Shimano Di2 Installation on S5

Similar documents
ROAD DISC TECHNICAL MANUAL

2019 MADONE ASSEMBLY MANUAL

2019 MADONE ASSEMBLY MANUAL

TABLE OF CONTENTS FRAME FEATURES INTRODUCTION

R5 RIM MANUAL EN. Version 1 I

FRAME FEATURES TABLE OF CONTENTS INTRODUCTION

SUPPLEMENTARY MANUAL

R5 DISC MANUAL EN. Version 1 I

R3 RIM MANUAL EN. Version 1 I

TABLE OF CONTENTS INTRODUCTION

FRAME FEATURES TABLE OF CONTENTS INTRODUCTION. A guide to your Cervélo C Series frame.

2016 Road Electronic Frame Fit Specifications This document is intended to communicate general frame fit guidelines for SRAM electronic products.

Lectric Cycles Mid-Drive Electric Motor Installation

Front derailleur. Dealer's Manual SORA FD-R3000 FD-R3030 CLARIS FD-R2000 FD-R2030. ROAD MTB Trekking. City Touring/ Comfort Bike DM-RBFD001-01

SECTION 1 UNPACKING INSTRUCTIONS

Shifting Lever. RAPIDFIRE Plus 11-speed

NITROGEN DISC 286A: ASSEMBLY GUIDE

KRYPTON X ROAD : ASSEMBLY GUIDE

E-118 Assembly Guide

GALLIUM PRO: ASSEMBLY GUIDE

Front derailleur. Dealer's Manual DURA-ACE FD-R9100 ULTEGRA FD-R FD ROAD MTB Trekking. City Touring/ Comfort Bike DM-RAFD001-03

ST Shimano Total Integration. Technical Service Instructions. General Safety Information SI-6CT0B

GALLIUM PRO 210A: ASSEMBLY GUIDE

HOME ASSEMBLY INSTRUCTIONS

E-116 Assembly Guide

VR SERIES TECHNICAL MANUAL

GALLIUM PRO 259A & 259B: ASSEMBLY GUIDE

1 Electronic Wiring. Felt IA Owner s Manual. CalPac / AeroPac Installation... Pg Note:

GALLIUM: ASSEMBLY GUIDE

KRYPTON X ROAD : ASSEMBLY GUIDE

Rear Drive System SERVICE INSTRUCTION. Specifications SI-R670B

DM-MARD (English) Dealer's Manual. ROAD MTB Trekking. City Touring/ Comfort Bike REAR DERAILLEUR XTR RD-M9100 RD-M9120

GALLIUM CS 281A: ASSEMBLY GUIDE. Revision Valid for MY2019 Gallium CS

Parts List. 7. Handlebars 8. Grips 9. Handlebar Stem 10. Front Brake 11. Front Wheel 12. Crank 13. Chain

Rocky Mountain Instinct / Pipeline Alloy Frame Assembly Guide. Date: April 7, 2017

RADON 237A: ASSEMBLY GUIDE. Revision Valid for MY2017 Radon

comfort without compromising on performance and to fit your various needs on touring,

SI-F971A. 9-speed super narrow chain such as CN-7700 / CN-HG92 8- / 7- / 6-speed narrow chain such as CN-HG50 / CN-IG51

Special instruction of installation for SAINT FH-M800/RD-M800 and FH-M805/RD-M805

Rocky Mountain Instinct / Pipeline Frame Assembly Guide. Date: March 31, 2017

Final Assembly Instructions Bikes with Threaded Headsets

DM-MBRD (English) Dealer's Manual. ROAD MTB Trekking. City Touring/ Comfort Bike. Rear Derailleur SLX RD-M7000 DEORE RD-M6000

Front derailleur. Dealer's Manual XTR FD-M9000 FD-M9020 FD-M9025 DEORE XT FD-M8000 FD-M8020 FD-M8025 DEORE FD-M612 FD-M617 FD-M618 SLX FD-M672 FD-M677

