Northern Indiana Public Service Company Michigan City Generating Station Primary Settling Pond Number Annual RCRA CCR Unit Inspection Report

Similar documents
Northern Indiana Public Service Company (NIPSCO) 2723 East 1500 North, Wheatfield, Indiana, USA Golder Associates Inc.

2018 INSPECTION REPORT

First Annual RCRA CCR Unit Inspection Report January 2016 RESTRICTED WASTE TYPE I LANDFILL OPERATING PERMIT NUMBER 37-01

Whitewater Valley Station Surface Impoundment Coal Combustion Residual Annual Report

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

CCR Landfill 2017 Annual Inspection Report NC1 Ash Disposal Area

Annual Inspection Report of CCR Impoundment and CCR Landfill Wenck Project # B

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

2016 Annual Inspection Report

Green CCR Surface Impoundment

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

CCR Landfill 2015 Annual Inspection Report NC1 Ash Disposal Area

CCR Landfill 2018 Annual Inspection Report North Omaha Ash Landfill

2017 Annual Inspection Report

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

2016 Annual Landfill Inspection Report. SCE&G Wateree Station Class III Landfill

2018 Annual Inspection Report

2016 Annual Inspection Report

Annual CCR Landfill Inspection. Lansing Landfill. Interstate Power and Light Company. Prepared for:

HISTORY OF CONSTRUCTION

Consulting Engineers and Scientists Annual Landfill Inspection Report. for the. Williams Station Highway 52 Class III Landfill

CCR Fugitive Dust Control Plan

Amended Written Closure Plan

Initial Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

TABLE OF CONTENTS LEGAL NOTICE

STRUCTURAL STABILITY ASSESSMENT

Written Closure Plan. Cherokee Station - Active CCR Impoundments Public Service Company of Colorado Denver, Colorado.

Closure Plan for CCR Surface Impoundments

Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

CLOSURE PLAN. CFR (b) Bottom Ash Pond Complex Cardinal Plant Brilliant, Ohio. September, 2016

CLOSURE PLAN. CFR (b) GERS Bottom Ash Pond. Northeastern 3&4 Power Station Oologah, Oklahoma. October, 2016

CCR Certification: Fugitive Dust Control Plan (b) for the. West Ash Pond. at the. F. B. Culley Generating Station.

TABLE OF CONTENTS 1.0 INTRODUCTION PLAN CERTIFICATION (B)(4) 1

Written Closure Plan. Comanche Station - Active CCR Surface Impoundment Public Service Company of Colorado Denver, Colorado

COAL COMBUSTION RESIDUAL (CCR) FUGITIVE DUST CONTROL PLAN

Notice of Intent to Close Inactive CCR Surface Impoundments

CCR CLOSURE PLAN Sibley Slag Settling Impoundment Sibley Generating Station East Johnson Rd Sibley, Missouri

LEGAL NOTICE. Report No. SL Revision: 0 Page No. i. Ottumwa Generating Station Notification of Intent to Initiate Closure

October 16, GRDA CCR Landfill Compliance Report Grand River Dam Energy Center 8142 Hwy 412B PO Box 609 Chouteau, OK Dear Mr.

Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop San Antonio, Texas Project No

COAL COMBUSTION RESIDUAL (CCR) FUGITIVE DUST CONTROL PLAN

CCR Closure Plan. CCR Certification: Written Closure Plan (b) & (c) for the. Landfill Sedimentation Pond. A. B. Brown Generating Station

TABLE OF CONTENTS LEGAL NOTICE

TABLE OF CONTENTS LEGAL NOTICE

Coal Combustion Residuals Closure Plan

CCR Closure Plan Ash Impoundment

CLOSURE PLAN. CCR (b) GERS East and West Bottom Ash Ponds. Pirkey Power Plant Hallsville, Texas. October, 2016

What I ve Learned About Dam Safety Good, Bad and Ugly

D.B. Wilson Station CCR Landfill

ENGINEER S CERTIFICATION OF AQUIFER SEPARATION DEMONSTRATION (40 CFR )

Written Closure Plan. Pawnee Station - Active CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016

CLOSURE PLAN. CFR (b) Document ID: GERS Bottom Ash Complex. Mountaineer Plant New Haven, West Virginia.

