Contents. 3) WTG Installation Vessel ) Hotel vessel ) Substation works ) Survey Vessel... 5

Similar documents
Contents. 3) WTG Installation Vessel ) Array cable burial Vessel ) Hotel vessel ) Substation works... 5

Contents. 3) Construction Vessels ) Guard Vessels ) Crew Transfer Vessels ) Upcoming Operations (following 7 days)...

Contents. 3) WTG Installation Vessel ) Array cable installation Vessel ) Hotel vessel ) Survey Vessel ) Guard Vessels...

Contents. 3) Construction Vessels ) Guard Vessels ) Crew Transfer Vessels ) Upcoming Operations (following 7 days)...

Contents. 3) WTG Installation Vessel ) Array cable installation Vessel ) Hotel vessel ) Rock bag removal Export cable ends...

Contents. 3) Construction Vessels ) Guard Vessels ) Crew Transfer Vessels ) Upcoming Operations (following 7 days)...

Contents. 3) Construction Vessels (All dates are weather dependant) ) Survey Vessel ) Guard Vessels... 4

Contents. 3) Construction Vessels (All dates are weather dependant) ) Survey Vessel ) Guard Vessels... 5

NOTICE TO MARINERS DUDGEON OFFSHORE WIND FARM CONSTRUCTION WORKS

The Array cable installation vessel Stemat 82 and Assist tugs Lydia D and Claudia B are expected to commence installing array cables during week 5.

NOTICE TO MARINERS DUDGEON OFFSHORE WIND FARM CONSTRUCTION WORKS

NOTICE TO MARINERS DUDGEON OFFSHORE WIND FARM CONSTRUCTION WORKS

Other vessel's involved in the Swale cable pull in and burial operations will be the multicat Wiltango, and the barges Wilcarry 300, & Wilcarry 342.

Notice of operations at London Array Offshore Wind Farm

Notice to Mariners No 24 / 2017 Blyth Offshore Demonstrator Project 9 th September 2017

The vessel Nova K, will be undertaking survey and PLGR work on the array cable routes.

Notice of operations at London Array Offshore Wind Farm. Date of Notice: 20 th May 2012 Notice no: 75. London Array Offshore Wind Farm

Notice of operations at London Array Offshore Wind Farm. Date of Notice: 03 rd June 2012 Notice no: 77. London Array Offshore Wind Farm

Notice of operations at London Array Offshore Wind Farm. Date of Notice: 01 st July 2012 Notice no: 81. London Array Offshore Wind Farm

Nemo Link s puxo campaign

For live Kingfisher updates of offshore activities, visit and on Twitter. 1 of 10

All Array cables have been installed and the cables have now been buried.

Safety Zone Application Construction Phase Sheringham Shoal Wind Farm Project

The shaded blocks below indicate the areas of activity published within this Bulletin.

MARINERS BRIEFING NEW ENGLAND SURVEY ACTIVITY CONTACT. RODNEY AVILA FISHERIES LIAISON Phone:

Protection for Vessels Engaged in Servicing Submarine Cables

G+ Global offshore wind health and safety organisation

MARINERS BRIEFING NEW ENGLAND SURVEY ACTIVITY CONTACT. RODNEY AVILA FISHERIES LIAISON Phone:

The shaded blocks below indicate the areas of activity published within this Bulletin.

G9 Stakeholder Forum Marine Operations

Multi-Purpose Workboats and Vessels. Marine Engineering and Construction. Salvage and Wreck Removal. Marine Consultancy Services

GERMAN RENEWABLE SHIPBROKERS S GERMAN RENEWABLE VESSEL PORTFOLIO ANY VESSEL ANYTIME

Code of Practise for Deployment and Marking of Fishing Gear

ADANI PORTS & SEZ LTD. ++ MUNDRA PORT ++ GENERAL INFORMATION

The shaded blocks below indicate the areas of activity published within this Bulletin.

