September 7, November 29, PSI MVUM EIS Travel Management Team Pike & San Isabel National Forests 2840 Kachina Dr.

Similar documents
Forest Service Travel Management Rule Status and Directives NOHVCC/NAOPM Conference Houston, TX March 26, 2009

Economic Contribution of Off-Highway Vehicle Recreation in Colorado. Executive Summary Season. A joint cooperation report

Engineering Report: Apache-Sitgreaves National Forests. Black Mesa Ranger District. Analysis of. National Forest System Roads (NFSRs) #s 504 & 169

Colorado West Slope Mule Deer Strategy Public Engagement Report

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another.

CERTIFIED MAIL RETURN P.O. Box 710. RECEIPT REQUESTED Tucson, AZ NUMBER:

AMATS Complete Streets Policy

Funding Sources Appendix I. Appendix I. Funding Sources. Virginia Beach Bikeways and Trails Plan 2011 Page I-1

Key Findings from a Statewide Survey of Wyoming Voters October 2018 Lori Weigel

Thank you in advance for considering this important issue. We hope that we may hear from you soon with a positive answer.

February 22, RE: Gunnison Sage Grouse Critical Habitat. Dear Sirs:

We believe the following comments and suggestions can help the department meet those goals.

Hunting, Fishing, Recreational Shooting, and Wildlife Conservation Opportunities and Coordination with States, Tribes, and Territories

BICYCLE PROGRAM IMPLEMENTATION UPDATE. Transportation and Trinity River Project Council Committee June 13, 2016

12 RECOMMENDATIONS Road Improvements. Short Term (generally the next five years)

Thank you for the opportunity to comment on the Draft Freshwater Fisheries Management Plan on behalf of Victoria s recreational fishing sector.

Mr. Forest Cole, (can you please confirm that you have received my , thank you)

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

Big Cypress National Preserve. Hunting Management Plan /

Description of Road Management Objectives, Existing Use, and Proposed Use:

City of Novi Non-Motorized Master Plan 2011 Executive Summary

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

The Florida Bicycle and Pedestrian Partnership Council

Citizens Advisory Committee March 26, 2014

Nebraska National Forests and Grasslands Bessey Ranger District Motorized Trail Width Project

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

POLICY STATEMENT: VISION ZERO

Blue Ribbon Commission Report Recommendations on Pedestrian and Bicycle Infrastructure Improvements

Description of Road Management Objectives, Existing Use, and Proposed Use:

EVERGREEN VISION 2020: BUILDING TRAILS, PARTNERSHIPS, & COMMUNITY

CHAPTER 7.0 IMPLEMENTATION

THE PLANNING AND. Transport and the law Integrated transport planning Strategies Responsibilities of local government and road controlling authorities

PennDOT Bicycle and Pedestrian Initiatives. Jonathan Heilman Roy Gothie Angela Watson

Subject: Scoping Comments Ochoco Summit OHV Trail Project

Traffic Calming Policy

AGENDA ITEM NO. 5b HCAOG TAC meeting of May 8, 2014

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

NOTICE: This publication is available at:

3.9 Recreational Trails and Natural Areas

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

County of Orange Resources and Development Management Department Harbors, Beaches and Parks. Strategic Plan. HBP Strategic Plan Workshop 1.

File Code: 1950:2720 Date: March 21, Dear Interested Party,

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Improving the Process: How Statewide Organizations Are Winning Federal Dollars for Bicycle and Pedestrian Projects

Introduction.

The approach of CanoeKayak BC Whitewater (CKBC-WW) to River Access issues is driven by the organizational Mission Statement:

Maryland Chapter Trout Unlimited Brook Trout Conservation Effort

TRCP National Sportsmen s Survey Online/phone survey of 1,000 hunters and anglers throughout the United States

Section 2 Strategic Alignment. Contents

Summary of Research RESULTS SAFETY TRAINING. Selected Results From a 2006 Survey of Registered Off-Highway Vehicle (OHV) Owners in Montana YES 44%

PRESENTATION TO THE BRITISH COLUMBIA LEGISALTIVE STANDING COMMITTEE ON FINANCE September 26, 2013

DRAFT for a State Policy for Healthy Spaces and Places

FOREST SERVICE MANUAL NATIONAL HEADQUARTERS (WO) WASHINGTON, DC

Spearfish Canyon State Park & Bismarck Lake

NASHUA REGIONAL PLANNING COMMISSION REGIONAL BICYCLE AND PEDESTRIAN PLAN

Executive Summary. March Photo by Tony Bynum, tonybynum.com

EVERGREEN VISION 2020:

