STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1055 ASPHALT MAT DENSITY BY GAUGE TESTING. January 15, 2016

Similar documents
STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1055 ASPHALT MAT DENSITY BY GAUGE TESTING. April 18, 2014

IN-PLACE DENSITY OF BITUMINOUS MIXES USING THE NUCLEAR MOISTURE-DENSITY GAUGE FOP FOR WAQTC TM 8

Asphalt Mixture Quality Acceptance

9 QUALITY ASSURANCE PROCEDURES

Method of Test for Determining the Cutout Correction and In Place Density of Asphalt Concrete by the Nuclear Gauge Method

Troxler Electronic Laboratories, Inc.

Hot Mix Asphalt (HMA) Quality Assurance

Asphalt Mixture Quality Assurance

Hot Mix Asphalt (HMA) Quality Assurance

1. SCOPE 2. REFERENCED DOCUMENTS. 2.1 SC Test Methods SC-T Forms SCDOT Electronic Forms SUMMARY OF TEST METHOD

In Place Density Determination of Asphalt Concrete by the Coring Method

2014 PennDOT Gmm Verification Program

Tex-207-F, Determining Density of Compacted Bituminous Mixtures

Standard Test Procedures Manual

Use Part II for absorptive mixtures that have more than 2.0 percent water absorption.

ATT-66/96, DENSITY TEST, ASBC CONTROL STRIP METHOD

DETERMINING DENSITY OF COMPACTED BITUMINOUS MIXTURES

PQI Model 301 & 300Test Block Procedure

Tex-1001-S, Operating Inertial Profilers and Evaluating Pavement Profiles. Chapter 10 Special Procedures. Overview

DETERMINING DENSITY OF COMPACTED BITUMINOUS MIXTURES

Managing Density For Asphalt Pavement

Student Manual. Lesson 4- Nuclear Density Testing. Version 1.0-3/09 4-1

Chapter 3 Tex-1001-S, Operating Inertial Profilers and Evaluating Pavement Profiles

Stop Chasing & Start Managing Density

IN-PLACE DENSITY AND MOISTURE CONTENT OF SOIL AND SOIL- AGGREGATE BY NUCLEAR METHODS (SHALLOW DEPTH) FOP FOR AASHTO T 310

OHD L-47. Guidelines for Resolving Differences in Test Results

Tex-207, Determining Density of Compacted Bituminous Mixtures

ADDENDUM REPORT. Project: Bid Package: 2 Current Let: 06/24/ :00 AM Version: Addendum Addendum : 1

Preferred Instruments Danbury, CT USA

CONTRACTOR MIX DESIGN GUIDELINES ASPHALT CONCRETE

ASPHALT PLANT LEVEL 1

DQM Annual Hopper QA Checks

Emerging Concrete Pavement Solutions Roller Compacted Concrete (RCC)

ATT-59, Part I. ATT-59/99, SMOOTHNESS OF PAVEMENTS Part I, Manual Profilograph. b) Determining the Profile Index from profilograms

BASICS OF ASPHALT PAVING: SCREEDS. Kevin Jeske Great Lakes Regional Manager

BEST PRACTICE FOR COMPACTING WARM AND HOT MIX ASPHALT NEAUPG OCTOBER 7,2009

T-24. A Practical Approach to Managing Density

NCHRP Project Synthesis Topic Tack Coat Specifications, Materials, and Construction Practices

SPECIFICATION FOR INSTALLATION OF RAISED PAVEMENT MARKERS. This specification shall apply to the installation of raised pavement markers.

HCMTCB MATERIALS SAMPLING & TESTING PERFORMANCE CHECKLIST

Limerock Bearing Ratio Technician Training Course

SPECIAL SPECIFICATION 7581 Performance Based Vegetation Management

(PLANT MIXED ASPHALT PAVEMENT (MSCR)). REVISED 02/03/17 DO NOT REMOVE THIS. IT NEEDS TO STAY IN FOR THE CONTRACTORS.

