Make Lincoln Highway an economically vibrant corridor that is safe, efficient, and beautiful for local residents and visitors.

Similar documents
Lincoln Highway Streetscape Plan Concept Plan

Broad Street Bicycle Boulevard Design Guidelines

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Executive Summary Route 30 Corridor Master Plan

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

MARTIN LUTHER KING JR. WAY

5 CIRCULATION AND STREET DESIGN

Chapter 2: Standards for Access, Non-Motorized, and Transit

5 Circulation & Parking

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Tonight is for you. Learn everything you can. Share all your ideas.

PUBLIC REALM MASTER PLAN

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

S T A T I O N A R E A P L A N

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

CONNECTING PEOPLE TO PLACES

Lincoln Highway Streetscape Plan Project Background

Paoli Road Improvement Feasibility Study

Pennsylvania Avenue (CR 484) Design Alternatives Study

6.4 RECOMMENDED IMPROVEMENTS

City of Davis East Covell Corridor Plan

East Burke Transportation, Safety and Capacity Improvements

Complete Streets. Designing Streets for Everyone. Sarnia

Transportation Corridor Studies: Summary of Recommendations

FONTAINE AVENUE STUDY Final Report

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

Active Transportation Facility Glossary

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

CURBSIDE ACTIVITY DESIGN

Chapter 5 Future Transportation

STONY PLAIN ROAD STREETSCAPE

5. Automobile Circulation, Wayfinding and Signage

Prince George s County plans, policies, and projects

Austin Avenue Bridges Project. Public Meeting Summary

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS

Transportation Planning Division

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010

Chapter 3: Multi-Modal Circulation and Streetscapes

Polk Streetscape Project

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

Omaha s Complete Streets Policy

LANCASTER CITY BICYCLE NETWORK

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

4 MOBILITY PLAN. Mobility Plan Objectives. Mobility Context. 1. Integrate with Local and Regional Transit Improvements

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

INDEX. Geometric Design Guide for Canadian Roads INDEX

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

Memorandum. Sunday, July 13, Saturday, July 19, 2014

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Lincoln Neighborhood Corridor Plan The LiNC

BROOKLAND Multi-Modal Transportation & Streetscape Study* NE Washington, DC

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

2.0 Existing Conditions

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

Community Meeting February 27, 2007 Dorchester Avenue Transportation & Streetscape Improvements Action Plan February 27, 2007

What Is a Complete Street?

Public Workshop #2. September 14, 2016

Appendix B - Street Sections

Table #6 VISION CHARACTERISTICS

e. 173rd/AVALON bicycle boulevard Shaker Heights Review Meeting - May 9, 2013

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

Raymond Avenue: Rightsizing Improved Safety and Pedestrian Experience

PEDESTRIAN CIRCULATION & STREETSCAPE DESIGN

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Bicycle Facilities Planning

Duwamish Way-finding and CTR Report

Cycle Track Design Best Practices Cycle Track Sections

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Off-road Trails. Guidance

WalkShop. Highland Creek Village

Cross Street Corridor Non-Motorized Enhancement Project Project Description

The Wiggle Route in Context

Miami Health District

Mainstreet Master Plan Land Use

Appendix 3 Roadway and Bike/Ped Design Standards

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

Providence Downtown Transit Connector STAKEHOLDER MEETING #2. Stakeholder Meeting #1 October 24, 2016

TRANSPORTATION NEEDS ASSESSMENT

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

NEWMARKET UPHAM S CORNER

PEDESTRIAN ACTION PLAN

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

summary of issues and opportunities

NJDOT Complete Streets Checklist

Water Street Promenade Engineering and Design Services

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

Streetscape: Core Shopping District

Transcription:

Lincoln Highway Streetscape Plan Stakeholder Workshop #2 Handout Contents Introduction and Project Vision Planning Principles Specific Recommendations including a Proposed Typical Roadway Section Renderings that illustrate various recommendations Images of best practices for Signage and Wayfinding Recommendations Introduction This handout provides a summary of transportation, land use, and design recommendations in the Lincoln Highway Streetscape Plan Study Area, which encompasses Lincoln Highway from Strasburg Pike to Pennsylvania Route 896. This handout is meant to accompany the discussion at the Stakeholder Workshop on February 3, 2015. It shows how the planning principles have been revised and then applied to a series of proposed recommendations for roadway, intersections, and planning areas identified in the study area. Project Vision Make Lincoln Highway an economically vibrant corridor that is safe, efficient, and beautiful for local residents and visitors. Lincoln Highway Streetscape Plan - Phase 2 1

Planning Principles 1. Slow Traffic to the Speed Limit The current 12-foot lane widths encourage higher speeds and only allow a nominal increase in capacity compared to narrower lanes. The Plan proposes to reduce lane width to 11 feet. The lane reduction would create a roadway design speed that is actually close to the speed limit without creating congestion. 2. Buffer Sidewalks from Traffic In order to create a safer pedestrian experience, the Plan proposes a minimum 4-foot landscaped buffer between sidewalk and curb. This is the minimum dimension that could contain larger landscape items, including trees. 3. Provide Multi-modal Access along the Entire Corridor The Plan proposes a 12-foot wide multi-use trail on the south side of the corridor. This was not discussed at the first stakeholder workshop, but suggested in follow up comments. A review of the corridor found that it would be possible to construct such a facility on the south side of the road on a mix of existing right-of-way and private property. There would be a minimum 5-foot landscaped buffer from the curb to buffer it from traffic. Where possible, that buffer could be increased. Where installation is not possible due to multiple driveways or a restricted right-of-way, it could be set further back into private property. 4. Consolidate Driveways As part of a safer corridor access management plan, the Plan proposes to consolidate driveways wherever possible, focusing efforts on locations with high accident rates and near signalized intersections. Removing driveways from the corridor can also help reduce the need for a continuous left turn lane. 5. Remove Continuous Center Lane Where Not Needed The corridor currently has a continuous center turn lane, even in places where no left turn is needed. The Plan proposes to remove it where it is not required and replace it with a mountable raised median. The resulting excess right-of-way would then be shifted to pedestrian and trail elements. 2 Lincoln Highway Streetscape Plan - Phase 2

6. Increase Safety with Protected Left Turn Lanes The Plan proposes protected (signaled) left-turn lanes at high-accident intersections and areas large number of left turning movements. 7. Maintain Consistent Through Lanes In order to address safety issues caused by merging traffic and general user confusion, through lanes are to be maintained wherever possible, particularly within the Funnel Character Area. 8. Integrate Signage and Wayfinding at All Scales Signage and wayfinding will be scaled and located at appropriate locations for cars, bikes, and pedestrians. 9. Create Attractive, Functional Landscaping Incorporating Stormwater Management Facilities Landscape guidelines will help create a cohesive and aesthetically pleasing look for the corridor frontage and contribute to stormwater management. Guidelines allow individual property owners to contribute to a larger coordinated landscape for the corridor. The Plan will highlight areas where stormwater management techniques can be integrated into the frontage and landscape design in order to address future flooding and stormwater issues. 10. Enable Interconnectivity The identification of new street alignments is a first step in connecting the corridor to hard-to-reach parcels, and opening up new navigation options for drivers, pedestrians, and cyclists alike. Increasing choices can improve circulation, reduce congestion, and offer calmer and more scenic routes for those traveling throughout the corridor. Lincoln Highway Streetscape Plan - Phase 2 3

