FM 1110 (Clint Cutoff Road) Widening & Realignment I-10 to SH 20 (Alameda Avenue)

Similar documents
I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

Proposed Action, Purpose and Need Technical Memorandum

Figure 1: Vicinity Map of the Study Area

FM 471 PROJECT. OPEN HOUSE FM 471 (Culebra Road) from SH 211 to Old FM 471 Medina and Bexar Counties. FM 471 Project

MULTIMODAL NEEDS ASSESSMENT

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

WELCOME. FM 2818 (Harvey Mitchell Parkway) Open House. Tuesday, Nov. 14, 2017

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

Transportation Corridor Studies: Summary of Recommendations

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

WELCOME! I-35 Comal County Operational Improvements Open House Wednesday, November 15, 2017 Canyon High School Cafeteria

Access Management Regulations and Standards

Bluffdale/ UDOT South High-T Intersection Project Type Operations

TABLE OF CONTENTS 7.0 THOROUGHFARE PLAN. Analysis of Future Conditions Thoroughfare Plan Proposed Cross-Sections.. 7.

Appendix B. Environmental Resource Technical Memorandum. Assessment on Travel Pattern and Access Impacts

Information on display. Inside this handout. Triangle Area revisions. Project need displays. Preferred alternative on aerial maps

Route 47 (North Main Street) Reconstruction

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING

Preliminary Engineering Study

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m.

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

Route 79/Davol Street Corridor Study

Colchester/Riverside/Barrett/ Mill Intersection Study. PAC Meeting #3 September 22, 2016

Financial Project ID No(s).: and ETDM No(s).: and 14181

Reams Road RCA Study. Board of County Commissioners Public Hearing

Application of a Complete Street

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

a 20 year period. separate phases of development with staggered years)

Public Open House #2. THE CITY OF NORTH VANCOUVER CHESTERFIELD AVENUE CYCLING IMPROVEMENTS (4th - 13th STREET) JULY 2013

Urban Planning and Land Use

Recommended Roadway Plan Section 2 - Land Development and Roadway Access

I-10 AT SCENIC LOOP RD. Open House

Roundabout Feasibility Memorandum

Project Development & Environment (PD&E) Study JUNE 22, SR 90 (SW 8th Street and SW 7th Street) SW 8 th Street/SW 7 th Street PD&E Study 1

122 Avenue: 107 Street to Fort Road

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Proposed Project I 35 from Denton to Cooke County Line

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

Welcome to the Public Meeting. Red Hill Business Park South Transportation Master Plan Addendum. December 4, :00 p.m. to 8:00 p.m.

Environmental Assessment Findings & Recommendations. Public Hearing November 13, 2014

Welcome to the Open House

TRAFFIC IMPACT ANALYSIS

Terwillegar Drive Expressway Draft Concept Plan

State Highway 16 Kuna-Mora Road to Ada/Gem County Line

I-35 COMAL COUNTY OPERATIONAL IMPROVEMENTS

SH 68. Meeting with Affected Property Owners September 9, 2014

Presentation Outline. PD&E Study Process Project Overview Proposed Alternatives & Evaluation Schedule Contact Information

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

State Highway 16/McDermott Road Kuna-Mora Road to Ada/Gem County Line

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

SH-6 Corridor Improvement Study Policy Committee Progress Report M O N D AY, J U N E 1 0, B R A Z O S C E N T E R

State Highway 16 Kuna-Mora Road to Ada/Gem County Line

INNOVATIVE INTERSECTION DESIGN

Welcome to the Quebec Alternatives Analysis Public Meeting

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP

MASTER THOROUGHFARE PLAN

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

PREFERRED ALTERNATIVE IMPLEMENTATION PLAN. Prepared for. Ohio Department of Transportation, District South SR 741 Lebanon, Ohio 45036

Bridges and Arizona Crossings

3.0 PROJECT DESCRIPTION

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20)

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

5 CIRCULATION AND STREET DESIGN

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project

4APNOIPF Vh, YII PTC CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. 8K TH 63 River Crossing Bridge Replacement Project

Roadway Design Manual

Simons Run Corridor Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

FY 2006 TRANSPORTATION CAPITAL PROGRAM

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

Bay to Bay Boulevard Complete Streets Project

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

Welcome. If you have any questions or comments on the project, please contact:

COMMUNITY MEETING AGENDA

Waterford Lakes Small Area Study

Sixth Line Development - Transit Facilities Plan

IH 20 RANGER HILL PUBLIC MEETING

TRASBURG RANSPORTATION

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY

Clackamas County Comprehensive Plan

Route 7 Corridor Study

JANUARY 2017 STUDY UPDATE. Logan City, Cache Co., CMPO

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Station Plan: Penn & 43rd Avenue

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

REVIEW OF LOCAL TRAFFIC FLOW / LONG RANGE PLANNING SOLUTIONS STUDY

SECTION 2 ALTERNATIVES INCLUDING PROPOSED ACTION 2.0 ALTERNATIVES INCLUDING PROPOSED ACTION 2.1 INTRODUCTION 2.2 ALTERNATIVES CONSIDERED BUT REJECTED