FOUR CORNERS POWER PLANT CLOSURE PLAN (b) COMBINED WASTE TREATMENT POND (CWTP) FC_ClosPlan_012_

Written Closure Plan. Pawnee Station - North CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016

Holding Pond Annual Inspection Report

Coal Combustion Residuals Annual Fugitive Dust Control Report. Prepared for Montana-Dakota Utilities Company R.M. Heskett Station.

Figure 1 - Photo of Surveyed Area. Figure 2 - Void Survey Results

CCR Unit Closure and Post-Closure Plan. The business of sustainability. Texas Municipal Power Agency Gibbons Creek Steam Electric Station

CLOSURE PLAN. CCR (b) GERS Landfill Area. Welsh Power Plant Pittsburg, Texas. October, 2016

CHOLLA POWER PLANT CLOSURE PLAN (b) SEDIMENTATION POND CH_ClosPlan_004_

FUGITIVE DUST CONTROL PLAN

Big Rivers Electric Corporation - Sebree Generating Station (R. A. Reid, R. D. Green and HMPL Station Two)

Holding Pond Annual Inspection Report

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011

Big Rivers Electric Corporation - D.B. Wilson Generating Station. Fugitive Dust Control Plan for Coal Combustion Residuals

TDLP INC. The Dam & Levee Professionals. Kevin Chancey Sarah Edens. Monica Murie Jason Unruh

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

INFILTRATION PRACTICE MAINTENANCE INSPECTION FORM

La Quinta Channel Extension Port of Corpus Christi Ingleside, Texas. Mark Coyle

COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for:

FOUR CORNERS POWER PLANT CLOSURE PLAN (b) UPPER RETENTION SUMP FC_ClosPlan_011_

CCR Fugitive Dust Control Plan

Ninilchik Harbor Page 2 of 11

COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for:

REVISION RECORD. Revision Number. Date Sections Affected/Reason 0 04/17/2017 Creation of Initial EAP

APPENDIX J HYDROLOGY AND WATER QUALITY

TECHNICAL MEMORANDUM 002 EMORANNO. 001

REVISION RECORD. Revision Number. Date Sections Affected/Reason 0 04/17/2017 Creation of Initial EAP

APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES

Designing Labyrinth Spillways for Less than Ideal Conditions Real World Application of Laboratory Design Methods

FUGITIVE DUST CONTROL PLAN

HYDRAULIC JUMP AND WEIR FLOW

Illinois State Water Survey

JAP Additional Information Sheet

IDEM Indiana Department of Environmental Management Office of Land Quality P.O. Box 6015 Indianapolis, IN OLQ PH: (317)

Sediment Basin 7E-12. Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures BENEFITS.

Indiana LTAP Road Scholar Core Course #10 Culvert Drainage. Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd.

COAL COMBUSTION RESIDUALS FUGITIVE DUST CONTROL PLAN

Hazardous Waste Training Plan. Supersedes: 02/15/16 (Rev.02) Preparer: Owner: Approver: EHS Team Member EHS Team Member EHS Manager

VIRGINIA SOIL AND WATER CONSERVATION BOARD GUIDANCE DOCUMENT ON DAM BREAK INUNDATION ZONE AND INCREMENTAL DAMAGE ANALYSIS AND MAPPING PROCEDURES

22. Specialty Valves.

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 1 PINE COUNTY

Scott Dam Spillway Comparing Physical Model Study Results

ADDENDUM A EMERGENCY ACTION PLAN FLY ASH BASIN FACILITY EMERGENCY ACTION PLAN. INACTIVE BOTTOM ASH BASIN MONROE POWER PLANT Monroe, Michigan

MOREHEAD CITY HARBOR, NC. Dredged Material Management Plan (DMMP)

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

Huntington District. For More Information Contact (304)

INADVERTENT RETURN PLAN FOR HORIZONTAL DIRECTIONAL DRILLING (HDD)

Fish Friendly Crossings- Examples from Nash Stream

Transcription:

REPORT Northern Indiana Public Service Company Michigan City Generating Station Primary Settling Pond Number 2 2018 Annual RCRA CCR Unit Inspection Report Submitted to: Northern Indiana Public Service Company (NIPSCO) 2755 Raystone Drive Valparaiso, IN 46383 Submitted by: 15851 South US 27, Suite 50 Lansing, Michigan, USA 48906 +1 517 482-2262 1898334 June 25, 2018

