ProMinent. Repair Instructions ProMinent Chlorine Dioxide Systems Bello Zon Replace CDVa reactor with CDVb

Similar documents
Please enter the identcode of the device here

Assembly and Installation Instructions Chlorine Dioxide Systems Bello Zon Type CDKc with Pre-dilution Module

VERTICAL AIR COMPRESSORS

Flexi-pro Aerosol Delivery System (FADS) Manual

AQUARIUS. Operating Instructions for the. Type 70 Electrolytic Gas Soldering / Welding Unit. Table of Contents

Bladder Damper PP/PVC

Siphon vessel / Priming aid

200L BELT DRIVEN AIR COMPRESSOR

24L AIR COMPRESSOR MODEL NO: TIGER 8/260 PART NO:

Regulators repair and maintenance. XS Compact 2nd stage. January 2014 Rev XSC /3 Ed. C /14 1

24L AIR COMPRESSOR OPERATION & MAINTENANCE INSTRUCTIONS MODEL NO: RANGER 7/240 PART NO: LS0913

Instructions for Assembly, Installation, and Operation of the Gas Addition Kit Accessory with the CEM Discover Systems

HYDROGEN PEROXIDE Railcar Unloading by Self-Priming Pump Technical Data Sheet

24L AIR COMPRESSOR MODEL NO: TIGER 11/250 PART NO: OPERATION & MAINTENANCE INSTRUCTIONS LS01/13

100L AIR COMPRESSOR MODEL NO: TIGER 16/1010 PART NO: OPERATION & MAINTENANCE INSTRUCTIONS LS01/13

VERTICAL AIR COMPRESSORS

24L OIL FREE AIR COMPRESSOR MODEL NO: TIGER 7/250 PART NO: OPERATION & MAINTENANCE INSTRUCTIONS LS10/13

Assembly Drawing: W-311B-A01, or as applicable Parts List: W-311B-A01-1, or as applicable Special Tools: , , &

OPERATING INSTRUCTIONS MANUAL FOR QACV PNEUMATIC DOSING PUMP

AIR COMPRESSOR OPERATION & MAINTENANCE INSTRUCTIONS MODEL NO: CHAMP 3 PART NO: LS0115

Installation of Your SprayMaster System

6900 Maintenance Instruction System Flush

Preliminary filter Precision measurement chamber Flow meter Instruction manual

GENO -Flushing Compressor Product Data Sheet F 02

Instructions for SILEX 1C Mixed bed cartridge filter

THE HF-300 SERIES. Operating and Service Manual. Series includes all variants of HF-300/301

Poollift Delphin. Version: February, 2015 MANUAL AND OPERATING INSTRUCTIONS

Assembly and Installation Procedures

SA121, SA122, SA123, SA128 and SA1219 Self-acting Temperature Control Systems (Knob Adjustment)

Safety instructions and operating manual

THE MF-400 SERIES. Operating and Service Manual. Series includes all variants of MF-400/401

BOSS PULISCI PROVA IMPIANTI MEDIA

SCUBAPRO. Balanced Power Inflator

Modular valve block. Operating manual Series MVB 100/200. Version BA EN Print-No TR MA DE Rev001

INSTALLATION GUIDE MODEL NUMBER X. UniMaxx-Plus-SC-500-AC-V3 UNIMAXX SOLAR PUMP STATION

AIR COMPRESSOR. Failure to follow all instructions as listed below may result in electrical shock, fire, and/or serious personal injury.

UltRo Dual Flow Reverse Osmosis Water System

Proportional Flow Dosing System Promatik NG

Dri-Line Mk2 Spirax-Monnier Compressed Air Drain Trap

80 Litre Suction Oil Drainer

KTM OM-2 SPLIT BODY FLOATING BALL VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

PRESSURISED PAINT CONTAINER

Type S301 & S302 Gas Regulators INTRODUCTION INSTALLATION. Scope of Manual. Description. Specifications. Type S301 and S302. Instruction Manual

COMPRESSOR OPERATION & MAINTENANCE INSTRUCTIONS MODEL NO: WARRIOR 55 PART NO: (110V) , (230V) , LS0512

OPERATING MANUAL CHEMTRAC 840M MANUAL RETRACTABLE PROCESS HOLDER

MODEL 1329 Tank Gauge

Mounting and Operating Instructions EB 2558 EN. Self-operated Pressure Regulators. Type Pressure Build-up Regulator