TXDOT DESIGNATION: TEX-922-K

OPERATING INERTIAL PROFILERS AND EVALUATING PAVEMENT PROFILES

TEST FOR STABILOMETER VALUE OF BITUMINOUS MIXTURES

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS

County of Sacramento Standard Construction Specifications January 1, 2008 TECHNICAL PROVISIONS

IA ASPHALT EVAULATION PERFORMANCE EVAULATION

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS

Use of Roller Compacted Concrete By GDOT. Presented By: Joe W. Sheffield, PE Georgia Department of Transportation District Engineer, Tifton, GA

TG3 Use of Nuclear Density Meters (NDM)

Manual of Operation and Instruction

HCMTCB ASPHALT CERTIFICATION KEY ELEMENTS LIST

Compaction Theory and Best Practices

Real-Time Smoothness Measurements on Concrete Pavements During Construction

TXDOT DESIGNATION: TEX-922-K

Restricted Menu Function Access Code:

Misaligned Folds Paper Feed Problems Double Feeds Won t Feed FLYER Won t Run iii

911A Summa Canister Sampler

Item 585 Ride Quality for Pavement Surfaces

High Performance Racetracks

HEATEC TEC-NOTE. Setting Siemens Pressure Transmitter. Used on Heatec Vertical Asphalt Tanks. Publication No , Revised

State of Nevada Department of Transportation Materials Division

Standard Recommended Practice. Field Measurement of Surface Profile of Abrasive Blast-Cleaned Steel Surfaces Using a Replica Tape

DETERMINING OPTIMUM RESIDUAL ASPHALT CONTENT (RAC) FOR POLYMER-MODIFIED SLURRY SEAL (MICROSURFACING) MIXTURES

ELE INTERNATIONAL COMPRESSION TESTER Standard Operating Procedure

ADA Operations Contact Info

Hemoglobin Reference Failure Troubleshooting

RESISTANCE OF COMPACTED ASPHALT MIXTURE TO MOISTURE INDUCED DAMAGE (Kansas Test Method KT-56)

Advantages & Specifications for the Use of Perma-Patch for the Repair of Potholes

Verification Of Calibration for Direct-Reading Portable Gas Monitors

SUPERPAVE Construction Lessons Learned. NEAUPG Annual Meeting Wilkes-Barre, PA October 23, 2003

OHD L-44 METHOD OF TEST FOR MEASUREMENT OF WATER PERMEABILITY OF COMPACTED PAVING MIXTURES

Aquavar SOLO 2 Frequently Asked Questions

Revised Specifications Highlights. David Wang State Construction Office Feb.23, 2010

Inspection and Approval of Asphalt Mix Design Laboratories

Declining Weight Blending System Quick Start Manual E Main St Marshall, IL Phone: Fax: Website:

HEATEC TEC-NOTE Publication No Revised

INSTALLATION MANUAL Residential and Small Commercial Applications

QUALITY ASSURANCE SPECIFICATION NONDESTRUCTIVE EXAMINATION PAGE 1 OF 7

MULTICHANNEL. Labnet International, Inc.

INSTALLATION MANUAL. Residential and Small Commercial Applications. Sensors just make sense

Calibration Procedure

Presented to: Louisiana Transportation Conference February 26, Presenter: Corey Zollinger, P.E

OHD L-44 METHOD OF TEST FOR MEASUREMENT OF WATER PERMEABILITY OF COMPACTED PAVING MIXTURES

Summary of Findings Concerning Longitudinal Cracking on 16' Wide Ramps

ACQUIDATA FAMILY CALIBRATION PROCEDURE CALIBRATION CHECKING

CSA Sample Draw Aspirator Adapter Operator s Manual

Kestrel 5700 Elite. App Quick Start Guide

955730_1 4/17/18. FlowSense Operator s Guide For Gen2 20/20 SeedSense Displays

Product Specification Spring Finger

TANK MANAGER FOR TWO TANKS OPERATING MANUAL. 10/31/11 C-More T6C L color touch panel

SECTION 25 TESTING AND DISINFECTING WATER MAINS General

Calibration Procedure

955108_2. AirForce Operator s Guide

Method of Test for Flat & Elongated Particles

INSPECTION OF RECOVERY BOILERS

MASSACHUSETTS STATE POLICE CRIME LABORATORY. Certificate of Calibration Procedure for the Alcotest 9510

Installation and Maintenance Instruction Manual

Transcription:

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1055 ASPHALT MAT DENSITY BY GAUGE TESTING January 15, 2016 1055.01 General 1055.02 Equipment and Operation 1055.03 Minimum Density Target Determination 1055.04 Testing Procedures 1055.05 Reporting 1055.06 Failure to Follow Requirements Appendix: Gauge Operation and Procedures 1055.01 General. This supplement defines equipment, procedures and reporting methods for asphalt mat density testing and acceptance. The Field Quality Control Supervisor (FQCS) must maintain a copy of this specification at the paving site. Use the density gauge equipment and quality control (QC) procedures below to determine the density of an asphalt mat. The reporting method defined below creates an all-inclusive document for both quality control and quality assurance (QA) testing by the Contractor and Department. The FQCS is the Contractors representative on site responsible to obtain and control density as defined below by being proactive in using available methods, materials or equipment to do so. Achieving the minimum density target as quickly as possible upon project start and then controlling density according to the below methods is the goal of this specification. Lack of proactiveness may be seen as placing asphalt not achieving requirements with no attempt at changes in methods, materials or equipment. Failure to proactively implement methods, materials and equipment to quickly obtain and control density as intended in this specification may mean an application of 1055.06. Do not determine and enter a gauge offset into a gauge control panel or use an existing offset of any kind. If an offset is present in the gauge that alters actual gauge readings all data collected will be rejected and acceptance for the project will be per 446 as outlined in 1055.06. 1055.02 Equipment and Operation. Use a nuclear density gauge in the Backscatter Method meeting the requirements of ASTM D 2950 or a Pavement Quality Indicator (PQI) Model 300, Model 301 or Model 380 manufactured by TransTec Systems. Nuclear density gauge operation When performing tests operate the gauge using 1 minute wet density readings. Do not alter the test time or number of readings at a test location. Take readings where the pavement surface is flat and no surface moisture is evident. Page 1 of 11

Assure nuclear gauges were calibrated in the past two years. Maintain a copy of the calibration sheet with each nuclear gauge. Standardize nuclear gauges using the procedure in Appendix B. Ensure the standard count is within 2% of the most recent calibration or replace the gauge. Document the count and difference on the forms TE -Min Density Target Nuclear, Appendix C and TE-Mat Density QCQA, Appendix E. PQI electronic density gauge operation When performing tests set the device in the single reading and shallow penetration modes. A density measurement will consist of the average of five readings taken in accordance with the reading pattern as described in Appendix A. Take readings where the pavement surface is flat and no surface moisture is evident. Verify the PQI 300, 301 gauge operation daily using the PQI test block. Follow the manufacturer instructions to establish an upper and lower limit at job start as a baseline verification. Ensure each day s verification result is within the upper and lower limits of the baseline verification. Document the verification limits and verification on the forms TE-Min Density Target Elec Gauge, Appendix D and TE-Mat Density QCQA, Appendix E. Verify the PQI 380 gauge operation daily using the Standardization plate issued with the gauge. Follow the Manufacturer s instructions for performing the standardization. Ensure each day s standardization result is within the limits established by the manufacturer and published on the calibration documents. Document each day s standardization result and limits on the TE forms Min Density Target Elec Gauge, Appendix D and Mat Density QCQA, Appendix E. 1055.03 Minimum Density Target Determination. Nuclear density gauge Determine a minimum density target in the first four hours of production or when a mix change necessitates a target density change. Calculate a minimum density target from the gauge test unit weights and the percent density of companion cores obtained from the same test locations as the gauge and Contractor tested according to Supplement 1036. Determine the minimum density target using a gauge reading and companion core result from each of a minimum of 3 separate locations. Re-establish the minimum density target if the difference between the daily gauge calibration standardization count and the most recent calibration count values exceed 2% or if a different nuclear gauge is to be used. Do not determine and enter a gauge offset into a gauge control panel or use an existing offset of any kind. Instead, record actual gauge readings on form TE Min Density Target Nuclear, Appendix C and perform form required calculations. If an offset is present in the gauge that alters actual gauge readings all data collected will be rejected and acceptance for the project will be per 446 as outlined in 1055.06. Present the gauge to Department personnel daily to confirm to them no offset is present. PQI electronic density gauge Determine a minimum density target in the first four hours of production or when a mix change necessitates a target density change. Calculate a minimum density target from the gauge test unit weights and the percent density of companion cores obtained at the same test locations as the gauge and Contractor tested according to Supplement 1036. Page 2 of 11

