A future cycle route network for North Staffordshire mb/08/16 Need for a strategy. Existing cycle route network

Similar documents
London Cycle Network Annual Report 2000

Nottingham Cycle City Frequently Asked Questions

ENFIELD TOWN THE REVISED DESIGN

WEST YORKSHIRE LTP CYCLE PROSPECTUS

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

Living Streets response to the Draft London Plan

Space for Cycling. A guide for decision makers

Canada s Capital Region Delegation to the Velo-City Global 2010 Conference

Department for Transport

2. Context. Existing framework. The context. The challenge. Transport Strategy

Active travel and economic performance: A What Works review of evidence from cycling and walking schemes

Nottingham, the great cycle city

E4 Cycle Route Exeter University to Redhayes Bridge. - Recommendations from Exeter Cycling Campaign

Transportation Master Plan Advisory Task Force

Walking and Cycling Action Plan Summary. A Catalyst for Change The Regional Transport Strategy for the west of Scotland

THE TWO BANKS OF THE TAGUS RIVER BY INTEGRATING THE BYCICLE INTO A MULTIMODAL SYSTEM

Devonport City Cycling Network Strategy

Parallel Workshop: Avoid

Bristol City Council has produced a draft Bristol Transport Strategy document.

Developing a Birmingham Transport Space Allocation policy. David Harris Transport Policy Manager Economy Directorate Birmingham City Council

Determining bicycle infrastructure preferences A case study of Dublin

EUROPEAN MOBILITY WEEK September 2015

GD 0043/18 ACTIVE TRAVEL STRATEGY

IAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm

9. Parking Supporting Statement

Community engagement guide May 2018

Guildford Borough (Draft)

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document

HAMILTON BIKING PLAN OUR VISION: A BIKE FRIENDLY CITY

Chelmsford City Growth Package

DOE Climate Change Proposals

Cycle network linking Wolverhampton city centre and Bilston town centre with employment sites and residential areas:

TOWARDS A BIKE-FRIENDLY CANADA A National Cycling Strategy Overview

PERSONALISED TRAVEL PLANNING IN MIDLETON, COUNTY CORK

Comments on the Hailsham to Eastbourne Sustainable Transport Corridor

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design

GETTING WHERE WE WANT TO BE

Active Travel Towns Funding Scheme Project Proposal. Sligo. Sligo Local Authorities

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

Integrated Urban Mobility

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT

Background. Caversham a vision for the future. Joint public meeting arranged by:

High frequency bus services operating to Little Island; Creation of a new Park and Ride site and train station at North Esk;

Douglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013

This report is PUBLIC [NOT PROTECTIVELY MARKED] WMCA Board. (1) To approve the adoption of the West Midlands Cycle Design Guidance.

City of Perth Cycle Plan 2029

1.5 On this basis it is fundamental that the Transport Strategy for the site focuses on the following key criteria,

Reflections on our learning: active travel, transport and inequalities

Cycling and Walking Investment Strategy & Local Cycling and Walking Infrastructure Plans

Climate Change Action Plan: Transportation Sector Discussion Paper: Cycling

Easton Safer Streets - Final Project Report BRISTOL

Launceston's Transport Futures. Greater travel options for the people of Launceston

Outcomes and Economic Benefits of Active Travel

Perne Rd / Radegund Rd Roundabout Cambridge

Oxfordshire Local Transport Plan 4 Science Vale Cycle Network Project Proposal Didcot Ladygrove Link

Active Travel Strategy Dumfries and Galloway

The European Transport Safety Council s proposals for a safety component in a future EU Cycling Strategy

Public health: a new priority in transport policy. Philip Insall Director, International, Sustrans

ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025


Part 3: Active travel and public transport planning in new housing developments

Welcome. Background. Goals. Vision

Birmingham Connected. Edmund Salt. Transportation Policy Birmingham City Council

IMPACT OF THE BERMUDA CONNECTIVITY PROJECT ON CYCLING

Space for Cycling. Delivering healthy streets. Roger Geffen Policy Director, Cycling UK

Public Consultation Centre

Active Travel Survey for Bridgend and Pencoed towns. Page description:

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

General Design Factors

VILNIUS SUMP. Gintarė Krušinskaitė International project manager place your logo here

Appendix 1 Greenway Standards

Oxford Street West. 21 December

NOTES FROM JUNIOR COUNCIL ORIENTATION SESSION HELD ON MONDAY, JANUARY 22, 2018, AT 3:30 PM IN COUNCIL CHAMBERS, CITY HALL