Santa Fe Cycles Assembly Guide Introduction

Assembly Tools. Assembly will take 1-2 hours

CRUZBIKE Quest 2.0 Assembly

Final Assembly Instructions Bikes with Threaded Headsets

DM-RARD (English) Dealer's Manual. ROAD MTB Trekking. City Touring/ Comfort Bike. Rear Derailleur DURA-ACE RD-R9100 ULTEGRA RD-R8000

Front derailleur. Dealer's Manual FD-M9000 FD-M9020 FD-M9025 FD-M8000 FD-M8020 FD-M8025 FD-M612 FD-M617 FD-M618 FD-M672 FD-M677

Drive Belt Instructions

9-speed super narrow. chain such as. CN-7701 / CN-HG93 8- / 7- / 6-speed narrow. chain such as CN-HG50 / CN-IG51

DM-FD (English) Dealer's Manual. Front derailleur FD-M9000 FD-M9020 FD-M9025 FD-M8000 FD-M8020 FD-M8025 FD-M612 FD-M617 FD-M618 FD-M672

TIMEMACHINE. Assembly Manual

2019 S5 RETAILER ASSEMBLY MANUAL

2019 S5 DISC RETAILER ASSEMBLY MANUAL

E-trike Li Assembly Guide

EZ-3 USX HD Supplemental Owner s Manual

FACTORBIKES.COM. Assembly Manual V2.20

Thank you for purchasing a WIKE BOX BIKE!

Final Assembly Instructions Bikes with Quill Stems

E-119 TRI: ASSEMBLY GUIDE

GALLIUM PRO : ASSEMBLY GUIDE

Dealer's Manual ROAD MTB Trekking City Touring/ URBAN SPORT E-BIKE Comfort Bike Front derailleur ALIVIO Non-Series

Final Assembly Instructions Bikes with 16 Wheel Size

BackCountry ebikes 2019 MULE Assembly

SANTA CRUZ BICYCLES Cable Routing Procedure MY17

Folding Dual Suspension MTB. Instruction Manual

Rocky Mountain Element Technical Manual. Rev B

MANTEL BIKE BOX: PACKING YOUR ROAD BIKE FOR TRANSPORT

Electronic Drivetrain Cabling Guide R1.0

ASSEMBLY GUIDE: Izip & Ezip Electric Bicycles with Rack-Top Mounted Batteries ( RTMB Bicycles )

Ladies Shopper Bike Assembly Manual 28C03

Shifting Lever. Dealer's Manual. RAPIDFIRE Plus SL-M2000 SL-M3010 SL-M4010. Thumb Shifter SL-TZ500. ROAD MTB Trekking. City Touring/ Comfort Bike

SG-7R46 SG-7R45 BR-IM41-R CJ-7S40 WARNING CAUTION SERVICE INSTRUCTIONS. Inter-7 Hub. Inter-M Brake Cassette joint NOTE:

DM-TRRD (English) Dealer's Manual. ROAD MTB Trekking. City Touring/ Comfort Bike. Rear Derailleur DEORE XT RD-T8000 DEORE RD-T6000

1. General Safety Information. Silvio V2.2 Assembly Instructions Assembly. Adjust to the rider.

E-117 TRI: ASSEMBLY GUIDE

Rear Drive System SERVICE INSTRUCTIONS SI-R920A WARNING. Note Always be sure to use the sprocket set bearing the same group

FACTORBIKES.COM. Assembly Manual DISC V1.05

Dealer s Manual Series

Assembly Tools. Assembly will take about an hour

E-119 TRI+ 284A: ASSEMBLY GUIDE

Reinforced connecting pin. Silver. 6.5mm. Black. 7.1mm

Thumb Shifter Plus Thumb Shifter

Cantilever Brake. Dealer's Manual. ROAD MTB Trekking. City Touring/ Comfort Bike

RS Important Notes. Contact. Bicycle Maintenance Stand instructions manual. Warranty Period : 1 year (from the date of your purchase)

DM-SL (English) Dealer's Manual. REVOSHIFT Shifter SL-RS47 SL-RS45 SL-RS36 SL-RS35 SL-RS34 SL-RS25