LRS(H)4 Pressure-Reducing Regulator User Manual

12S 1st Stage. -Maintenance Procedure-

50L BELT DRIVEN AIR COMPRESSOR

REVERSE OSMOSIS WATER FILTRATION SYSTEM MODEL EWR 4075 INSTRUCTION MANUAL

STIH) Technical Information Accessories for STIHL cut-off machines / drills. 1. New pressurized water tank

MANUAL. Sesame. Thermoplastic Tank Technologies

SA121, SA122, SA123, SA128 and SA1219 Self-acting Temperature Control Systems (Dial Adjustment)

Type C-CUT. Quickstart. English Deutsch Français

30T A/Manual Hydraulic Shop Press

APT14, APT14HC and APT14SHC Spares 2

Chemical Injection Technologies Installation/Service Bulletin

OWNER S TECHNICAL MANUAL

2008 by Controlmatik ABW

Operating instructions Diaphragm pump MP-520. Article No Original operating instructions. T-Dok-397-EN-Rev.0web

Assembly-, installation- and maintenance instruction manual for bladder accumulators IBV / EBV , top reparable

Roofing Adhesive PRODUCT DESCRIPTION PRODUCT DATA. Spray Applied Insulation Adhesive for Sarnafil Roofing Systems

User's Manual. MixRite TF 10. Edition 05.08

Instruction Manual - Diaframless TM Ejector Chlorine, Sulfur Dioxide and Ammonia

Owner's Manual Sealweld SuperSeal II Pump

CHEMICAL INDUCTION KIT (Pt.No Issue 6, October 2015)

Budget Range Operators Handbook

FILTER REGULATORS MODEL NO: CAT155 & CAT156 FITTING & MAINTENANCE INSTRUCTIONS PART NO: & ORIGINAL INSTRUCTIONS

BCV31 DN40 - Blowdown Control Valve

COMBINATION AIR RELEASE DEGASSING (CARD) VALVES INSTALLATION AND MAINTENANCE MANUAL

INSTALLATION AND OPERATION INSTRUCTIONS

75 Ton SD Shop Press Operating Instructions

Dri-Line Mk3 Monnier Compressed Air Drain Trap

OPERATING AND MAINTENANCE MANUAL GOLD LINE EXTRACTION CLEANERS M14-M26

1. CONDITIONS FOR USE 2. SAFETY

INSTALLATION AND OPERATION MANUAL CHEMICAL BYPASS FEEDER General Instructions Regarding All Models

PARTS & SERVICE. regulator (new) for NGW/ GBW applications. Rev. 02/2018 Id.No. DOK50026

WARNING! Equipment for treatment of water intended for human consumption (Directive 98/83 CE).

Installation and commissioning instructions 255 series and 256 series

OPERATING INSTRUCTIONS

GETZ EQUIPMENT INNOVATORS PART NO.: 9G59554 MODEL: MS 36 SC-R HYDROSTATIC TEST PUMP

Operating instructions Chlorine Dioxide Systems Bello Zon Type CDKc

Steam Trap BK 15 (DN40, DN 50) Original Installation Instructions English

POWER FLUSH KIT INSTRUCTIONS

OPERATOR S MANUAL Ar-Gone Weld Gas Analyzer

Operating Instructions

IMPORTANT PLEASE READ BEFORE COMMENCING INSTALLATION

Type BBS-03, BBS-05, BBS-06, BBS-25

553 Series.

SAPAG. Safety valves, type 5700 Storage, Use, Operation and Maintenance Instructions. IMPORTANT NOTICE

O P E R A T O R S M A N U A L

Installation and Maintenance Manual. ECO Filtration Unit with 6-way-Top-Mount-Valve. Art. Nr

BTM7, BTS7 and BTS7.1 Stainless Steel Thermostatic Clean Steam Traps

Type 2000 INOX. Quickstart. English Deutsch Français. 2/2-way angle seat valve 2/2-Wege Schrägsitzventil Vanne à siège incliné 2/2 voies

AVM7 Stainless Steel Thermostatic Air Vent

Cavitron DualSelect. Introduction ENGLISH. Directions For Use. Cavitron DualSelect Dispensing System ENGLISH 1

