Engagement Summary: Round 1

Similar documents
Nanaimo Transportation Master Plan. Phase 1 Consultation Summary

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

Hamilton Transportation Master Plan Public Consultation. Public Information Centre One Summary

WELCOME. City of Greater Sudbury. Transportation Demand Management Plan

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

2012 Transit Study Randolph County

CHAPTER 3: Vision Statement and Goals

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

Governance and Priorities Committee Report For the July 2, 2015 Meeting

EXECUTIVE SUMMARY. Vision

Pre-Plan Consultation Summary

Chapter 5. Complete Streets and Walkable Communities.

INTRODUCTION. Specifically, the objectives are to:

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

Tonight is for you. Learn everything you can. Share all your ideas.

METROPOLITAN TRANSPORTATION PLAN OUTREACH: INTERACTIVE MAP SUMMARY REPORT- 10/03/14

Climate Change Action Plan: Transportation Sector Discussion Paper: Cycling

122 Avenue: 107 Street to Fort Road

City of Novi Non-Motorized Master Plan 2011 Executive Summary

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

Winnipeg Walk Bike Projects Downtown Tire Talk - Summary

Key objectives of the survey were to gain a better understanding of:

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Active Transportation Infrastructure Investment A Business Case

Transportation Master Plan Advisory Task Force

Welcome! Public Open House on UBC s Transportation Plan

Hennepin County Bicycle and Pedestrian Planning

WILMAPCO Public Opinion Survey Summary of Results

Kelowna On the Move. Pedestrian and Bicycle Master Plan

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

CITY OF ABBOTSFORD TRANSPORTATION AND TRANSIT MASTER PLAN

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

Current Travel Needs and Operating Conditions (See pages 4 9 of the Discussion Guide)

Speed Limits Study and Proposal. Public Input Session: 8/14/13

Transportation 2040 Update: Eudora Public Input As of June 1, 2017

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

ACTIVE TRANSPORTATION

May 12, 2016 Metro Potential Ballot Measure Issue Brief: Local Return

NOTES FROM JUNIOR COUNCIL ORIENTATION SESSION HELD ON MONDAY, JANUARY 22, 2018, AT 3:30 PM IN COUNCIL CHAMBERS, CITY HALL

MASTER BICYCLE AND PEDESTRIAN PLAN

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015

Physical Implications of Complete Streets Policies

Living Streets Policy

CONNECTING PEOPLE TO PLACES

City of Toronto Complete Streets Guidelines

Sacramento Grid 2.0. The Downtown Transportation Study

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Cycling Master Plan Community Engagement Session WELCOME

PEDESTRIAN ACTION PLAN

WELCOME! To the Centennial Neighbourhoods Secondary Plan and Transportation Management Plan Information Centre. City of Hamilton

Cherry Creek Transportation and Land Use Forum September 25, 2013 Meeting Summary

TRANSPORTATION NEEDS ASSESSMENT

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Encouragement. Chapter 4. Education Encouragement Enforcement Engineering & Facilities Evaluation & Planning. Encouragement Chapter 4

Bicycle Master Plan Goals, Strategies, and Policies

Canada s Capital Region Delegation to the Velo-City Global 2010 Conference

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

ATTACHMENT 4 - TDM Checklist. TDM Checklist Overview

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Centennial Neighbourhoods Transportation Management Plan Summary of Phase 1 Consultation. Overview of Issues

Public Information Centre

How To Encourage More Efficient Transportation in Brazilian Cities

Strategic Plan for Active Mobility Phase I: Bicycle Mobility

TRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project.

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

50 Avenue S.W. Corridor Study Glenmore Aquatic Centre Drop-In Event

Sustainable Transportation Initiatives and Plans in Caledon

Major Bike Routes 102 Avenue Workshop April 21, 2015

The Wiggle Route in Context

phoenix regional bike share program sponsorship

The study area for this project is the entire County of Oxford including both the urban centres and rural areas.

Appendix C 3. Bicycle / Pedestrian Planning

Introduction.