I-395 Express Lanes Northern Extension Project Public Hearings

Executive Summary June 2015

3.0 ACCESS CONTROL PLAN - HARMONY ROAD (SH68)

APPENDIX D COST SUMMARY TABLES

APPENDIXB. Traffic Operations Technical Memorandum

Transcription:

La revisión ambiental, consultas y otras acciones requeridas por las leyes ambientales federales aplicables para este proyecto están siendo o han sido, llevado a cabo por TxDOT - en virtud de 23 USC 327 y un Memorando de Entendimiento fechado el 16 de diciembre del 2014, y ejecutado por la FHWA y el TxDOT.

Purpose and Need The purpose of the proposed project is to improve system linkage, capacity and mobility by providing a direct connection between I-10 and SH 20 (Alameda Avenue). The proposed transportation improvements to FM 1110 would help facilitate the safe and efficient movement of people and goods in the Lower Valley.

Project Location Map Young John St. De La Rosa Ave. Burbidge Rd. Virrey Rd. LEGEND Study Area N NOT TO SCALE Existing FM 1110 Alignment Ruffian Way Recommended Preferred Alternative

General Project Information Limits: FM 1110 (Clint Cutoff Road) from Project length: Approximately 2.76 miles Recommended Preferred Alternative County: El Paso Anticipated Construction Cost: $35 million Young John St. Improvements include: The proposed project includes the widening and realignment of FM 1110 to provide a direct connection between I-10 and SH 20. Four travel lanes (two lanes in each direction), a raised median to allow for turning lanes at intersections, sidewalks and bicycle lanes. Additionally, the proposed project would provide improvements to the intersections at FM 76 and SH 20, an overpass at the Union Pacifi c Railroad tracks, a bridge over the 100-year fl oodplain near FM 76, and drainage improvements. Phases: The proposed project may be constructed in phases: Phase I: Consists of widening FM 1110 between I-10 and FM 76 Phase II: Consists of realigning FM 1110 between FM 76 and SH 20 at a new location De La Rosa Ave. Burbidge Rd. LEGEND Study Area Virrey Rd. Existing FM 1110 Alignment Ruffian Way N NOT TO SCALE Recommended Preferred Alternative

Potential Environmental Impacts Right of Way/Relocations Approximately 39 acres of additional ROW from 24 parcels would be required Approximately 0.14 acre of a permanent easement would be required from one parcel One potential residential relocation Cultural Resources/Section 4(f) The Proposed project would cross 3 EPCWID No. 1 features Crossings would be designed and constructed to avoid any adverse effects to these features A Section 4(f) de minimis impact determination is anticipated for crossings of the EPCWID No. 1 features Traffic Noise Project would result in traffi c noise impacts

Constraints Map nm æ ï b$ Ñ a `!! FM 1110 Study Area School Place of Worship Cemetery Border Patrol Fire Dept. Police Dept. Park Historic-Age Structures Pond Flood Zone Drainage Feature Clint Water Tower Radio Tower Anthony LEGEND ¾ ¾! El Paso Electric Co. Utility Line MCI Utility Line Sprint Nextel Utility Line El Paso County Rural Transit Bus Route 40 El Paso County Rural Transit Bus Route 84 Major Arterial Local Road Union Pacific Railroad Municipal Building San Town of Clint Elizario City of San Elizario City of Socorro NEW MEXICO RODRIQUENA LATERAL Alameda Ave William D Surratt Elementary School Jeff Jones Rd Union Pacific Railroad æ nm æ æ æ Main St nm! a Early College SALATRAL LATERAL Richfield Dr æ æ San Elizario Rd Pickard Pickard Rd ") FM 1110 Ñ Fenter Rd Clint El Paso Cemetery Valley ï Cotton Sprint Sprint Nextel Nextel MCI MCI T&R Chemical Celum Rd North Loop Dr Clint Frey Rd San Lorenzo Cemetery ï ") FM 1110 Bridgeway Dr Ñ Socorro! Darrington Rd 10 10 City of El Paso El Paso County Mallard Rd MIDDLE DRAIN US Customs and b$ Border Patrol Herring Rd GREEN LATER AL CLINTLATERAL Coffin Rd MESA DRAIN ") FM 76 ± 0 1000 2000 Feet MEXICO U 375 Socorro San Elizario ") FM 1110 Clint!(20 ")76 Fabens Horizon 10 Tornillo TEXAS Franklin Canal Clint High School nm Denton Rd!( 20 Union Union Pacific Pacific Pacific Railroad Railroad Railroad DISCLAIMER: This map was generated by HNTB Corporation using GIS (Geographic Information Systems) Software. No claims are made to the accuracy or completeness of information shown herein nor to its suitability for a particular use. The scale and location of all mapped data are approximate. Source: Paso del Norte Mapa GIS Data (2013)- railroad, roads, waterways, and municipalities/cdps. The aerial imagery is NAIP2012 imagery from the Texas National Resource Information Systems (TNRIS) website. ") FM 258

