Oil Well Potential Test, Completion or Recompletion Report, and Log

Similar documents
Oil Well Potential Test, Completion or Recompletion Report, and Log

Oil Well Potential Test, Completion or Recompletion Report, and Log

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

INSTRUCTIONS FOR COMPLETING FORM H-9 STATEWIDE RULE 36 CERTIFICATE OF COMPLIANCE

Railroad Commission of Texas

OIL/GAS WELL COMPLETION REPORT. Well Name and Number Surveyed elevation (feet): KB GL

Colorado Oil and Gas Conservation Commission

Disposal/Injection Well Pressure Test Report (H-5)

Colorado Oil and Gas Conservation Commission (COGCC) Completed Interval Report, Form 5A Data Field Definitions

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD

Oklahoma Corporation Commission Oil & Gas Conservation Division Post Office Box Oklahoma City, Oklahoma Rule 165:

D & V Oil Co. LP. Daily Completion Report - University CN A #6 API # /23/2016. Perfs ' ' Activity :

High Cost Gas Statewide Rule 101 (Tight Formations)

ENDEAVOR ENERGY RESOURCES

Drilling Morning Report

W I L D W E L L C O N T R O L FLUIDS

BLACK HILLS PLATEAU PRODUCTION COMPANY

Statewide Rule 36: H2S

Railroad Commission of Texas. Chairman Barry T. Smitherman Commissioner David Porter Commissioner Christi Craddick

APPENDIX A1 - Drilling and completion work programme

Chapter 5 HORIZONTAL DRILLING

Texas Administrative Code

Hydro-Mech Bridge Plug

FREQUENTLY ASKED QUESTIONS

Reclassification and Recompletion

FORGE Energy UL 21 Freedom 1 API Number:

Advanced Applications of Wireline Cased-Hole Formation Testers. Adriaan Gisolf, Vladislav Achourov, Mario Ardila, Schlumberger

PTRT 1471: Exploration and Production I. Chapter 6: Drilling and Well Completion

Depth - Driller COMPANY VAL ENERGY INC. BROWN-ROLFE 3-26 FIELD COUNTY GROUND LEVEL. , 11.0 ft above perm. Datum. Elev.: K.B ft

Intermittent Gas Lift Utilizing a Pilot Valve

Practice Exam IADC WellSharp Driller and Supervisor

H. H. HOWELL, INC. Inland Ocean Bevans #1 Bevans & Wildcat Field Menard County, Texas

Directive 059: Well Drilling and Completion Data Filing Requirements

Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas

Gas Lift Valve Testing

HydroPull. Extended-Reach Tool. Applications

Worked Questions and Answers

Mobeetie Resource Dev LLC EXAMINER S REPORT AND RECOMMENDATION STATEMENT OF THE CASE

Kerry A. Pollard Texstar Midstream Utility, LP Gallon E. Gray Phillip Zamzow EXAMINER S REPORT AND RECOMMENDATION STATEMENT OF THE CASE

A Longer Lasting Flowing Gas Well

CHDT Cased Hole Dynamics Tester. Pressure testing and sampling in cased wells

Understanding pressure and pressure

Hydraulic Optimization Worksheet for MS Excel All Versions subsequent to 5.0

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS

Representing EXAMINERS REPORT AND PROPOSAL FOR DECISION STATEMENT OF THE CASE

Form MMS 123A1123S Electronic Version. Application. We have incorrect pressure tests for the annulars on subject ABP The ABP shows we

OIL AND GAS DOCKET NO

DRILLING HOSE SOLUTIONS

Appalachian Basin Gas Well. Marietta College, Marietta, Ohio June 7-8, Development. Robert McKee, P.E. Design Engineer Multi Products Company

FRAC FLUIDS AND WATER USAGE Evaluating The Commercial Viability and Success In Using Water-Free Fracs

OCEAN DRILLING PROGRAM

PHE KE30-A8 WORKOVER PROGRAM

Enbridge G & P (East Texas) LP EXAMINER S REPORT AND PROPOSAL FOR DECISION STATEMENT OF THE CASE

SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Drillers Core Curriculum and Related Learning Objectives

Abandonment Program for Paramount Fort Liard F 36

RULE 36 & H 2 S SAFETY

Extended leak off testing

Coal Bed Methane (CBM) Permeability Testing

Casing Design. Casing Design. By Dr. Khaled El-shreef

Drilling Efficiency Utilizing Coriolis Flow Technology

OIL AND GAS DOCKET NO

Acid Gas Progress Report Requirements

DUO-SQUEEZE H LCM Mixing Tables and Operating Procedures

WELL SUSPENSION AND ABANDONMENT GUIDELINES AND INTERPRETATION NOTES OFFICE OF THE REGULATOR OF OIL AND GAS OPERATIONS

Cased-Hole Logging Environment

Situated 250km from Muscat in

New power in production logging

County: Field: Location: Well: Company: Drilling Measured From: API Serial No. KELLY BUSHING KELLY BUSHING. District: Grant.