Beyond the Highway. Trails and trails. Tom Beekman, P.E. Northwest Regional Planning Chief Department of Transportation

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

FINAL ENVIRONMENTAL IMPACT STATEMENT ON RESIDENT CANADA GOOSE MANAGEMENT Questions and Answers

RE: BUFF Boxley Valley Comprehensive Area Plan Study Area Comments

PLANNING TO KEEP WELLFLEET SPECIAL

Portland International Airport Bicycle and Pedestrian Plan (October 2003) Staff Acknowledgements

For Immediate Release September 14, 2015 Contact: Sue Chrzan Tampa Hillsborough Expressway Authority ext.

Chincoteague National Wildlife Refuge and Wallops Island National Wildlife

5. Pedestrian System. Accomplishments Over the Past Five Years

National Oceanic and Atmospheric Administration. Notice of Intent to Prepare an Environmental Impact

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Kennesaw Mountain National Battlefield Park Mountain Road Alternatives

CSS and Complete Streets Partnering with Mn/DOT for Complete Streets. Scott Bradley Director of CSS April 27, 2010 CTS Research Conference

PROJECT BACKGROUND/DESCRIPTION

Multi-Modal Transportation Assessment and Development Strategy. January 13, 2014 Madison County Commission Meeting

San Luis Valley National Wildlife Refuge Complex, CO; Availability of Record of

APPENDIX F SUPPLEMENTAL TRAFFIC DATA

Detroit River International Crossing Study Local Advisory Council/Local Agency Group Meeting September 24, 2008, 7:00 p.m. Southwestern High School

Operational Plan & Budget

Tahoe National Forest; Placer County, California; Squaw Valley to Alpine Meadows. Notice of intent to prepare an environmental impact statement.

2. Context. Existing framework. The context. The challenge. Transport Strategy

STRATEGIC PLAN Mission To unite and strengthen bicycle advocacy, provide education, and work for a more bicycle friendly Minnesota

Planning and Programming Committee Meeting April 14,

Beyond the Highway. Tale of the Trails. Tom Beekman, P.E. Northwest Regional Planning Chief Department of Transportation

Mining & Petroleum Focus Group Southern Rocky Mountain Management Plan. Synopsis of Focus Group Key Issues

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

May 12, Dear Superintendent Kimball:

A national cycling strategy for more and safer cycling

The Big Picture. FY Bicycling Highlights

The Role of MPOs in Advancing Safe Routes to School through the Transportation Alternatives Program

FOREST SERVICE MANUAL NATIONAL HEADQUARTERS (WO) WASHINGTON, DC

Strategic Plan Basketball in Victoria:

Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page

Youth Cow Elk and Doe Deer Hunts at Burns Hole -Ranching for Wildlife-

City of Fairfax, Virginia City Council Work Session

Pedestrian-Bicycle Task Force, and 2017 Lawrence Budget Recommendations by Sustainability Action

Service Business Plan

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No

Ministry of Forests, Lands, and Natural Resource Operations OVERVIEW OF ANGLING MANAGEMENT PLANS FOR THE SKEENA WATERSHED

TRAFFIC IMPACT STUDY CRITERIA

Transcription:

September 7, 2016 PSI MVUM EIS Travel Management Team Pike & San Isabel National Forests 2840 Kachina Dr. Pueblo, CO 81008 November 29, 2018 Pike & San Isabel National Forest, Travel Management EIS Comments regarding conversion of National Forest System Roads (NFSR) to Multiple Use Trails Dear Mr. Dow: We want to thank the Pike & San Isabel National Forest (PSI) for the efforts being made toward meeting the requirements of the Stipulated Settlement Agreement, Civil Action No. 11-cv-00246-WYD. In addition to the settlement requirements, we support your efforts to improve the system of motorized routes, and in the steps being taken to identify a minimum road system that will meet the future needs of the motorized and multiple use recreation community. As Intervener Defendants to the settlement agreement, we desire an outcome that is based on the best available scientific data and a decision that is in the public interest. Please accept these comments on behalf of the Trails Preservation Alliance ("TPA") and the Colorado Off-Highway Vehicle Coalition ("COHVCO"). The TPA is a volunteer organization created to be a viable partner to public lands managers, working with the United States Forest Service (USFS) and the Bureau of Land Management (BLM) to preserve the sport of trail riding and multiple-use recreation. The TPA acts as an advocate for the sport and takes the necessary action to ensure that the USFS and BLM allocate a fair and equitable percentage of public lands access to diverse trail multi-use recreational opportunities. COHVCO is a grassroots advocacy organization representing approximately 170,000 registered off-highway vehicle ("OHV"), snowmobile and 4WD users in Colorado seeking to represent, assist, educate, and empower all motorized recreationists in the protection and promotion of multi-use and off-highway motorized recreation throughout Colorado. COHVCO is an environmental organization that advocates and promotes the responsible use and conservation of our public lands and natural resources to preserve their aesthetic and recreational qualities for future generations. TPA and COHVCO are referred to collectively in this correspondence as "The Organizations." The Organizations offer the following comments and concerns regarding this project.

