JABATAN KIMIA Kategori Arahan Kerja

Similar documents
Operation of the Perkin Elmer TGA-GC/MS

JABATAN KIMIA Kategori Arahan Kerja

Procedures for operation of the TA Instruments DSC

FOURIER TRANSFORM INFRARED SPECTROSCOPY

Usage Policies Notebook for NanoFurnace Furnace (EasyTube 3000 System)

AKTA ION EXCHANGE CHROMATOGRAPHY SOP Date: 2/02/05 Author: A DeGiovanni Edited by: C. Huang Reviewed by:

UNITY 2 TM. Air Server Series 2 Operators Manual. Version 1.0. February 2008

Purpose and Scope: Responsibilities: Warnings and precautions: Background Beers law

University of MN, Minnesota Nano Center Standard Operating Procedure

AKTA 3D SOP. Click on the System Control tab. This screen has 4 windows.

Title: Xactix XeF2 Etcher Semiconductor & Microsystems Fabrication Laboratory Revision: A Rev Date: 03/23/2016

Artisan Technology Group is your source for quality new and certified-used/pre-owned equipment

SSI Solaris 150 RTA Revision /27/2016 Page 1 of 9. SSI Solaris 150 RTA

IVIS Spectrum Whole Animal Imager

AKTA MC SOP Page 1 9/27/04 AKTA METAL CHELATING SOP

JETFIRST 150 RTA SYSTEM OPERATING MANUAL Version: 2 Feb 2012

Chapter 7 Single Point Calculations

Plasma-Therm PECVD. Operating Characteristics. Operating Instructions. Typical Processes. I. Loading. II. Operating

In Response to a Planned Power Outage: PPMS EverCool II Shut Down and Re-start Procedure

Savannah S100 ALD at SCIF, UC Merced Standard operating Procedure

GCMSD-Headspace Analysis SOP

FROG-4000 TM Chemical Analysis System

Instruction Sheet. Important Note: Information that requires special emphasis. Note: Information that supplements points in the main text.

SPLIT HOPKINSON PRESSURE BAR OPERATIONS MANUAL 5/9/2014

User guide for operating the Agilent 6420A QqQ mass spectrometer by direct infusion/injection

Arizona State University Center for Solid State Electronics Research Issue: E Title: Heat Pulse 610 Operating Procedure Page 1 of 7

Vapor Sorption Analyzer

5890II GC Standard Operating Procedure 9/2/2005

Protocol Gas Verification For Compressed Gas Cylinders Containing Either SO 2, NO or CO. Quality Assurance Plan/Standard Operating Procedure

D-Opto Dissolved Oxygen Sensor Operation Manual for the D-Opto 4-20mA

AX5000 Operational Manual

TGA Operator s Manual. Thermogravimetric Analyzer. PN Rev. D (Text and Binder) PN Rev. D (Text Only)

Superconducting Susceptometer (MPMS-5S) Quantum Design Room 296 (MPMS)

P3000 Deadweight Tester Setup, Part 1: Limited Partial Correction Method

Equipment Operating Procedure Glove Box

FOOD INTAKE MONITOR. Hardware and Software User s Manual DOC-047 Rev 3.0. Copyright 2009 All Rights Reserved

Tutorial: Adding Twitch ChatPlay

Instructions for Assembly, Installation, and Operation of the Gas Addition Kit Accessory with the CEM Discover Systems

MINIBRUTE ANNEAL TUBE STANDARD OPERATION PROCEDURE

Agilent Auxiliary Gas Module AGM 2. User s Guide

TR Electronic Pressure Regulator. User s Manual

System Overview. TCD Detector temperature setpoint Regulator

User Manual for the Mars Calibration Bench

[CROSS COUNTRY SCORING]

FROG-4000 TM Chemical Analysis System

Nanofabrication Facility: ECR Etcher SOP Rev. 01b, March 06. Standard Operating Procedure for PlasmaQuest ECR II Etching

SOP: Buck Scientific BLC-20P HPLC Operation

O2100C Oxygen Measurement Module Technical Use Notes do not use other wall adapters with the O2100Cmodule. 10% / V 5% / V 2% / V 1% / V 10% / V

The HumiSys. RH Generator. Operation. Applications. Designed, built, and supported by InstruQuest Inc.

