Company Health and Safety Policy

Similar documents
B S Glass Ltd Safety procedures- outsourced Workplaces

IMMANUEL CHURCH, CHICHESTER HEALTH AND SAFETY POLICY

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS

Contractor handbook. Purpose

Health & Safety Policy & Plan. Rightway Roofing.

Section J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS

Lifting Operation & Lifting Equipment Procedure

Pre-control risk estimate. Likelihood Risk

Contractor / Exhibitor Handbook

KIERNAN ELECTRICAL SITE INDUCTION. Site Supervisors: Chris Lettice

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading

Safe Work Method Statement

Contractor/Visitor Safety Orientation UNBC

Health and Safety Inspection Procedure

Working at Height - MEWPS & Ladders. Your company details Address Tel: Fax: Mobile:

2.0 Management Systems and Documentation

1.1 OHS Policy and Responsibilities

Health, Safety and Welfare Policy

Health, Safety and Environment Management System. HSE-PRO-008 HSE Responsibilities Procedure

Lifting Operations and Lifting Equipment Regulations (LOLER) Policy. Version No. 2. Review: May 2019

Health, Safety & Environmental Policy. Rotec Hydraulics Ltd

CONSTRUCTSAFE TIER 1 HEALTH AND SAFETY COMPETENCY TEST FRAMEWORK

1. Objective of the initiative To ensure that all employees and subcontractors are aware of the risks associated with working at height.

CONTRACTOR SAFETY INDUCTION HANDBOOK

COMPANY HEALTH & SAFETY POLICY

S31 Opening Statement Working at Height

McKay Moore Drainage Ltd. Health and Safety Policy

WORK HEALTH AND SAFETY

Health & Safety Policy HSP 13 Working at Height Version Status Date Title of Reviewer Purpose/Outcome

Site Induction Document & Site Rules

Company Health & Safety Policy

COREWEST DIAMOND DRILLING LTD. * ENVIROMENT, HEALTH AND SAFETY PROGRAM* APPENDIX A GENERAL WORKSAFE PRACTICES

Code of Practice and Instructions to Contractors Working for Viridor

??????? is committed to providing a safe work environment for its employees and preventing occupational injuries due to falls.

Safe work method statements

Permit-Required Confined Spaces...29CFR

Communicate and document the health and safety arrangements and ensure that these are available to staff and clients alike.

Compliance with Health & Safety legislation

SOAS LONE WORKING GUIDANCE

SUPPLIER HEALTH AND SAFETY. Supporting a healthy and safe working environment for our people and customers

Method Statement Author

MANUFACTURING TECHNICAL INSTRUCTIONS - SAFETY FALL HAZARD CONTROL REQUIREMENTS SERIES & NO. SMI - 157

CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH PROCEDURE

SWMS No 012 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 6

Lifting Equipment Protocol

Health &Safety Policy HS803

The Sample Company Pty Ltd

On the Lee Tunnel project, some significant near misses involving cranes have occurred this year.

WHS CONTRACTOR INFORMATION PACKAGE

You must NOT touch any equipment unless you are authorised to work on or with that equipment and you have followed correct safety procedures.

Duties of WAH Competent Persons

ESSENTIAL SAFETY RESOURCES

Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT. Health and Safety Policy

Harbour Town Gold Coast Site Induction

Newtown Neighbourhood Centre

Health and Safety Policy

The purpose of this document is to establish the procedures for accident prevention and investigation at (Insert Company Name) jobsites.

A25/A26. MEWP Scissor and Boom

Lone Working Guidance for University Departments and Functions December 2009 Safety Services Office

DRIVER FATIGUE MANAGEMENT PLAN

8. Fall Protection Procedures WAC

Responsibilities / Accountability

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO LOW LEVEL LIGHT UNITS

Safety at Work. Rules for Staying Alive

SWMS No 007 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 6

EXHIBITION Guide. Roles and Responsibilities OS11. A handbook for exhibitors and contractors

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH M ABN

Our commitment to safety

Health and Safety Policy Statement

evolution Health, Safety and Environmental Policy Evolution Media Installations Ltd Digital & Electrical Installations

Fall Protection / Open Holes & Guardrail

INTRODUCTION UNIFIED COMMAND

Working at Height. Policy and Procedures. Author: Beth Webster Assistant Safety Advisor. On behalf of School Safety Committee.

