ITEM Annex Page 7 Guildford Borough (Draft) Forward Programme Part A This is a work in progress and its completion is subject to the adoption of the Local Plan and Infrastructure Delivery Schedule November 0 Short term delivery programme 0- years (0/5 05/6) Medium term programme -6 years (06/7-09/0) Long term programme 6+ years (00/0+) (Part of the Guildford Borough Local Transport )
Annex Draft Forward Programme Part A November 0 SCC directorate start date cost Funding sources Location and scheme/package description purpose Delivery ITEM long ) Principal road network schemes borough-wide Improvement to public transport and accessibility to services Implementation via current LTSF programme for 0/5 7 : Park and Ride marketing. bus stop accessibility works Epsom Road, London Road, Portsmouth Road and Shalford Road. bus stop accessibility and information improvements for Ash, Ripley and Send (See overleaf ID )*. Short Major Local Sustainable Transport Fund (LSTF).50m (.78m capital and.m revenue) Varying but mostly detailed design travel in Guildford and reduce carbon emissions. a footway widening scheme on the A5 under Wooden Bridge (rail and pedestrian bridges) a new cycle and pedestrian crossing facilities east of Woodbridge Meadows on the River Wey Bridge, and crossing facilities over the south side of the Ladymead /Woodbridge Road crossroads (See overleaf ID )**. the traffic management system (UTC/SCOOT 8 ) update in town centre. the first phase of the wayfinder mapping for town centre (construction starts Sep 0) a travel planning and promotion programme. All costs are indicative and subject to revision and refinement s funded (in part, or whole) by Local Committee are sourced from the Local Committee forward Integrated Transport scheme (ITS) programme (Item 8, Annex to December 0 Local Committee (formal) All start dates are indicative and subject to change See front cover of annex for timeframes 5 Local: scheme costed at less than 50,000; Intermediate: scheme costed at between 50,000 and million; Major: scheme costed at million and above 6 Please see Section of the strategy for a full list of priorities 7 Surrey County Council. (0) Local Sustainable Transport Fund update and 0/5 programme [Online] Available at: http://mycouncil.surreycc.gov.uk/documents/g0/public%0reports%0pack%0wednesday%0-mar- 0%09.00%0Guildford%0Local%0Committee.pdf?T=0 (Last accessed: 0/07/0). 8 Urban Traffic Control (UTC)/Split Cycle Offset Optimisation Technique (SCOOT) Page Page 8
Annex Draft Forward Programme Part A November 0 SCC directorate start date cost Funding sources Location and scheme/package description purpose Delivery long ) Implementation via current LTSF programme for 0/5 9 : * Guildford priority bus corridors: Guildford Park Road Aldershot Road Worplesdon Road Woodbridge Road Short Major Local Sustainable Transport Fund (LSTF).50m (.78m capital and.m revenue) Varying from preliminary design to construction travel in Guildford and reduce carbon emissions. A0 Woking Road (via Slyfield Green) Epsom Road Park Barn Shalford Road Godalming Road London Road ITEM 9 Surrey County Council. (0) Local Sustainable Transport Fund update and 0/5 programme [Online] Available at: http://mycouncil.surreycc.gov.uk/documents/g0/public%0reports%0pack%0wednesday%0-mar- 0%09.00%0Guildford%0Local%0Committee.pdf?T=0 (Last accessed: 0/07/0). Page Page 9
Annex Draft Forward Programme Part A November 0 SCC directorate start date cost Funding sources Location and scheme/package description purpose Delivery ITEM long ) Implementation via current LTSF programme for 0/5 0 : ** Guildford cycling schemes: A5 cycle route Surrey Way to University A5 cycle route Middleton Road (excluding Wooden Bridge footbridge ramp improvements) A5 cycle route Middleton Road (Footway widening under wooden bridge footbridge ramp improvements) A5 cycle route Wooden bridge footbridge ramp improvements Short Major Local Sustainable Transport Fund (LSTF).50m (.78m capital and.m revenue) Varying from detailed design to construction travel in Guildford and reduce carbon emissions. A5 cycle route Ladymead/Woodbridge junction A5 Cycle route Stoke crossroads Cycle route Slyfield to Stoke crossroads via A0 Cycle route 5 Woking Road to Wooden Bridge via Bellfields estate Cycle route 6 - Salt Box to Wooden Bridge via Grange Road Cycle route 0 Surrey Research Park via University to Walnut Tree Close Short to Medium N/A Surrey Highways Medium Term Plan m Varying from to construction Part of Surrey s road investment programme for planned maintenance. In Guildford to enable 85km of road (% of local network) to be reconstructed. Operation Horizon - five year (0-08) Surrey Road Maintenance programme for Guildford 0 Surrey County Council. (0) Local Sustainable Transport Fund update and 0/5 programme [Online] Available at: http://mycouncil.surreycc.gov.uk/documents/g0/public%0reports%0pack%0wednesday%0-mar- 0%09.00%0Guildford%0Local%0Committee.pdf?T=0 (Last accessed: 0/07/0). More information at: http://mycouncil.surreycc.gov.uk/documents/s0/anx%0%0revised%0feb%00%0operation%0horizon_guildford.pdf Surrey County Council. (0) Operation Horizon 5 Year Carriageway Maintenance Plan [Online] Available at: http://mycouncil.surreycc.gov.uk/documents/s00/rev%0guildford%0cttee%0report%0%0march%0.pdf Last Page Page 0
