Appendix D Special Use Permit Legal Descriptions
TWE Project D-1 Manti-La Sal National Forest 600 kv Transmission Line Long-Term Right-of-Way: T. 13 S., R. 2 E., sec. 8, lot 1; PB 37, unsurveyed protracted. T. 10 S., R. 4 E., sec. 19, lots 1, 2, 3, and 6. The areas described aggregate 25.32 acres. The ROW is 250-feet wide by 0.84 miles in length. Access Roads for 600 kv Transmission Line outside of Long-Term Right-of-Way: T. 13 S., R. 2 E., PB 37, unsurveyed protracted. T. 10 S., R. 4 E., sec. 19, lots 2 and 3. The areas described aggregate 12.86 acres. The ROW is 50-feet wide by 2.15 miles in length. Uinta National Forest 600 kv Transmission Line Long-Term Right-of-Way: T. 12 S., R. 3 E., sec. 9, SE1/4NE1/4 and E1/2SE1/4. T. 9 S., R. 5 E., sec. 25, SE1/4SE1/4; sec. 33, S1/2SW1/4; sec. 35, SE1/4NE1/4, NE1/4SW1/4, S1/2SW1/4, N1/2SE1/4, and SW1/4SE1/4; sec. 36, N1/2NE1/4, SW1/4NE1/4, NE1/4NW1/4, S1/2NW1/4, and NW1/4SW1/4. T. 10 S., R. 5 E., sec. 2, lot 3. sec. 13, lot 3; sec. 14, S1/2SW1/4, N1/2SE1/4, and SW1/4SE1/4; sec. 21, S1/2SW1/4 and SE1/4; sec. 22, N1/2NE1/4, SW1/4NE1/4, S1/2NW1/4, and NW1/4SW1/4; sec. 23, NW1/4NW1/4; sec. 28, N1/2NW1/4; sec. 29, NE1/4, S1/2NW1/4, and NW1/4SW1/4; sec. 30, lot 12, SE1/4NE1/4, SE1/4SW1/4, N1/2SE1/4, and SW1/4SE1/4; sec. 31, lots 1, 2, 3, and 4.
TWE Project D-2 T. 4 S., R. 10 W., sec. 31, SE1/4NE1/4, SE1/4SW1/4, N1/2SE1/4, and SW1/4SE1/4. sec. 1, N1/2NE1/4, SW1/4NE1/4, S1/2NW1/4, and NW1/4SW1/4; sec. 2, SE1/4SW1/4, NE1/4SE1/4, and S1/2SE1/4; sec. 8, SE1/4SW1/4 and S1/2SE1/4; sec. 9, S1/2NE1/4, N1/2SW1/4, SW1/4SW1/4, and N1/2SE1/4; sec. 10, NE1/4NE1/4, S1/2NE1/4, and S1/2NW1/4; sec. 11, NW1/4NE1/4, N1/2NW1/4, and SW1/4NW1/4; sec. 17, N1/2NW1/4; sec. 18, lots 2 and 3, NE1/4, and SE1/4NW1/4. T. 5 S., R. 12 W., sec. 13, SE1/4NE1/4, NE1/4SW1/4, S1/2SW1/4, and N1/2SE1/4; sec. 14, lot 1 and SE1/4SE1/4; sec. 23, lot 1. The areas described aggregate 555.66 acres. The ROW is 250-feet wide by 18.33 miles in length. Access Roads for 600 kv Transmission Line outside of Long-Term Right-of-Way: T. 12 S., R. 3 E., sec. 9, SE1/4SE1/4. T. 9 S., R. 5 E., sec. 25, NE1/4NE1/4, SE1/4SW1/4, and S1/2SE1/4; sec. 29, SW1/4SW1/4; sec. 33, S1/2NE1/4, S1/2NW1/4, and N1/2SE1/4; sec. 34, NW1/4SW1/4 and S1/2SW1/4; sec. 35, SE1/4NE1/4, S1/2SW1/4, and SE1/4; sec. 36, N1/2, N1/2SW1/4, SW1/4SW1/4, and NW1/4SE1/4. sec. 11, lot 1; sec. 13, lots 1, 2, and 3; sec. 14, lots 1 and 4, S1/2NE1/4, NE1/4SW1/4, S1/2SW1/4, and N1/2SE1/4; sec. 15, lots 2, 3, and 4, W1/2SW1/4, and SE1/4SE1/4; sec. 16, SW1/4SW1/4; sec. 17, S1/2SE1/4; sec. 18, S1/2SE1/4; sec. 19, lots 5, 6, 7, 8, and 11, N1/2NE1/4, SE1/4NE1/4, and E1/2NW1/4; sec. 20, N1/2NE1/4, N1/2NW1/4, and SW1/4NW1/4; sec. 21, NE1/4NE1/4, S1/2NE1/4, N1/2NW1/4, SE1/4NW1/4, SE1/4SW1/4, and N1/2SE1/4; sec. 22, NE1/4NE1/4, SW1/4NE1/4, NW1/4, and N1/2SW1/4;