Suitability of Work Equipment

Geotechnics, Face and Stockpile Operations

DIVING SERVICES UK COMMERCIAL & RESCUE DIVING CONTRACTORS

Health & Safety Plan `

Incorporating: Alan s Skip Hire Ltd Alan s Skip Hire (Wales) Ltd Ash Metal Recycling Ltd ASH Trade Waste Services Ltd Health & Safety Policy

Safe Work Method Statement (SWMS)

HEALTH AND SAFETY MANUAL

Contractor Control Procedures. Contractor Control Procedures. Working Together. November Borders College 24/11/2014.

Don t let a fall shatter your life!

SUBJECT: LIFTING OPERATIONS AND LIFTING EQUIPMENT (LOLER)

Safety Management Plan Version Sept 06 A

A MESSAGE FROM THE MD

SAFE SYSTEM OF WORK PLAN (SSWP)

Health and Safety Policy & Arrangements. CONTOUR ROOFING (ESSEX) LTD 12 Harolds Road, Pinnacles Harlow, Essex CM19 5BJ

SAFETY, HEALTH AND ENVIRONMENTAL POLICY AND MANAGEMENT SYSTEM

Safe Work Procedure for installation of external cladding

P.J. HEGARTY & SONS SAFETY STATEMENT

Accident/Incident Reporting and Investigation Procedures

Scope: This plan applies to all personnel, including contractors, who enter or work in confined spaces, or supervise such activities.

Site Induction Document & Site Rules

RISK ASSESSMENT A UNIVERSITY GUIDE TO PRACTICAL RISK ASSESSMENT UNDER THE MANAGEMENT OF HEALTH AND SAFETY AT WORK REGULATIONS 1992

Dryside Ltd Unit 270, 14 London Road Guildford Surrey GU1 2AG

HEALTH & SAFETY GUIDANCE

TRAINING PRICE LIST. TRAINING TEAM

We live by the Life Saving Rules so that everyone goes home safe, every day.

Understanding health and safety in gas utilisation

Health and Safety Policy

Transcription:

Company Health and Safety Policy LDM Installers Ltd. Document reference: H&SP0B5-00 Document by: Radu N. Lupsa Date: 25.08.2010 Review date: 25.02.2011 36 CASTLEVIEW GARDENS, LONDON, IG1 3QB. TEL/FAX: 02085181405. MOB: 07852330812 Website: www.ldminstallers.co.uk Email: mail@ldminstallers.co.uk 1 of 9

TABLE OF CONTENTS 1.0 General Statement of Policy 2.0 Organagram 3.0 Staff Duties 4.0 Training and Competency 5.0 Working at Height 6.0 Lifting Operations and Equipment 7.0 Manual handling 8.0 Accident Procedures 9.0 Alcohol and Drugs 10.0 First Aid 11.0 Environmental Concerns 12.0 Record Keeping and Review 13.0 CONFIRMATION OF EMPLOYEE READING POLICY 2 o f 10

1.0 General Statement of Policy It is the intention of Health and Safety Policy of LDM Installers Ltd to implement, monitor, and comply with The Heath and Safety at Work Act (1974) to ensure, so far as reasonably practicable, that it will: Provide a safe system of work to all employees. Consult with employees on matters of Health and Safety. Provide and maintain safe plant and equipment Ensure safe use handling and disposal of substances. Provide information, instruction, training and supervision for employees in a task specific way. Assess and review competency of staff and procedures regularly. Provide adequate funding and resources to implement this policy. Ensure that activities do not infringe on the safety of others, the public, or the environment. Review and revise this policy as necessary at regular intervals. Signature: Date: 25 January 2011 Radu N. Lupsa Company Director LDM Installers Ltd 3 o f 10

