CCR Landfill 2015 Annual Inspection Report NC1 Ash Disposal Area

Similar documents
CCR Landfill 2017 Annual Inspection Report NC1 Ash Disposal Area

CCR Landfill 2018 Annual Inspection Report North Omaha Ash Landfill

2018 Annual Inspection Report

2016 Annual Inspection Report

2017 Annual Inspection Report

2016 Annual Inspection Report

CCR Fugitive Dust Control Plan

2016 Annual Landfill Inspection Report. SCE&G Wateree Station Class III Landfill

Initial Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

Annual CCR Landfill Inspection. Lansing Landfill. Interstate Power and Light Company. Prepared for:

Whitewater Valley Station Surface Impoundment Coal Combustion Residual Annual Report

Northern Indiana Public Service Company (NIPSCO) 2723 East 1500 North, Wheatfield, Indiana, USA Golder Associates Inc.

2018 INSPECTION REPORT

First Annual RCRA CCR Unit Inspection Report January 2016 RESTRICTED WASTE TYPE I LANDFILL OPERATING PERMIT NUMBER 37-01

Consulting Engineers and Scientists Annual Landfill Inspection Report. for the. Williams Station Highway 52 Class III Landfill

TABLE OF CONTENTS 1.0 INTRODUCTION PLAN CERTIFICATION (B)(4) 1

Northern Indiana Public Service Company Michigan City Generating Station Primary Settling Pond Number Annual RCRA CCR Unit Inspection Report

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

Annual Inspection Report of CCR Impoundment and CCR Landfill Wenck Project # B

D.B. Wilson Station CCR Landfill

TABLE OF CONTENTS LEGAL NOTICE

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

Written Closure Plan. Pawnee Station - Active CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016

CCR Closure Plan Ash Impoundment

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

Written Closure Plan. Pawnee Station - North CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016

Written Closure Plan. Cherokee Station - Active CCR Impoundments Public Service Company of Colorado Denver, Colorado.

TABLE OF CONTENTS LEGAL NOTICE

TABLE OF CONTENTS LEGAL NOTICE

CHOLLA POWER PLANT CLOSURE PLAN (b) SEDIMENTATION POND CH_ClosPlan_004_

Closure Plan for CCR Surface Impoundments

CLOSURE PLAN. CFR (b) GERS Bottom Ash Pond. Northeastern 3&4 Power Station Oologah, Oklahoma. October, 2016

CCR Certification: Fugitive Dust Control Plan (b) for the. West Ash Pond. at the. F. B. Culley Generating Station.

FOUR CORNERS POWER PLANT CLOSURE PLAN (b) UPPER RETENTION SUMP FC_ClosPlan_011_

CLOSURE PLAN. CCR (b) GERS Landfill Area. Welsh Power Plant Pittsburg, Texas. October, 2016

Written Closure Plan. Comanche Station - Active CCR Surface Impoundment Public Service Company of Colorado Denver, Colorado

CCR CLOSURE PLAN Sibley Slag Settling Impoundment Sibley Generating Station East Johnson Rd Sibley, Missouri

Notice of Intent to Close Inactive CCR Surface Impoundments

Green CCR Surface Impoundment

ENGINEER S CERTIFICATION OF AQUIFER SEPARATION DEMONSTRATION (40 CFR )

COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for:

Big Rivers Electric Corporation - Sebree Generating Station (R. A. Reid, R. D. Green and HMPL Station Two)

CLOSURE PLAN. CFR (b) Document ID: GERS Bottom Ash Complex. Mountaineer Plant New Haven, West Virginia.

October 16, GRDA CCR Landfill Compliance Report Grand River Dam Energy Center 8142 Hwy 412B PO Box 609 Chouteau, OK Dear Mr.

CLOSURE PLAN. CFR (b) Bottom Ash Pond Complex Cardinal Plant Brilliant, Ohio. September, 2016

COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for:

Amended Written Closure Plan

CLOSURE PLAN. CCR (b) GERS East and West Bottom Ash Ponds. Pirkey Power Plant Hallsville, Texas. October, 2016

CCR Unit Closure and Post-Closure Plan. The business of sustainability. Texas Municipal Power Agency Gibbons Creek Steam Electric Station

Big Rivers Electric Corporation - D.B. Wilson Generating Station. Fugitive Dust Control Plan for Coal Combustion Residuals

Coal Combustion Residuals Closure Plan

Holding Pond Annual Inspection Report

FOUR CORNERS POWER PLANT CLOSURE PLAN (b) COMBINED WASTE TREATMENT POND (CWTP) FC_ClosPlan_012_

COAL COMBUSTION RESIDUALS FUGITIVE DUST CONTROL PLAN

CCR Closure Plan. CCR Certification: Written Closure Plan (b) & (c) for the. Landfill Sedimentation Pond. A. B. Brown Generating Station

Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop San Antonio, Texas Project No

CCR Fugitive Dust Control Plan

Coal Combustion Residuals Annual Fugitive Dust Control Report. Prepared for Montana-Dakota Utilities Company R.M. Heskett Station.

