STERI-TROL Clean Service 'S' Series Two-port Control Valves DN15 (½") to DN100 (4")

Similar documents
CVS10 Sanitary Check Valves

DCV10 Stainless Steel Disc Check Valve for use with Condensate Pumps

DCV6 Disc Check Valve

DCV1, DCV3 and DCV3LT Disc Check Valves Installation and Maintenance Instructions

Spiratec ST14, ST16 and ST17 Sensor Chambers and sensors

TSS21 Sealed Thermostatic Steam Tracer Trap

TP1 and TP2 Temporary Cone Shaped Strainers

CP10 Sensor Installation and Maintenance Instructions

KBV21i and KBV40i Key Operated Boiler Blowdown Valves Installation and Maintenance Instructions

PV4 and PV6 Piston Valves

DF1 and DF2 Diffusers

Fig 12, Fig 14HP, Fig 16, Fig 16HP and Fig 16L Strainers

BT6HC Hygienic Sanitary Balanced Pressure Steam Trap for High Capacity and CIP/SIP Applications

MST21 Stainless Steel Balanced Pressure Thermostatic Steam Trap

KBV21i and KBV40i Air Actuated Boiler Blowdown Valves

AVC32 Carbon Steel Air Vent for Steam Systems

Fig 1, Fig 12, Fig 13, Fig 14HP, Fig 16, Fig 16HP and Fig 16L Strainers

Dri-Line Mk3 Monnier Compressed Air Drain Trap

TA10A and TA10P Steam Tracing Temperature Control Valves Installation and Maintenance Instructions

AVM7 Stainless Steel Thermostatic Air Vent

AE14 Automatic Air Vents for Liquid Systems Installation and Maintenance Instructions

IFTGS14 Ball Float Steam Trap ½" and ¾" with Integral Spiratec Sensor

S1, S2, S3, S5, S6, S7, S8, S12 and S13 Separators

SRV66 Sanitary Pressure Reducing Valve

Dri-Line Mk2 Spirax-Monnier Compressed Air Drain Trap

CS10-1 Stainless Steel Clean Steam Separator

BT6-B Sanitary Balanced Pressure Thermostatic Steam Trap

FTGS14 Ball Float Steam Trap DN15 (½") to DN25 (1")

SA121, SA122, SA123, SA128 and SA1219 Self-acting Temperature Control Systems (Dial Adjustment)

MF2M Monnier Miniature Compressed Air Filter

SA121, SA122, SA123, SA128 and SA1219 Self-acting Temperature Control Systems (Knob Adjustment)

AE30 Automatic Air Eliminators / Air and Gas Vents for Liquid Systems

MSC-P and MSC-N Manifolds for Steam Distribution and Condensate Collection

M33F ISO, M33S ISO and M33V ISO Ball Valves Installation and Maintenance Instructions

Manual Actuated Boiler Blowdown Valves

BTM7, BTS7 and BTS7.1 Stainless Steel Thermostatic Clean Steam Traps

CA44, CA44S, CA46 and CA46S Air and Gas Traps

BCV31 DN40 - Blowdown Control Valve

S1, S2, S3, S5, S6, S7, S8, S12 and S13 Separators Installation and Maintenance Instructions

UIB30 and UIB30H Sealed Inverted Bucket Steam Traps for use with Pipeline Connectors

Fig 3, 7, 33, 34, 34HP, 36, 36HP, 37, 3616 and Fig 3716 Flanged Strainers

M70i ISO and M80i ISO Stainless Steel Ball Valves for Sanitary Systems Installation and Maintenance Instructions

M10HTi ISO Tobacco Ball Valve Screwed, SW, BW and Flanged versions

FV Flash Vessel Installation and Maintenance Instructions

IX1 Spirax-Monnier International Compressed Air Filter Installation and Maintenance Instructions

HM and HM34 Inverted Bucket Steam Traps Installation and Maintenance Instructions