AAMPO Regional Transportation Attitude Survey

Public Consultation Centre For. Transportation Master Plan Update. Information Package

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

Perryville TOD and Greenway Plan

October 30 th, 2012 Committee of the Whole Meeting Cycling Task Force Recommendations BIKE RACKS

CHAPTER 1 INTRODUCTION

US 41 COMPLETE STREETS CORRIDOR PLANNING STUDY from University Parkway to Whitfield Avenue

complete streets design and construction standards public primer City of Edmonton

City of Charlottesville Bicycle and Pedestrian Master Plan Update

TRANSPORTATION TRAINING TOPICS. April 6, 2010

APPENDIX B. TDM Existing Conditions

HYATTSVILLE TRANSPORTATION PLAN. City Council Update March 19, 2018

El Paso County 2040 Major Transportation Corridors Plan

IBI Group November 5, 2012

McKenzie Interchange Project Fall 2015 Engagement. Appendix 2: Engagement Materials and Feedback Form

Rochester Area Bike Sharing Program Study

NUMBER PROJECT TITLE ESTIMATED COST

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Transportation Issues Poll for New York City

Stakeholder Communication and Public Involvement Plan

Byron Avenue. Public Meeting. Thursday June 16, Traffic Calming Design Sherbourne Road to Island Park Drive

Zlatko Krstulich, P.Eng. City of O9awa

Transcription:

Engagement Summary: Round 1 June 21, 2018

REPORT FOR: City of Courtenay 830 Cliff Avenue Courtenay, BC V9N 2J7 PREPARED BY: Urban Systems Ltd. 550 1090 Home Street Vancouver, BC V6B 2W9 ALONG WITH: Kathleen Hamilton CONTACT: Allison Clavelle, P.Eng. aclavelle@urbansystems.ca June 4, 2018 This report is prepared for the sole use of City of Courtenay. No representations of any kind are made by urban Systems Ltd. or its employees to any party with whom Urban Systems Ltd. does not have a contract. Copyright 2018.

CONTENTS 1. Introduction... 1 2. About the Process... 1 3. What We Did... 2 3.1 Engagement Activities... 2 3.2 Promotion and Outreach... 3 3.3 Key Topics... 3 4. Overall Observations... 4 5. Survey Comments By Question:... 5 6. Who We Heard From... 21

INTRODUCTION Courtenay has more than doubled in size over the past 25 years, and as cities grow and change, so do their transportation needs. The City is developing Connecting Courtenay, a Transportation Master Plan that will provide direction on transportation infrastructure for the next 20 years. To inform the Transportation Master Plan, the City of Courtenay is seeking public input about issues and challenges and big ideas to be considered as part of the long-term transportation network. Based on public input, best practices, and technical assessment, Connecting Courtenay will identify existing issues, model future impacts, identify long-term improvements and set priorities for five and 10 years investments. The draft plan will be presented to City Council in summer 2018. ABOUT THE PROCESS The daily lives of all citizens are affected by the transportation network, regardless of their mode of choice. Developing an integrated transportation network of the future requires the input and involvement from a range of community interests and perspectives. Meaningful engagement in the master planning process will ensure the plan reflects the community s needs and wants and establishes a greater foundation for public awareness and understanding for implementation of the plan over coming years. Public engagement efforts will focus the on inform involve phases of the spectrum International Association of Public Participation (IAP2) values and spectrum: After extensive data collection completed in the fall of 2017, the first phase of engagement kicked-off with an open house and online survey in early March 2018, followed up a series Page 1

of engagement booths at busy public gathering places and meetings with various stakeholders. For more information: www.courtenay.ca/connectingcourtenay WHAT WE DID 3.1 ENGAGEMENT ACTIVITIES To reach a broad range of stakeholders and the broad community, a series of public engagement activities and tools were utilized. An open house was held at the Florence Filberg Centre - Conference Hall Wednesday, March 7, 2018, from 5 p.m. 7 p.m. Over 90 people attended. A series of stakeholder meetings were held with key groups including the Accessibility Committee, School District #71, several regional government partners and the Cycling Coalition. To raise awareness and make it easier for the broad public to participate, several engagement booths were held at a variety of high-traffic public locations including North Island College, the Comox Valley Farmers Market, Driftwood Mall and the Lewis Recreation Centre. These booths were an opportunity to reach a diverse range of residents where they are. An online survey was available from March 7 to March 29, 2018. Print surveys were also offered as an alternative to the online version. The survey was the central repository for public input and garnered a high response rate with 965 surveys completed including over 3,000 comments. Page 2