COAL COMBUSTION RESIDUAL (CCR) FUGITIVE DUST CONTROL PLAN

FUGITIVE DUST CONTROL PLAN

COAL COMBUSTION RESIDUAL (CCR) FUGITIVE DUST CONTROL PLAN

LEGAL NOTICE. Report No. SL Revision: 0 Page No. i. Ottumwa Generating Station Notification of Intent to Initiate Closure

FUGITIVE DUST CONTROL PLAN

Juneau Douglas Harbor

New Castle County Guidelines for the Certified Construction Reviewer, Owner/Developer, Site Contractor and Professional Engineer

Holding Pond Annual Inspection Report

Statistical Method Certification, Coal Combustion Residuals Landfill, Reid Gardner Generating Station

Hazardous Waste Training Plan. Supersedes: 02/15/16 (Rev.02) Preparer: Owner: Approver: EHS Team Member EHS Team Member EHS Manager

Explosive gas migration monitoring for a sanitary landfill facility.

Environmental Management Strategy

HISTORY OF CONSTRUCTION

INFILTRATION PRACTICE MAINTENANCE INSPECTION FORM

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

Cat Island Chain Restoration

Appendix L MEMORANDUM OF AGREEMENT DRAFT

La Quinta Channel Extension Port of Corpus Christi Ingleside, Texas. Mark Coyle

ROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax

Creation of Fish and Wildlife Habitat on the Closed Salmon Harbour Mine in Minto, NB

IDEM Indiana Department of Environmental Management Office of Land Quality P.O. Box 6015 Indianapolis, IN OLQ PH: (317)

SECTION PRESSURE TESTING OF PIPING

APPENDIX H. Risk-Based Disposal Application. Revised EE/CA. Lower Duwamish Waterway Superfund Site: T-117 Early Action Area

CDBG HANDICAP RAMPS 4TH TO 5TH STREET, EDDY TO SYCAMORE AND LIONS PARK IMPROVMENTS GRAND ISLAND, NEBRASKA INDEX OF SHEETS DESCRIPTION SHEET NO.

ALTERNATIVE SHORELINE TREATMENT GUIDELINE

1-22. KETCHIKAN, ALASKA (Thomas and Bar Point Basins) (CWIS NOS & 87071) Condition of Improvement 30 September 2007

IESI Bethlehem Landfill Committee Meeting Minutes

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam.

Ketchikan Harbors Thomas Basin and Bar Point Harbor

Proposed Groundwater Assessment Work Plan (Rev.1)

REVISION RECORD. Revision Number. Date Sections Affected/Reason 0 04/17/2017 Creation of Initial EAP

What I ve Learned About Dam Safety Good, Bad and Ugly

Hunters Point Naval Shipyard Environmental Remediation Program Overview

Cordova Harbor Page 2 of 9

MOREHEAD CITY HARBOR, NC. Dredged Material Management Plan (DMMP)

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

EXHIBT A - BID FORM SUNSET VALLEY GOLF COURSE. Golf Course Master Plan Implementation. Date: December 1, 2016

RLRC COMMUNITIES EAST GRAND FORKS AREA CHARACTER THE RED LAKE RIVER & THE RED RIVER OF THE NORTH CONFLUENCE EAGLE POINT BOAT LAUNCH DESIGN

APPENDIX M DREDGED MATERIAL MANAGEMENT PLAN (DMMP) FINAL INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL ASSESSMENT

Temporary Vehicle Restraint System Policy

Transcription:

CCR Landfill 21 Annual Inspection Report NC1 Ash Disposal Area Omaha Public Power District Nebraska City Station Nebraska City, Nebraska January 19, 216

OPPD Nebraska City Station NC1 Ash Disposal Area CCR Landfill 21 Annual Inspection Report Table of Contents Professional Engineer Certification... 1 1 Introduction... 2 1.1 Purpose... 2 1.2 Facility Background... 2 2 Review of Available Information (4 CFR 27.84(B)(1)(i))... 3 3 Visual Site Inspection (4 CFR 27.84(B)(1)(ii))... 3 3.1 Extent of Inspection... 3 3.2 Inspection Findings... 3 4 Changes in Geometry... 4 Approximate CCR Volume... 4 6 Appearance of Structural Weakness... 4 7 Changes Affecting Stability or Operation... 4 Appendices Appendix A: Facility Site Map CCR Landfill 21 Annual Inspection Page i January 216 Nebraska City Station, NC1 Ash Disposal Area