3 CONSTRUCTION. 3.1 Construction Methods and Sequence. 3.2 Construction Sequence

London Array Offshore Wind Farm. Vessel Data Matrix

Scottish Hydro Electric Power Distribution Operation, Inspection, Maintenance and Decommissioning Strategy Bute Cumbrae Cable Replacement

UNDERWATER SERVICES COMPANY PROFILE

Dive Operations Plan for Personal Submersibles. Revision

Notice of operations at London Array Offshore Wind Farm

Gorgon - Pilotage - Passage Plan Materials Offloading Facility (MOF) to PBG

Order no. 939 of 27 November 1992 on the protection of submarine cables and submarine pipelines (the Cable Order)

THE ROLE OF INSTALLATION AND SUPPORT VESSELS

Astrolabe Reef Access Plan Stakeholder Presentation

That is why. April 24, 2008

The shaded blocks below indicate the areas of activity published within this Bulletin.

The shaded blocks below indicate the areas of activity published within this Bulletin.

Marine Management Organisation Marine Licence

TAT 14 (Segment K) North Western Approaches

South African Maritime Safety Authority Ref: SM6/5/2/1 /1

Seventeenth Coast Guard District Auxiliary Policy Directive 01-07

International regulations and guidelines for maritime spatial planning related to safe distances to multiple offshore structures (e.g.

Oil Tanker - VLCC. Yosu Inward Transit Monitoring (Entering into the Port of Yosu on a Loaded VLCC) LEG 1: APPROACHING ANCHORAGE AND PILOT STATION

Port Marine Safety (PMS) Risk Assessment: Poole 100 Offshore Powerboat Races

LIST OF NOTICES TO MARINERS 2017 PAC 201 JUAN DE FUCA STRAIT AND STRAIT OF GEORGIA, FIRST EDITION, 2012

Offshore Wind Vessels. Steven Kopits Douglas-Westwood LLC

For live Kingfisher updates of offshore activities, visit and on Twitter. 1 of 10

HDD Wire Guided Waterway Crossing ATON Plan. Augwick Creek (S-L28)

Gorgon - Pilotage - Passage Plan PBG to Materials Offloading Facility (MOF)

Aids to navigation can include buoys, day beacons, range markers, and lighthouses.

UNDERSTANDING IN DEPTH, COMMITTED TO CORE.

THE SYLLABUS FOR WRITTEN EXAMINATION PILOT'S FOURTH CLASS LICENCE (TEES AND HARTLEPOOL) AND

Charlottetown Marine Terminal Pipeline Decommissioning Project Description

Good Mooring to You! Jensen Beach Mooring Field. Kathy Fitzpatrick, P.E. Coastal Engineer, Martin County

Wind Mills of the Mind Delivering large scale offshore wind. Andy Kinsella CEO, Offshore November 24th, 2011, Dundalk

Argentine Navy ARA San Juan (S-42) Search 2018

SAILING INSTRUCTIONS

ROV Development ROV Function. ROV Crew Navigation IRATECH SUB SYSTEMS 2010

IMCA Competence Assessment Portfolio June 2013

IMCA Competence Assessment Portfolio June 2013

A Consultation on the Proposed Port/Pilotage/VTS limits for St Helier and associated Guidance/Restrictions

Focus on Operational Efficiency and Crew Safety - Introducing Advanced ROV Technology in Marine Towed Streamer Seismic

Gorgon - Pilotage - Passage Plan - PBG to Gorgon Marine Terminal - Alternative Route

Visiting Lake Macquarie

Cook Inlet pipeline crossing is about making the best choices

Sailing Instructions

LIST OF CORRECTIONS. 14 / July /052(T) - 07/125(T) - 08/136(T) - 08/137(T) - 12/177(T) - 15/212(T) - 18/232-22/285(T)

Liverpool Yacht Club Tranmere Sailing Club Littlewoods Trophy Sunday 3 rd July 2016