SANTANA STOWAWAY TANDEM WITH AIRLINER SAFECASE AND FTS FOAM TRAY SYSTEM ASSEMBLY AND DISASSEMBLY

NITROGEN: ASSEMBLY GUIDE

2012 K9100 COMPACT Worldwide Cycling Solutions Through Creative Innovations.

EZee Glider Manual. Tools needed for Assembly: Wrench (included) Philips Screwdriver (not included) Assembly Instructions

Road. Gallium Pro. Shifter - Dura Ace ST-9070 L Shifter - Ultegra ST-6870 L Wire - EWSD50-I (x2) Jonction EW90-A

PRECAUTION INTENDED USE OF THIS MANUAL INTRODUCTION AKING CARE OF

PIVOT SHUTTLE Dropper Post Cable Housing Replacement Maintenance Procedure

Nexus. Dealer's Manual. ROAD MTB Trekking. City Touring/ Comfort Bike SG-3R40 SG-3R45 SG-3R75 SG-3R75-A SG-3R75-B SG-3D55 SG-3C41

DM-MBST (English) Dealer's Manual. ROAD MTB Trekking. City Touring/ Comfort Bike. Shifting lever. EZ-FIRE Plus ST-EF500 ST-EF510

Using Your Bike Friday : Folding Rear Rack

DM-RAPD (English) Dealer's Manual. ROAD MTB Trekking. City Touring/ Comfort Bike. SPD-SL Pedal DURA-ACE PD-R9100 ULTEGRA PD-R8000 SM-PD63

INSTRUCTION GUIDE TRANSITION CARBON (ALL MODELS)

Troubleshooting Guide

Transcription:

Installing Shimano Dura Ace Di2 Shifting Systems Note these instructions and pictures are for assembling the Shimano Dura Ace Di2 system (Internal Spec) on the Cervélo S5 frame. The Shimano Ultegra Di2 system utilizes different technologies and parts which require separate instructions for installation. Please refer to the Cervélo website www.cervelo.com for more information. 3

Frameset Installation Procedure It is recommended to install the Di2 Internal Spec system as a first step when building up a bare S5 frame. When retrofitting an existing bike, it is best to disassemble the bicycle completely. Whereas manual controls can utilize the ICS3 system to direct cables, the electronic cables used in this system require routing through the frame from the insertion point at the head tube, and at the connection points at the bottom bracket (BB), chainstay, and seat tube. This process is easiest to accomplish without other components mounted. Gently pull apart the cables at the connection points and set aside for assembly. Tip: If the Bottom Bracket has been installed, please refer to the manufacturer s instructions for the appropriate removal procedure. Parts Required: Shimano Dura-Ace Di2 wiring harness Junction B (EW-7975-A-1) Two M4 button head 10 mm bolts Cervélo Di2 rubber grommets for top tube and chainstay STEP 1: Disassembly of Internal Wiring Harness The Shimano Dura-Ace Di2 system comes with the internal electric wire control cable EW-7975-A-1 (Junction B) pre assembled. The individual connections must be separated to route them internally through the S5 frame. STEP 2: Shifter Control Cable Installation Using the rearward cable hole in the top tube, (covered by E-Wire sticker) slide the small connector end of Shimano shifter control cable through the hole and into the frame. This cable has black connector ends, and is marked Junction on the silver tag at the large end. The E-Wire hole on the S5 top tube is designed to be elongated (7 mm wide x 8 mm long) in order to accept the cable as delivered with zip ties attached. To insert, locate the buckle of the first Shimano installed zip tie towards the rear of the frame, and with gentle force, press it through the opening and into the frame. 4