1 Introduction On April 17, 21 the U.S. Environmental Protection Agency (EPA) published the final rule for the regulation and management of coal combustion residuals (CCR) under Subtitle D of the Resource Conservation and Recovery Act (RCRA). The CCR rule defines a set of requirements for the disposal and handling of CCR within CCR units (defined as either landfills or surface impoundments). The Omaha Public Power District (OPPD), Nebraska City Generating Station (Station) currently has two (2) active CCR landfills; NC1 Ash Disposal Area and NC2 Ash Disposal Area. Section 4 CFR 27.84(b) specifies that an owner or operator of a CCR landfill or any lateral expansion of a CCR landfill must have the landfill inspected on a periodic basis by a qualified professional engineer to ensure that the design, construction, operation, and maintenance of the CCR unit is consistent with recognized and generally accepted good engineering standards. This annual inspection report covers the NC1 Ash Disposal Area. 1.1 Purpose The CCR rule requires the initial inspection report for existing CCR landfills must be completed and placed in the operating record no later than January 19, 216. Subsequent inspections and reports must be completed and filed on an annual basis. The requirements of the annual inspection include: A review of available information regarding the status and condition of the CCR unit - 27.84 (B)(1)(i), A visual inspection of the CCR unit to identify signs of distress or malfunction - 27.84 (B)(1)(ii), An inspection report that includes the following: o Changes in geometry since the last inspection - 27.84 (B)(2)(i) o Approximate volume of CCR in unit at time of inspection - 27.84 (B)(2)(ii) o Appearance of actual or potential structural weakness of the CCR unit, in addition to any existing conditions that are disrupting or have the potential to disrupt the operation and safety of the CCR unit - 27.84 (B)(2)(iii) o Any other changes which may have affected the stability or operation of the CCR unit since the last inspection - 27.84 (B)(2)(iv) OPPD, as owner and operator of the Station, must notify the Nebraska Department of Environmental Quality (NDEQ) Director within 3 days of placing the CCR Landfill Annual Inspection Report in the operating record and posting to the CCR web site (4 CFR 27.16 and 27.17). 1.2 Facility Background OPPD has a two-unit (Nebraska City (NC) Unit 1 and NC Unit 2) fossil fuel-fired generating plant at the Station located. miles southeast of Nebraska City, Nebraska, along the west shore of the Missouri River. This Station has two (2) existing CCR landfills that are permitted under the current NDEQ Title 132 regulations for fossil fuel combustion ash disposal area; the NC1 Ash Disposal Area and NC2 Ash Disposal Area that are active after the CCR rule effective date of CCR Landfill 21 Annual Inspection Page 2 of 4 January 216 Nebraska City Station, NC1 Ash Disposal Area

October 19, 21. This initial annual inspection report covers the NC1 Ash Disposal Area (NDEQ Permit No. NE4712, Facility ID 8343). The NC1 Ash Disposal Area is an unlined CCR landfill of approximately 2 acres that has historically received CCR for disposal. A facility site map is included in Appendix A. 2 Review of Available Information (4 CFR 27.84(B)(1)(i)) Numerous documents pertaining to the operation and structural integrity of the CCR landfill were reviewed before, during and after the site inspection, including: The CCR Landfill weekly inspection records (per Section 27.84(a)) from October 19, 21 through December 29, 21 NDEQ Title 132 permit application Recent topographic survey for the permit renewal application Documentation regarding recent NC1 Ash Disposal Area, Phase 1 Sideslope Closure Review of the above documents did not uncover any unresolved issues that indicated operational, safety or structural concerns of the CCR landfill. 3 Visual Site Inspection (4 CFR 27.84(B)(1)(ii)) On December 14, 21, a site inspection of the NC1 Ash Disposal Area was performed by an independent Professional Engineer, Garrett Williams of HDR, who was accompanied by Brad Sojka, OPPD Environmental Specialist. This site inspection was performed in advance of the CCR rule submittal deadline to ensure that the inspection was completed prior to snow cover.. Office review of available information was conducted by Garrett Williams. The weather during the site visit was overcast and mildly windy with temperatures ranging from 36 to 4 degrees Fahrenheit. Rain events prior to the annual inspection made for wet conditions during the inspection. The site was free of snow cover. 3.1 Extent of Inspection The inspection included an extensive site walk of the NC1 Ash Disposal Area. As the CCR rule only requires the inspection of the existing active CCR landfill itself, this report does not address the condition of the groundwater monitoring system, access roads beyond the landfill perimeter, grades and drainage channels that are not a component of the CCR landfill. The field visit included inspection of the following: Perimeter channel conditions Sideslope erosion Stability of CCR fill areas 3.2 Inspection Findings The following are the findings of the site inspection: CCR Landfill 21 Annual Inspection Page 3 of 4 January 216 Nebraska City Station, NC1 Ash Disposal Area