Xactix XeF2 OPERATION MANUAL

FireHawk M7 Interface Module Software Instructions OPERATION AND INSTRUCTIONS

Appendix D: SOP of INNOVA 1412 Photoacoustic Multi-Gas Monitor. Description and Principle of Operation

Exercise 2-2. Second-Order Interacting Processes EXERCISE OBJECTIVE DISCUSSION OUTLINE. The actual setup DISCUSSION

This addendum describes the back pressure control implementation if FuelCell Version 4.1a and later.

Sensepoint XCD. Calibration Guide

TGA 2950 CE. TA Instruments. Operator s Manual. Thermogravimetric Analyzer. PN Rev. D (Text and Binder) PN Rev.

[CROSS COUNTRY SCORING]

Quick Start Guide for SA-9600 Series Surface Area Analyzer

XC2 Client/Server Installation & Configuration

The MRL Furnaces USED FOR THIS MANUAL COVERS

Running the LiCor 6400 Infra Red Gas Analyzer (IRGA) with 4 whole-plant cuvettes attached

Quantitative Analysis of Hydrocarbons by Gas Chromatography

3. Select a colour and then use the Rectangle drawing tool to draw a rectangle like the one below.

DATA AKSES. Akademi Audit Negara. View. CAATs ASAS ACL / 1

Adsorption Unit Operating Procedures: CO2 Adsorption on to Activated Carbon

RM-80 respiration monitor

OPERATION OF THE DIMPLER

University of Minnesota, MN Nano Center Standard Operating Procedure

Artisan Technology Group is your source for quality new and certified-used/pre-owned equipment

Physics Experiment 17 Ideal Gas Law Qualitative Study

AKTA pure 25 New Owner s Intro

SHIMADZU LC-10/20 PUMP

Pegas 4000 MF Gas Mixer InstructionManual Columbus Instruments

1. Study the performance of a binary distillation column operated in batch mode.

Boyle s Law: Pressure-Volume Relationship in Gases

How to Setup and Score a Tournament. May 2018

Observations Possible Causes Recommended Actions. Turquoise color

CLEANLINESS STANDARD NCPRE tool contamination classification

BASIC RULES OF USAGE, OLIS DSM-20 CD Management The instrument is currently managed by the Analytical Biophysics Core Facility.

Birck Nanotechnology Center

Usage Policies Notebook for Trion RIE / ICP Dry Etch

D-OptoLogger Dissolved Oxygen Logger Operation Manual

Quick Start Guide. A. Hardware installation B. Software installation C. Start the software for the first time D. Do your first measurement

NORDCALC Introduction... 2 Registration... 2 Flow Calculations tab Torque Calculation & Actuator Mounting Data tab... 21

Figure 1: Plug in ion inlet of mass spec

Login to ilab Kiosk. Revised 05/22/2018. Load your sample:

SOP for use of the SX19 Stopped-Flow Instrument

Table of Content IMPORTANT NOTE: Before using this guide, please make sure you have already set up your settings in

[MYLAPS INTEGRATION]

FX134, FX1234, FX3030 Problem and Solutions

Overview. 2 Module 13: Advanced Data Processing

High Pressure Chem-SCAN Operating Manual

Inspection User Manual This application allows you to easily inspect equipment located in Onix Work.

D-Opto Dissolved Oxygen Sensor Operation Manual

How to run a club night

Agilent 490 Micro GC Natural Gas Analyzer

Exercise 5-2. Bubblers EXERCISE OBJECTIVE DISCUSSION OUTLINE. Bubblers DISCUSSION. Learn to measure the level in a vessel using a bubbler.

Inspection User Manual

Gas Absorption Draft Standard Operating Procedure

Software for electronic scorekeeping of volleyball matches, developed and distributed by:

Transcription:

Mukasurat: 1 daripada 7 1. TUJUAN Tujuan prosedur ini dtubuhkan adalah untuk memberikan arahan yang jelas bagi langkah atau tatacara bagaimana menjalankan analisis sampel menggunakan peralatan Thermogravimetry-Chromatography Mass Spectrometry (TGA-GCMS) for Pyris 1 TGA. 2. SKOP Terpakai untuk pengguna dari Jabatan Kimia. 3. PROSEDUR ARAHAN 1) Always switch on Pyris 1 TGA system in CAT sequence :- i) C- Computer. ii) A- Analyzer. iii) T- TAGS( Themal Analyzer Gas Station). 2) Click Start/Program/Pyris/Pyris Manager to turn on Pyris software i) Wait for 20 seconds, click on the connection button on Pyris Manager bar to establich connection between Pyris 1 TGA system and computer. ii) 3) Turn on sample purge gas, block purge gas and compressed air by turning regulator clockwise. (Note: Typical purge gas- Nitrogen Gas - set at 25 psi, Balance purge gas- set at 50 psi, Compressed Air- set at 25 psi). Start / Stop Button Go To Temperature Button Sample Weight Button Zero Weight Button Raise Furnace & Lower Button Cool Furnace Button

