Commissioning of SCRUBBER SYSTEM. (Tender Reference No. : SROL/PUR/SS/01)

Similar documents

ST.JOSEPH S HIGHER SECONDARY SCHOOL

DATESHEET AND SYLLABUS FOR UNIT TEST-TERM-II UNIT TEST-IV FOR CLASS I

CENTRAL BAORD OF SECONDARY EDUCATION REGIONAL OFFICE 35-B, M. G. MARG, CIVIL LINES, ALLAHABAD , , Fax No.

ACTIVITY I ACTIVITY II: The date of submission of Holiday Homework is 4 July 2018.

World Heart Day. Media Coverage

Important Instructions for the Candidates applying for the position of Project Assistant I/II/III/JRF & SPF:

(Ministry of Consumer Affairs, Food & Public distribution, Govt. of India)

Question of the Day Which was the first bank purely managed by Indians? (c) Bank ofindia (d) Allahabad bank

Chapter Three अध य य त न

THE AIR FORCE SCHOOL CLASS-V HOLIDAY HOMEWORK ( ) THEME- ALL THOSE WHO WANDER ARE NOT LOST

य द क ई स म त ह त क पय अगल प ठ पर दय पऽ म अ ह त र क उपर ल खत पत पर भ ज द

Tejali Hello all welcome to English Together. य भ ग त आपण न रन र ळ य व षय बद दल ब लत आणण त य स ब ध त शब द ज ण घ त. म त ज ल आणण म झ य स बत आह...

Subject: Quotation for Games & Sports Articles.

Chapter Four अध य य च र

CLASS-III SYLLABUS

Activities and Competitions

Current Affairs/कर ट अफ यसर ( 19 सतम बर 2018) By Surendra Pandey (Twice Appeared for IAS interview)

Current Affairs/कर ट अफ यसर ( 22 सतम बर 2018) By Surendra Pandey (Twice Appeared for IAS interview)

MARCH APRIL MAY WEIGHT- TEACHING TOPICS / CHAPTERS

ANNUAL SYLLABUS CLASS-V. Puran Murti Global School

ARWACHIN BHARTI BHAWAN SR. SEC.SCHOOL SYLLABUS (CLASS-4) SESSION SUBJECT-ENGLISH

A TRIP TO THE MARKET - A shopping trip to Jackson Heights, New York. VOCABULARY AND EXERCISES.

PRESS RELEASE HON BLE VICE-PRESIDENT SHRI M. VENKAIAH NAIDU TOOK SALUTE OF THE BSF CEREMONIAL PARADE-2017 DURING BSF 52 ND RAISING DAY PARADE

Class-I TERM III - DATE SHEET MARCH

CLASS- II SYLLABUS ENGLISH SYLLABUS

Current Affairs Live 6:00 PM Daily

Prose: Prose: Prose: Prose:

2. Write the brief summary of each chapter in your own words. 6. Prepare some famous tongue twisters of English as a model.

DELHI PUBLIC SCHOOL, NTPC FARAKKA SYLLABUS BREAK UP FOR THE SESSION

DELHI PUBLIC SCHOOL, NTPC FARAKKA SYLLABUS BREAK UP FOR THE SESSION

Salwan Public School, Gurugram Session Syllabus for SA-II Class - III Subject English Hindi EVS Mathematics Topics

Current Affairs The wake Up Show 16 April, By: Kumar Sambhav

It gives me great pleasure to invite your school to the annual event, TAGFEST, 2018, on Wednesday, August 29, 2018.

World Wildlife Day. March 03, 2017

DOON INTERNATIONAL SCHOOL

Current Affairs The wake Up Show 12 th April, By: Kumar Sambhav

ANNUAL SYLLABUS

S2 Electr c an N reman

G.D. GOENKA PUBLIC SCHOOL, FIROZABAD (CBSE Affiliation No ) NH-2, Hazratpur, Firozabad ( ) Pre board Syllabus - Class X

G. D. GOENKA PUBLIC SCHOOL. SILIGURI SESSION HOLIDAY HOMEORK CLASS IV

Disclosure to Promote the Right To Information

SADHU VASWANI INTERNATIONAL SCHOOL FOR GIRLS SHANTINIKETAN, NEW DELHI

SAFETY AT A GLANCE. The safety performance has significantly improved over the years with:

ST.JOSEPH S HIGHER SECONDARY SCHOOL

व य पक प पकच ल म स द प र ख प र षण स ज ञ पकम

G.D. GOENKA PUBLIC SCHOOL, FIROZABAD (CBSE Affiliation No ) NH-2, Hazratpur, Firozabad ( ) Pre board Syllabus - Class X

SADHU VASWANI INTERNATIONAL SCHOOL FOR GIRLS SHANTINIKETAN, NEW DELHI

Current Affairs/कर ट अफ यसर ( 17 सतम बर 2018) By Surendra Pandey (Twice Appeared for IAS interview)

ST.JOSEPH S HIGHER SECONDARY SCHOOL

News Broadcasting Standards Authority Order No. 49 (2018)

