Seal Extension Guidelines. Asset Management and Systems

Similar documents
ONE SIZE DOESN T FIT ALL RECONCILING OVERLAPPING TRANSPORT NETWORKS IN A CONSTRAINED URBAN ENVIRONMENT

Regional Bus Priority

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

Local Highway Panels Members Guide. 9 Public Rights of Way

COUNCIL POLICY NAME: COUNCIL REFERENCE: 06/119 06/377 09/1C 10llC 12/1C INDEX REFERENCE: POLICY BACKGROUND

5 DECEMBER Cycling In London. Andrew Summers, Transport for London Strategy and Policy Manager Active Travel and Health.

Living Streets response to the Draft London Plan

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT

Regional Cycling Plan

Section 2 Strategic Alignment. Contents

TRAFF IC CALMING POLICY

Response to further information request Ministry of Education Notice of Requirement (200 & 252 Park Estate Road)

QLDC Council 29 October Report for Agenda Item: 3

Launceston's Transport Futures. Greater travel options for the people of Launceston

City of Ottawa s Complete Streets Approach to Transportation Projects

Draft Greater Sydney Region Plan

PAEKĀKĀRIKI HILL ROAD / BEACH ROAD / SH1 INTERSECTION PROGRESS REPORT

Cycle Lanes Dixon Street (Worksop Road to Crayne Street)

Transportation Master Plan Advisory Task Force

DRAFT for a State Policy for Healthy Spaces and Places

THE NEW ZEALAND CYCLE TRAIL APPLICATION FORM

THE PLANNING AND. Transport and the law Integrated transport planning Strategies Responsibilities of local government and road controlling authorities

Safe Speed programme ATTACHMENT 1. Randhir Karma, Group Manager Network Management and Safety

Planning for tennis in your Local Government Area. A resource from Tennis Australia

Implementing Complete Streets in Ottawa. Project Delivery Process and Tools Complete Streets Forum 2015 October 1, 2015

A1307 Haverhill to Cambridge: Approval to consult on transport improvement concepts

Wellington City Council. Cycle Network Development Programme Business Case

2. Context. Existing framework. The context. The challenge. Transport Strategy

Birmingham Connected. Edmund Salt. Transportation Policy Birmingham City Council

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Delivering the. Strategy 7.0

QUEENSTOWN TOWN CENTRE TRANSPORT STRATEGY

Manifesto for a safe, efficient and sustainable transport in NZ

Municipality of Sofia Traffic Master Plan. Intelligent Transport Systems Strategy Andrew Walsh

Kings Road, Herne Bay: Proposed Crash Remedial Measure

QLDC Council 24 July Report for Agenda Item: Fergburger Proposed Shotover Street Footpath Upgrade

Active Travel Strategy Dumfries and Galloway

Regional Cycle Programme Update

9. Parking Supporting Statement

Strategy for Walking & Cycling Action Plan

Additional Policies & Objectives for Local Area Plans Ashbourne LAP. Ashbourne

CHRISTCHURCH AND EAST DORSET Local Plan Review Options Consultation Response Form

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Traffic Calming Policy

Active and Public Transport Plan

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

Developing a Birmingham Transport Space Allocation policy. David Harris Transport Policy Manager Economy Directorate Birmingham City Council

EXECUTIVE SUMMARY Callan Park accommodates travel from a wide range of transport modes, including walking, cycling, bus and light rail.

Auckland Transport Code of Practice 2013

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

Installation of Traffic Signals and Pedestrian Crossings

AUCKLAND INNOVATION THE CITY EAST WEST TRANSPORT STUDY ABSTRACT

Progress with the Road Investment Strategy

Active Transportation Infrastructure Investment A Business Case

Nottingham Cycle City Frequently Asked Questions

NOTES FROM JUNIOR COUNCIL ORIENTATION SESSION HELD ON MONDAY, JANUARY 22, 2018, AT 3:30 PM IN COUNCIL CHAMBERS, CITY HALL

DYNAMIC LANES FOR AUCKLAND

STANDARD PROCEDURE FOR MANAGING SPEED ON RESIDENTIAL STREETS

Bicycle Master Plan Goals, Strategies, and Policies

Report to COUNCIL for decision

21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE

PUBLIC EXHIBITION OF COASTAL ZONE MANAGEMENT PLAN FOR COLLAROY-NARRABEEN BEACH AND FISHERMANS BEACH

Cork to Limerick Route Pre-Feasibility Study Update

CITY OF SAINT JOHN TRAFFIC CALMING POLICY

Bus and Transit Lane Review Update

Tonight is for you. Learn everything you can. Share all your ideas.