TW Temperature Control Valve

BRV71 and BRV73 Pressure Reducing Valves

Spirax Compact FREME Flash Recovery Energy Management Equipment

SA Control Valve types: BM, BMF, BX, SB, NS, KA, KB, KC (Normally open) BMRA, BMFRA, BXRA, SBRA, NSRA, KX, KY (Normally closed)

ML3M Monnier Miniature Compressed Air Lubricator

BCV31 DN20 - Blowdown Control Valve

APT14, APT14HC and APT14SHC Spares 2

Airodyn, BRair and BRoil Compressed Air Drain Traps

BPT13 Balanced Pressure Thermostatic Steam Traps

TDC46M, TDS46M and UTDS46M Thermodynamic Steam Traps with Maintainable Seat Installation and Maintenance Instructions

S and SF Inverted Bucket Steam Traps

Fig 7, 33, 33.1, 34, 34HP, 36, 36HP, 37, 3616 and Fig 3716 Flanged Strainers Installation and Maintenance Instructions

SRV461S and SRV463S Stainless Steel Direct Acting Pressure Reducing Valves

PC10HP Pipeline Connector (ASME 600)

MFP14-PPU (Vented) Automatic Packaged Pump Units

TD62LM and TD62M Thermodynamic Steam Traps with Replaceable Seats

Type 130 and HL10 'Safeguard High Limit Control' Installation and Maintenance Instructions

MPC1M, MPC2M and MPC2AM Monnier High Efficiency Compressed Air Filter / Regulators

QuickHeat TM Packaged Heat Exchanger Solutions

SRV2S Pressure Reducing Valve

FT53, IFT53, FT54, IFT54, FT57 and IFT57 Ball Float Steam Traps - DIN

TD62LM and TD62M Thermodynamic Steam Traps with Replaceable Seats Installation and Maintenance Instructions

M45 ISO Ball Valve DN25 to 150 Installation and Maintenance Instructions

CA16 and CA16S-14 Air and Gas trap Installation and Maintenance Instructions

CA10S, CA14 and CA14S Air and Gas Traps

BSA6T and BSA64T Stainless Steel Bellows Sealed Stop Valves Installation and Maintenance Instructions

BDV1 and BDV2 Blowdown / Depressurisation Valves

Spirax SafeBloc TM DBB3 Double Block and Bleed Bellows Sealed Stop Valve. 1. Safety information. 2. General product information. 3.

M111 Spiraflo Transducer

IP2M, IP2AM and IP2DM Monnier International Compressed Air Filter/ Regulators

SCA Series Inverted Bucket Steam Traps

BCVi43 Blowdown Control Valve

Vane Flow Switches Colima FLU Series

TD45 Thermodynamic Steam Trap Installation and Maintenance Instructions

USM21 Sealed Bimetallic Steam Trap for use with Pipeline Connectors Installation and Maintenance Instructions

1. General safety information. 2. General product information. 3. Installation. 4. Commissioning. 5. Operation. 6. Maintenance. 7.

AVS32 Stainless Steel Air Vent for Steam Systems Installation and Maintenance Instructions

595-K/L and 596-K/L Series Self Operated Valves Installation and Maintenance Instructions

LP31 Level Probe. 1. Safety information. 2. General product information. 3. Installation. 4. Wiring. 5. Maintenance

FT16 Ball Float Steam Trap Installation and Maintenance Instructions

AE50S Automatic Air and Gas Vent for Liquid Systems Installation and Maintenance Instructions

A3S Bellows Sealed Stop Valve Installation and Maintenance Instructions

BTD52L Thermodynamic Steam Trap Installation and Maintenance Instructions

BSA and BSAT Bellows Sealed Stop Valves Installation and Maintenance Instructions

Fig 1, Fig 12, Fig 13, Fig 14, Fig 16 and Fig 16L Strainers Installation and Maintenance Instructions

UBP32 Sealed Balanced Pressure Thermostatic Steam Trap for use with PC_ Pipeline Connectors Installation and Maintenance Instructions

Thermocirc Installation and Maintenance Instructions

FT43, FT44, FT46 and FT47 Ball Float Steam Traps Installation and Maintenance Instructions