Once the cable is all the way through, feed the cable back into and down the head tube through the upper opening so that it is hanging straight down out of the lower head tube opening. Tip: The zip ties are mounted to the control cable by design their function is to reduce cable noise inside the frame. It is recommended to leave these in place to reduce unwanted cable rattle. Push the cable into the bike as far as next (second) zip tie of the control cable. The black end of the cable should now be visible when looking through the head tube into the top tube. Pull the cable forward to draw it out through the upper opening in the head tube. Continue to feed the rest of the cable and zip ties through the top tube leaving just enough for the large junction cable end to reach the front of the head tube at a later stage. Pull the other end gently throughout the insertion process ensuring that the cable does not get caught on the stainless steel ICS3 tubes running down the rear of the head tube. Tip: Reach inside the head tube opening towards the rear to locate the ICS3 tubes. The Di2 cables must run down one side or the other of these tubes, by pulling carefully through the top tube to minimize the chance that the zip ties will get caught on the internal structure. Next the cable must be routed into the down tube and out of the bottom bracket. This is best accomplished by running a wire through the frame to attach to the control cable end protruding from the head tube, and pulling the whole system out through the BB. Remove the BB cable guide by using a small flat screwdriver to gently pry the BB cable guide from the frame to expose the cable access port. Insert a spare shift cable (wire only no casing) into the large forward hole, oriented with the ball end entering first. Feed the cable through to run along the bottom of the down tube, taking care to ensure that it runs underneath the interior ICS3 cable fittings located near the head tube. These can be seen by viewing through the forward BB cable access port towards the head tube, and shining a light or using a backlight behind the head tube. 5

Tip: There is considerable friction when pulling the cables through the tube, as the zip ties snag on the internal features, so ensure the taped connection is secure. Be sure to remove all tape once the cable routing is completed. Continue to feed the cable through until the ball end is visible inside the head tube. Feed the joined Di2 cable connector head back through the lower head tube opening and into the down tube by pulling the shift cable wire out through the BB. Continue until the taped connector head protrudes through the large forward hole of the cable access port. Pull the ball end of the cable out through the lower head tube opening, taking care not to pull the other end of the cable inside the frame. Overlapping the shift cable and the Di2 control cable by approximately 5cm, use electrical tape to connect the cables together. Ensure that both the Di2 cable connector and the ball end of the shift cable are firmly affixed to the dual cables with no protrusions so that they will not snag on the ICS3 fittings. Remove all tape joining the cables together and set the shift cable wire aside. Carefully push the Di2 connector end back into the BB shell recess through the large forward hole of the cable access port. 6

Reaching through the drive-side of the BB, locate the connector end. Pull the connector out of the frame through the drive-side BB, stretching it gently to remove slack and ensure the straightest routing possible. Pull the red connector end out through the drive-side of the BB. Step 3: Battery Holder Feed the connector end of the Shimano battery housing cable (Red connector) into the battery cable access hole. Using two M4 screws (button head, 10mm length), install the Battery Holder on the frame mounts and tighten the bolts to a maximum of 3Nm. Note that the screws provided with the battery holder by Shimano do not fit the S5 frame. 7

STEP 4: Rear Derailleur Control Cable Insert the connector end of the Shimano rear Derailleur control cable (Yellow connector) through the opening on the upper face of the drive-side chainstay, and feed the cable through the chainstay until it appears in the bottom bracket shell recess. Pull the connector out through the drive-side of the BB. Leave approximately equal lengths of cable protruding from the chainstay and bottom bracket. Install the S5 Di2 chainstay rubber cable grommet over the cable to ensure that the cable junction end does not fall into the chainstay. Ensure the groove in the edges of the grommet seats properly on the chainstay hole, starting from the front and working backwards. STEP5: Front Derailleur Control Cable Insert the connector end of the Shimano front Derailleur control cable (White connector) from the top into the front Derailleur cable hole found at the junction of the seat tube and the chainstay. Feed the cable through until the connector appears in the bottom bracket shell recess. 8