SAILING INSTRUCTIONS

NOBLE REV 02 FPSO MOORING SYSTEM INTEGRITY STUDY

MORETON BAY BOAT CLUB Queen s Birthday Short Course Event Monday 3 rd October 2016

LIST OF CORRECTIONS. 02 / January /052(T) - 07/125(T) - 08/136(T) - 08/137(T) - 12/177(T) - 15/212(T) - 18/232-22/285(T)

NOTICE TO MARINERS. No 17 of Diving at Work Regulations 1997 and Commercial Operations Involving Swimmers

LOCAL NOTICES TO MARINERS 1/13. Valid from: 01/1/13 Expires on: Until withdrawn. HHAL Local Notice To Mariners In Force

OFFSHORE SURVEY IN DEVELOPMENT PROJECTS. Ian Douglas Head, Offshore Surveys, Shell Projects & Technology Europe

Offshore Racing SAILING INSTRUCTIONS

35 years of unparalleled support to the offshore oil and gas industry.

Anchor operations for Jack-up barge in offshore wind farms during service Customers perspective

The shaded blocks below indicate the areas of activity published within this Bulletin.

To be read in conjunction with the 2018 MYCQ Sailing Instructions, Revision H. RACE: The Great Bay Race TYPE: Summer 5

Preliminary Survey Notification and Information for Fisheries Interests.

Wind Farms and Fisheries: Some Commercial Solutions

STAKING TRAFFIC CONTROL SIGNAL SYSTEMS

TRACK RECORD. First Mover. Burbo Bank Ext. - Tristan Stedman

COMBINED OCEAN POINTSCORE SAILING INSTRUCTIONS 2018 / 2019

COGS RACE 2. St Austell Brewery. FOWEY to FALMOUTH

Liverpool Yacht Club Tranmere Sailing Club Tranmere Sailing Club, Offshore Challenge Saturday 2 nd July 2016

A buoy, for example is an aid to navigation. Aids to navigation include many types of buoys as well as day beacons, range markers, and lighthouses.

Gorgon Pilotage Passage Plan - PBG to Gorgon Marine Terminal Primary Route

Transcription:

Contents 1) Notice to Mariners (NtM) (Active)... 2 2) Hazards/Mitigation for Project Vessels and PAX... 3 3) WTG Installation Vessel... 4 4) Hotel vessel... 4 5) Substation works... 5 6) Survey Vessel... 5 7) Installation Vessels Fibre Optic Cable... 5 8) Guard Vessels... 6 9) Crew Transfer Vessels... 7 10) Upcoming (following 7 days)... 9 11) Summary of (previous 7 days)... 10 12) Looking further ahead (beyond 7 days) (new activities starting)... 10 13) Project Met mast details... 10 14) Project Wave Rider... 11 15) As Laid Cardinal Buoy Positions... 11 16) Contact details... 11 17) Export Cable Coordinates... 12 18) Flotel Anchorage Position... 12 19) Site Chart... 13 20) WTG Coordinates in LAT and LON... 14 Page 1 of 14