TD10, TD52M and TD259 Thermodynamic Steam Traps Installation and Maintenance Instructions

FTC62 and FTS62 Ball Float Steam Traps Installation and Maintenance Instructions

PC3000, PC3001 and PC4000, PC4001 Pipeline Connectors

VAD Variable Area Desuperheaters

Colima TOR Magnetic Level Switches

BDV60 Blowdown Vessel Installation and Maintenance Instructions

Transcription:

18050/2 IM-P183-03 CH Issue 2 STERI-TROL Clean Service 'S' Series Two-port Control Valves DN15 (½") to DN100 (4") Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning 5. Maintenance 6. Spare parts Printed IM-P183-03 in the UK CH Issue 2 Copyright 20071

2 IM-P183-03 CH Issue 2

1. Safety information Safe operation of these products can only be guaranteed if they are properly installed, commissioned, used and maintained by qualified personnel (see Section 1.11) in compliance with the operating instructions. General installation and safety instructions for pipeline and plant construction, as well as the proper use of tools and safety equipment must also be complied with. 1.1 Intended use Referring to the Installation and Maintenance Instructions, name-plate and Technical Information Sheet, check that the product is suitable for the intended use/application. The products listed below comply with the requirements of the European Pressure Equipment Directive 97/23/EC, if required. The products fall within the following Pressure Equipment Directive categories: STERI-TROL PN16 Product Group 2 Group 2 Gas Liquid DN15 to DN65 SEP SEP DN80 to DN100 1 SEP I) The products have been specifically designed for use on steam, air, water, diathermic oil and/or other non-dangerous fluids which are in Group 2 of the above mentioned Pressure Equipment Directive. They can be used on other fluids in Group 2 or dangerous fluids belonging to Group 1, but if this is contemplated, Spirax Sarco should be contacted to confirm the suitability of the product for the application being considered. II) Check material suitability, pressure and temperature and their maximum and minimum values. If the maximum operating limits of the product are lower than those of the system in which it is being fitted, or if a malfunction of the product could result in a dangerous overpressure or overtemperature occurrence, ensure a safety device is included in the system to prevent such over-limit situations. III) Determine the correct installation situation and direction of fluid flow. IV) Spirax Sarco products are not intended to withstand external stresses that may be induced by any system to which they are fitted. It is the responsibility of the installer to consider these stresses and take adequate precautions to minimise them. V) Remove protection covers from all connections and protective film from all name-plates, where appropriate, before installation on steam or other high temperature applications. 1.2 Access Ensure safe access and if necessary a safe working platform (suitably guarded) before attempting to work on the product. Arrange suitable lifting gear if required. 1.3 Lighting Ensure adequate lighting, particularly where detailed or intricate work is required. 1.4 Hazardous liquids or gases in the pipeline Consider what is in the pipeline or what may have been in the pipeline at some previous time. Consider: flammable materials, substances hazardous to health, extremes of temperature. IM-P183-03 CH Issue 2 3