2.0 Organagram (Company Structure for Health and Safety Management) Company Director Radu N. Lupsa Independent Safety Advisor Administration Rodica G. Blezneag Finance Manager Site Manager Adin Mihes Site Manager Daniel Maries Site Manager Daniel Sampson Supervisor I. V. Trif Supervisor Ciprian Vlasceanu Supervisor A. Petras Supervisor D. Lupsa Supervisor V. Sandor Installation Teams Logistics Teams 4 o f 10

3.0 Staff Duties 5 o f 10 Company Director: To ensure that all aspects of this policy is adhered to and take responsibility for maintaining and resourcing adequately finances and staff time to achieve this. Site Managers: To ensure Health and Safety procedures are in place before works commence and monitor these procedures in conjunction with Safety Advisors and other interested parties. Monitor supervisor s responsibilities and record keeping. Attend safety meetings and action any issues raised. Regularly review methods of work by undertaking assessments of risk on a task specific basis to include all potential dangers to staff, other workers, the public, and environment. Ensure safety infringements are reported to the relevant parties and follow up any concerns raised. Supervisors: To ensure safety procedures are implemented on site and adequate record keeping is kept. Ensure all staff are inducted to site and understand the rules and their responsibilities, and that they read and understand relevant method statements before they start works. To keep records of this. Inspect work areas before works commence to ensure it is safe to work, and keep records of these. Conduct regular tool box talks to staff on subjects relevant to their activities, and keep records of these. Report any infringements or safety concerns and to ensure works stop if it is unsafe to continue. To check all tools and equipment and PPE are undamaged and are certified and in date. To advise senior management when these need replacing or re-certifying. To keep records of these. To keep a site diary of activities and staff present, to allocate works appropriate to the skills of the individual, and ensure all staff are accounted for at the end of each shift and during evacuations etc. Employees (general): All employees have a duty of care to ensure the health and safety of themselves, other workers, the public, and the environment are maintained. To understand and apply rules and methods of work and to advise any changes of these to their line manager/supervisor. To wear and maintain appropriate PPE as directed. To not be under the influence of drugs or alcohol while at work and report if they suspect that others might be.

4.0 Training and Competency We aim to ensure that every person who undertakes work on behalf of LDM Installers Ltd. is fully competent to carry out their work. We will achieve this standard through a mixture of training and allowing for experience. Training needs will be assessed by a responsible manager at various stages but at least annually. Risk assessments Company needs Manual Handling assessments TRAINING NEEDS COSHH assessments Appraisal or annual review Lifting Plans Site Inspections / Performance Site Rules Information, Training and Supervision We understand there is a need to train our employees on a regular basis to ensure that they are competent to fulfil their position within LDM Installers Ltd. and to carry out work safely. On initial employment or following re-assignment LDM Installers Ltd. will give all new employees induction training. The Director will identify further training. This does not stop any employee requesting further training for his or her own development. All training records will be kept at LDM s office, 36 Castleview Gardens, Ilford, Essex, IG1 3QB. An annual training schedule will also be drafted for all employees and we will endeavour to accomplish it. 6 o f 10

Specific jobs requiring special training are: Site Managers and Site Supervisors Managing Safety Site Safety for Supervisors CSCS Relevant Supervisory or Management card Risk Assessments Toolbox Talk Pack 5.0 Working at Height Site Based Personnel Site Safety Awareness Manual Handling COSHH Working at Height Selection, Inspection and Use of Ladders PASMA - Erection and Use of Alloy Towers IPAF Scissor Lift, Self Propelled Boom CPCS-Telescopic Forklift Driver CPCS-Slinger/Signaller CSCS Fenestration Installation - Level 2 Fenestration, Installation & Surveying - Level 3 Personal Protective Equipment (PPE) Emergency Procedures First Aid 7 o f 10 Working is said to be at height if a person could be injured falling from it, even if it is at or below ground level. LDM Installers Ltd will strive to ensure, as far is as reasonably practicable, that employees working at height do so in a way that is safe and secure. If reasonably practicable, working at height will be avoided. When this is not practicable, the amount of working at height will be kept to a minimum. Work at height will be completed from existing work areas in preference to the use of additional access equipment. Fall prevention controls will be used in preference to fall arrest and any controls shall look a giving a collective protection to all, in preference to personal fall protection. Operatives who use the equipment will ensure that any access equipment (ladder, tower scaffold, platform etc.) will be checked every time after it has been assembled and/or installed, and before it is used.