It has recently come to the attention of the Organizations that the PSI intends to revise the Proposed Action. Up to this point, the Proposed Action has been identified as Alternative B. Now, as a result of public scoping, the new Proposed Action will be Alternative C. We could possibly support this revision since Alternative C (with some modifications) emphasizes a safe and environmentally sound transportation system that consists of the routes currently in the Infrastructure Application System (INFRA), plus urgent priorities previously identified during the Travel Analysis Process (aka TAP) and documented in the associated TAP reports and addendums. This alternative also better addresses the Minimum Road System (MRS), which the Organizations could possibly support as long as the TAP Addendums are used to guide and advise the MRS process, and as long as the outcome from the MRS process improves the motorized recreation system of routes on the PSI. We also will likely support the creation of a Preferred Alternative for the final EIS, based on a modified Proposed Action, after evaluating public comments on the Draft Environmental Impact Statement (DEIS). We intend to identify a collection of sustainable trails, parking areas and travel areas that are being analyzed in Alternative D that should be included in the Preferred Alternative. Those routes and trails will be specifically identified during the public comment period allocated for the DEIS. We appreciate the willingness of the PSI to provide the public with regular progress reports and updates via the psitravelmanagement.org website. Recently, access to that website along with the reports and data work products was closed, and we hope that the PSI MVUM EIS Travel Management Team will reconsider that decision to take down the website and once again provide reports, updates and data that will provide the public with sufficient information to follow the progress and participate in every step of this process. Over the past few months, our recreation and transportation planning specialists have reviewed the publically provided data and information related to the alternatives, the TAP Addendums and the Minimum Road System process. The results of our review have provided us with some important conclusions and recommendations that we want to share with you prior to the publication of the DEIS. The primary recommendation we have at this point in time is for the PSI to fully embrace the strategy of the conversion of roads to motorized trails. This strategy is a practical and a beneficial way of meeting the requirements of the MRS, and at the same time providing a safer, more economical, more environmentally sound and more flexible motorized route/trail system for public recreational uses. We feel it is important at this point to reiterate the following comment (along with several similar comments in our previous document) that our Organizations made back in 2016: 10. The Organizations would encourage and support the Forest s decision to convert most any existing National Forest Service Road (NFSR) to a 2

Full Size Trail or another trail designation (e.g., Trail open to Motorcycles, or open to Vehicles 50 or less in width). We encourage the use of conversion techniques contained in Chapter 17 of the National Off-Highway Vehicle Conservation Council s (NOHVCC) 2015 Great Trails: Providing Quality OHV Trails and Experiences publication. In our analysis, we have identified the roads most suited for conversion to motorized trails. They are the mixed-use roads, maintained at a maintenance level 2 (ML2), with a Moderate or High Recreational Use benefit rating in the TAP Addendums. Historically, these are the old Jeep trails that have been on the forest for many decades. Some of these trails were intended to provide access to remote dispersed camping sites, and others provided access to scenic vistas, while others were intended simply as fun driving opportunities that created looped routes for public, motorized, off-road enjoyment. When they were officially added to the NFSR system, mostly back in the 60 s, 70 s and 80 s, these routes were put into the Roads database because at that time there was no official database/attribute for full size motorized trails. Now with this EIS process, together we have the opportunity to correct that discrepancy and record these Jeep trails as National Forest System Trails (NFSTs), where they rightly belong. Our analysis of the draft action alternatives spreadsheet reveals the following data: In Alternative C, there are approximately 1,372 miles of PSI ML2 mixed use roads. Of these: o 623 miles have an overall TAP rating of H/L (45%) o 539 miles have an overall TAP rating of H/H (39%) o 150 miles have an overall TAP rating of L/L (11%) o 60 miles have an overall TAP rating of L/H (4%) The High Benefit/Low Risk (H/L) roads are ideal roads as is, and for the most part should be kept as is, with very few if any conversions to trails. The High Benefit/High Risk (H/H) roads have unacceptable resource risks that need some type of mitigation to satisfy the requirements of the MRS. One of those mitigations that increases safety, reduces costs and better protects natural resources is the conversion to motorized trails. There are approximately 517 miles of H/H, ML2 roads in this category with a Moderate or High Recreational Use Benefit rating that should be converted to motorized trails. The Low Benefit/Low Risk (L/L) roads do not cause significant resource damage, and they do not have overall significant benefits, but the L/L roads with a High or Moderate Recreational Use Benefit rating should be converted to motorized trails. The data shows approximately 105 miles of L/L ML2 roads in this category. The Low Benefit/High Risk (L/H) roads have unacceptable resource risks that need some type of mitigation to satisfy the requirements of the MRS, and they also need a Moderate or High Recreational Use benefit rating to justify the conversion to motorized trails. There are approximately 37 miles of L/H ML2 3