Recommendations 5 1) Convert one of the existing through lanes to a dedicated left turn lane to help move traffic more efficiently between the Bypass and Strasburg Pike. There are also opportunities for improving pedestrian crossings and medians in this area. 2) Reduce lane width to allow for a larger median designed to facilitate emergency access and improve pedestrian conditions. 3) Design and construct landscaping and streetscaping improvements to reinforce this area s identity as a major gateway. 4) Extend existing sidewalks along the south side of Lincoln Highway and create new sidewalks along the north side. There are no safe pedestrian routes along Lincoln Highway from Oakview Road to the Walmart entrance. New sidewalks with new and improved crosswalks could create a hospitable pedestrian realm through this high-traffic area. The most significant issue for this sidewalk configuration is safe access across the eastbound Route 30 Bypass exit, which could be accomplished through a pedestrian overpass or the 4 Lincoln Highway Streetscape Plan - Phase 2

installation of a new signal and crosswalk at the existing Kmart shopping center entrance. The pedestrian connection through the auto island will require a pedestrian crosswalk across Lincoln Highway, which could be installed at the existing signal across from Pep Boys. 5) Install gateway signage at the eastern and western edges of the Route 30 Bypass loop. This functions as a gateway to the corridor from the west. The major gateway feature will be located at the eastern edge of the Route 30 Bypass island with supporting, smaller gateway features located further west. This approach will help create a unique identify for the corridor rather than simply delineating where the corridor begins and ends. Lincoln Highway Streetscape Plan - Phase 2 5

Oakview Intersection Improvements Directional Signage Major Gateway Signage Buffer with Tree Plantings Pedestrian Signage Custom Crosswalk Materials Directional Signage 6) Upgrade the Oakview Road intersection with landscaped buffers and crosswalk treatments. By removing one of two dedicated left turn lanes on the westbound side, it is possible narrow the width of the roadway at the intersection, which will help to calm traffic reduce the time pedestrians need to make their way across the wide intersection. Given the Oakview Road intersection s role as a major pedestrian node, high-quality landscaping and streetscape elements, including new transit shelters and street furniture, would help establish an identity for this node. Distinct and high-quality crosswalks will make a statement about the area s navigability for all roadway users. 6 Lincoln Highway Streetscape Plan - Phase 2

New Road Connection and Trail Between Strasburg and Oakview 8 Multi-Use Path 7 New Road Connection 7) Construct a new road parallel to Lincoln Highway to connect Oakview Road to Strasburg Pike. There are few east-west connections in close proximity to Lincoln Highway, which forces local users to drive on Lincoln Highway or go far out of their way to avoid the corridor. A new road connection between Strasburg Pike and Oakview Road would create a local alternative to Lincoln Highway in the western end of the corridor, which is one of the most difficult areas to navigate. This will also offer a scenic route for the diverted multi-use trail (Recommendation 8). The new roadway will provide direct neighborhood access for local users who live directly south of the Walmart. Additional study is needed to address issues with roadway placement, topography, and proximity to the service areas of Kmart and Walmart. 8) Design and build a multi-use path to offer pedestrians and cyclists an alternative for traveling across this area.this would be an indirect, scenic, and lower volume route following the existing Walmart sidewalk down to a new road connection, turning north on Oakview Road to reconnect with the proposed sidewalk. This additional facility provides more direct multi-modal access to the Kmart and Walmart shopping centers. Lincoln Highway Streetscape Plan - Phase 2 7

Proposed Typical Roadway Sections A roadway cross section is a graphic that illustrates all roadway elements including sidewalks, bike lanes, shoulders, travel lanes, turning lanes, and medians The intersection of the Route 30 Bypass has resulting in a varied set of cross sections for Lincoln Highway between Strasburg Pike and Oakview Street. East of Greenland Drive, the amount of right-of-way and lane configuration is relatively constant and can be addressed with one typical roadway section to accommodate cars, trucks, buggies, bicycles, and pedestrians. The following page illustrates the roadway section that applies the planning principles to the Lincoln Highway corridor. The proposed minimum widths for each facility (traffic lane, medians, sidewalk, etc.) within the sections are listed below. All proposed dimensions are within PennDOT and civil engineering design standards. Reduce center turn lane from 14 feet to 12 feet Reduce driving lanes from 12 feet to 11 feet to slow traffic to the speed limit while still accommodating the majority of truck and bus traffic. Maintain 2-foot shoulder width from lane to curb Create a 5-foot minimum landscape buffer between curb and 6-foot wide sidewalk; this is the minimum size to plant a tree Create a 5-foot minimum landscape buffer between curb and 12-foot multi-use trail; this is the PennDOT minimum buffer for a multi-use trail Create a multi-use trail along the south side of the corridor. Where the multi-use trail is out of the line-of-sight for pedestrians using it, a standard 6-foot wide sidewalk could be added to the south side between the trail and curb. This condition will vary as right-of-way fluctuates and different opportunities present themselves to utilize private property for portions of sidewalk or multi-use trail. In most places, a sidewalk and trail will use the same 12-foot right-of-way; in others, they can be separated from one another. 8 Lincoln Highway Streetscape Plan - Phase 2