Project Timeline TASKS Fall 2015 Selection of Preferred Alternative Spring 2017 Anticipated Environmental Clearance 2020 Phase II: Anticipated Completion Date Summer 2014 - Spring 2015 Data Collection and Alternative Screening/ Reasonable Alternatives Spring 2016 Public Meeting 2 2018 Phase I: Anticipated Completion Date 2014 2015 2016 2017 2018-2020 PROJECT START WE ARE HERE PROJECT END 2014 2015 2016 2017 2018-2020 Summer 2015 Public Meeting 1 January 2017 Anticipated Public Hearing Summer 2018 Phase II: Anticipated Start of Construction Fall 2015 - Winter 2016 Develop Schematic for Preferred Alternative/ Environmental Document Summer 2017 Phase I: Anticipated Start of Construction

Evaluation Matrix Total Category Score No Build Widening Alignment Alternatives Alternative A Alternative B Alternative C Alternative D Engineering Score ++ ++ + + Cost Score 0 Environmental Score 0 Public Involvement Score 0 + + + ++ Overall Score 0 0 + Substantial Negative Effect Some Negative Effect Measure Key No Effect Neutral Some Positive Effect Substantial Positive Effect 0 + ++

Typical Sections EXISTING FM 1110 (2-Lane Urban Collector) From I-10 to FM 76 Existing Right of Way Existing Right of Way 4 Shoulder 4 Shoulder 11 Lane 11 Lane From FM 76 to SH 20 Existing Right of Way Existing Right of Way 3 Shoulder 3 Shoulder 11 Lane 11 Lane PROPOSED FM 1110 (4-Lane Minor Arterial w/raised Median) Proposed FM 1110 Proposed Right of Way Proposed Right of Way 6 Sidewalk 1 Curb Offset (Typical) 5 Bike Lane 12 Lane 1 5 Bike Lane 18 Median 12 Lane 1 12 Lane 6 Sidewalk 12 Lane 1 1 Not to Scale

FM 1110 Traffic Analysis (2015 vs 2038) FM 1110 Corridor Operations Analysis (2015 vs 2038) Existing Traffic Conditions (2015) Level of Service (LOS) LOS A / B LOS C / D LOS E / F Signalized (LOS) No - Build Traffic Conditions (2038) STOP Stop-Controlled (LOS) # Link Volume (DHV) 2000 ft. N

FM 1110 Traffic Analysis (Future Build Conditions 2038) FM 1110 Corridor Operations Analysis (Future Build 2038) Future Traffic Conditions (2038) Level of Service (LOS) LOS A / B LOS C / D LOS E / F Signalized (LOS) # Link Volume (DHV) 2000 ft. N

FM 1110 Traffic Analysis (Operations Analysis) Traffic Level of Service (Urban Street) Intersection Level of Service (LOS) Level of service (LOS) is a measure used to characterize the effectiveness of transportation infrastructure elements, where: LOS A = Free-flowing traffic operation LOS B = Reasonably free-flowing traffic operation Study Intersection Type of Control 2015 Existing Delay (sec/veh) LOS 2038 Future No-Build* Delay (sec/veh) LOS 2038 Future Build Delay (sec/veh) LOS LOS C = Stable traffic flow operation LOS D = Approaching unstable traffic flow operation I-10 northbound frontage and FM 1110 (Clint Cutoff Rd) All-way Stop 28 D 7 A 8 A LOS E = Unstable traffic flow and significant delay LOS F = Extremely low speed traffic flow; significant delay and extensive queuing Traffic Level of Service (LOS) Delay (Instersection) I-10 southbound frontage and FM 1110 (Clint Cutoff Rd) FM 1110 (Clint Cutoff Rd) and FM 76 (North Loop Rd) FM 76 (North Loop Rd) and FM 1110 All-way Stop 110 F 18 B 15 B Signal 10 A 19 B 11 B Signal 14 B 27 C N/A N/A Level of Service (Criteria) Unsignalized Delay (sec/veh) Signalized Delay (sec/veh) FM 1110 and SH 20 (Alameda Ave) Signal 17 B 25 C 13 B STOP A 10 10 B >10-15 >10-20 C >15-25 >20-35 FM 1110 (new alignment) / Denton Rd and SH 20 (Alameda Ave) * With the improvements at FM 1110 and I-10 interchange Signal N/A N/A N/A N/A 19 B D >25-35 >35-55 E >35-50 >55-80 F 50 80

Provide Comments Submit a comment after the Public Meeting E-mail: ELP_FM1110Project@txdot.gov Phone: (915) 790-4200 Visit: www.txdot.gov Keyword: FM 1110 Mail: Attn: Gus Sanchez Project Manager TxDOT El Paso District Re: FM 1110 13301 Gateway Boulevard West El Paso, Texas 79928-5410 Comments must be received or postmarked on or before Friday, May 13, 2016 to be included in the Public Meeting Summary.