Determine the minimum density target using gauge readings and a companion core result from each of a minimum of 5 separate locations. Re-establish the minimum density target if the day s gauge verification result is not within the upper and lower limits or if a different electronic gauge is to be used. Do not determine and enter a gauge offset into a gauge control panel or use an existing offset of any kind. Instead, record actual gauge readings on form TE Min Density Target Electronic Gauge, Appendix D and perform form required calculations. If an offset is present in the gauge that alters actual gauge readings all data collected will be rejected and acceptance for the project will be per 446 as outlined in 1055.06. Present the gauge to Department personnel daily to confirm to them no offset is present. 1055.04 Testing Procedures. Perform QC testing to maintain mat density between 93.0 and 96.5 percent. For QC results outside these limits immediately adjust compaction and/or the mix and immediately retest until the target is achieved. Stop placement if signs of flushing are occurring or if excess aggregate breakage is occurring. Maintain adequate compaction and verify by QC tests as follows: A. For a different JMF re-do the startup procedure. B. If mix properties change, are out of specification or plant problems occur re-do the startup procedure after problems are resolved and record results on the given forms. Areas missed due to a gauge failure or other inability to obtain required QC tests must be tested for QC and QA according to the below procedures when equipment is available. Startup - At the start of production, immediately determine the maximum achievable density by taking gauge measurements in a single location under multiple rollers and rolling passes. Ensure basic compaction practices such as proper mix temperatures, rollers tight to the paver and adequate number of rollers vs. paver speed are followed. Take measurements as frequently as possible to determine the maximum achievable density. Stop compacting if mat distress is evident. Correlate the final gauge readings with cores taken according to 1055.03 and tested immediately. Maintain the maximum achievable density by the same compaction practices until the minimum density target is determined. Determine the minimum density target according to 1055.03 using the JMF Maximum Specific Gravity (MSG) until an actual test MSG is available. When an actual test MSG is available recalculate the density of each previous core and report the new densities and adjusted minimum density target on the required forms. Do not determine and enter a gauge offset into a gauge control panel or use an existing offset of any kind. If an offset is present in the gauge that alters actual gauge readings all data collected will be rejected and acceptance for the project will be per 446 as outlined in 1055.06. Use plant MSG results even if any plant QC tests have an out of specification situation. Redo the startup procedure when in specification test MSG results are achieved. If core results are Page 3 of 11

below 93.0 percent adjust the mix or compaction as necessary and allowable per specification and repeat the startup procedure. If a project includes 448.03 Density, acceptance will include any density deductions according to Supplement 1055.04. Quality Control Testing - Use the minimum density target as a guide to maintain mat density above 93.0 percent in QC. Place a label on the pavement at each required test location. The Contractor is expected to perform more QC tests than required but only record required QC tests. Record all required tests and locations on the required form. Take the first required QC test at a location of approximately 1000 feet (300 meters) and one test at each location of approximately every 1000 feet (300 meters) thereafter. Sequentially alternate the transverse location of the required test at each 1000 foot (300 meters) location by starting at the left side of the mat for test one, middle for test two and right for test three and then repeat accordingly for additional locations. Take right and left tests centering the gauge at one foot (0.3 meters) from the mat edge. Adjust compaction as needed to obtain the desired target unit weight at each test location and retest with the gauge to verify it is achieved. Quality Assurance Testing Quality assurance testing will begin after the first production day, regardless the status of achieving the minimum density target. Present the gauge to Department personnel before beginning QA tests each day to confirm to them no offset is present. A minimum of once in each production day or night the Department will randomly select two locations for QA testing. One location will be at a location previously tested and marked in QC testing. The other random location will be on the mat after the first 500 feet (150 meters) of that day. Only select QA test locations within the traffic control zone. The QC technician will perform the testing in the presence of Department personnel. Perform three gauge tests (right, center, left) at each Department selected QA test location, average the three test readings and calculate the average percent density. Take right and left tests centering the gauge at one foot (0.3 meters) from the mat edge. Department personnel will place their initials on the QC form, Appendix E, beside data tested in their presence. Each QA test will represent one half (1/2) days production. If only one of the two daily QA average densities is below 92.0 percent but above 91.0 percent do nothing. If one of the two daily QA average densities is below 91.0 percent use Table 1055.04-1 to determine the percent deduction pay adjustment due to density for that one half (1/2) days production. Table 1055.04-1 Density (%) Payment Deduction 90.0 to 90.9 5% 89.0 to 89.9 15% 88.0 to 88.9 30% Less than 88.0 remove Page 4 of 11