Standing water was present in perimeter channel from the previous weekend rain event. Water was contained and controlled per the current NDEQ permit. No further action is required at this time. In areas of recent closure construction where topsoil was not fully stabilized with vegetation, the slopes were showing signs of minor erosion. This is expected due to the slope grades and lack of vegetation growth. Rill erosion in these areas posed no apparent operational or structural concerns and are planned to be corrected when weather permits. Some small areas of uncompacted ash were observed on the landfill plateau. Work was ongoing at the time of this inspection to compact all loose ash. No further action is required at this time. Separate bottom ash stockpile was present within the footprint and located within the perimeter of the CCR landfill. Bottom ash was being segregated and stored for beneficial reuse. This stockpile posed no apparent operational or structural concerns. No further action is required at this time. 4 Changes in Geometry The CCR rule requires that the site geometry changes be identified since the last annual inspection. Since this is the first annual inspection, the geometry changes will be addressed in the next inspection report. The current elevation of CCR that has not received final cover ranges from to 9. This will be the initial basis for future inspection reports. Approximate CCR Volume Total ash deposited within the NC1 Ash Disposal Area was estimated by comparing an October 21 survey to the final permit grades and subtracting that volume from the projected total permit volume. Ash generation/disposal estimates for October 21 through December 21 ( of approximately 3, CY) were added to the estimate. The total CCR volume in place at the time of inspection is estimated to be 2,296, cubic yards. 6 Appearance of Structural Weakness Based on the visual inspection, no apparent or potential structural weaknesses were observed. 7 Changes Affecting Stability or Operation The CCR rule requires that changes that affect stability or operation of the CCR landfill be identified since the last annual inspection. Since this is the first annual inspection, changes will be described in the next annual inspection report. CCR Landfill 21 Annual Inspection Page 4 of 4 January 216 Nebraska City Station, NC1 Ash Disposal Area

Appendix A Facility Site Map

LETDOWN STRUCTURE (TYP) FINAL COVER AREA 92 B M BOTTOM OF SLOPE (TYP) CONTROL POINT NO. 86 /8" REBAR NORTHING = 31617.1 EASTING = 2811236.6 ELEVATION = 923.2 EDGE OF CONC. ROAD 3 3" RCP W/ CONC FES FL = 3.9 CONC. PAD ELEV. = 6.78 3 92 EDGE OF CONC. ROAD SCALE IN FEET CONTROL POINT NO. 83 /8" REBAR NORTHING = 31371.9 EASTING = 289243.6 ELEVATION = 8.76 92 92 92 BARRICADE BLOCKS NOTE: 92 B 93 M 93 93 CAP TERMINATION TOPOGRAPHY BASED ON AERIAL SURVEY BY E&A 92 CONSULTING GROUP INC., DATED MAY 19, 2. 92 CAP TOPOGRAPHY WITHIN NC1 DISPOSAL AREA BASED ON TERMINATION GROUND SURVEY BY E&A CONSULTING GROUP INC., 94 94 94 DATED NOVEMBER 214. DIRT TOP OF SLOPE BERM (TYP) 92 9 1 94 94 9 9 94 93 EDGE OF GRAVEL ROAD 94 DIRT BOTTOM ASH DIRT 92 BOTTOM ASH 93 STOCKPILE STOCKPILE MW-2 CONC. PAD ELEV. = 7.78 94 94 MW-12 CONC. PAD ELEV. = 7.77 DIRT DIRT 94 92 94 93 92 94 93 94 93 93 92 92 EDGE OF GRAVEL ROAD 93 1 9 MW-3 CONC. PAD ELEV. = 7.6 CONC WALL W/ MANHOLE RIM ELEVATION = 8.9 B M CONTROL POINT NO. 84 /8" REBAR NORTHING = 314269.97 EASTING = 286.16 ELEVATION = 6.2 92 MW-9 CONC. PAD ELEV. = 8.31 CONC. PAD ELEV. = 7.1 24" RCP FL = 2.78 B M CONTROL POINT NO. 8 /8" REBAR NORTHING = 314234.23 EASTING = 2811268.82 ELEVATION = 6.19 24" RCP FL = 2.93 EDGE OF GRAVEL ROAD SCATTERED GRAVEL 1 9 OPPD NEBRASKA CITY STATION S 72N D ROAD MW-4 CONC. PAD ELEV. = 7.4 DATE OCTOBER 21 NC1 ASH DISPOSAL AREA FIGURE INSPECTION MAP 1