3 Shoulder Sidewalk/Buffer Varies 12 Turn Lane 12 Lane 12 Lane 14 Continuous Turn Lane 12 Lane 12 Lane 3 Shoulder Sidewalk/Buffer Varies Existing Typical Roadway Section 12 Path 5 Buffer 11 Lane 11 Lane 12 Continuous 11 Lane 11 Lane 5 Buffer Turn Lane 2 Shoulder 2 Shoulder 6 Sidewalk Proposed Typical Section Lincoln Highway Streetscape Plan - Phase 2 9

Multi-modal Access at Lancaster Mennonite School New Bike Network 9) Construct a bikeway along Mill Creek that ties into Lincoln Highway at the Lancaster Mennonite School and Tanger Outlets. The Lancaster Mennonite School and Mill Creek are significant regional assets that would benefit greatly from improved bicycle and pedestrian access. The map above illustrates potential bikeway connections and green infrastructure improvements that support it. 10) Incorporate stormwater management features into landscape design along the corridor. Landscape improvements offer the opportunity to raise the profile of Lincoln Highway s streetscape while simultaneously helping to reduce water runoff. 10 Lincoln Highway Streetscape Plan - Phase 2

Millstream Road and Driveway Consolidation 11) Consolidate existing driveways between Mill Creek Bridge and Tanger Drive into three right-in/ right-out driveways. The stretch of smaller businesses located between the Mill Creek Bridge and the Tanger Drive Intersection contains numerous individual driveways, which have created a hot-spot of mid-block left turn accidents. The westernmost driveway would be located directly across from Millstream Road, anticipating a longer-term improvement of installing a signal in this location. Establishing a driveway in this location sets the stage for simplifying and signalizing turning movements in the future. Installation of a mountable median could further improve access management and safety in the area. Lincoln Highway Streetscape Plan - Phase 2 11

New Road Connections and Multi-Modal Options 13 12 Multi-Use Path New Roadway Connection On-Road Bike Network Off-Road BIke Network 12) Add a new east-west roadway and bikeway connection between Gridley and Bowman Roads to the Township s Official Map. The new roadway connection would improve local access, relieve traffic pressures on Lincoln Highway, and provide an off-highway bike and buggy access route. The road would form the spine of a new regional bikeway and would tie back to Lincoln Highway at Dutch Wonderland, the Lancaster Host, and Mill Creek Square. The new connections would be a simple two-lane road with bike and pedestrian facilities. 13) Identify safe alignments across all properties on the south side of Lincoln Highway for a multiuse trail running parallel to Lincoln Highway. With variable amounts of right-of-way available, such a trail would need to utilize private property in some locations and occasionally pull back from the curb to ensure a continuous and safe route for pedestrians and cyclists. Additional analysis and outreach to specific property owners is needed to determine the feasibility of alternatives and to move forward with preliminary design. 12 Lincoln Highway Streetscape Plan - Phase 2

Multi-Use Path and Stormwater Collection at Rockvale Outlets Due to limited right of way width, the multiuse path may need to follow an alignment along private property through part of Rockvale Outlets. The path could be designed in conjuntion with demonstration green infrastructure improvements to the existing basin. Lincoln Highway Streetscape Plan - Phase 2 13