Principal. Subject : Inter-Collegiate Cultural Fest VEDH 2018

Disclosure to Promote the Right To Information

Disclosure to Promote the Right To Information

MONTHWISE SYLLABUS BREAKUP SESSION: CLASS: I SUBJECT: ART AND CRAFT BOOK: CREATIVITY BEYOND (BLUEPRINT EDUCATION)

G.D GOENKA PUBLIC SCHOOL Class II

Kite Diary. (Project- ll ) Manisha Swarnkar Animation ( ) IDC,IIT Bombay Project guide Prof. Phani Tetali

DRAFT IN WIDE CIRCULATION Document Despatch Advice

Disclosure to Promote the Right To Information

Disclosure to Promote the Right To Information

Current Affairs The wake Up Show 2 nd May, By: Kumar Sambhav

Oxygen Administration

CURRENT AFFAIRS (NEWS 24 AUGUST 2018)

Disclosure to Promote the Right To Information

This note presents the findings from the meeting and the responses to the questionnaire.

Current Affairs The wake Up Show 31 st July, By: Kumar Sambhav

Disclosure to Promote the Right To Information

SWASTIK PUBLIC SCHOOL

Disclosure to Promote the Right To Information

1. The inability to realize that a problem can-be saved by using a familiar object in an unusual way is likely due to. www.

Disclosure to Promote the Right To Information

Current Affairs The wake Up Show 10 th April, By: Kumar Sambhav

Non-percolating Flexible Lay Flat Fire fighting Delivery Hose Specification (Fourth Revision of IS 636)

Subject Code : 101 Section Code : 1->Section 1 Difficulty: 1. Answer Key. Q Id. Subject Code. Questions. Meaning of "Chicken feed"

Disclosure to Promote the Right To Information

Current Affairs The wake Up Show 1 st May, By: Kumar Sambhav

Disclosure to Promote the Right To Information

Disclosure to Promote the Right To Information

III MK s Inter School Cricket Tournament- Finals Bonalu Holiday Social Science Week

क न द र य व द य लय, क.र.प.ब. स यख स ज ल ध

of Medical Gas Cylinders

ST.JOSEPH S HIGHER SECONDARY SCHOOL

Event Name: Maharashtra Fire Services November 2017 Exam Name : Fire Prevention Officer Nov 17 Total Questions : 100.

Cover Story of the Month

PROMOTIONS AND OUTREACH PROGRAM FOR BRT & NMT IN PCMC AREA

DELHI PUBLIC SCHOOL PARADIP REFINERY SYLLABUS FOR SESSION Class - V

Department of Fisheries Online Exam Fisheries Junior Clerk Online Exam Total Questions : 100. Total Marks 200

ORGANISATIONAL STRUCTURE FOR SAFETY

JABAL FARASAN INTERNATIONAL SCHOOL RABIGH POST MID TERM EXAMINATION-DECEMBER ( ) CLASS-I

Disclosure to Promote the Right To Information

INVITATION TO VIVIDHA

Vasant Valleytoday. The Noose Around Delhi s Neck. july 2018 Vasant Valley Today // PAGE 1

Class VII SYLLABUS PLANNING FOR TERM I & II ( ) / Social Science

R.B.D.A.V.SR.SEC.PUBLIC SCHOOL, BATHINDA HOLIDAYS HOMEWORK FOR CLASS 3 RD ENGLISH

Disclosure to Promote the Right To Information

व य पक पर च लन मस द प रल ख प र षण स ज ञ पन

Transportation Status Report by Citizens of Pune

IMPORTANT INSTRUCTIONS. 2. The competitions will commence at 0900 hrs in the respective venues.

Disclosure to Promote the Right To Information

द प वल न ह मलन 2015, व म ब इल अपप ल च

Transcription:

न व द स च श व पत र/ CORRIGENDUM to Tender Document for Supply, Installation and Commissioning of SCRUBBER SYSTEM (Tender Reference No. : SROL/PUR/SS/01) INVITED BY Scientist E & Head, BUREAU OF INDIAN STANDARDS, Southern Regional Office Laboratory (SROL),IV Cross Road,Taramani, Chennai 600 113 Ph: 044-22541208, 22541216 mail id : srol@bis.org.in द र आम त रत रत ज ञ न क ई और ह ड भ रत य म क ब य र,दक ष ण त र य क य लय प रय गश ल,च थ क र स र ड त र म, च न ई 600 113 Ph: 044-22541208, 22541216 mail id : srol@bis.org.in यह क स चचत ककय ज त ह कक 28 04 2017 ग -3 गई औ -4 ग य य गय ह This is to bring to the notice of all concerned that in the tender floated on 28 04 2017 the specification given at Annexure -3 and the Technical compliance statement given at Annexure-4 are revised as follows. ग ह ह इ ग औ य य ह ग, य The bidders are advised to submit the bids as per the revision of Technical specification and technical compliance statement issued in this corrigendum only failing which the bids will be considered as invalid. ग ह ह य ह ह ई ह य औ : इ ह ह, य य ग Those who have already submitted their bids are advised to examine and re-submit fresh bids complete in all respects including EMD, in accordance with this corrigendum only, failing which the bids will be considered as invalid.

