Pasquale Imbò e Marco Pelucchi ENI S.pA;

Similar documents
Successful Deployment of a Long Gun String Via Intelligent Coiled Tubing

Best Practices - Coiled Tubing Deployed Ball Drop Type Perforating Firing Systems

Subsea Safety Systems

VortexFlow DX (Downhole) Tool Installation Instructions

ENDEAVOR ENERGY RESOURCES

Cased-Hole Logging Environment

The scope of this document

Practice Exam IADC WellSharp Driller and Supervisor

5k Slickline Lightweight Pressure Control Equipment 4 ID

Development / installation of. permanent downhole capillary. injection facilities in gas wells with. sub-surface safety valves

SPE Coiled Tubing in High-pressure Wells. Well Control Considerations. Introduction

Deepwater Horizon Incident Internal Investigation

Live well deployment of long perforating gun system using combined CT technologies

Engineered solutions for complex pressure situations

HydroPull. Extended-Reach Tool. Applications

Reducing Nonproductive Time

Dynamic Underbalance (DUB)

Completion Workover Riser System. Enabling efficient operations by reducing interface complexities and minimizes operational risk

Perforations Cleanup with Surge Chambers to Increase Well Productivity SLAP Jorge Patino, Halliburton. Oct 18 th, 19 th & 20 th, 2016

PHE KE30-A8 WORKOVER PROGRAM

RPSEA UDW Forum June 22 & 23, Secure Energy for America

TAM Single SeT inflatable

W I L D W E L L C O N T R O L SNUBBING OPERATIONS

NORSOK Standard D-010 Rev 4, August 2012

OCEAN DRILLING PROGRAM

Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation

2-7/8 TRIPLE PORTED PBL BYPASS SYSTEM

North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug

Hydro-Mech Bridge Plug

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM

Performance and Value of the invision System : Offshore in Coiled Tubing Operations

PROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION

FORGE Energy UL 21 Freedom 1 API Number:

Gas Lift Challenges. Gas-Lift Workshop. Qatar February 4-8, Mike Johnson ExxonMobil Production Company

WELLHEADS, FLOWLINES & GAS LIFT INJECTION SYSTEMS

Wellwork Chronological Regulatory Report

Oman Central Gas Velocity Strings in deep tight gas wells. September th European Conference on Gas Well Deliquification.

6-3/4 DUAL PORTED PBL BYPASS SYSTEM (Applicable to sizes 6-1/4 & 6-1/2 also)

International Well Control Forum. Well Intervention Pressure Control Level 2 Syllabus July 2015 Version 7.0

EP WELLS DAILY OPERATIONS REPORT Report 38 07/18/2017

Joint industry project on foam

Abandonment Program for Paramount Fort Liard F 36

W I L D W E L L C O N T R O L FLUIDS

Field Loading Procedures Casing Cutters

DB Bridge Plug. Features. Benefits. Applications

SCORPION HIGH-QUALITY, FULLY COMPOSITE PLUGS

Coiled Tubing string Fatigue Management in High Pressure Milling Operation- Case Study

Inflatable Packers for Grouting 11/10/00

FREQUENTLY ASKED QUESTIONS

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD

SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Supervisors Core Curriculum and Related Learning Objectives

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM

SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Drillers Core Curriculum and Related Learning Objectives

The key to connectivity

The Developing Design of the Blowout Preventer in Deep Water

37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, Alan Brodie, PTC

3(752/(80 SPECIALTY 3(752/(80 SPECIALTY 5(17$/,1& 5(17$/,1&

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack)

NeoProducts, LLC 1201 Dealers Ave. Harahan, LA Ph:

Offshore Managed Pressure Drilling Experiences in Asia Pacific. SPE paper

Retrievable Bridge Plugs

Wellwork Chronological Regulatory Report

SPE MS. Copyright 2015, Society of Petroleum Engineers

FLATpak tm Umbilical Coiled Solutions for Artificial Lift Applications

D & V Oil Co. LP. Daily Completion Report - University CN A #6 API # /23/2016. Perfs ' ' Activity :

Casing Design. Casing Design. By Dr. Khaled El-shreef

Advanced Applications of Wireline Cased-Hole Formation Testers. Adriaan Gisolf, Vladislav Achourov, Mario Ardila, Schlumberger

Downhole Gas Separator Selection

Standard Operating and Maintenance Instructions for Pumping System Model PS-90

Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells. Kerry Daly, Global BD Manager- DST TCP

Restoring Fluid Flow in Tubing Strings

Coal Bed Methane (CBM) Permeability Testing

Air and Gas Drilling

SPE Forum: Source Control for Wells in Shallow Water. Lars Herbst, Gulf of Mexico Regional Director

Inflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer

Innovating Gas-Lift for Life of Well Artificial Lift Solution. The Unconventional Solution!