Wellwork Chronological Regulatory Report

COGCC OPERATOR GUIDANCE MECHANICAL INTEGRITY TEST GUIDANCE: PRACTICES AND PROCEDURES

1. The well has been shut in on a kick and the kill operation has not started.

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

BANDAR PANJI-1 WELL CONTROL INCIDENT REPORT

Oil, Gas and Salt Resources of Ontario

DEPARTMENT OF ENVIRONMENTAL PROTECTION Office of Oil and Gas Management

Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells. Kerry Daly, Global BD Manager- DST TCP

Advanced Intermittent Gas Lift Utilizing a Pilot Valve

Coiled Tubing string Fatigue Management in High Pressure Milling Operation- Case Study

SUBSEA KILL SHEET EXERCISE No. 5

PowerDrive X6. Rotary Steerable System for high-performance drilling and accurate wellbore placement

Deliquification Short Stories

Chapter 5 Drilling and Well Testing Practices

EXAMINER S REPORT AND RECOMMENDATION STATEMENT OF THE CASE

HPHT Annular Casing Packer. Obex Annular Casing Packer

Statewide Rule 36: Operations in Hydrogen Sulfide Areas. Statewide Rule 32: Flaring/Venting of Produced Gas. May 5, 2015

W I L D W E L L C O N T R O L CIRCULATION & WELL CONTROL

Inflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer

Petroleum Development

Representing EXAMINERS REPORT AND PROPOSAL FOR DECISION STATEMENT OF THE CASE

Squeeze Cementing. Brett W. Williams Cementing Technical Advisor January 2016 Tulsa API Meeting

GeoNeurale. Testing, Testing 1,2,3. GeoNeurale. by Gene Ballay PART 1. Lichtenbergstrasse Munich Garching

Captains Meeting 2009 Introduction to Well Testing- Expro. Edwin Schoorl

BIMBAR INFLATABLE PACKERS AND ACCESSORIES

Study Guide IADC WellSharp Driller and Supervisor

Well Testing Operations. Turkey, Istanbul, Points Taksim Hotel. Training Course : One Weeks Training Course In. As Under Details :

RIH intermediate section casing in Bazian-1 exploration oil well

Transcription:

Tracking No.: 102948 Status: Submitted RAILROAD COMMISSION OF TEXAS Oil and Gas Division API No. 42- Oil Well Potential Test, Completion or Recompletion Report, and Log 1. FIELD NAME (as per RRC Records or Wildcat) SHAFTER LAKE, N. (SAN ANDRES) 2. LEASE NAME UL 13 JAFFREY 3. OPERATOR'S NAME (Exactly as shown on Form P-5, Organization Report) RRC Operator No. FORGE ENERGY, LLC 276868 4. ADDRESS 10999 IH 10 WEST SUITE 900 SAN ANTONIO, TX 78230-0000 5. If Operator has changed within last 60 days, name former operator This facsimile W-2 was generated electronically from data submitted to the RRC. 6a. Location (Section, Block, and Survey) 6b. Distance and direction to nearest town in this county. 23, 13, UL, A-U415 ANDREWS 12. If workover or reclass, give former field (with reservoir) & Gas ID or oil lease no. FIELD & RESERVOIR SHAFTER LAKE, N. (SAN ANDRES) GAS ID or OIL LEASE # 003-45564 Oil-0 Gas-G Oil Well 13. Type of electric or other log run 14. Completion or recompletion date Gamma Ray (MWD) 01/13/2014 7. RRC District No. 08 8. RRC Lease No. 9. Well No. 1W 10. County of well site ANDREWS 11. Purpose of filing Initial Potential Retest Reclass Well record only (Explain In remarks) Well # X SECTION I- POTENTIAL TEST DATA IMPORTANT: Test should be for 24 hours unless otherwise specified infield rules. 15. Date of test 16. No. of hours tested 17. Production method (Flowing, Gas Lift, Jetting, Pumping- Size & Type of pump) 18. Choke size 19. Production during Test Period 20. Calculated 24- Hour Rate Oil - BBLS Oil - BBLS Gas - MCF Gas - MCF Water - BBLS Water - BBLS Gas - Oil Ratio Oil Gravity-API-60 o Flowing Tubing Pressure Casing Pressure 21. Was swab used during this test? 22. Oil produced prior to test (New & Reworked wells) 23. Injection Gas-Oil Ratio Yes No X REMARKS: N/A 0 PSI PSI INSTRUCTIONS: File an original and one copy of the completed FormW-2 in the appropriate RRC District Office within 30 days after completing a well and within 10 days after a potential test. If an operator does not properly report the results of a potential test within the 10-day period, the effective date of the allowable assigned to the well will not extend back more than 10 days before the W-2 was received in the District Office. (Statewide Rules 16 and 51) To report a completion or recompletion, fill in both sides of this form. To report a retest, fill in only the front side. WELL TESTERS CERTIFICATION I declare under penalties prescribed in Sec. 91.143, Texas Natural Resources Code, that I conducted or supervised this test by observation of (a) meter readings or (b) the top and bottom gauges of each tank into which production was run during the test. I further certify that the potential test data shown above is true, correct, and complete, to the best of my knowledge. Signature: Well Tester Name of Company RRC Representative OPERATOR'S CERTIFICATION I declare under penalties prescribed in Sec. 91.143, Texas Natural Resources Code, that I am authorized to make this report, that this report was prepared by me or under my supervision and direction, and that data and facts stated therein are true, correct and complete, to the best of my knowledge. FORGE ENERGY, LLC Type or printed name of operator's representative (210) 478-5960 04/21/2014 Title of Person Shannon Harman Telephone: Area Code Number Month Day Year Signature