SCC directorate ITEM Annex Draft Forward Programme Part A November 0 Location and scheme/package description purpose Delivery cost Funding sources Rail and Accessibility 5 Proposed North Downs Line Improvements Improvements include electrification, modernised rolling stock, frequency improvements and train lengthening. Improvements would address overcrowding on the line, improve integration with the rest of network and boost economic growth in economic hubs along the route, especially Guildford. Full electrification along its length will enable faster and more reliable services from Guildford to Gatwick and Reading, and allow new services to be run incorporating the North Downs line and the rest of the electrified network. The North Downs Line has the potential to be the M5 for rail. 00m Network Rail EM & CC LEP Local Junction improvements/major schemes on the Strategic Route Network 6 Proposed Guildford A Strategic Corridor Improvements The scheme aims to improve the operational performance of the A including junctions improvements between the A/A Hogs Back and the A/A00 Clay Lane/Burpham Junction. Provide increased capacity and improvements to key junctions. Improve journey times and reduce accidents. 00m Highways Agency EM LEP Local 7 Proposed A/M5 Junction 0 Wisley interchange improvements Increase capacity, ease congestion and improve road safety at strategic interchange between M5 and A. 0m Highways agency EM LEP Local Growth Fund Page start date long ) Long Strategic Long Strategic Medium to Long Major Page
SCC directorate start date ITEM Annex Draft Forward Programme Part A November 0 Location and scheme/package description purpose Delivery cost Funding sources Junction improvements/major schemes on the Primary Route Network Page 5 long ) 8 Proposed Guildford Gyratory Package Provide a new or widened pedestrian bridge from Walnut Tree Close to Bedford Road and the replacement of the Wooden Bridge over the A to provide for pedestrians and cyclists. The scheme to consider closure of Walnut Tree Closure. Improve access between Guildford railway station and town centre for walking and cycling.8m EM LEP Local Growth Fund 9 Proposed SARP/Clay Lane link road Infrastructure to access major developments Major Short (Submission of Business Case Sep 05) Reduce congestion, improve bus journey time reliability and provide better infrastructure for pedestrians and cyclists. Intensification of existing Slyfield Industrial Estate 7.m EM LEP Local Growth Fund Public Works Loan Board GBC s by place Guildford Borough - Central Medium Major Short Minor 0 George Abbot crossroads (A0/A00) improvements Chertsey Street, Guildford junction with North Street Improve accessibility for pedestrian and bus users and facilitate off road bus stations relocating road space. 6k Proposed A Strategic package of improvements North-East Guildford infrastructure A Interchange improvements: Bus priority measures Pedestrian and cycle measures Reduce congestion, improve accessibility and promote sustainable travel in Guildford Reduce accidents 7.5m Highways Agency EM LEP Local Surrey County Council. (0) Minor Improvements Programme Review. Short Major Page
Annex Draft Forward Programme Part A November 0 SCC directorate start date cost Funding sources Location and scheme/package description purpose Delivery long ) Proposed Guildford Sustainable Transport Package Short Major EM LEP Local.95m travel in Guildford. Corridor(s)and routes yet to be determined Improve pedestrian experience. Wayfinding signage system Phase Short Minor 50k Encourage walking and cycling 0 new waymakers Build and reinforce Guildford s identity Guildford High Street Setts maintenance strategy Short Intermediate Detail Design.5m SCC GBC Improve pedestrian experience and town centre attractiveness. The scheme will replace the existing setts. Relieve congestion and promote sustainable travel in Guildford 5 Short Major EM LEP Local 6m Proposed Guildford hub transport improvements Infrastructure support for town centre regeneration Medium Intermediate N/A SCC and other sources Unknown.m Parking restriction Pan-Stoughton area 6 travel in Guildford. LSTF Medium Major Unknown.06m 5 7 Sustainable travel measures (LSTF programme) Provision of information including traffic improved signing, maps and use of websites. Training: Eco Driver training, cycle training travel planning and business travel plan forums. Expansion of the Brompton Dock scheme. Car sharing schemes including car clubs and electric vehicles. 8 ITEM Long Major Network rail Unknown Improve interchange between rail, bus, walking and cycling at the rail station. Guildford Railway Station (linked to Solum development) Surrey County Council. (0) Guildford High Street ready to get setts [Online] Available at: http://www.surreycc.gov.uk/get-involved/your-local-area/guildford-local-area/news-from-guildford/guildford-high-street-ready-to-get-setts (Last accessed: 0/07/0) 5 Surrey County Council. (0) LSTF Bid document. Page 6 Page
SCC directorate Annex Draft Forward Programme Part A November 0 Location and scheme/package description purpose Delivery cost Funding sources Page 7 start date ITEM 9 long ) Proposed Merrow railway station Provide direct rail access at Merrow and align it with the TravelSMART initiative. 7m Network rail EM LEP Local 0 Long Major Proposed Park Barn railway station Provide direct rail access at Park Barn and align it with the TravelSMART initiative. 7m Network rail EM LEP Local Long Major Guildford sustainable movement corridor (based on GTAMS) Improve walking, cycling and public transport within Guildford town centre. 75-00m To be confirmed during scheme Guildford Borough - West Long Major A8 Kings Road improvements, Shalford Close slip road outside shops Provision of footway and pedestrian facility Pedestrian improvements 50k SCC and other sources Notes Medium Minor s in Bold are based on Expressions of Interest submitted to the EM Local Enterprise Partnership Local Transport Body in March 0 Page