New Workover and Completion Technology Utilised in Bass Strait M.L. Eaton, A.G. Barry and S. Schoemaker Esso Australis Pty Ltd

Chapter 5 Drilling and Well Testing Practices

Optimising Hydraulic Energy to Dramatically Improve Lateral Reach

Elevation Resources DAILY OPERATIONS. Clean and prep location, MIRU pulling unit to mill liner top

On-Off Connector Skirt

Multi-Stage Plunger Lift: Case Histories

WELL SCAVENGER. Versatile wellbore clean-up tool for the most demanding operations

Advanced Intermittent Gas Lift Utilizing a Pilot Valve

Design criteria, planning critical for successful deepwater well testing in HPHT developments

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS

Success Paths: A Risk Informed Approach to Oil & Gas Well Control

Evaluation of Hydropath Clearwell Technology On Carbonate Brine Scaling Using Tube Blocking Method

Wellhead Compressor Installation on Liquid Loaded Gas Wells in Sicily: A summary of results and best practices

Testing Services Overview

Perforating Center of Excellence TESTING SERVICES OVERVIEW

Disposal/Injection Well Pressure Test Report (H-5)

W I L D W E L L C O N T R O L SHUT-IN PROCEDURES

MOCS. Multiple Opening Circulation Sub. Fluid Bypass Valve

W I L D W E L L C O N T R O L COMPLICATIONS

APPENDIX A1 - Drilling and completion work programme

Daily Drilling Report

Hard or Soft Shut-in : Which is the Best Approach?

Downhole Gas Separator Selection

A LIFE OF THE WELL ARTIFICIAL LIFT STRATEGY FOR UNCONVENTIONAL WELLS

Transcription:

7th European Gas Well Deliquification Conference Innovative Failsafe Capillary Injection System Resolves Liquid Loading in Gas Well with a Cost- Effective Solution that Maintaining Production and Well-Safety Requirements Pasquale Imbò e Marco Pelucchi ENI S.pA; 7th www.eni.it European Gas Well Deliquification Conference Groningen on 24-26 September 2012

Presentation Introduction ENI field trail and solution The Capillary Deliquification System Conclusions 2

Water Loading Many mature Gas wells have had to be shut in due to water loading in the production string The atctually possible solution Periodically injecting chemicals from surface or but Continuos injection of a downhole, foaming agent can be used If an injection line is part of the completion string This presentation describes the first ENI field trial of a Capillary Deliquification Safety System that can be retrofitted into existing wells with rigless intervention to quickly reinstate production. 3

Eni, in the attempt to find a possible solution to the Water loading problem in Barbara Field has carried out a series of field test. Recent applications have shown that Foaming Agent is the optimum deliquification system to remove water in the production string and improve production rate. The Halliburton CAPILLARY DELIQUIFICATION SAFETY SYSTEM offer a cost-effective alternative to rig work over and occasional foaming treatments The synergy of the two system, foamer plus capillary string, allows a good technical solution for water loading especially in gas string, like the off-shore installations in the Adriatic sea, Italy 4

Barbara E #45 parameters The Barbara Gas Field was discovered in 1971 and is located offshore in the northern sector of the Adriatic Sea The Barbara #E45 is a well in the Barbara Field recompleted in 2004 with single completion in OHGP with this parameters: 5

The Barbara #E45 parameters: Depth max = 1142 mmd Deviation max = 27.5 deg at 550 mmd Completion Type casing 7-in. 29# @ 1120mMD tbg 3-1/2-in. 9.2# to 1099 mmd Open Hole 8 ½-in. 1120 1142 mmd Minimum ID 2.750-in. @ 502.64 mmd STHP 35 bar WHP 20 bar The small production of water, 0.6 mc/day, decreases the productivity and, only after 12-24 hours, the production is completely stopped. Since one year the well was in shut-in condition. 6

The Capillary deliquification Safety System the Capillary Deliquification Safety System, has been developed to facilitate delivery of foaming agents or other chemical and liquids to a specified depth within the completion while maintaining the operability of a downhole safety device, i.e. SCSSV The system can be installed in an existing completion with the Surface Controlled Subsurface Safety-valve wireline Retrievable or Tubing Retrievable where the communication of the control system is activated to operate an installed wireline-retrievable safety valve (WLRSV). The injection feature is operated via the control system for the WLRSV. Use the existing control system as injection lines means that a modification of the well head is not require 7

The Capillary deliquification Safety System The most important tool of this system is the Wire line retrievable surface controlled subsurface safety valve (WR-SCSSV) and the injection check valve 8

Completion Sketch Casing 7" 29# Tubing 3 ½ PJD TRSV size 2.81" Mts 203 WLRSV w/ Chemical Injection Feature Injection Check valve 1" This safety valve has the same features as a standard wireline retrievable safety valve with the addition of a chemical injection feature supplied by the control line that operates the WLRSV. Capillary String size ¼ x 0.0049" Gravel Pack Packer mts 1100 Shear Out Safety Joint Top Open Hole size 8 ½ Mts 1120 When the control-line pressure reaches the predetermined pressure, a check valve installed below the valve opens, allowing the chemical injection to take place while maintaining the presence of a safety valve. Screen size 4" x 0.008" Flow Regulator Mts 1140 Bottom Open Hole Mts 1142 A check valve installed below the WLRSV opens when the differential pressure across the seat of the injection valve exceeds the safety valve s spring set pressure 9