1.5 Hazardous environment around the product Consider: explosion risk areas, lack of oxygen (e.g. tanks, pits), dangerous gases, extremes of temperature, hot surfaces, fire hazard (e.g. during welding), excessive noise, moving machinery. 1.6 The system Consider the effect on the complete system of the work proposed. Will any proposed action (e.g. closing isolation valves, electrical isolation) put any other part of the system or any personnel at risk? Dangers might include isolation of vents or protective devices or the rendering ineffective of controls or alarms. Ensure isolation valves are opened and closed gradually to avoid shocks to the system. 1.7 Pressure systems Ensure that any pressure is isolated and safely vented to atmospheric pressure. Consider double isolation (double block and bleed) and the locking or labelling of closed valves. Do not assume that the system has depressurised even when the pressure gauge indicates zero. 1.8 Temperature Allow time for temperature to normalise after isolation to avoid danger of burns. 1.9 Tools and consumables Before starting work ensure that you have suitable tools and/or consumables available. Use only genuine Spirax Sarco replacement parts. 1.10 Protective clothing Consider whether you and/or others in the vicinity require any protective clothing to protect against the hazards of, for example, chemicals, high/low temperature, radiation, noise, falling objects, and dangers to eyes and face. 1.11 Permits to work All work must be carried out or be supervised by a suitably competent person. Installation and operating personnel should be trained in the correct use of the product according to the Installation and Maintenance Instructions. Where a formal 'permit to work' system is in force it must be complied with. Where there is no such system, it is recommended that a responsible person should know what work is going on and, where necessary, arrange to have an assistant whose primary responsibility is safety. Post 'warning notices' if necessary. 1.12 Handling Manual handling of large and /or heavy products may present a risk of injury. Lifting, pushing, pulling, carrying or supporting a load by bodily force can cause injury, particularly to the back. You are advised to assess the risks taking into account the task, the individual, the load and the working environment and use the appropriate handling method according to the circumstances of the work being done. 4 IM-P183-03 CH Issue 2

1.13 PTFE - Handling precautions Within its working temperature range PTFE is a completely inert material, but when heated to its sintering temperature it gives rise to a gaseous decomposition product or fumes which can produce unpleasant effects if inhaled. The inhalation of these fumes is easily prevented by applying local exhaust ventilation to atmosphere as near to their source as possible. Smoking should be prohibited in workshops where PTFE is handled because tobacco contaminated with PTFE will during burning give rise to polymer fumes. It is therefore important to avoid contamination of clothing, especially the pockets, with PTFE and to maintain a reasonable standard of personal cleanliness by washing hands and removing any PTFE particles lodged under the fingernails. 1.14 Residual hazards In normal use, the external surface of the product may be very hot. If used at the maximum permitted operating conditions the surface temperature of some products may reach temperatures of 200 C (392 F). Many products are not self-draining. Take due care when dismantling or removing the product from an installation (See Section 5, Maintenance ). 1.15 Freezing Provision must be made to protect products which are not self-draining against frost damage in environments where they may be exposed to temperatures below freezing point. 1.16 Disposal Unless otherwise stated in the Installation and Maintenance Instructions, this product is recyclable and no ecological hazard is anticipated with its disposal providing due care is taken. However, if the valve is fitted with a Viton or PTFE seat, special care must be taken to avoid potential health hazards associated with decomposition/burning of these seats. Viton: - Can be landfilled, when in compliance with National and Local regulations. - Can be incinerated, but a scrubber must be used to remove Hydrogen Fluoride, which is evolved from the product and with compliance to National and Local regulations. - Is insoluable in aquatic media. PTFE: - Can only be disposed of by approved methods, not incineration. - Keep PTFE waste in a separate container, do not mix it with other rubbish, and consign it to a landfill site. 1.17 Returning products Customers and stockists are reminded that under EC Health, Safety and Environment Law, when returning products to Spirax Sarco they must provide information on any hazards and the precautions to be taken due to contamination residues or mechanical damage which may present a health, safety or environmental risk. This information must be provided in writing including Health and Safety data sheets relating to any substances identified as hazardous or potentially hazardous. IM-P183-03 CH Issue 2 5