MILTON ROAD LLF PROJECT UPDATE

University of Leeds Travel Plan

MARKHOUSE ROAD IMPROVEMENTS

Broom Hill/Blackberry Hill Walking and Cycling Improvements

Traffic Management and Emissions

Goodlettsville Bicycle and Pedestrian Plan Executive Summary

Stepping up a gear. Our vision for cycling in Cardiff

Supporting Tasmania s Road Users

Report to Cabinet. 18 May 2016

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

City of Madison: 2017 Capital Budget Capital Improvement Plan

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

Derby Cycling Group, c/o 126, Station road, Mickleover, Derby, DE3 9FN. Date: 20 th November, 2018.

Appendix N(b): Portishead Station Outline Travel Plan

Kelowna On the Move. Pedestrian and Bicycle Master Plan

Madison Urban Area and Dane County. Bicycle Transportation Plan Summary. September Introduction. Bicycle Plan Scope and Planning Process

Evaluating a Cycling Strategy

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

CAMBOURNE TO CAMBRIDGE BETTER PUBLIC TRANSPORT PROJECT PHASE 2 PUBLIC CONSULTATION MADINGLEY MULCH ROUNDABOUT TO CAMBOURNE

Closing statement. I have chosen not to object in principle to the proposal to close S08.

Government transport policy

Regional Transportation Needs Within Southeastern Wisconsin

City of Novi Non-Motorized Master Plan 2011 Executive Summary

Chapter 5. Complete Streets and Walkable Communities.

ABERDEEN: CITY OF THE FUTURE

FAQ sheet Dutch Cycling Embassy

Transport Workshop Dearbhla Lawson Head of Transport & Infrastructure Policy & Funding University of the Third Age.

Transcription:

Need for a strategy 1. The government s aim is to double cycling levels nationally by 2025 [note 1]. This would bring significant health, environmental, economic and traffic benefits [note 2]. It is widely recognised that there is great potential to increase cycling nationally and locally [note 3]. Many measures to help improve conditions for cyclists e.g. lower speed limits, more and better crossings over main roads and wider footways will also benefit pedestrians. 2. It is essential to have an effective long term cycling strategy for North Staffordshire to stand any chance of doubling cycling levels by 2025. A long term strategy would be able to help secure the necessary future funding for schemes and to safeguard future cycle routes affected by future development and to exploit opportunities for new routes. 3. A main element of the strategy would be to provide space for cycling [note 4] via a long term future cycle route network of safe direct cycle routes to the main employment areas, higher education sites and other key destinations. 4. Defining and implementing a future cycle route network for the North Staffordshire urban area needs a joint approach between the responsible local and national agencies including Stoke and Staffordshire highway authorities, local councils and Highways England because of the many cross-boundary cycle trips particularly those crossing the A500T and A50T. Existing cycle route network 5. The existing cycle route network includes a. traffic free greenway routes e.g. canal towpaths, former rail lines, river valley paths and park paths [map 1] b. routes alongside main roads e.g. shared footways [map 1] c. safe crossing points over main roads e.g. light controlled cycle/pedestrian crossings d. on road cycle lanes on sections of main roads e. Side roads some of which are shown as advisory routes on local cycle maps Scope to extend existing cycle route network 6. Greenway routes North Staffordshire has an extensive, traffic free and attractive greenway cycle network thanks to the upgrading of nearly all local canal towpaths and the conversion of former railway lines. There is some scope to improve and extend this network particularly in the Trent and Lyme valleys. [annex 1]. However the role of the greenway network for everyday utility cycling is limited by factors such as the lack of opportunity for greenway routes in some areas, remoteness from public view, narrowness for 2-way movement (canal towpaths), a lack of street lighting and inconvenience due to barriers. 7. Routes along main roads - There appears to be a lot of scope to create further cycle routes parallel to some of the busiest and fastest main roads by using cycle paths/shared footways and parallel side roads. Such cycle routes would provide a safer route option for cyclists and be likely to attract the most cyclists because they usually provide the most direct routes to key destinations. [see Map 2] Also they have the benefit of being in public view and being lit at night. It is noticeable that there are a lot of local cyclists who now cycle on the footway to avoid cycling on busy main roads. Often they are cycling illegally because the highway authority has not authorised cycling there.