WNoO application: - Issued weekly by the ROW Project Marine Co-ordination Team - Notice to Mariners (NtM) will be issued for any unplanned/unmarked navigational hazards introduced by the project within our area of operation 1) Notice to Mariners (NtM) (Active) Notice to Mariners Ref. NTM001 NTM009 NTM016 NTM017 NTM049 NTM 064 NTM 069 NTM 070 NTM 071 NTM 072 Date of Issue Activity (Vessel in brackets) Status of Works Expected close out 15/12/2015 Cardinal as Laid Positions Ongoing June 2018 10/03/2016 Approval of Safety Zones Ongoing June 2018 27/05/2016 Installation Rock Pads Ongoing June 2018 24/06/2016 Installation Rock Pads Round 2 Ongoing June 2018 09/02/2017 Safe distances of all structures within Rampion Offshore Wind Ongoing Until further notice 09/05/2017 Export cable ROV Surveys On HOLD TBA 20/06/2017 Installation of Fibre Optic cables Planned 30/09/17 15/08/2017 Row Wave Rider update Ongoing Until further notice 23-08-2017 Updated Main Array Hazard Area Ongoing Until further notice 23-08-2017 Updated Export Cables Hazard areas Ongoing Until further notice Secretary of State has approved our application for statutory Safety Zones (08/03/16) during the construction of the Rampion Wind Farm. These Safety Zones are defined as: 500m around all structures (where construction vessels are present) 50m around all structures (whilst personnel are working on them) including the offshore substation. All project vessel masters and 3 rd party sea users are requested to remain a minimum safe distance of 500m around each vessel. Project vessels are to keep a sharp lookout (Radar/AIS and visual) for nonproject vessels entering these zones and report to Duty MC via P1 ASAP. Page 2 of 14

2) Hazards/Mitigation for Project Vessels and PAX GSK pipeline o 30m Safety Zone either side of the GSK pipeline situated to the East of the export cable corridor. No project vessels will be permitted to enter this safety zone without prior permission by the Duty MC Redundant sewage outfall pipeline o 30m Safety Zone either side of the redundant sewage outfall pipeline to the west of the cable route Fishing gear o All Vessels to keep a sharp lookout and report any fishing gear to duty MC who will in turn distribute information to all other project vessels. o All vessels to operate appropriately where the hazard of fishing gear exists Fishing vessels o Standing order for all project vessels to pass at a safe distance. Dive Vessels/Divers o Standing order for all project vessels to pass at a safe distance o Specifically, if any vessel is present over a known dive site, project vessels are to pass a minimum of 1NM uptide. Scour protection and exposed cables on sea bed around foundations o Guard vessel in operation o Co-ordinates disseminated to FLOs Subsea cables (buried, shallow buried and surface laid). o All project vessels to keep a sharp lookout for third party sea users venturing near subsea cables laid on sea bed. Report any such instances to Traffic ASAP. Special consideration of the exposed cable at the jointing location (50 42.97 N, 000 17.88 W) and to the east of the Offshore Substation. Drift Netting o Project vessels to operate accordingly during transits in darkness with regard to the commencement of the drift net season Refer to Documents RAM-ERA-SMG-SAF-0001_00 (Guidelines for CTV operators on specific hazards) Ensure all project vessels have latest Office Site Chart (Check with Duty MC for latest Rev) Page 3 of 14

Name Flag Call Sign/MMSI Contact Info L (m) B (m) D (m) GT (t) Contractor Status (Start) Picture 3) WTG Installation Vessel MPI Discovery NL PCFF/246741000 138 40 5.9 19533 Eon WTG Installation Start 01/03/2017 MPI Adventure NL PCKV/245924000 136.4 40 5.4 19533 Eon WTG Installation Start 08/06/2017 4) Hotel vessel Wind Solution UK 2AR07/235062382 122 19 5.1 8893 Eon Flotel Start 25/04/2017 Page 4 of 14

Name Flag Call Sign/MMSI Contact Info L (m) B (m) D (m) GT (t) Contractor Status (Start) Picture 5) Substation works Pacific Osprey CY 5BUF3/210286000 161.3 49.03 5.1 24586 Eon Substation jack up start 15/05/17 till Late 2017 6) Survey Vessel RRV Audrey (UK) 2CTN7/235075634 13 6 1.1 13.5 Turbine Transfers Survey s. Working out of Brighton Start 01/11/2016 Bibby Athena (UK) 2ICA5 /235108458 27.5 10 2.9 260 BIBBY Survey s. Working out of Brighton Start 01/11/2017 7) Installation Vessels Fibre Optic Cable Husky (UK) 2EQ17/235087309 21.59 6,51 2.6 72 GMSL Excavation works Start 29-06-2017 Beluga (NL) NA 45.11 17.07 2.9 700 GMSL Excavation works Start 29-06-2017 CRC Argosy (UK) 2IHL8/235109792 9 3.1 0.8 3.8 GMSL Crew change Vessel for Beluga Page 5 of 14