TWE Project D-3 sec. 23, NW1/4NW1/4; sec. 28, N1/2NW1/4; sec. 29, NE1/4NE1/4, S1/2NE1/4, S1/2NW1/4, NE1/4SW1/4, and NW1/4SE1/4; sec. 30, lots 2, 3, 4, 5, 8, 9, 10, and 12, SE1/4SW1/4, and N1/2SE1/4; sec. 31, lots 3, 4, 5, 6, 8, and 9, and NE1/4NW1/4. T. 3 S., R. 10 W., sec. 32, N1/2NE1/4; sec. 33, NW1/4NW1/4, S1/2NW1/4, and E1/2SW1/4. T. 4 S., R. 10 W., sec. 4, lots 3 and 4, SW1/4NW1/4, and W1/2SW1/4; sec. 9, NW1/4, NE1/4SW1/4, and S1/2SW1/4; sec. 16, NW1/4 and NE1/4SW1/4; sec. 17, E1/2NE1/4, NE1/4SW1/4, N1/2SE1/4, and SW1/4SE1/4; sec. 30, lot 4, SE1/4NE1/4, E1/2SW1/4, and N1/2SE1/4; sec. 31, lot 4, NE1/4NE1/4, S1/2NE1/4, E1/2SW1/4, and W1/2SE1/4. T. 4 S., R. 11 W., sec. 25, SE1/4SE1/4; sec. 35, NE1/4SE1/4 and S1/2SE1/4; sec. 36, NE1/4NE1/4, S1/2NE1/4, S1/2NW1/4, N1/2SW1/4, and SE1/4SE1/4. sec. 1, N1/2NE1/4, SW1/4NE1/4, NW1/4, and NW1/4SW1/4; sec. 2, SE1/4NE1/4, NW1/4, NE1/4SW1/4, N1/2SE1/4, and SE1/4SE1/4; sec. 3, NE1/4, S1/2NW1/4, and SW1/4SW1/4; sec. 4, SE1/4NE1/4 and E1/2SE1/4; sec. 8, SE1/4SW1/4 and SE1/4; sec. 9, NE1/4, NE1/4NW1/4, S1/2NW1/4, N1/2SW1/4, and NW1/4SE1/4; sec. 10, NE1/4, N1/2NW1/4, and SE1/4NW1/4; sec. 11, W1/2NW1/4; sec. 17, W1/2NW1/4 and NW1/4SW1/4; sec. 18, lot 4, NE1/4NE1/4, S1/2NE1/4, SE1/4NW1/4, E1/2SW1/4, N1/2SE1/4, and SW1/4SE1/4. T. 5 S., R. 12 W., sec. 13, S1/2SW1/4 and SE1/4; sec. 14, lots 1 and 4, and SE1/4SE1/4; sec. 15, lots 1, 2, and 3, and NW1/4SE1/4; sec. 16, lot 4; sec. 21, lot 1; sec. 22, lot 1; sec. 23, lot 1 and NE1/4NE1/4; sec. 24, NW1/4NE1/4 and N1/2NW1/4. The areas described aggregate 343.15 acres. The ROW is 50-feet wide by 56.78 miles in length.
TWE Project D-4 Temporary Facilities related to 600 kv Transmission Line outside of Long-Term Right-of-Way: sec. 29, NE1/4NE1/4, S1/2NE1/4, and S1/2NW1/4; sec. 30, N1/2SE1/4. T. 3 S., R. 10 W., sec. 32, NW1/4NE1/4 and NE1/4NW1/4. sec. 9, SW1/4NE1/4, SE1/4NW1/4, NE1/4SW1/4, and NW1/4SE1/4; sec. 11, N1/2NW1/4; sec. 18, NE1/4NE1/4. The areas described aggregate 24.12 acres. All acreage and length calculations were completed in GIS. Acreage and length calculations are independent of one another; extrapolation of one to the other will not match exactly due to how project components intersect aliquot boundaries. Legal description format is based on BLM specifications: U.S. Department of the Interior, Bureau of Land Management Cadastral Survey. (Revised 2014). Specifications for Descriptions of Land: For Use in Land Orders, Executive Orders, Proclamations, Federal Register Documents, and Land Description Databases. Washington, DC: U.S. Department of the Interior. Legal description was created using ArcGIS: The legal description was generated in ArcGIS using TWE Project data files, land jurisdiction information received from AECOM on 6/10/2014, and the latest PLSS data available online from the BLM Cadastral Survey Program (http://www.geocommunicator.gov/geocomm/lsis_home/home/index.htm). CadNSDI PLSS data with a last updated date of 4/11/2011 were downloaded from this website for the state of Utah.