Mukasurat: 2 daripada 7 Part 2 : Method Set Up Sample Run Method Editor is used to set uo method for sample run. 1) Click Window/Method Editor to start. 2) Click on Sample Info tab on the Method Editor window, input sample information accordingly into the related columns, such as Sample ID, Operator ID and File Name. (Note 1: Browse button is used to specify alternative data saving path if default folder is not preferred).

Mukasurat: 3 daripada 7 3) Allow Pyris 1 TGA system achieve equilibration and stability; gently hang an empty sample pan onto hangdown wire with the use of sample platform. 4) Monitor the weight reading, once it has stabilized, click Zero Weight button on Control Panel tab to tare the weight. 5) Load sample into the empty sample pan, wait for the weight to stabilize and press sample weight button to read the weight of sample in milligram. WARNING: Always load and unload sample and calibration materials into the TGA sample pan with the used of sample platform and hang the sample pan onto hangdown wire gently. Do not open the Balance Chamber. If weight changes become unstable, please contact our service representative. 6) Next, Click on Program tab to create method for sample analysis. Key in method initial temperature.

Mukasurat: 4 daripada 7 7) Create new temperature program by clicking Add a Step button to create a new method step. Note : Temperature Scan Isothermal Repeat Steps Heating and cooling temperature setting Constant temperature setting Duplicate steps in method program 8) For Temperature Scan Step,input final temperature, heating/cooling rate and data sampling options in respective columns.

Mukasurat: 5 daripada 7 Note: There are two data sampling options :- Number of Points Second between Points Total number of data points for the highlighted step per second. (One point taken at each second). Normally set lower value, for test with faster reaction rate. (Example : 0.5 in order to take 2 data points per second). 9) For Isothermal step, input Initial temperature and Holding Time in respective columns. 10) By default, at the end of the test (end of last temperature program step), the furnace will be brought back to default load temperature (<50 C) for safety and convenient sample loading purpose. In order to change default end temperature, click the End Condition button and change the temperature setting accordingly.

Mukasurat: 6 daripada 7 11) To save the newly created method, go to File / Save Method As. 12) After TGA system and balance achieve equilibrium, click to start the analysis. (COUTION : Loading and unloading of testing material should be carried out at room temperature or 50 C. The temperature of the furnace can reach as high as 1000 C. Always use tweezers to remove sample pan). 13) After the end of run, proceed to Data Analysis for calculation. Click Start Pyris / Data Analysis.

Mukasurat: 7 daripada 7 14) Remove sample and reference pans after the end of analysis.if you wish to continue with second sample, just clean the sample pan, load the next sample and start another run. (REMEMBER : Always load and unload testing material at room temperature or 50 C) Part 3 : Proper way of Shutting Down STA System 1) Bring the furnace temperature down to below 50 C, let the device to return to room temperature. 2) Turn off computer, DSC system and purge gas in sequence. Part 4 : Maintenance Step 1 Step 2 Furnace cleaning Sample pan cleaning 1) Click the Clean Furnace button at the Control Panel.System will perform furnace cleaning by heating up to 900 C. As the furnace cleaning is completed, furnace will be moved to cool position and cool back to load temperature (30 C) with air cooling. 2) Purge the TGA with oxygen or compressed air and bring the furnace temperature to 900 C by clicking the Go To Temp button after key in 900 C in its entry box. Hold the furnace at 900 C for 5 to 10 minutes before cool it down to 30 C by clicking the Go To Temp button after key in 30 C in its entry box. (Note : Do not perform this without oxygen or compressed air purging). 3) Always ensure balance purge (50 psi) is higher than sample purge (25 psi) to prevent sample back stream. (Do not attempt to open the balance chamber!). 4. PROSEDUR BERKAITAN Instrument Usage/Service Application Procedure GP-I-001 5. RUJUKAN SEMAKAN SEMAKAN DISEDIAKAN DISEMAK TARIKH CATATAN 1 Hashim Bin Mohammad Salleh. Muhammad Fauzan Bin Zainudin 09.08.2018 Isu kali pertama