Eastern Gateway at Route 896 Directional Signage Custom Crosswalk Materials Major Gateway Signage Crossing Islands Pedestrian Signage Landscaped Buffers and Tree Plantings Pedestrian Signage 14) Install gateway signage and/or a major vertical gateway feature on the northeast corner of Lincoln Highway and Route 896. This would be visible from the east as well from the north and south approaching from Route 896. 15) Design and construct crossing islands at the northwest and southeast corners to help protect pedestrians and calm traffic. Islands will reduce the confusion of the skewed intersection and buffer pedestrians from traffic as they cross. 16) Design and install unique crosswalk treatments and pedestrian amenities to emphasize the intersection s role as a gateway and create a positive first impression for visitors arriving from the east. Distinct and high-quality crosswalks would make a statement about the area s navigability for all roadway users. Street trees along Lincoln Highway would buffer pedestrians from traffic. 14 Lincoln Highway Streetscape Plan - Phase 2

Signage and Wayfinding Images Major Gateway Signage Large gateways provide visual markers that can be easily identified by travelers and help introduce the placebrand vocabulary The addition of landscaping can provide a welcoming and fresh environment for an area, and can become a unifying thread within itself Illumination can provide improved identification and visibility at night Proposed Locations: Intersection of Lincoln Highway and Route 30 Bypass Intersection of Lincoln Highway and Route 896 Overpass Mounted Gateway Signage Existing structures can be utilized/retrofitted Height provides high vehicular visibility Provides place branding opportunities through art/ color Additional dimensional letters can give depth and prominence to a message Can be illuminated Proposed Location: Route 30 Bypass Overpass Lincoln Highway Streetscape Plan - Phase 2 15

WILLOW GROVE DOWNTOWN WILLOW GROVE DOWNTOWN WILLOW GROVE DOWNTOWN WILLOW GROVE DOWNTOWN Signage and Wayfinding Images Minor Gateway Signage Minor gateways provide visual markers that can be easily identified by travelers and help introduce the placebrand vocabulary The addition of color and place branding elements can help reinforce the identity throughout the area. Illumination can provide improved identification and visibility at night Proposed Locations: Walmart Shopping Center On minor roads at least 1000 feet before intersection with Lincoln Highway Pole Mounted Banners Banners can express an identity and create continuity along a busy corridor Express and define an edge or boundary Graphics and architectural elements can reinforce the place branding Advertise special events, parking and other important activities Banners can be permanent or temporary 16 Lincoln Highway Streetscape Plan - Phase 2

Signage and Wayfinding Images Directional Signage Directional signage can direct users to important areas of interest Common elements (architecture, colors, etc.) can be carried through the sign system to reinforce the placebrand, and provides familiarity and continuity for the user Height can be adjusted to meet the visibility needs of various traffic conditions and locations Proposed Locations: All corners of every signalized intersection Pedestrian Signage Pedestrian scaled signage provides information, orients, and engages the user The pedestrian scale makes information manageable and can be designed to meet the specific needs Provides the place brand at a pedestrian scale Can provide important information such as emergency contact information or other digital links through QR codes Lincoln Highway Streetscape Plan - Phase 2 17

Signage and Wayfinding Locations 18 Lincoln Highway Streetscape Plan - Phase 2

Legend Major Gateway Signage Minor Gateway Signage Overpass Mounted Gateway Signage Directional Signage Pedestrian Signage Lincoln Highway Streetscape Plan - Phase 2 19

Next Steps Presentation to Board of Supervisors - February 9th Solicit Feedback from PennDOT Advisory Committee Meeting #4: Present Initial Costs and Priority Recommendations Prepare Final Plan QUESTIONS/COMMENTS Doug Robbins Project Manager 215-940-9279 douglas.robbins@aecom.com 20 Lincoln Highway Streetscape Plan - Phase 2