Name Flag Call Sign/MMSI Contact Info L (m) B (m) D (m) GT (t) Contractor Status (Start) Picture C-Fenna (UK) MBAH3/232008023 24.68 11 2.7 255 GMSL Dive Support Start 08-07-2017 Island Phoenix (UK) 2IUR3/235112943 14 5 0.8 36 GMSL Crew Change vessel for C-Fenna Start 16-07-2017 CS Recorder (UK) MATL3/232007052 105.5 20 6.2 6292 GMSL Offshore Fibre Optic cable lay Start Mid August Jif Challenger (FR) FIYA/228074700 34 14 3.1 499 GMSL Nearshore Fibre Optic cable lay Start Mid August 8) Guard Vessels George Johannes (UK) MCPF5/232006450 26.27 6.48 3.2 122 Choice Marine Guard Boat Duties 24/7 Start 30/07/2017 Commander P (UK) 2GIR2/235097729 18 6 0.9 27 Offshore Turbine Services Fast Response Guard Vessel Start 18/08/2017 Page 6 of 14

Name Flag Call Sign/MMSI Contact Info L (m) B (m) D (m) GT (t) Contractor Status (Start) Picture 9) Crew Transfer Vessels Rix Tiger (UK) 2GGY4/235097309 19 9 1.8 42 Rix Sea Shuttle Site CTV Working out of Newhaven Rix Panther (UK) 2FRT9/235093688 Windcat 6 (UK) MXFD/235057789 CH 16/P1 19 8 1.5 42 Rix Sea Shuttle 16 6 2 40 Windcat CTV and Ad-hoc Inspections Working out of Newhaven Start 15/03/2016 Site CTV Working out of Newhaven Windcat 10 (UK) 2BAN2/235064453 22 6 2 36 Windcat Site CTV Working out of Newhaven Windcat 17 (UK) 2BYDS/235070402 18 6 2.5 35 Windcat WTG M&E completion Start 19/09/2016 Windcat 19 (UK) 2CUS9/235075935 22 6.5 1.9 40 Windcat WTG Commissioning Start 06/03/2017 Porth Eilian (UK) 2GNX8/235099056 CH 16/P1 18 8 1.9 55 Turbine Transfers Crew change / Water taxi 11/03/2017 Windcat 22 (UK) 2CUS9/235075935 22 6.5 2.1 40 Windcat Terminations Package Working out of Newhaven Start 11/01/2016 Page 7 of 14

Name Flag Call Sign/MMSI Contact Info L (m) B (m) D (m) GT (t) Contractor Status (Start) Picture Njord Snipe (UK) 2HGH2/235103431 20 8 1.8 65 Njord Offshore Crew change / water taxi 11/03/2017 Sure Pride (UK) 2FUM/235094357 Avocet (UK) 2DXB6/235082698 CH 16/P1 CH 16/P1 20 8 2 67 Surewind WTG Commissioning Start 15/05/2017 SAP CTV 19 6 1.8 60 Gardline Working out of Newhaven Start 16/07/2017 Porth Nefyn (UK) 2IRQ8/235112231 19 8 1.6 48.1 Turbine Transfers WTG M&E completion Start 07/04/2017 Sure Pilgrim (UK) 2GEJ9/235096669 CH 16/P1 20 8 2 67 Surewind WTG Commissioning Start 06/03/2017 Rhosneigr bay (UK) 2INI6/235111197 CH 16/P1 25.4 8.5 2.5 103 Turbine Transfers OSP CTV Page 8 of 14