2. General product information 2.1 Description STERI-TROL 'S' series are 316L stainless steel, two-port and three-port control valves. They are designed for mixing / diverting fluids (three-port only), and for on / off and modulating control of clean steam, pure steam and process fluids. The valve is operated by a pneumatic actuator and may be interfaced with a control system using any of the Spirax Sarco range of positioners. Available types SA Two-port angle pattern design SH SQ Two-port horizontal pattern design Three-port design Valve characteristics - options: SAE Equal percentage (E) - Suitable for most modulating process control SHE applications and good control at low flowrates. SAL SHL SQL Linear (L) - Primarily for liquid flow control where the differential pressure across the valve is constant. Important note: Throughout this document, reference has been made to the standard SAE control valve. With the exception of the trim type and porting arrangement, the SAE, SHE, SAL and SHL control valves are virtually identical. Approvals and certification Compliant to ASME BPE 2002. FDA, 3A and USP 26 Class VI approved sealing materials. Designed in accordance with 3A s and EHEDG. EN 10204 type 3.1 certificates supplied as standard. Surface finish certificate available on request. Valve seating - options: S Metal-to-metal (as standard) - Stainless steel V Soft seal - White Viton to provide a tight shut-off Valve stem sealing - options: E EPDM (as standard) - 3A and FDA approved V White Viton - 3A, FDA and USP 26 Class VI approved The STERI-TROL can be used with the following actuators and positioners: Electric EL3500 and EL5600 series Pneumatic Positioners PNS00, PNS4000, PN9000E and PN9000R series PP5 (pneumatic) or EP5 (electropneumatic) ISP5 (intrinsically safe electropneumatic) SP200 (smart electropneumatic) SP0 Refer to the relevant actuator Technical Information sheet for further details. Note: For further product data regarding the SPIRA-TROL 'S' series see the Technical Information Sheet 6 IM-P183-03 CH Issue 2

2.2 Technical data Plug design DN15 to DN100 Parabolic Leakage Metal-to-metal (0.01% of Kv) Soft seal IEC 534-4 Class VI Rangeability Equal percentage 50:1 Linear :1 Travel DN15 to DN50 (½" to 2") 20 mm DN65 to DN100 (2½" to 4") mm Surface finish Internal (Mechanical or electropolished) 0.4 µ External < 0.6 µ Fig. 1 IM-P183-03 CH Issue 2 7

2.3 Pressure / temperature limits Temperature C Pressure psi g Steam saturation curve Pressure bar g Temperature F The product must not be used in this region. Viton (V) stem seals must be selected for use in this region. Note: the EPDM (E) stem seals are limited to 150 C Body design conditions PN16 Maximum design pressure 16 bar g @ 120 C (232 psi g @ 248 F) Maximum design temperature 200 C @ 14 bar g (392 F @ 203 psi g) Minimum design temperature -20 C (-4 F) Maximum operating temperature EPDM (E) 150 C (2 F) Viton (V) 170 C (338 F) Minimum operating temperature -10 C (14 F) Note: For lower operating temperatures consult Spirax Sarco. Maximum differential pressure See the Technical Information sheet Designed for a maximum cold hydraulic test pressure of: 24 bar g (348 psi g) 8 IM-P183-03 CH Issue 2

3. Installation Note: Before actioning any installation observe the 'Safety information' in Section 1. Referring to the Installation and Maintenance Instructions, name-plate and Technical Information Sheet, check that the product is suitable for the intended installation: 3.1 Check materials, pressure and temperature and their maximum values. Do not exceed the performance rating of the valve. If the maximum operating limit of the product is lower than that of the system in which it is being fitted, ensure that a safety device is included in the system to prevent overpressurisation. 3.2 Remove protection covers from all connections and protective film from all name-plates, where appropriate, before installation on steam or other high temperature applications. 3.3 Determine the correct installation situation and the direction of fluid flow. Valves will have fluid flow from the lower port. The valve should preferably be installed along a pipeline, slightly declined in the direction of flow, to ensure complete drainability of the valve body. When mounting an actuator to the valve body, the actuator Installation and Maintenance Instructions must be followed. 3.4 Bypass arrangements - It is recommended that isolating valves be fitted upstream and downstream of the control valve, together with a manual bypass control valve. This enables the process to be controlled manually using the bypass valve while the pneumatic valve is isolated for maintenance. 3.5 Support pipework should be used to prevent stresses being exerted on the valve body. 3.6 Ensure adequate space is provided for the removal of the actuator from the valve body for maintenance purposes: 3.7 Isolate connecting pipework. Ensure it is clean from dirt, scale etc. Any debris entering the valve may damage the PTFE head seal preventing a tight shut-off. 3.8 Open isolation valves slowly, until normal operating conditions are achieved. 3.9 Check for leaks and correct operation. 4. Commissioning Ensure all pipework is free from dirt after the process pipework has been constructed. 4.1 Make certain the valve actuator is in the correct position and connected up to the air or mains supply before the system is energised. 4.2 If the motive supply is air it must be dry, clean and free from oil contamination. This is particularly important where a pneumatic positioner is used. 4.3 Should an electric actuator be required then all electrical wiring and connections should be carried out in accordance with national or local regulations and standards. 4.4 Turn on the process fluid slowly and look for any leaks from connections. IM-P183-03 CH Issue 2 9