8. Crossing points over main roads - It is vital that there are safe crossing points for cyclists (and pedestrians) where cycle routes cross busy main roads. There are several locations where better crossing facilities and safer crossing approaches are badly needed including the A500T and A50T [annex 1]. 9. Cycle lanes - There seem to be few useful opportunities to extend on road cycle lanes without causing significant delays to traffic e.g. by removing a traffic lane at a junction. Also there is debate about the value to cyclists of some existing cycle lanes on main roads in North Staffordshire and the extent to which more cycle lanes on busy main roads would attract new cyclists. Some cycle lanes are helpful e.g. in allowing cyclists to pass traffic queues leading to junctions. However, many existing cycle lanes have limited value because they are very short or disappear at road junctions or are obstructed by parked vehicles. 10. Side roads Side roads can form a significant part of many cycle trips. Their safety and convenience for cycling can be improved where appropriate by lower speed limits (20 mph), cyclist friendly traffic calming and easier accessibility e.g. dropped kerbs across road closures. 11. Lower speed limit roads reducing speed limits from 30 mph to 20 mph in town centres and other sections of road with lots of pedestrian activity would make conditions safer and less intimidating for cyclists and pedestrians and would usefully contribute to the wider cycle network. Priorities for new routes 12. Cycle routes that follow main roads and link to safe crossing points are likely to be key parts of the future cycle route network because a. they provide direct routes to most of the main employment areas and key destinations [map 2]. b. They would provide a safe alternative to cycling on busy/fast roads c. There is ample scope to provide such routes and crossings 13. In identifying future cycle routes and schemes priority would be given to those likely to attract the most cycling [note 5 and map 3] and how well they: serve main destinations e.g. main employment sites, higher education sites and town centres support regeneration schemes e.g. ceramic valley have wider benefits e.g. also helping pedestrians provide the best value for money and best fit with available funding e.g. LEP improve cycling safety e.g. provide alternatives to fast main roads provide attractive convenient routes e.g. flat valley routes without undue delays at main road crossings have local support 14. Applying these criteria suggests that priority should go to identifying cycle routes and schemes alongside [annex 2] a. the A500T and A50T and sufficient safe crossing points over them and b. other main roads with higher speed limits (over 30 mph) such as A34 and A53 and c. the busiest other main roads such as the A52 and A50.

Summary To exploit the benefits and potential for increased local cycling then Stoke on Trent and Staffordshire highway authorities, with input from Highways England, need to prepare a long term cycle strategy for North Staffordshire. This strategy would: a) identify a long term future safe and direct cycle route network to serve existing and future main destinations. b) Adopt criteria for prioritising future routes and schemes c) Adopt a policy to safeguard opportunities for future cycle routes alongside main roads by requiring adequate future footway width for shared cycle use. d) Identify opportunities for funding and establish a rolling 5-year programme of cycle route improvement schemes Note 1 Cycling and walking investment strategy - draft (3/2016) - DfT. Our long term goal up to 2040 is that. we want everyone in the country to have access to safe, attractive routes for cycling and walking. The. target we have set to measure progress towards our 2040 ambition..[is].. to double cycling, where cycling activity is measured as the estimated total number of bicycle stages made each year, from 0.8 billion stages in 2013 to 1.6 billion stages in 2025. [Comment: This is a much less ambitious target than put forward in Get Britain cycling (4/2013) by the All party parliamentary cycling group and which recommends that The government should set national targets to increase cycle use from less than 2% of journeys in 2011, to 10% of all journeys in 2025, and 25% by 2050 ] Note 2 Cycling and the economy (8/2016) - Cycling UK briefing note If cycle use increases from less than 2% of all journeys (current levels) to 10% by 2025 and 25% by 2050, the cumulative benefits would be worth 248bn. Calculating the economic benefits of cycling in EU-27 (6/2013) - European Cyclists Federation We calculate an annual economic benefit of cycling in the EU-27 of at least 205 bn. [Comment: This estimate is based on costing the health, congestion-easing, CO2 emission reduction and pollution reduction benefits]. Note 3 Stoke-on-Tent: Local Transport Plan 2011/12 to 2025/26 Stoke City Council census data on distance travelled to work indicates that up to 59% of the population travel less than 5km. This represents a huge opportunity for mode shift to walking and cycling which is currently only 13% of total mode share.