Table of Contents 1.0 INTRODUCTION... 3 2.0 FACILITY DESCRIPTION... 4 3.0 BACKGROUND AND DOCUMENT REVIEW SUMMARY... 5 4.0 2018 VISUAL INSPECTION... 6 5.0 CLOSING... 7 TABLES Table 1: Summary of Background Document Review... 5 ii

1.0 INTRODUCTION The United States Environmental Protection Agency (EPA) promulgated the Resource Conservation and Recovery Act (RCRA) Coal Combustion Residuals (CCR) Rule (Rule) on April 17, 2015, with an effective date of October 19, 2015. The Rule requires owners or operators of existing CCR surface impoundments to have those units inspected on an annual basis by a qualified professional engineer in accordance with 40 CFR 257.83(b)(1). The annual qualified professional engineer inspections are required to be completed and the results documented in inspection reports (per 40 CFR 257.83(b)(2)) for CCR surface impoundments. (Golder) was retained by Northern Indiana Public Service Company (NIPSCO) to perform the annual inspection of the Primary Settling Pond Number 2 (Primary 2), a CCR surface impoundment located at the Michigan City Generating Station (MCGS, Site). The CCR Rule establishes national minimum criteria and new CCR management obligations for existing, new, and lateral expansions of CCR disposal units. One of the new obligations pertains to inspections, specifically; CCR unit owners/operators must initiate the following activities: every 7-day inspections and every 30-day instrument monitoring of CCR Units by October 19, 2015; and annual inspections of CCR units by January 18, 2016, however Primary 2 was initially in the process of closure, therefore the next annual inspection for Primary 2 must be performed by July 15, 2018. This report presents the results of the annual inspection of Primary 2 CCR surface impoundment unit at the MCGS, located in Michigan City, La Porte County, Indiana. Primary 2 is an above grade surface impoundment that is not currently regulated by the Indiana Department of Water Dam Regulations (IDOW). The inspection was conducted to comply with 257.83 of the new CCR Rule. Per 40 CFR 257.83(b)(1), Golder reviewed available information regarding the status and condition of the CCR unit and performed an onsite visual inspection which was conducted on May 16, 2018. The objectives of the inspection included the following: Review of Operational Records (as applicable, see Section 3): Design and construction information. Results of previous structural stability assessments. Results of previous annual inspections. A visual inspection of the CCR unit to identify signs of distress or malfunction of the CCR unit and appurtenant structures. A visual inspection of hydraulic structures underlying the base of the CCR unit or passing through the dike of the CCR unit for structural integrity and continued safe and reliable operation. In accordance with 257.83(b)(2), this inspection report has been prepared by a qualified professional engineer documenting the points listed above, and identifying the following since the previous annual inspection: Any changes in geometry of the CCR surface impoundment since the previous annual inspection. The location and type of existing instrumentation and the maximum recorded readings for each instrument since the previous annual inspection. 3

The approximate minimum, maximum, and present depth and elevation of the impounded water and CCR since the previous annual inspection. The storage capacity of the impounding structure at the time of inspection. The approximate volume of the impounded water and CCR at the time of inspection. Any appearances of an actual or potential structural weakness of the CCR unit, in addition to any existing conditions that are disrupting or have the potential to disrupt the operation and safety of the CCR unit and appurtenant structures. Any other change(s) which may have affected the stability or operation of the impounding structure since the previous annual inspection. 2.0 FACILITY DESCRIPTION Primary 2 was designed by Sargent and Lundy Engineers (S&L) of Chicago, Illinois in 1972, and put into service in 1973 and has been continuously owned and operated by NIPSCO to the present time. Primary 2 is formed by an above grade embankment that is approximately 14 feet high on the outside and approximately 19 feet high on the inside. The contractor who built Primary 2 is not known. Historical geotechnical data from hydrogeologic and geotechnical investigation reports completed at the site by others were provided to Golder. Drawings and numerous boring logs were available from the initial 1970s facility design/construction. Golder also completed a geotechnical investigation and embankment stability analyses in 2012. Primary 2 currently receives air heater wash and boiler room sump water from the MCGS via above ground steel pipelines that discharge into Primary 2. Primary 2 is currently not accepting CCR materials. At the time of the inspection, Primary 2 was receiving discharges from the generating station. There is one discharge structure in Primary 2. The discharge structure is concrete and utilizes stop logs to control water elevation and currently discharges to the Final Settling Pond. 4