CAIRNGORMS NATIONAL PARK AUTHORITY FOR DECISION

Strategic Director for Environment. Enclosures Appendix A - Option drawings. Jamie Blake- Strategic Director for Environment

APPENDIX 2 PROPOSAL FOR REPLACEMENT FOR POOLE (DOLPHIN) LEISURE CENTRE FINAL SPECIFICATION

Respect Empowerment. Wei/being Equity OUR VALUES. Service. mum-nay. mmumm. imouvnumpv mmmmmmmm. Mhnwamumm new xmul burw u mmu

CLOSED. The draft concept design has been broken down into 5 categories for the purpose of this survey:

HAMILTON BIKING PLAN OUR VISION: A BIKE FRIENDLY CITY

Sustainable Mobility in Greater Sudbury NeORA Conference September 25, 2012

Part B Design Guidance / Principles _

CITY OF WEST KELOWNA COUNCIL POLICY MANUAL

Douglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013

WEST CENTRAL DRAFT DISTRICT PLAN SUBMISSION 3 HASSAL ST WESTMEAD

INNER LOOP EAST. AIA Rochester Annual Meeting November 13, 2013 TRANSFORMATION PROJECT. Bret Garwood, NBD Erik Frisch, DES

Speed Limit Policy Isle of Wight Council

Alta Planning + Design

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

Department of Internal Affairs Mandatory Non-Financial Performance Measures 2013 Roads and Footpaths

Evaluating a Cycling Strategy

Auckland Council Finance & Performance Committee Presentation

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012

Incorporating Healthy Eating & Active Living

Policy. The Calico Group. Calico Homes. Calico Enterprise. SafeNet. Acorn Recovery Projects. Whitworth Care Trust

Note this page is intentionally left blank for page layout purposes

Appendix 5 Traffic Assessment

This objective implies that all population groups should find walking appealing, and that it is made easier for them to walk more on a daily basis.

connectivity through walking and cycling

Scotland s consultancy for sustainable transport.

Transport Workshop Dearbhla Lawson Head of Transport & Infrastructure Policy & Funding University of the Third Age.

RACQ SUBMISSION ON DRAFT BRISBANE CITY COUNCIL TRANSPORT PLAN FOR BRISBANE The Royal Automobile Club of Queensland Limited

Transit boulevard: A new road type for Sydney s Growth Centres

Wellington Public Transport Spine Study

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017

Additional Policies & Objectives for Local Area Plans Ashbourne LAP. Ashbourne

DEPARTMENT OF TRANSPORT

Transcription:

Seal Extension Guidelines

1. Guideline Definitions AADT - Annual Average Daily Traffic is measured at regular annual (or greater) intervals and adjusted for seasonal effects, using an approved traffic counter which is left in situ for 1-2 weeks. AT - Auckland Transport ATCOP - Auckland Transport Code of Practice Formed Road - road either sealed or unsealed that is maintained by the roading authority. HCV - Heavy vehicle or commercial vehicle movements are recorded as movements of a vehicle with a gross vehicle mass of greater than 3.5 tonne vehicle/axis. A heavy vehicle is considered to generate the dust equivalent to three cars, where light vehicles contribute little to the structural deterioration of the road surface. Legal Road - has the same meaning as road in the Local Government Act 1974 (Section 315). In short, it covers the total area of land between road boundaries but is limited to the formed carriageway in this principle. Legal Terminology - used in this document to describe whether an aspect or statement is a requirement under law/mandatory or good practice: Must indicates something that is mandatory or required by law Should indicates a recommendation May indicates something that is optional and may be considered for use. Maintenance Seal - the lowest-cost seal applied to an unsealed road where expensive on-going maintenance has been required. Ownership of Road - Only formed roads that are currently owned and maintained by AT are considered for seal extension works. 2. Guideline Statement The Mayor has outlined his vision of turning Auckland into the world s most liveable city by 2040. The Auckland Plan has identified that an efficient and integrated network of roads and public transport is vital to delivering this vision. As a Council Controlled Organisation (CCO), AT is responsible for delivering the region s transport services from roads and footpaths to cycling, parking and public transport. Through the Statement of Intent and to contribute to the achievement of priority areas and targets contained in the Auckland Plan, AT is required to prioritise and optimise investment across transport modes and related infrastructure. AT has developed a set of guidelines to ensure that the transport services will be delivered on a consistent basis around the Auckland region. These guidelines identify the approach AT will apply when managing the transport assets. The approach identified in the guidelines is cognizant with the Level of Service identified in the Integrated Transport Programme and Asset Management Plan. 3. Background Auckland Transport is responsible for the provision of seal extensions for the Auckland region and these guidelines will be used to determine the priority of seal extension projects against the available budget. There is in excess of 7,300 km of legal road around the AT region and Gulf Islands, of which approximately 894 km (12%) is unsealed. AT will undertake to maintain the unsealed roads in the region at the current level of service detailed in the Road Network Asset Management Plan and ATCOP. These guidelines do not alter the current level of service for unsealed or sealed roads or the level of funding required to maintain that level of service. 2