SECTION III 24. Type of Completion DATA ON WELL COMPLETION AND LOG (Not Required on Retest) X New Well Deepening Plug Back Other 26. Notice of Intention to Drill this well was filed in Name of FORGE ENERGY, LLC 27. Number of producing wells on this lease in this field (reservoir) including this well 1 644.1 29. Date Plug Back, Deepening, Workover or Drilling Operations: Commenced Completed 31. Location of well, relative to nearest lease boundaries 600.0 Feet From South Line and 880.0 West Line of the UL 13 JAFFREY Other DATE 08/09/2013 32. Elevation (DF. RKB, RT. GR ETC.) 33. Was directional survey made other than inclination (Form W-12)? Yes X 5268 GR No 34. Top of Pay 35. Total Depth 36. P. B. Depth 9000 38. Is well multiple completion? Yes No 28. Total number of acres in this lease 12/04/2013 12/20/2013 0.0 X 30. Distance to nearest well, Same Lease &Reservoir 37. Surface Casing Determined by 39. If multiple completion, list all reservoir names (completions in this well) and Oil Lease or Gas ID No. FIELD & RESERVOIR N/A 40. Intervals Drilled by: 43. Rotary Tools X Cable Tools 41. Name of Drilling Contractor Field Rules CASING RECORD (Report All Strings Set in Well) 25. Permit to Drill, Plug Back or Deepen Rule 37 Exception Water Injection Permit Salt Water Disposal Permit Recommendation of T.D.W.R. Railroad Commission (Special) GAS ID or OIL LEASE # Oil-0 Gas-G PERMIT NO. 767558 CASE NO. PERMIT NO. F-19501 PERMIT NO. PERMIT NO. Feet from Lease X Dt. of Letter 07/25/2013 Dt. of Letter Well # 42. Is Cementing Affidavit Attached? Yes CASING SIZE WT #/FT. DEPTH SET MULTISTAGE TYPE & AMOUNT HOLE SIZE TOP OF SLURRY VOL. TOOL DEPTH CEMENT (sacks) CEMENT cu. ft. 12 6/8 1805 C 1370 13 3/8 SURFACE 2384.0 7 7/8 5273 C 1030 8 5/8 SURFACE 2249.1 X No 44. N/A LINER RECORD Size Top Bottom Sacks Cement Screen 45. TUBING RECORD 46. Producing Interval (this completion) Indicate depth of perforation or open hole Size Depth Set Packer Set From N/A To 4 1/2 5251 5220 From To From To From To 47. ACID, SHOT, FRACTURE, CEMENT SQUEEZE. ETC. Depth Interval Amount and Kind of Material Used 5273.0 5800.0 5000 GAL 15% HCI, 1500 GAL 10# BRINE WITH WF130 & ROCK SALT, 5000 GAL 15% HCI, 500 GAL FRESH WATER OVERFLUSH 48. FORMATION RECORD (LIST DEPTHS OF PRINCIPAL GEOLOGICAL MARKERS AND FORMATION TOPS) Formations Depth Formations GRAYBURG 4326.0 LOWER GRAYBURG 4524.0 SAN ANDRES 4626.0 REMARKS: N/A Depth