Such equipment will in addition be inspected as often as necessary to ensure safety, and in particular to make sure that any deterioration can be detected and remedied in good time. Any faults will be reported to the Site Managers, and the equipment in question removed from service immediately Responsible managers will ensure that all people erecting and using access equipment are competent to do so. Responsible managers will ensure that a rescue procedure is in place prior to work commencing to ensure that any person working at height can be rescued. 6.0 Lifting Operations and Equipment 7.0 Manual handling 8.0 Accident Procedures 8 o f 10 The responsible manager will ensure that any projects where lifting operations are to take place have appropriately trained lifting supervisors in attendance to conduct the lift, as per the lift plan created by the appointed person. The responsible manager will ensure that all lifting equipment has been thoroughly inspected by a competent person as defined by the Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) Prior to use, all lift accessories shall be inspected by the competent banksman to ensure it is without damage. A record of all lifting appliance and accessories used will be maintained along with copies of thorough examination certification prior to them being used. LDM Installers Ltd will were reasonably practical avoid the need for manual handling by its employees, although we do accept that due to the nature of our works that the elimination of manual handling cannot be achieved. Were manual handling cannot be eliminated the responsible manager will make an assessment of the risk identifying the loads to be handled. Lifting aids will be used were possible to reduce the need to lift and the health effects of manual handling. All of LDM Installers Ltd s staff will assist and comply with the accident and evacuation procedures of the site, as and when directed. This will include: Reporting of all injuries and dangerous occurrences in the site accident book. Assist with investigations and reporting of incidents including securing the area etc as directed. To ensure staff are aware of site procedures and conduct regular reviews of these.

9.0 Alcohol and Drugs Provide any records necessary including daily staff counts for use with evacuations. LDM Installers Ltd maintains a zero tolerance policy for staff found to be under the influence of substances that impairs their performance or risks the safety of others. Individuals will be immediately stopped from working and removed from site and disciplinary action taken. The company will also comply with the drugs and alcohol policy of site, as directed. Any employee taking prescription drugs that may affect their work, their safety or the safety of others, must inform management. 10.0 First Aid The company ensures it meets its regulatory obligations to provide first aid cover for it s staff. The company will review and supply adequate numbers of first aid trained staff as appropriate to the activities and staff levels. Staff will always work within teams of two or more and have access to a trained first aider. Staff will be briefed where to find the first aid box and/or station and report any injuries in the site accident book. The company will also comply with the relevant first aid requirements of the site, as directed. 11.0 Environmental Concerns It is an objective of the company to take a pro-active approach in the care of the environment in it s activities and comply with regulatory and site requirements. 12.0 Record Keeping and Review To ensure the safe handling of substances hazardous to the environment to prevent contamination through the use or disposal of these substances. To recycle and reduce packaging and waste where possible. To educate staff as to the importance of reducing the impact of work activities on the environment. All aspects of health and safety inspections, as required by the law, will be recorded and these records kept to be made available as requested. All equipment and PPE will be regularly inspected for damage and records kept. Risk assessments and method statements for work activities are to be reviewed as appropriate to ensure that circumstances have not changed or if further risks/controls need to be addressed. 9 o f 10

13.0 CONFIRMATION OF EMPLOYEE READING POLICY LDM Installers Ltd. Health and Safety Policy To be completed by ALL Personnel I (Name in BLOCK CAPITALS) I confirm that I have read LDM Installers Limited s Health and Safety Policy and fully understand the responsibilities that apply to me in the capacity in which I am employed. If I am unable to fulfil those responsibilities in any way, I will inform my Manager or the Director as soon as is reasonably practicable. Signed: Date: Revision: 25/08/2010 PLEASE COMPLETE THIS PAGE AND RETURN IT TO HEAD OFFICE. 10 o f 10