4. Purpose and Scope The seal extension programme is funded through the LTP/RLTP. All projects within the RLTP programme are prioritised using criteria based on their strategic fit, effectiveness and economic efficiency and compete against each other for funding. There is a further prioritisation process so that the most critical to complete seal extensions are carried before the less critical ones. Subject to the seal extension programme being included in the Annual Plan, these guidelines set out the prioritisation criteria and methodology for assessing the relative merits of competing seal extension projects to determine how the funding allocated in the Annual Plan should be used. The guidelines take into account environmental factors such as dust by considering adjacent amenities as well as social factors through the number of adjacent dwellings and incidents associated with an unsealed road. The guidelines exclude maintenance seals. The guidelines assist Auckland Transport with: Prioritising seal extension requests received by AT from residents or Local Boards Developing the seal extension forward work programme The application to NZTA for funding (where applicable) 5. Guidelines The guidelines describe the assessment process that AT uses to prioritise unsealed roads currently being considered for sealing. The outcome of the process is a ranking of the unsealed roads against the available budget identified in the Annual Plan. The process involves assessing the unsealed roads to identify the number of dwellings that may benefit from the seal extension, the amenities that are in close proximity and road safety. Seal extensions will be given the highest priority without further assessment where: a) The benefits associated with sealing the road are likely to be sufficient to gain a subsidy from NZTA b) The road proposed for seal extension is a special case where either the Local Board or Auckland Council has resolved to fully fund the seal extension If neither of the above criteria applies for the seal extension, the road must be assessed using the following process: Assessment Process A two stage assessment is proposed: 1. An assessment of the physical characteristics of the road 2. Regional and local priority adjustment Stage 1- Physical characteristics The unsealed roads being considered in any given year are assessed using Table 1 to produce a numerical total score. 3

Table 1 Assessment criteria and scoring for the physical characteristics of unsealed roads Traffic Movements (AADT) Score Dwellings/km (<100m from road) Score Amenities 1 Score 1-50 2 1-2 1 1-2 1 51-100 4 3-4 2 3-5 2 101-200 6 5-10 3 6-10 3 201-500 8 11-15 4 >10 4 >500 10 16-20 5 >20 6 Score: Score: Score: Gradient 2 Score (%) Incidents 3 Score HCV 4 Score <1 1 1 1 1-5 2 1 5 2 2-3 2 6-10 4 5.1 8 3 4-5 3 11-15 6 8.1 12.5 4 6-10 4 16-20 8 >12.5 5 >10 5 >20 10 Score: Score: Score: Total Score 5 : 1. Amenities refers to amenities less than 100m from the road where dust may be a nuisance factor include: a community hall, place of worship or reserve, or a place of work (dairy shed or commercial premises), or road forms part of a school bus route, or orchard or food crops, or a residential house. 2. Gradient is used in this assessment as a proxy for the maintenance cost of the unsealed road. 3. Incidents refers to the documented number of serious safety incidents or accidents that have occurred on the unsealed road in the previous five years. 4. HCV is recorded as movements of a vehicle with a gross vehicle mass of greater than 3.5 tonne vehicle/axis. 5. Total Score is the sum of the scores of the six factors in the table. The weightings for vehicle movements and heavy vehicles have been increased in the assessment to reflect usage and potential damage to the unsealed road which impact on the level of routine maintenance required. Any spurious or unreliable traffic data should be validated. Commercial activities, tourism and associated events will be reflected in the scores assigned to Traffic Movements and Amenities. Stage 2- Regional and Local Priority Adjustment The total score determined through stage 1 of the assessment is then adjusted for the regional and local value of sealing the road: 1. High Priority Value - Total Score + 30% Sealing an unsealed through route or diversion route Improves access to a regional park or regionally significant walk Improves access to identified growth areas Promotes economic growth/tourism, such as completion of a scenic route Promotes the outcomes of the unitary plan Promotes significant improvements to water quality in sensitive catchments or marine environments 4

2. Medium Priority Value - Total Score + 15% Improves access to a bushwalk, beach or local facility Improves access to local community amenities reducing community isolation School bus route 3. Low Priority Value - Total Score + 0% All other unsealed roads Roads that have significant physical or economic barriers to undertaking seal extension works Using the two stage assessment described above, the prioritised seal extension list identifies the initial priority of roads for sealing. A further refinement of priorities within the highest priority roads will be carried out during the programme feasibility, investigation and design processes phases to create a final programme of seal extension projects. 6. Monitoring and Review These guidelines shall be reviewed as part of the three year review cycle aligned to the LTP. 7. Related Guidelines The seal extension guideline relies on the reseal guideline to determine the seal material to be used. 8. Document Status Owner (contact for updates, clarity etc.) Responsible department Stakeholders for consultation Principle users Authorised by: Siri Rangamuwa Ext: (42) 9122 Email : Siri.Rangamuwa@aucklandtransport.govt.nz AMP and Policy Manager RCM Version no: 6.4 Issue date: 30/1/2013 Review date: 5/2015 [date] Document ref no: P-0002 Intranet Ref: 5