3.2 PROMOTION AND OUTREACH In an effort to establish broad awareness of the Connecting Courtenay initiative and the opportunities to provide input, a number of activities occurred: Established a project tag line of Connecting Courtenay and posed a call to participate asking What Moves You? A project logo and consistent visual identity were applied to encourage recognition of the initiative. 500 business cards promoting the online survey were distributed to residents to encourage participation in the online survey. Media release was distributed to local media resulting in event promotion and attendance at event The open house and online survey were advertised in the local newspaper (Comox Valley Record) Digital signage in City facilities Promoted on City of Courtenay website and within City of Courtenay social media (Facebook and Twitter) Emails to key transportation stakeholders and large employers within the Comox Valley Information was shared through established City of Courtenay communications tools 3.3 KEY TOPICS How do residents currently travel? What is their experience? What discourages them from using other modes? How would residents like to see transportation funding change in the future What is their bold idea for transportation in Courtenay? What is your vision? Page 3

OVERALL OBSERVATIONS Survey respondents indicated the three There were 975 respondents to the survey. Sixty percent of respondents identified as women and 40% as male. There was broad representation across all adult age groups with a slight majority within the 30-39 age range. 80% of respondents own their home and 75% of respondents live in a single-family home. The majority of respondents are residents and their primary mode of travel is vehicle. 75% of respondents indicating owning a bike. When asked where greater transportation investment should be made, more than half of respondents indicated transit, cycling, and pedestrian networks. More than half of respondents also indicated other and gave a more specific example around a quarter of these requested more spending on river crossings. Congestion during peak/desired travel times was identified as the top challenge when driving. When asked what could improve the driving experience, respondents indicated greater investment in transit, as well as cycling and pedestrian infrastructure. More trails and pathways and physical separation from vehicle traffic were rated highest to encourage greater travel by foot or bike. Sidewalk lighting was also indicated. Respondents indicated transit service is not frequent enough and takes too long to reach their destination. Improvements to existing bridges and the addition of new crossings were commonly mentioned within the comments. When respondents were asked to state their bold vision for Courtenay, the majority of comments are related to major capital, Survey results did not vary significantly by gender, age, resident or business owner. Page 4

SURVEY COMMENTS BY QUESTION: Total number of survey respondents (print and online): 965 # of comments: ~ 3,000 1. Please indicate what mode of transportation you typically use to travel to the following locations: Page 5

2. How often do you use the following methods to get to a destination? Page 6

3. How would you rate the effectiveness of the existing transportation networks in Courtenay today? Please rate these networks from 1 to 5, with 1 being the least effective and 5 being the most effective. 75 comments for Other (please specify): Need new bridge/bridges improved/crossings need addressing (23) Desire commuter train to rest of island (4) Transit needs to be improved (3) Page 7

4. The City invests capital and operating funds into the construction, maintenance, and operation of transportation networks today. How would you like to see that funding change in the future? Please rank these networks from 1 to 5, with 1 being much less investment, 5 being much more investment, and 3 being the same level of investment as today. 84 comments for Other (please specify) Bridge mentions (28) Commuter train to other island destinations (5) Bike routes (4) Page 8

5. Which of the following factors discourage you from walking for more of your dayto-day needs? Our definition for walking includes using a mobility aid such as a wheelchair or scooter. 98 comments for Other (please specify) Poor connections/destinations too far (17) Age/health/mobility limitations (14) Air quality/wood burning (4) Unsavory characters/personal safety (4) Crossings not marked (3) Parked cars on sidewalks (3) Sidewalks too high or too narrow (3) Street lighting (3) Page 9

6. What could we do to make it easier to be a pedestrian in Courtenay? 101 comments for Other (please specify) More pedestrian controlled signals at crossing/improved lighting (9) Snow clearing in winter (7) Enforcing/lowering speed limits and traffic calming (5) Air quality/wood burning (5) Pedestrian bridge at Ryan/Lerwick/sidewalks on Ryan (4) Land-use planning increased density, less sprawl, complete streets planning (4) Visibility of crosswalks (3) Education about benefits of walking/active-healthy lifestyle (3) Personal safety/unsavory characters (3) Connect existing infrastructure (3) Page 10