3.0 BACKGROUND AND DOCUMENT REVIEW SUMMARY The existing reports reviewed for this assessment are summarized below. Table 1: Summary of Background Document Review Document Date Author Various construction drawings 1972 Sargent & Lundy Engineers (S&L) Draft Round 10 Dam Assessment Report, NIPSCO Michigan City Generation Station, Coal Ash Impoundments Final Report Summary of Hydraulic Evaluation of Impoundments, Technical Memorandum, NIPSCO, Michigan City Generating Station, Michigan City, Indiana 2012 Geotechnical Investigation and Embankment Stability Analyses, NIPSCO Michigan City Generating Station, Michigan City, Indiana 2017 Initial Annual RCRA CCR Unit Inspection Report Primary Basin Number 2 Surface Impoundment, NIPSCO, Michigan City Generating Station, Michigan City, Indiana CCR Surface Impoundment - Primary 2 Inflow Design Flood Control System Plan, NIPSCO Michigan City Generating Station Weekly Inspections, Primary Settling Pond #2, NIPSCO, Michigan City Generating Station, Michigan City, Indiana March 2012 August 2012 August 2012 July 2017 April 2018 July 2017 May 2018 GZA GeoEnvironmental, Inc. (GZA) for the EPA NIPSCO 5

4.0 2018 VISUAL INSPECTION The 2018 onsite inspection of Primary 2 was performed by Tiffany Johnson, P.E. of (Golder) on May 16, 2018. Golder s inspector was accompanied by Mr. Joe Kutch, Coal Combustion Residuals Program Manager and Mr. Jeff Neumeier, Environmental Coordinator with NIPSCO MCGS for the inspection. The visual inspection provides the following information as stipulated in 40 CFR 257.83(b)(2): Any changes in geometry of the CCR surface impoundment since the previous annual inspection. There were no changes in the geometry of the Primary 2 since the last inspection. The location and type of existing instrumentation and the maximum recorded readings for each instrument since the previous annual inspection. There is currently no instrumentation in place designed to monitor for the structural stability of the Primary. The approximate minimum, maximum, and present depth and elevation of the impounded water and CCR since the previous annual inspection. Maximum: approximately 603 feet above mean sea level (from NIPSCO) Minimum: approximately 601 feet above mean sea level (from NIPSCO) Present Depth: approximately 11 feet (based on visual observation on May 16, 2018) The storage capacity of the impounding structure at the time of inspection. Approximately 70,260 cubic yards (CY), based on previous inspection report information (GZA, 2012) and confirmed by NIPSCO. The approximate volume of the impounded water and CCR at the time of inspection. Impounded water = approximately 500,000 gallons (confirmed by NIPSCO) CCR = approximately 10,000 cubic yards (confirmed by NIPSCO) Any appearances of an actual or potential structural weakness of the CCR unit, in addition to any existing conditions that are disrupting or have the potential to disrupt the operation and safety of the CCR unit and appurtenant structures. None were observed. Any other change(s) which may have affected the stability or operation of the impounding structure since the previous annual inspection. None were observed. Based on a review of the historical reports listed in Table 1 and conditions noted during the annual inspection, Primary Settling Pond No. 2 is in acceptable condition. The following de minimus items were observed: 6

Minor vegetation within the rip-rap observed along the north/northwestern downstream slope during the previous inspection was removed in June 2017 and has been well maintained. Sparse vegetation within the rip-rap lined slopes is managed a minimum of 2 times per year. Noted minor erosion on northern and southwestern inside slopes. Noted minor erosion under inflow structure pipes at the northern crest. There is currently no instrumentation in place designed to monitor for the structural stability of Primary 2. At the time of the inspection and report, there are no plans for installation of stability monitoring instrumentation. Based on visual observations made on May 16, 2018, the overall condition of Primary 2 is acceptable. No structural weaknesses or safety issues were observed within the upstream, downstream, crest or hydraulic structures of Primary 2. Based on visual observations made on May 16, 2018, there were no conditions visually identified that would likely impact the operation of Primary 2. 5.0 CLOSING This report has been prepared in general accordance with normally accepted civil engineering practices to fulfill the Resource Conservation and Recovery Act (RCRA) reporting requirements in accordance with 40 CFR 257.83(b). Based on our review of the information provided by NIPSCO and on Golder s on-site visual inspection, the overall condition of Primary 2 is acceptable. Golder s assessment is limited to the information provided to us by NIPSCO and to the features that could be inspected visually in a safe manner. Golder cannot attest to the condition of subsurface or submerged structures. 7