Pull the connector out the drive-side of the BB. Leave enough cable above the chainstay to reach the front Derailleur mount. Tip: Before making the initial connections for any of the cables, slide the supplied heat shrink tubes onto each cable, and push them far enough along the cable so as to not interfere with the set up. This means that if the initial connections are successful, you will not need to break them in order to seal the system. STEP 7: Attaching the Derailleurs Install the Di2 front Derailleur to the front Derailleur mount and adjust the position according to Shimano s instructions. Apply grease to the threads of the bolt and tighten to 5Nm to 7Nm. STEP 6: Connecting the Junction Box All four cable connectors should now be protruding through the drive-side of the BB shell. Match up the arrows on the top of the Derailleur and the control cable (marked FD on a silver tag), and plug the end of the FD cable into the recessed port of the front Derailleur until they connect with a click. Following Shimano instructions, attach the colour-coded junction box cables to the appropriate control cables outside of the frame. 9

Install the Di2 rear Derailleur to the rear Derailleur hanger according to Shimano s instructions. Apply grease to the threads of the bolt and tighten to 8Nm to 10Nm. Match up the arrows on the top of the rear Derailleur and the control cable (marked RD on a silver tag), and plug the end of the RD cable into the recessed port of the rear Derailleur until they connect with a click. Parts Required: Shimano Di2 tool TL-EW01 Shimano Dura-Ace Di2 wiring harness Junction A (EW79A) STEP 8: Connecting the Levers To complete the lever connections it is first necessary to install the fork, headset, stem, handlebars, and Di2 Dual Control Levers on the bike. Refer to the component manufacturer s installation instructions, Cervélo S5 Supplementary Manual, and Cervélo Owner s Manual for installation information. Carefully fold back the rubber hoods on the Dual Control levers to expose the cable port doors on the inside surface of the lever. Using the wide, two-pronged end of the TL-EW01 tool or a fingernail, pry open the cable port at the rearward door edge to expose the connectors. 10

Locate the small red connector end of the EW79A Junction B cable and orient the raised edge to fit into the grooved surface of the cable port door of the right lever (marked with red dot). Align the arrows on both black connector ends and press together until they connect with a click. Using the narrow end of the TL-EW01 tool, press the connector end into the connector port until they connect with a click. Repeat the process to locate and insert the white connector end into the left lever cable port (marked with white dot). Run the cables from the levers along the underside of the handlebars and beside the stem in order to connect the large black harness connector (marked Junction on the silver tag) protruding from the E-Wire hole on the top tube. Tip: Use electrical tape to secure the cables running from the levers to the handlebars under the area to be covered with bar tape. This allows you to position the Junction A box easily. It is designed to be attached to the rear brake cable casing using the included zip ties once the brake cables are installed. Install the rubber top tube grommet into the rearward E-Wire cable hole and around the shifter control cable to hold it firmly in place. 11

STEP 9: Testing and Sealing the Connectors Open the lever on the battery holder and insert a charged Shimano battery SM-BTR1 by aligning the raised surface (marked Shimano) on the battery with the groove in the holder. Slide the battery into the holder body until they connect with a click. Close the lever until is snaps shut, locking the battery in place. Test the system for circuit connections by pressing the shift buttons on the Di2 Dual Control levers and confirm that each button operates as intended. Once performance is confirmed, seal the four connector junctions located outside the drive-side BB (Junction B) with the heat shrink tubes positioned on the cables. Slide the heat shrink tubes over the joined connectors and use a heat gun or hairdryer to shrink the tubes and hold them permanently in place. Tip: Take care to angle the heat source so as not to discolour the paint on the BB area. Once all connections have cooled, push the Junction B box with attached wires back into the drive-side of the BB shell recess and up into the hollow area above the BB located between the seat tube and down tube. If necessary, some electrical tape can be used to hold them in place. Install the chosen bottom bracket per the manufacturer s directions ensuring that all of the cables are routed smoothly above or below it. Locate the S5 single-bend cable guide nipple over the middle 5mm hole in the cable-port bridge, and push firmly to secure the guide in place. When seated properly, the guide should sit flush with the bottom bracket shell. Complete assembly of the S5 bicycle. Refer to the component manufacturer s installation instructions, Cervélo S5 Supplementary Manual, and Cervélo Owner s Manual for additional information. 12

If you have any questions about Di2 assembly onto your S5 or for further assistance, please contact Cervélo Customer Service or your authorized Cervélo retailer. 13