7. What else should we know about being a pedestrian in Courtenay? 268 Comments Ryan Road mentions (24) Need improved connectivity to destinations and close sidewalk gaps (16) Enforcement of speed/distracted drivers (11) Education and awareness activities (7) Sidewalk clearing (7) 8. Which of the following factors discourage you from cycling for more of your dayto-day needs? 142 comments for Other (please specify) Lack of cycling infrastructure (14) Need wider roads/shoulders (12) Lack of connectivity (8) Lack of street cleaning (8) Page 11

9. What could we do to make it easier to bike in Courtenay? 108 comments for Other (please specify) Increased regulatory - enforcement/bike licensing/speed limits (15) More cycling education/maps (13) No more cycling investment needed/maintain status quo (11) Increased street cleaning/sweeping salt/sand (8) Invest in bike paths and trails (4) More cyclist controlled signals (4) Page 12

10. What else should we know about riding a bicycle in Courtenay? 222 comments Need more dedicated cycling infrastructure (32) Conflict that exists between cyclists and drivers (24) Need increased education (18) Increased enforcement of cyclists and drivers (15) Safety concerns (14) Ryan Road, Superstore, Lerwick area (11) Connections to destinations and close gaps (8) Street cleaning (7) 11. Transit services in Courtenay are provided by the Comox Valley Regional District (CVRD) and BC Transit. We work with the CVRD and BC Transit to plan services. Which of the following factors discourage you from taking transit for more of your day-to-day needs? 122 comments for Other (please specify) Distance to bus stop too far/doesn t service my area (28) Schedule limits evening/weekend service (17) Intervals are too far apart/routes too long (11) Poor public information (7) Better service needed to major destinations including North Island College/hospital (5) Arden mentions (4) Page 13

12. What could be done to make it easier to take transit in Courtenay? 85 comments for Other (please specify) Expanded coverage to more areas (15) Increased frequency/intervals (13) Improved schedules/public information/maps (9) Smaller buses more often/more routes (7) Increased short, return loops/fewer one way (4) 13. What else should we know about taking transit in Courtenay? 153 comments Increase frequency (21) Need to connect to specific destinations (16) Increased evening, early morning and Sunday service (15) Shift to smaller buses to increase frequency (11) Improve public information (8) Page 14

14. Which of the following factors do you find most inconvenient when considering driving for your day-to-day needs? 181 comments for Other (please specify) Congestion at bridges/ryan Road to downtown (57) General congestion (18) Cost of gas/insurance (11) Too many signalized intersections/timing of signals (9) Lack of parking downtown (9) Lack of enforcement (5) Page 15

15. Which of the following factors discourage you from carpooling (sharing the drive between occupants of multiple residences) for more of your day-to-day commuting needs? Page 16

16. What could we do to make it easier to drive or carpool in Courtenay? 137 comments for Other (please specify) Increased capacity at crossing/another bridge (61) Introduce coordinating functions/car share forums/ride share companies (19) Disincentives to driving/narrow roads/make it more difficult (8) Traffic light timing (7) Page 17

17. What else should we know about driving and carpooling in Courtenay? 155 comments New crossing/increased capacity at crossings (31) Signal timing (13) Invest in infrastructure for cycling/ped and bus (9) Allow rideshares/provide coordination tools to support carpools (7) Create incentives not to drive (6) Create parking for carpoolers (5) 18. What is your bold idea for transportation in Courtenay? What is your vision? 594 comments The comments were organized by mode and categorized by the type of big idea. Some comments included multiple ideas and were counted in multiple columns. The results are summarized by mode in the tables below. Page 18

Page 19

Page 20

WHO WE HEARD FROM 19. Please describe yourself. Check all that apply. 21 comments for Other (please specify) Several mentioned retired should be option Some were unaware of which quadrant of Courtenay they lived in (N, W, S, E) Page 21

20. Age group 21. Gender Page 22

22. Accessibility 23. Household Page 23

24. Accommodation 25. People in household Page 24

26. Vehicles 27. Bike Page 25

28. Transit 29. Groceries Page 26

30. Commute Distance Page 27