circumference of the tube over a distance of approximately 15mm to 50mm from the valve socket to expand the tube and carry the heat down inside the socket. Continue heating until the flux on the tube becomes liquid at which time the flame should be directed on the valve socket as well as the tube but pointed away from the valve body. When the flux has become very fluid and watery in appearance apply the brazing alloy against the heated tube starting at the bottom of the junction of the tube and valve socket. If the joint is at the proper temperature the brazing alloy will flow quickly around the tube and into the socket. If the alloy does not flow readily continue heating until the proper temperature is reached. Remove the flame as soon as the liquid brazing alloy has covered the entire joint and penetrated down to the socket. After a few seconds when the alloy has set, apply a water soaked cloth to the joint and to the entire valve to carry away excess heat as quickly as possible and remove residual flux. When the temperature has been lowered remove all excess flux using a wire brush if necessary. Fully open valves, ensure caps are refitted to Schrader valves and valve shaft. Existing Operational System / Pipework If additional fan coils are to be fitted or other work carried out after the initial installation before making alterations ensure that both the relevant ball valves on the circuit to be worked on are fully closed. Connect gauge lines to the relevant Schrader valves and recover all refrigerant to F-Gas guidelines. Once works are carried out pressure test and fully evacuate the pipe lines to F-Gas guidelines. If additional pipework has been added to the liquid line additional refrigerant will need to be added at the outdoor unit. Please refer to the PURY City Multi service manual to calculate the additional quantity required. 4

BC Box with Port Isolation - Installation Instructions BC Box with Port Isolation Connecting to unused isolation valves on an existing system If additional fan coils are to be fitted or other work carried out after the initial installation before making alterations ensure that both the relevant ball valves on the circuit to be worked on are fully closed. Cut tube ends square. Remove burrs. Remove all grease and oil from joint area and clean the outside of the tube with emery cloth. Insert tube to full depth of connection socket to ensure proper fit. Withdraw tube half way out of the socket, apply brazing flux evenly over the tube and outside of the socket and reinsert tube. Wrap a wet cloth around the valve body and bonnet, but away from the socket to be brazed. With the torch adjusted to a reducing flame apply heat to the entire circumference of the tube over a distance of approximately 15mm to 50mm from the valve socket to expand the tube and carry the heat down inside the socket. Continue heating until the flux on the tube becomes liquid at which time the flame should be directed on the valve socket as well as the tube but pointed away from the valve body. When the flux has become very fluid and watery in appearance apply the brazing alloy against the heated tube starting at the bottom of the junction of the tube and valve socket. If the joint is at the proper temperature the brazing alloy will flow quickly around the tube and into the socket. If the alloy does not flow readily continue heating until the proper temperature is reached. Remove the flame as soon as the liquid brazing alloy has covered the entire joint and penetrated down to the socket. After a few seconds when the alloy has set, apply a water soaked cloth to the joint and to the entire valve to carry away excess heat as quickly as possible and remove residual flux. When the temperature has been lowered remove all excess flux using a wire brush if necessary. Once works are carried out pressure test and fully evacuate the pipe lines to F-Gas guidelines. Fully open valves, ensure caps are refitted to Schrader valves and valve shaft. Additional refrigerant will need to be added at the outdoor unit. Please refer to the PURY City Multi service manual to calculate the additional quantity required. 5

BC Box with Port Isolation BC Box with Port Isolation - Installation Instructions Ball Valve Insulation Ensure the Ball valves (High pressure liquid and Suction off the B/C box are insulated. We recommend 1 1/2 Lagging to ensure coverage. As part of standard practice please insulate all exposed pipework, flares and valves. Please see example below: Fig 1 Fig 2 6

BC Box with Port Isolation Disclaimer Warranty: All products manufactured on behalf of Mitsubishi Electric UK are warranted against defective materials for a period of three years from the date of delivery to the original purchaser. Warning: Mitsubishi Electric UK assumes no liability for damages consequent to the user of this product. We reserve the right to change this manual at any time without notice. The information furnished by us is believed to be accurate and reliable. However, no responsibility is assumed by us for its use, nor for any infringements of patents or other rights of third parties resulting from its use. 7

Please be sure to put the contact address/telephone number on this manual before handing it to the customer. MITSUBISHI ELECTRIC UK MITSUBISHI ELECTRIC UK, TRAVELLERS LANE, HATFIELD, HERTFORDSHIRE, AL10 8XB 8