If both QA average densities are below 92.0 percent use Table 1055.04-2 to determine the percent deduction pay adjustment due to density for each one half (1/2) days production. Table 1055.04-2 Density (%) Payment Deduction 91.0 to 91.9 5% 90.0 to 90.9 10% 89.0 to 89.9 15% 88.0 to 88.9 30% Less than 88.0 remove 1055.05 Reporting. Use form TE Mat Density QC QA, Appendix E, for reporting results, whether as part of startup, QC by the Contractor or QA tests selected by Department personnel. Use forms TE Min Density Target Nuclear, Appendix C, or TE Min Density Elec Gauge, Appendix D for determining the minimum density target. Verbally report QC test results to Department personnel (when available) and the Contractor FQCS. Give a copy of all reports to the Project Engineer and fax or email copies to District Testing no later than the workday following the production day of the material represented by the report. 1055.06 Failure to Follow Requirements. Should the District determine that requirements of this specification are not being followed as intended, a gauge offset was used in density determinations or that actual density of the mat is predominantly not as reported acceptance of the mat will revert to 446 requirements (without incentive payment). The project Field Quality Control Supervisor approval may be revoked should the District and Quality Control Qualification Committee (QCQC) of 403 determine that requirements of this specification are not being followed. QC requirements of Supplement 1055 are still required. The Department will perform the testing of the cores and assess the Contractor liquidated damages of two hundred and fifty dollar ($250) for each lot tested. Page 5 of 11

Appendix A: Operation of Density Gauges PQI300, 301 Electro-magnetic Density Gauge Testing Preparation Pick five locations on the asphalt that are dry. Readings A. Turn the PQI300, 301 on. Select the type of pavement you will be calibrating the PQI300, 301 from the menu choices. A B, I or T will be displayed with in [ ]. B. Choose #2 (run) from the startup menu. C. Using the B key, press the key until Single Mode appears on the screen. D. Using the F key, press it to select shallow or deep penetration mode. An S or D will be displayed within brackets [ ]. E. Place the PQI300, 301 in the first location on the asphalt mat. Using a crayon marker draw a circle around the PQI300, 301. The round sensor plate may be used as a guide. Press the ENT key, (DO NOT TOUCH THE PQI) and wait for a reading to complete. Record the density reading. HINT: Better readings are taken if no hands or objects are in contact with the PQI300, 301. F. Move the PQI approximately 2 inches up and to the right on the outside of the circle. Consider this position as the 2 o clock location. Press the ENT key to take another reading and record it in the table given in the back of this manual. Figure A PQI Measurement Pattern G. Move the PQI300, 301 clockwise around the marked circle to about the 4 o clock position. Press the ENT key to take another reading and record it in the table. H. Continue to move the PQI300, 301 in clockwise steps around the marked circle stopping at the 8 o clock and 10 o clock positions to take and record density readings. Following the pattern in Fig. A, move the PQI300, 301 to the next circle location, record a density reading in the center and at each clock position, in turn, until the table is complete. Page 6 of 11