The capillary string used for this application has the following characteristics: ¼-in. OD Material TP: 316 Ti Wall Thickness: 0.049-in. Working Pressure: 8744 psi Hydraulic Pressure Test: 12.000 psi Linear weight: 0.1585 kg/m The capillary string is connected to the lower section of the WLRSV with a special assembly tool. This allows better distribution of its weight. 10

Operational steps POOH a plug 2.75-in from 503 m (the well was close) Perform two calibration with slick line with Gauge Cutter 50 mm to bottom hole and with Gauge Cutter 69,5 mm just bellow the TR-SCSSV RIH @ 1120 (top perforation) the Capillary String OD ¼ -in and once @ depth pick up 190 m in order to space out. Attach the slickline BHA complete with the WLRSV to the ¼ - in.od capillary string. Perform test @ 2000 psi check functionality of WLRSV. Increase to 4000 psi to check integrity of connection RIH and set all assembly slickline with.108-in. wire Note: All operations will be conducted in the Live gas well without killing the well 11

Date From Hrs To Hrs Sequence of Operations 25-mar-10 07:30 12:00 Rig up slickline - flowing capillary string with foamer Job Log 13:00 Fishing plug 2.75-in. At 503 mts - calibrated with 57.7 mm at 1137 mts 14:30 Dummy run lock 2.81-in. @ 203 mts 14:30 15:00 Rig down slickline - 15:00 18:00 Rig up surface equipment for coiled-tubing services 26-mar-10 07:00 10:30 Run capillary string under pressure of 500 psi @ 1133 mts tr 10:30 15:30 Pumped 30 liters at bottom hole at the flow rate of 158 lts/day 15:30 Space out - BOP closed and tested in back flow. Results OK 17:30 Bleed off capillary string to 0 psi, OK 27-mar-10 06:30 Bleed off BOP capillary, OK- Connected WLRSV 2.813" 09:30 Capillary string 1/4-in. Performed circulating test at 4800 psi 09:30 Disconnected WLRSV - flow total volume of capillary string reopened check valve 1-in. @ 2300 psi - Reconnected WLRSV 12:00 2000 psi OK - open check valve at 2300 psi OK - visual test of the WLRSV, OK 13:00 Run capillary string with slickline, landing on TRSV ln - OK 15:00 Energized Vee-packings OK 15:00 17:30 Flowed 15 liters - flow rate 18 lts/day with pressure of 2400 psi 28-mar-10 07:45 Opened well head - discharged about 70 liters/hour of fluid foamer 09:30 At 18 lts/day - defoamer at 36 lts/day - production rate 30.000 std m 3 /D 09:30 Increased flow rate of foamer at 43.2 lts/day and defoamer At 43.2 lts/day - discarged about 50 lts/day of fluid - gas production 00:00 33,000 29-mar-10 30-mar-10 Continued production rate with the same parameters Continued production rate with the same parameters 12

Equipment required Capillary Coil Unit Capillary Unit for 1/4-in. Capillary Coil 1500m di 1/4-in. OD x 0.049-in. wall thickness capillary coil; 1/4-in. pipe slips + C plate BOP/riser configuration for Capillary string Stuffing box for ¼-in. Capillary String 1 x 8 ft, 8 ¼-in. lubricator Double BOP 8 ¼-in. dressed with ¼-in. pipe and blind rams Slickline Unit The slickline Unit should be equipped with a drum.108-in wire BOP/riser configuration for slickline operation Stuffing box 0.108-in slickline wire 2 1/2 -in. lubricator X-over to connect on top of Double BOP 8 ¼-in. coil service 13

Conclusions Casing 7" 29# Tubing 3 ½ PJD TRSV size 2.81" Mts 203 WLRSV w/ Chemical Injection Feature Injection Check valve 1" Capillary String size ¼ x 0.0049" The continuous application of Foaming Agent through the Capillary Deliquification Safety System has brought back the productivity of the well Barbara E #45s to 100% of its productivity capability. Gravel Pack Packer mts 1100 the Capillary Deliquification Safety System installed without any change to the wellhead it can be Shear Out Safety Joint Top Open Hole size 8 ½ Mts 1120 Screen size 4" x 0.008" Flow Regulator Mts 1140 the Capillary Deliquification Safety System maintaining the operability of a downhole safety device. the Capillary Deliquification Safety System can be run with just one trip using standard Rigless intervention techniques. This saves time and costs Bottom Open Hole Mts 1142 14

7th European Gas Well Deliquification Conference Thanks for your attention QUESTIONS SPE www.eni.it Annual Technical Conference and Exhibition Florence, Italy, 19 22 September 2010