10) Upcoming (following 7 days) Operation Location Vessel Operational Notes WTG Installation WTG Installation K10, I11, J11, MPI Discovery H11, I12, I13, J13 MPI Adventure In Field installing final cycle 14, Demob Deeside IN Esbjerg Loadout cycle 15 Array Cable Terminations M08, A09, B09, D11, B10, C11, D12, I13, I12, H11, J12 Avocet Rix Panther Windcat 22 are due to be completed by Late 2017 WTG M&E completion/ commissioning All locations Windcat 19, Windcat 17, Sure Pilgrim, Sure Pride, Porth Nefyn Ongoing Inspection Snagging Painting cleaning All locations Windcat 10 Rix Tiger Windcat 6 Ongoing Crew change Water Taxi All Locations/Newhaven Port Njord Snipe Porth Eilian Ongoing Project Guard vessels Site 24hr Guard Vessels George Johannes, Commander P, Ongoing OSS works Offshore sub station Rhosneigr Bay Ongoing OSS Flotel Accommodation jack up vessel Pacific Osprey East of OSP Survey Multibeam/side scan/depth of burial Surveys Audrey Bibby Athena Ongoing operations until end of construction Start Sept 17 Flotel Anchored outside field Anchorage No 3 Wind Solution Start 26/04/2017 Fibre Optic cable installation Export cable route CS recorder Jiff Challenger Waiting for weather window, 3 days work Page 9 of 14

Dive works OSP FO cable installation OSP Fenna C CRC Island Phoenix Installation of J tubes and cable clamps Start 30/07/17 Nearshore excavations FO cable Beach to KP 4.5 Beluga Husky CRC Argosy Completed back fill, after Install of Fibre Optic All Mariners Operating in the Vicinity of Rampion Offshore Wind Farm are advised to familiarise themselves with MGN 372 https://www.gov.uk/government/uploads/system/uploads/attachme nt_data/file/440734/mgn_372.pdf 11) Summary of (previous 7 days) Guard vessel offshore 24/7 WTG installation/loadout MVOW mechanical completions. Ongoing surveys Diving FO installation Terminations Pacific Osprey OSP commissioning 12) Looking further ahead (beyond 7 days) (new activities starting) Jointing export cable Cable protection operations MPI Discovery De-Mob MPI Adventure De-Mob 13) Project Met mast details The current lattice structure has failed and will be replaced in due course. Currently on the sea bed at coordinates below: ID Latitude Longitude Met mast 50 41.287'N 0 20.594'W Page 10 of 14

14) Project Wave Rider ID Latitude Longitude Status Wave Rider No1 50 o 46.555 N 000 o 19.070 W As Laid Wave Rider No2 50 o 41.675 N 000 o 16.299 W As Laid Wave Rider No3 50 o 40.219 N 000 o 12.949 W As Laid 15) As Laid Cardinal Buoy Positions Cardinal Name Light Signature Deployed Latitude Deployed Longitude North 1(AIS) Q 50 41.377 N 0 21.898 W North 2 V Q 50 42.072 N 0 17.098 W North 3 (AIS) Q 50 42.771 N 0 12.286 W East 1 Q (3) 10s 50 41.050 N 0 11.311 W South 1(AIS) Q (6) + L Fl 15s 50 39.172'N 0 11.363'W South 2 V Q (6)+L Fl 10s 50 38.398 N 0 16. 147 W South 3 (AIS) Q (6) + L Fl 15s 50 37.631 N 0 20.931 W West 1 Q (9) + 15s 50 39.439 N 0 21.930 W 16) Contact details Marcus Moore Offshore Site Manager Tel: +44 (0) 7447 013684 Email: marcus.moore@rampionoffshore.com Gordon Bain Lead Marine Coordinator Tel: +44 (0) 7816 648082 Email: leadmc@rampionoffshore.com. Duty Marine Coordinator Tel: +44 (0) 7557 942945 Email: traffic@rampionoffshore.com Page 11 of 14