PQI 380 Electro-magnetic Density Gauge Testing Preparation Pick five locations on the asphalt mat that are dry. Readings A. Turn on the PQI380. Press the Start PQI button. B. Select Mix C. Enter your specific mix information in one of the available memory slots. D. When all information is programmed, select Back and then Control Menu. E. From the Control Menu, select Modes F. Select Single to set the gauge to Single reading mode. G. Select Control Menu to return to the Control Menu H. Select GO to start measurements. I. Place the PQI380 in the first location on the Asphalt mat. Using a crayon marker draw a circle around the PQI380. The round sensor plate may be used as a guide. Press the Measure button, (DO NOT TOUCH THE PQI) and wait for a reading to complete. Record the density reading. HINT: Better readings are taken if no hands or objects are in contact with the PQI380. J. Move the PQI380 approximately 2 inches up and to the right on the outside of the circle. Consider this position as the 2 o clock location. Press the Measure button to take another reading and record it in the table given in the back of this manual. Figure B PQI Measurement Pattern K. Move the PQI380 clockwise around the marked circle to about the 4 o clock position. L. Press the Measure button to take another reading and record it in the table. M. Continue to move the PQI380 in clockwise steps around the marked circle stopping at the 8 o clock and 10 o clock positions to take and record density readings. Following the pattern in Fig. B, move the PQI380 to the next circle location, record a density reading in the center and at each clock position, in turn, until the table is complete. Page 7 of 11

Appendix B Nuclear Density Gauge Calibration Take a standard count daily, to compensate for the source decay and to check proper operation of the gauge. Place the reference standard block on a dry, flat surface of asphalt. The location should be at least 10 feet from any building or vertical structure and 33 feet from any other nuclear gauge or radioactive source. Ensure that the top surface of the reference standard block and bottom of the gauge are clean of debris. Place the gauge between the grooves on the reference standard block. Place the source rod on your left and the right side of the gauge against the metal butt plate on the block. Ensure that the source rod is in the SAFE position. Take the standard count and ensure it is within 2 percent of the calibration. Record results on all forms where required. Run standardization at a four minute count. Page 8 of 11

Appendix C TE- Min Density Target Nuclear MINIMUM DENSITY TARGET REPORT: Nuclear Gauge Project: Route: Location: Date: Day #: Mix Type: JMF #: Plant #: District: FQCS: Density Technician: MSG (F): Weather & Temperature: ( ) Day ( ) Night Gauge # / Model #: Number of Lifts: Daily Standard Count: Nuclear Gauge Readings (PCF) Gauge Offset Set to Zero Location 1 2 3 Average Calibration Std. Count / % Diff: PCF (a) Core Density Test Results (see TE-199 for detail) Location 1 2 3 Average % Density (b) Apply the following to obtain the nuclear gauge Minimum Density Target: Minimum Density Target (PCF) = 93 x Gauge Reading Average PCF / Average % Density of cores Minimum Density Target = 93 x / = PCF (a) (b) (c) Remarks: Test conducted by: Date: 9 of 11

Appendix D TE- Min Density Target Elec Gauge MINIMUM DENSITY TARGET REPORT: Electro-Mag Gauge Project: Route: Location: Date: Day #: Mix Type: JMF #: Plant #: District: FQCS: Density Technician: MSG (F): Weather & Temperature: ( ) Day ( ) Night Gauge # / Model #: Upper/lower verification limit: / Electro-Mag Gauge Readings (PCF) Gauge Offset Set to Zero Location 1 2 3 4 5 Center 2 o clock 4 o clock 8 o clock 10 o clock Location Average Overall Avg: (a) Core Density Test Results (see TE-199 for detail) Location 1 2 3 4 5 % Density Average: (b) Apply the following to obtain the nuclear gauge Minimum Density Target: Minimum Density Target (PCF) = 93 x Gauge Reading Average PCF / Average % Density of cores Minimum Density Target = 93 x / = PCF (a) (b) (c) Remarks: Test conducted by: Date: 10 of 11

Appendix E TE- Mat Density QCQA DAILY MAT DENSITY QCQA REPORT Project: Route: Location: Date: Day #: Page of Mix Type: JMF #: Plant #: District: FQCS: Field Technician: Gauge #/model Weather/Temperature: Daily Standard Count (nuclear): Calibration Std. Count / % Diff. Daily Verification Result (elec.) Upper/lower verification limit / # Minimum Density Target (c) PCF Gauge Readings (Contractor QC) ** Use a zero offset when providing gauge readings ** Longitudinal Transverse Actual Gauge % Density = d/c x 93 Location Location (circle) Reading (d), pcf (1055.04 target range 93.0-96.5) ODOT QA TESTS PCFs AVG / / / / / / * Avg Gauge PCF / Minimum Density Target PCF x 93 = % Density % Density* Offset Verified Zero (Y/N) ODOT Initials Tests performed by: Date Submitted: 11 of 11