Nantasket Beach Two-Way Conversion and HRA Land Transfer. Board of Selectmen Meeting May 31, 2018

Similar documents
Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Government of the District of Columbia Department of Transportation

Uptown West Neighbourhood Transportation Study

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

Improvements Infrastructure Gap Assessment and Improvements Street Striping

Traffic Impact Memorandum. May 22, 2018

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

Roosevelt Estates Neighborhood Improvements

Traffic Calming Policy

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

MEMORANDUM. Nantasket Road at Kingsley Road Kingsley Road at Sumner Street Kingsley Road at Revere Street Kingsley Road at Kenberma Street

STONY PLAIN ROAD STREETSCAPE

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Paoli Road Improvement Feasibility Study

Item No. 14 Town of Atherton

Project Kickoff Meeting February 15, 2018

Welcome! San Jose Avenue Open House August 25, 2015

1. What is the Doran Street and Broadway/Brazil Grade Separation Project (Project)?

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project

Traffic Calming Policy

OCALA/MARION TPO CITY OF BELLEVIEW CORRIDOR PLAN STUDY PRESENTATION TO THE BELLEVIEW CITY COMMISSION JANUARY 25, :00 PM

ADOT Statewide Bicycle and Pedestrian Program Summary of Phase IV Activities APPENDIX B PEDESTRIAN DEMAND INDEX

Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014

DOWNTOWN TUPELO MAIN STREET: ROAD DIET STUDY

EXHIBIT R1. Neighborhood Cul-de-Sac Implementation

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Miami Health District

Outer Cape Bicycle & Pedestrian Master Plan. PUBLIC WORKSHOP #2 March 26, 2015

AGENDA ITEM G-2 Public Works

PEABODY SQUARE RECONSTRUCTION PROJECT

Forest Hills Improvement Initiative

Mineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st

Memorandum. Sunday, July 13, Saturday, July 19, 2014

Summary of Comments Public Information Meeting Wieuca Road at Phipps Boulevard Intersection Improvements June 7, 2017

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

North Shore Transportation Improvement Strategy

Transportation Corridor Studies: Summary of Recommendations

Tonight is for you. Learn everything you can. Share all your ideas.

NEWMARKET UPHAM S CORNER

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Capital Metro Downtown Multimodal Station

Community Transportation Plan

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

Ann Arbor Downtown Street Plan

Traffic and Flood Control Improvements in the Transit Oriented Development District Project Updates Tuesday, November 29, 2016 Meriden Public Library

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

MassDOT s Transportation Choice and Healthy Transportation Policy Initiatives

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017

Chapter 5. Complete Streets and Walkable Communities.

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

MEMORANDUM. Existing Operations. City of Clearwater. Michael Herrman. Date: January 26, Seminole Boat Launch Overview. M&N Job No.

City of Atlanta-MARTA Sales Tax Referendum Draft Project List. Atlanta City Council Work Session May 19, 2016

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

S T A T I O N A R E A P L A N

Report. Typical Sections. City of Middleton, WI

Highland Creek Village Transportation Master Plan: Stakeholder #3 Meeting Summary

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

By Dan Burden, Executive Director Walkable and Livable Communities Institute

Solana Beach Comprehensive Active Transportation Strategy (CATS)

City of Davis East Covell Corridor Plan

SANTA CRUZ/ALAMEDA ROAD CONFIGURATIONS INTERSECTION AND STREET VIEWS

City of Tamarac, Florida Traffic Calming Policy

Route 79/Davol Street Corridor Study

About the study. North Milwaukee Ave. Key goals of this study are to: Achieve Vision Zero* by. Harmonize the space and improve walkability

RE: Natomas Landing (P99-091)

Blue Ribbon Commission Report Recommendations on Pedestrian and Bicycle Infrastructure Improvements

Station Plan: Penn & 43rd Avenue

Exit 13/Golden Triangle Study FREQUENTLY ASKED QUESTIONS

NOTICE OF AVAILABILITY/NOTICE OF COMMENT PERIOD OF A DRAFT EIR/EIS/EIS FOR PUBLIC REVIEW AND HEARINGS

Overview: Phase 3 Draft Development and Circulation Plans, White Bear Station

Downtown Davidson Pedestrian and Bicycle Safety Plan

Complete Streets Process and Case Study: Taft / McMillian Two-Way Street Conversion Cincinnati, Ohio. Traffic Engineering Workshop June 4, 2014