17) Export Cable Coordinates Weekly Notice of (WNoO) East Export Cable Route West Export Cable Route LATITUD LONGITUD KP LATITUD LONGITUD KP 50 49.0411453' N 0 20.1491986' W 0 50 49.0392569' N 0 20.1559728' W 0 50 49.0383954' N 0 20.1471673' W 0.006 50 49.0365229' N 0 20.1541776' W 0.005 50 48.8450241' N 0 20.0043473' W 0.401 50 48.8321138' N 0 20.0213010' W 0.415 50 48.5435783' N 0 19.7817419' W 1.019 50 48.5312412' N 0 19.8257254' W 1.019 50 47.5754360' N 0 19.0671645' W 3 50 47.5283632' N 0 19.1741222' W 3.03 50 47.0619271' N 0 18.8052062' W 4.001 50 46.9242174' N 0 18.9365803' W 4.184 50 46.7959655' N 0 18.7318572' W 4.502 50 46.8710244' N 0 18.9223825' W 4.284 50 46.6611182' N 0 18.7172942' W 4.752 50 46.5838764' N 0 18.8887138' W 4.818 50 46.1228324' N 0 18.7778840' W 5.753 50 46.0611405' N 0 18.9565559' W 5.791 50 45.4028104' N 0 18.9771812' W 7.108 50 45.4302627' N 0 19.1313961' W 6.978 50 45.3447367' N 0 18.9859594' W 7.216 50 45.3274051' N 0 19.1548573' W 7.171 50 45.2907955' N 0 18.9871717' W 7.316 50 45.1830551' N 0 19.1582731' W 7.439 50 45.2264755' N 0 18.9803895' W 7.436 50 45.0807508' N 0 19.1340815' W 7.631 50 43.8545862' N 0 18.5755551' W 10.024 50 44.4092272' N 0 18.9209074' W 8.901 50 43.5353821' N 0 18.4567545' W 10.632 50 44.2370203' N 0 18.8760834' W 9.225 50 43.4067649' N 0 18.3879768' W 10.884 50 43.7399867' N 0 18.7176892' W 10.165 50 43.3218335' N 0 18.3272998' W 11.057 50 43.4531794' N 0 18.5891475' W 10.718 50 43.2482600' N 0 18.2567879' W 11.216 50 43.3127411' N 0 18.5123192' W 10.994 50 43.2046700' N 0 18.2066487' W 11.316 50 43.2634912' N 0 18.4778397' W 11.094 50 43.0451085' N 0 17.9882516' W 11.708 50 43.2007868' N 0 18.4231791' W 11.227 50 42.8969501' N 0 17.7661912' W 12.088 50 43.1559313' N 0 18.3757412' W 11.327 50 42.4324193' N 0 16.8658103' W 13.453 50 42.8176502' N 0 17.8872884' W 12.179 50 41.9317806' N 0 15.9784611' W 14.851 50 42.4145324' N 0 17.1150045' W 13.356 50 41.7220852' N 0 15.6528737' W 15.397 50 41.9242877' N 0 16.2156689' W 14.752 50 41.7133732' N 0 15.6394384' W 15.42 50 41.6643728' N 0 15.6559910' W 15.568 50 41.7133732' N 0 15.6394384' W 15.42 50 41.6643728' N 0 15.6559910' W 15.568 50 41.6218602' N 0 15.5819279' W 15.602 50 41.6269395' N 0 15.6136011' W 15.654 50 41.6218602' N 0 15.5819279' W 15.602 50 41.6269395' N 0 15.6136011' W 15.654 50 41.5681136' N 0 15.5889815' W 15.702 50 41.5677536' N 0 15.5919882' W 15.766 18) Flotel Anchorage Position ID Latitude Longitude New Anchorage Position 2 50 o 42.690 N 000 o 10.539 W Page 12 of 14

19) Site Chart Weekly Notice of (WNoO) Page 13 of 14

20) WTG Coordinates in LAT and LON Page 14 of 14