5. Maintenance Note: Before actioning any maintenance programme observe the 'Safety information' in Section 1. 5.1 Periodic maintenance After 24 hours of operation Every 3 months of operation Annually After 24 hours of operation check the piping connections for tightness. Every 3 months of normal operation visually check the gland seal for signs of leakage. Inspect the valve to check for wear or scale deposits, replacing any worn or damaged parts, such as the plug or stem or gland seal. Please see Section 6, for a list of available spare parts. 5.2 Procedure for replacing the stem packing and the stem/plug Warning: Please acknowledge the 'Safety information' in Section 1 regarding the handling and disposal of PTFE and Viton parts. Reference Figures 2 and 3: - Isolate the valve on both sides. - Remove the actuator from the valve. Refer to the Installation and Maintenance Instructions covering Spirax Sarco actuators. - Remove the bottom adaptor (19). - Remove the body clamp (32), lift the bonnet (27) and free the stem (26) from the bonnet. Caution: Care should be taken when removing the cover since fluid under pressure may be trapped between the isolating valves. - Remove the seals (29, and 31). - E xamine par ts fo r a ny s igns of damage and/or wear. Score marks or scaly deposits on the valve stem (26) could damage the seals, and it should therefore be replaced. Fit the new seals (29, and 31) after liberally smearing them with the appropriate FDA approved oil. - Clean the parts taking care to avoid scratching the stem (26) or the packing chamber. Refit the cleaned or replacement valve stem and plug. - Using a new bonnet seal (28), replace the bonnet (27) on the valve body (if it is the SH valve which is being serviced, also replace the body seal (28)), leaving the stem protruding. Tighten the body clamp (32). - Ensure the valve stem (26) can move freely. - Refit the bottom adaptor (19). - Refit the actuator, following the relative assembly instructions. - Bring the valve back into service. Open the isolation valves and check for leaks. 31 29 32 Fig. 2 SQ valve 27 32 28 26 28 10 IM-P183-03 CH Issue 2

PNS4000 series actuator PNS00 series actuator 18 19 31 26 29 27 32 28 Valve Fig. 3 Actuator and SA valve IM-P183-03 CH Issue 2 11

6. Spare parts Spare parts The available spares are identified by the part numbers listed below. When placing an order for spare parts, always specify the actuator or the valve model (shown on the data plate) and the name of the part as described below. Available spares Description Part number Stem seal kit ('O' ring and 'V' ring) 8 and 12 Diaphragm kit (diaphragm 'O' ring and 'V' ring) 2, 8 and 12 Actuator Travel indicator 22 Spring kit Linkage kit (set of springs, included 3 off longer hex, head bolts and nut on some spring range) (lock-nut, top adaptor connectors, bolts and nuts) 4 and 16 17, 18, 19, 20 and 21 Valve stem seal set (excluding bonnet seal) 29, and 31 SA, SH and EPDM (packet of 3) 28 Bonnet seal Valve SQ models Viton (packet of 3) 28 Plug and stem (Equal percentage or Linear) 26 Spare parts ordering example: 1 off Valve stem seal set for a STERI-TROL DN15 SAE6SOSV0004 two-port control valve. 1 off Stem seal kit for a type PNS3320 pneumatic actuator having a spring range 0.4 to 1.2 bar. 4 16 2 8 12 18 17 19 31 29 20 21 28 26 29 31 28 26 28 Fig. 4 Actuator and SA valve Fig. 5 SH valve 12 IM-P183-03 CH Issue 2