Staffordshire Local Transport Plan 2011 Staffordshire County Council Policy 5.1: We will promote alternatives to private motor vehicles. This will be achieved by: Investing in measures to improve conditions for pedestrians and cyclists, particularly in urban areas where a real opportunity for modal change exists. Note 4 Space for cycling (4/2014) - Cycling UK - Five things that councils must do to create Space for Cycling: 1 On busy roads, dedicate space for cycling, designed so that anyone can ride there with a feeling of safety. 2 On less busy streets, limit the speed of through traffic. Reduce speed limits to 20mph in built-up areas and 40mph or lower on rural lanes. 3 Ensure that cycling route networks are continuous and interlink seamlessly, with major junctions no longer posing barriers to cycling. 4 Create traffic-free routes that provide a sensible alternative to, not a replacement for, the most direct on-road route. 5 Maintain roads with cycling in mind. When resurfacing roads, make space for cycling Note 5 National Propensity to Cycle Tool Project: (3/2016) Department for Transport The prototype tool allows users to see commuting cycling potential at the area and route level comparing the 2011 Census against three scenarios ( Government Target, Gender Equality, and Go Dutch, with an e-bike scenario to be added soon).

Map 1 - Existing off road cycle routes North Staffordshire urban area Main destinations - = employment, = retail, = education/health Existing greenway cycle routes Existing cycle paths/shared footways

Map 2 - Main destinations and main roads North Staffordshire urban area Main destinations = employment, = town centre = retail park = education/health Primary routes (> 30 mph speed limit) Primary routes (30 mph speed limit) Main roads (>30 mph speed limit) Main roads (30 mph speed limit)

Map 3 - Propensity to cycle tool [Note: lines connect the centroids of middle supernumary output zones (census population) and NOT to main destinations] Scenario census 2011 cycling Cycling straight lines N. lines most cycling (200)

Annex 1 a) Greenway improvement/extension potential 1. Biddulph Valley (Brindley Ford to Brown Lees) 2. Berryhill greenway (Lawn Farm Crescent) 3. Lyme valley (Cambridge Drive to Clayton Woods greenway) 4. River Trent (Boothen to Stoke former SCFC Victoria ground) 5. River Trent (Hanford to Trentham) 6. River Trent (Stoke to Bucknall) 7. All greenways and towpaths - barrier review to assess need for removal or replacement with more cycle/pedestrian friendly design b) Major junctions where safer crossings and cycle approach routes are needed 1. A500/A5271 (Longport) + Porthill Bank 2. A500/A527 (Wolstanton) + Grange Lane 3. A500/A34 (Talke) + A34 4. A500/A527 (Chemical Lane) 5. A50 Blythe Bridge (Lysander Road)

Annex 2 - Suggested priority main roads for identifying future cycle routes map main road webmap 1 A500T (Talke to Hanford) https://www.google.com/maps/d/edit?hl=en&mid=1vzf6trbe 8nx8s3YfoABA50u_-Fs 2 A50T (Blythe Bridge to A500) https://www.google.com/maps/d/edit?hl=en&mid=10tvoeaw V-SCDimF0QZ-trPvN4_U 3 A34 (Talke to Trentham) https://www.google.com/maps/d/edit?hl=en&mid=1uq2pir WXm8qHUBw1zPsaWc1qXKc 4 A50 (Fenton to Tunstall) https://www.google.com/maps/d/edit?hl=en&mid=1qnvv93s albilegp0ctitoojic2s 5 A52 (Bucknall to Newcastle) https://www.google.com/maps/d/edit?hl=en&mid=1bzge4ob L5QLAZlTeJb9bv8aI3e4 6 A53 (Newcastle to Sneyd Green) https://www.google.com/maps/d/edit?hl=en&mid=1bdbwq3 SnIsLHqa7cIy-zdkJxpho

A500T EXISTING & SUGGESTED FUTURE CYCLE ROUTES Existing greenways Existing on road routes Suggested new or improved routes

A50T EXISTING & SUGGESTED FUTURE CYCLE ROUTES Existing greenways Existing on road routes Suggested new or improved routes

A34 EXISTING & SUGGESTED FUTURE CYCLE ROUTES Existing greenways Existing on road routes Suggested new or improved routes

A50 EXISTING & SUGGESTED FUTURE CYCLE ROUTES Existing greenways Existing on road routes Suggested new or improved routes

A52 EXISTING & SUGGESTED FUTURE CYCLE ROUTES Existing greenways Existing on road routes Suggested new or improved routes

A53 EXISTING & SUGGESTED FUTURE CYCLE ROUTES Existing greenways Existing on road routes Suggested new or improved routes