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

Access Management Regulations and Standards

Major Bike Routes 102 Avenue Workshop April 21, 2015

Eastern PA Trail Summit October 1, 2018

Hennepin/First Transportation Study

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

MASTER BICYCLE AND PEDESTRIAN PLAN

Las Tunas Downtown Revitalization City Council Study Session. December 1, :00 p.m. Live Oak Park Community Center

THIS PAGE INTENTIONALLY BLANK

CASE STUDY WALKABLE WASHINGTON WHO WE ARE & WHAT WE DO CITY OF BOTHELL DOWNTOWN REVITALIZATION PLAN BOTHELL, WA

Hennepin County Bicycle and Pedestrian Planning

To: Mid America Regional Council From: Louisburg Recreation Commission. March 6, 2018

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Goodlettsville Bicycle and Pedestrian Plan Executive Summary

INTERMODAL TRANSPORTATION PLAN

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

Chapter 3: Multi-Modal Circulation and Streetscapes

WHITE STREET/ ENGLISH PLAZA STREETSCAPE IMPROVEMENT PROJECT

City of Birmingham Draft Multi-modal Transportation Plan

Town of Ashland. Downtown Planning Initiative 2 nd Community Workshop. March 29, Presented by:

Florida Redevelopment Association 2015 Annual Conference

TRANSPORTATION & MOBILITY VISIONING MEETING. August 23 24, 2017

I-10 Bypass Project Banning to Cabazon

Transcription:

Nantasket Beach Two-Way Conversion and HRA Land Transfer Board of Selectmen Meeting May 31, 2018

Public Meetings 2015/2016 STUDY PHASE 4 public listening sessions and presentations 2017 PRELIMINARY DESIGN PHASE Business visits and 5 HRA & BOS public meetings, including October 12 Traffic Commission hearing

Two-Way Benefits Improves pedestrian safety and access between beach and businesses: Reduces the speedway effect between Water Street and Phipps Street; Safer, more comfortable crossings will encourage residents and beach visitors to patronize local businesses Provides an engaging walking and biking experience that will connect the Surfside and Kenberma commercial districts 4

Two-Way Benefits Eliminates current traffic bottlenecks Better protects the Samoset Ave neighborhood Improves access to businesses, parking, and Hull itself Provides balanced patron flows north and south through Surfside that may otherwise not want to recirculate 5

Two-Way Benefits Improves emergency access One-way system provides no efficient alternative route Two-way system provides quicker emergency vehicular access and response route alternatives 6

Two-Way Benefits Realize Nantasket Beach s potential Land exchange provides a significantly better land configuration for HRA s redevelopment potential Improves tax base with a larger development parcel size Encourages year-round economic activity Allows flexibility for street closures and large festivals Off-peak Season Peak Season 7

Two-Way Benefits Enhance existing businesses and create jobs Capitalize on Nantasket s history as a regional destination Respond to Town s changing demographics Retirees and new residents seeking more walkable environment and car-lite living 8

Two-Way Design Northern End New cross street to circulate beach traffic without going through Samoset Ave neighborhood Limited signs & roadway striping on certain segments Traffic signal at Edgewater Rd provides egress for beach traffic and a safer neighborhood pedestrian crossing Increases on-street parking on Nantasket Ave

Two-Way Design Southern End Provides greenspace and pedestrian zone within Nan Ave segment to be removed Improves sidewalk connections and changes parking to back-in angled for bike safety Limited changes to signs and striping in Surfside retail area Slows beach traffic moving through Miller s Crossing and provides greener streets

Summary of Two-Way Flow Benefits Improves the safety and quality of pedestrian spaces Allows for the right-sizing of Nantasket Avenue Eliminates current traffic bottlenecks Improves access for businesses / emergency services Transfer of surplus land to HRA will allow new roadway design to activate pedestrian space and knit together Surfside and Kenberma

Consideration for Testing Two-Way Certain intersections require physical modifications to give it a fair test (Anastos Corner & North of Water St) Many signs, temp pavement markings, and police details would be necessary A one- or two-week trial period will not provide a reasonable time frame for traffic to adjust When trial period ends costs and potential safety challenges with going back to one-way

Next Steps Consider 2018 MassWorks grant application Submit 25% Permit plan set to MassDOT District 5 for preliminary review Provide scope to HRA for final design tasks and advance final design for Town jurisdiction areas Review environmental permitting needs associated with final design detail and roadway changes, if any

Article 11 Exhibit

Recommended Loading Zones Time of Day (Morning) Loading Zones Daddy s Nantasket Liquors Nantasket Flowers & Dumpster Depot Most on-street stalls available during mornings now