roads with a Moderate or High Recreational Use Benefit Use rating that should be converted to motorized trails. The grand total of miles of mixed use, ML2 roads that should be shown in Alternative C as Convert to Motorized Trail is approximately 659 miles. The majority of these roads should be converted to full size trails, but some would be more suited as 50 ATV trails and some as single-track motorcycle trails. The intent of the TAP Addendums is to guide and inform the National Environmental Policy Act (NEPA) analysis and help move the PSI toward the MRS. The Convert to Motorized Trail strategy is based on the TAP results and informs the Environmental Impact Statement (EIS) in general and the Proposed Action MRS Alternative specifically. The Organizations unequivocally support the Convert to Motorized Trail strategy as we have previously stated in our comments, and we encourage the PSI Travel Management team to use the reasoning provided above to increase the miles of roads converted to trails in Alternative C (and Alternative D) and to more closely match our numbers above. The current Draft Action Alternatives Spreadsheet has approximately 390 miles of road in Alternative C that will be analyzed for conversion to trail, so we would like to see that number increase by approximately 60%. When the DEIS is published, we will be looking specifically at the miles of roads converted to motorized trails in the Proposed Action alternative, and if that number is not somewhere close to 659 miles, we will be expressing our opposition to the DEIS in general and to the MRS process specifically during the comment period. Conversion of roads to trails in accordance with the methods and techniques contained in Chapter 17 of the National Off-Highway Vehicle Conservation Council s (NOHVCC) 2015 Great Trails: Providing Quality OHV Trails and Experiences publication would allow the PSI staff to be much more flexible, creative and innovative in meeting the increasing desires, needs and demands of the public to provide high quality motorized recreational experiences. The spectrum of possibilities to make trails more interesting, challenging and fun is much greater with trails than with the engineering requirements for roads. The Organizations would also offer that meeting the mandatory NEPA requirements can be, and is often more straight forward and expedient when considering the modifications or improvements to trails than for roads. The Organizations are aware that there may be some concern that conversion of roads to trails for motorized use may cause trepidation that those routes would now require a State/Colorado Parks and Wildlife (CPW) OHV sticker for legal travel. The Organizations are very aware of, and in some cases participating in current statewide discussions to explore funding mechanisms and user fees to help supplement public land management agency operating budgets for activities beyond OHV use. The Organizations contend that expanded implementation of user fees for public lands will become inevitable in the future. That utilizing the highly successful CPW OHV sticker program for travel on motorized trails that have been converted from roads is 4

reasonable and in unison with the ongoing discussions to implement and expand user fees to activities other than OHV use, hunting, fishing, etc. Thank you for your consideration of these comments. Together we hope to help develop a sustainable system of motorized routes on the PSI, and at the same time perhaps even help identify the minimum road system needed for safe and efficient travel and for the administration, utilization and protection of PSI and our National Forest lands. The TPA and COHVCO would welcome a discussion of these issues at your convenience. Our point of contact for this project will be William Alspach, PE at 675 Pembrook Dr., Woodland Park, CO, williamalspach@gmail.com, cell 719-660-1259. Sincerely, Scott Jones, esq. D. E. Riggle COHVCO Co-Chairman Director of Operations CSA Vice President Trails Preservation Alliance 508 Ashford Dr. 725 Palomar Ln. Longmont, CO 80504 Colorado Springs, CO 80906 (518) 281-5810 (719) 338-4106 scott.jones46@yahoo.com info@coloradotpa.org cc PSICC Forest Supervisor Deputy PSICC Forest Supervisor 5