BRYCE HARLOW July 25, 2013 15955 SC_276868_00300000_000000_15955.pdf --Measured-- 880 ft FWL 600 ft FSL MRL:SECTION 00300000 000000 102.74000 32.37750 FORGE ENERGY LLC 10999 IH10 W STE 900 SAN ANTONIO TX 78230 83 P-5# 276868 ANDREWS UL 13 JAFFREY #1W ND SUR-UL,BLK-13,SEC-23,--[TD=9000], The interval from the land surface to a depth of 300 feet and the ZONE from 1200 feet to 1650 feet must be protected. George Dunfield, P.G. 7/25/2013

Witnessed By Josh Hughes Recorded By Raehil Suleman Unit Number Location: 2136 Midland Logger on Bottom Time Circulation Stopped Time 11-Dec-2013 09:30:00 Max Recorded Temperatures 103.22 degf RM @ BHT RMF @ BHT 0.04 @ 103.22 0.04 @ 103.22 Source RMF RMC Pressed RMC @ Meas Temp RMF @ Meas Temp 0.05 ohm.m @ 71.13 degf RM @ Meas Temp 0.05 ohm.m @ 71.3 degf Source of Sample Active Tank MUD Fluid Loss PH 15 cm3 9.5 Density Viscosity 10.3 lbm/gal 30 s Type Fluid In Hole Salt Brine Bit Size 11 in Casing Schlumberger 1805 ft Casing Driller Size @ Depth 13.375 in @ 1805.00 ft Top Log Interval 4300.00 ft Bottom Log Interval 5283.00 ft Schlumberger Depth 5283.00 ft Depth Driller 5272.00 ft Logging Date 11-Dec-2013 Run Number R1_Main County: Field: Location: Well: Company: 42-003-45564 23 13 U415 API Serial No. Section: Block: Abstract: Andrews Shafter Lake, N. (San Andres) 880' FWL & 600' FSL UL 13 Jaffrey 1W Forge Energy, LLC Location: Permanent Datum: Ground Level Elev.: 3268.00 f Log Measured From: Kelly Bushing 25.00 ft above Perm.Datum Drilling Measured From: Kelly Bushing University Lands Survey D.F. 3292.00 ft Sec. 23, Blk. 13, Abs. U415 G.L. 3268.00 ft 880' FWL & 600' FSL Elev.: K.B. 3293.00 ft Spectral Gamma Ray High Resolution Laterolog Array Platform Express County: Andrews State: Texas Field: Shafter Lake, N. (San Andres) Well: UL 13 Jaffrey 1W Company: Forge Energy, LLC THE USE OF AND RELIANCE UPON THIS RECORDED-DATA BY THE HEREIN NAMED COMPANY (AND ANY OF ITS AFFILIATES, PARTNERS, REPRESENTATIVES, AGENTS, CONSULTANTS AND EMPLOYEES) IS SUBJECT TO THE TERMS AND CONDITIONS AGREED UPON BETWEEN SCHLUMBERGER AND THE COMPANY, INCLUDING: (a) RESTRICTIONS ON USE OF THE RECORDED- DATA; (b) DISCLAIMERS AND WAIVERS OF WARRANTIES AND REPRESENTATIONS REGARDING COMPANY'S USE AND RELIANCE UPON THE RECORDED-DATA; AND (c) CUSTOMER'S FULL AND SOLE RESPONSIBILITY FOR ANY INFERENCE DRAWN OR DECISION MADE IN CONNECTION WITH THE USE OF THIS RECORDED-DATA. 1. Header 2. Disclaimer 3. Contents 4. Remarks and Equipment Summary 5. Depth Summary 6. R1_Main Main Pass 2"=100' 6.1 Integration Summary 6.2 Software Version 6.3 Composite Summary 6.4 Log ( HRLA_2_inch ) 7. R1_Main Main Pass 5"=100' 7.1 Integration Summary 7.2 Composite Summary 7.3 Log ( HRLA_5_Inch ) 7.4 Parameter Listing 8. R1_Main Repeat Analysis 5"=100' 8.1 Composite Summary