Annexure3 Technical Specification of SCRUBBER SYSTEM S. No. Component Requirement (1) (2) (3) 1 Scrubber unit The absorption/spray portion of scrubber unit should have a diameter of 900 mm (ID) and height of 2000 mm. The base of scrubber (water holding portion) should be of dia 1200 mm (ID) and height 1000 mm. The Scrubber should be of acid resistant PP + FRP material for strength and structural stability. Thickness of PP portion should be 5 mm minimum and FRP coating should be 5 mm minimum. 2. Scrubber liquid The Scrubber should have water circulation system which will absorb acid fumes coming from the Fume cupboards. A level controller should be provided that opens and closes a water makeup valve and liquid level indicator to maintain the liquid level in the scrubber. 3. Drain facility Provision should be made in the scrubber for neutralizing chemical feed. Scrubber should be provided with a blow down valve to drain the concentrated/neutralized liquid. 4. Water pump The pump should be of PP fitted with 0.75 KW motor. 5. Chimney The Scrubber outlet should be fitted with a vertical duct made of PP (Minimum 3 mm) + FRP (Minimum 3 mm) material of 12000 mm height (approximately) and dia of 400 mm (ID) minimum. This will serve as the chimney. The outlet of chimney should be at least 4000 mm above the roof top of the laboratory.

The outlet of chimney should be covered in such a manner to prevent inflow of outside water/dust in to chimney. 6. Blower unit The Blower unit should have Impeller made of FRP material and casing of PP + FRP. It should be mounted on a 5 HP, 1400 RPM, 3 Phase Motor shaft. The Blower should be connected to the outlet of the Scrubber 7. Ducts Ducting has to be provided to connect three fume hoods to the scrubber. The exhaust pipes of all the three fume hoods should be of FRP, 200 mm (ID) minimum. The exhaust pipes from the all the three fume hoods should be connected to a single common main duct of FRP material, 300 mm (ID) minimum. Thickness of ducting pipes should be 4.0 mm minimum. 8. Dampers A suitable damper at the outlet of each fume hood should be provided to prevent back flow of fumes to the fume hood which is/are not in operation at a particular time. 9. Position of scrubber and blower unit The Blower unit and the Scrubber unit shall be positioned on the ground level near the rear entrance of the laboratory building. (Opposite to Mechanical Workshop). 10 Civil Work All Civil work for installation and commissioning of the scrubber system shall be done by the bidder.

Annexure-4 स क क रबर ससस क टम क आप र त, इ स ट ल शन और कम शर न ग Technical compliance statement by the bidder for SCRUBBER SYSTEM S. No. Component Requirement Quoted details by the bidder Deviation from col (2), if any Remarks (1) (2) (3) (4) (5) (6) 1 Scrubber unit The absorption/spray portion of scrubber unit should have a diameter of 900 mm (ID) and height of 2000 mm. The base of scrubber (water holding portion) should be of dia 1200 mm (ID) and height 1000 mm. The Scrubber should be of acid resistant PP + FRP material for strength and structural stability. Thickness of PP portion should be 5 mm minimum and FRP coating should be 5 mm minimum. 2. Scrubber liquid The Scrubber should have water circulation system which will absorb acid fumes coming from the Fume cupboards. A level controller should be provided that opens and closes a water makeup valve and liquid level indicator to maintain the liquid level in the scrubber. 3. Drain facility Provision should be made in the scrubber for neutralizing chemical feed. Scrubber should be provided with a

blow down valve to drain the concentrated/neutralized liquid. 4. Water pump The pump should be of PP fitted with 0.75 KW motor. 5. Chimney The Scrubber outlet should be fitted with a vertical duct made of PP (Minimum 3 mm) + FRP (Minimum 3 mm) material of 12000 mm height (approximately) and dia of 400 mm (ID) minimum. This will serve as the chimney. The outlet of chimney should be at least 4000 mm above the roof top of the laboratory. The outlet of chimney should be covered in such a manner to prevent inflow of outside water/dust in to chimney. 6. Blower unit The Blower unit should have Impeller made of FRP material and casing of PP + FRP. It should be mounted on a 5 HP, 1400 RPM, 3 Phase Motor shaft. The Blower should be connected to the outlet of the Scrubber 7. Ducts Ducting has to be provided to connect three fume hoods to the scrubber. The exhaust pipes of all the three fume hoods should be of FRP, 200 mm (ID) minimum. The exhaust pipes from the all the three fume hoods should be connected to a single common main duct of FRP material, 300 mm (ID) minimum.

Thickness of ducting pipes should be 4.0 mm minimum. 8. Dampers A suitable damper at the outlet of each fume hood should be provided to prevent back flow of fumes to the fume hood which is/are not in operation at a particular time. 9. Position of scrubber and blower unit The Blower unit and the Scrubber unit shall be positioned on the ground level near the rear entrance of the laboratory building. (Opposite to Mechanical Workshop). 10 Civil Work All Civil work for installation and commissioning of the scrubber system shall be done by the bidder. Note: Quote the actual specifications of equipment to be supplied in col (3), wherever applicable Deviations, if any, from col (2) be quoted in col (4).