STANDARD OPERATING PROCEDURE

Instrument Operating Manual

Pressure relief valve

Transcription:

Repair Instructions ProMinent Chlorine Dioxide Systems Bello Zon Replace CDVa reactor with CDVb IMPORTANT The repair manual is valid only when used in conjunction with the appropriate operating manual and/or CDVa and CDKa operating instructions manual! NOTE The repair manual contains instructions for replacing the reactor with the spare reactor, the subsequent tightness check and for recommissioning the chlorine dioxide system. Part No. 987012 ProMinent Dosiertechnik GmbH 69123 Heidelberg Germany AL BEZ 018 10/03 GB

Publishing Details Publishing Details: Repair Instructions ProMinent Chlorine Dioxide Systems Bello Zon Replace CDVa reactor with CDVb ProMinent Dosiertechnik GmbH, 2003 ProMinent Dosiertechnik GmbH Im Schuhmachergewann 5-11 69123 Heidelberg Germany info@prominent.de www.prominent.de Subject to revision Printed in the F.R. Germany Page 2

Table of contents 1 Transport, Handling and Storage... 4 2 Description of Design and Function... 4 2.1 Design... 4 3 Information about Decommissioning the Chlorine Dioxide System... 5 3.1. Decommissioning the Chlorine Dioxide System... 5 3.1.1 Safety Requirements / Safety Instructions... 5 3.1.2 Decommissioning... 6 3.1.2.2 Required Materials... 6 3.1.3 Flushing... 6 3.1.3.1 System without Flushing Assembly... 6 3.1.3.2 System with Flushing Assembly... 6 4 Replacing The Reactor... 7 4.1 Safety Requirements / Safety Instructions... 7 4.2 Required Materials... 7 4.3 Chemical Requirements... 8 4.4 Expansion of the Existing Reactor... 8 4.5 Detoxication of Reactor Contents... 7 4.6 Installation of new Reactor... 8 4.7 Disposal of Spent Parts... 9 5 Recommissioning... 9 6 Technical Details... 9 7 What to do in an Emergency... 10 Page 3

Transportation, Handling and Storage / Description of Design and Function 1 Transportation, Handling and Storage The Bello Zon 0.4 l CDVb reactors are wrapped in a cardboard surrounding package which is designed either as a sealed disposable wrapper, or is transported together with other parts. Observe the following ambient conditions for storage of the reactors (e.g. danger of frost, UV protection): admissible storage temperature : TS = -10 C to +40 C admissible transport temperature : TS = -10 C to +40 C do not expose reactors to direct sunlight prior to storage and/or transportation, ensure that the reactor is empty 2 Description of Design and Function 2.1 Design The spare assembly comprises a CDVb/CDKb series reactor, the reactor intake valves, reactor outlet adapter and discharge valve parts. The assembly is supplied by PM Heidelberg ready for installation into the Bello Zon chlorine dioxide generating system. The reactors are available in the following sizes : Spare assembly Part number For system type Spare 0.2 l reactor set. TN 1023234 CDVa 7 Spare 0.4 l reactor set. TN 1021935 CDVa 35-120 The procedure for replacing the reactor and discharge valve parts and the actual construction is shown in drawing 81_01-401_00_18-04. Page 4

Information about Decommissioning the Chlorine Dioxide System 3 Information about Decommissioning the Chlorine Dioxide System 3.1 Decommissioning the chlorine dioxide system 3.1.1 Safety requirements / safety instructions IMPORTANT Observe the following regulations: a) Accident prevention regulations GUV 8.15 and/or VGB 65 WARNING Ensure the operating or installation room is well ventilated while replacing the reactor. Any leaked chemicals must be safely removed e.g. presence of water supply and floor drain. IMPORTANT A user manual and/or operating instructions manual must be made available before commencing operation. 12 (1-5) describes the personal safety equipment that must be provided for operators. b) Observe the ordinance on hazardous operating substances (Arb-StoffV), version issued 11th February 1982 BGBl. / p.145. Additional safety instructions: WARNING Before all maintenance operations (when replacing parts etc.) flush the Bello Zon system with water until it and above all the reactor no longer contain any chemicals. In the worst case, the undiluted ClO 2 solution can be subjected to underpressure in the reactor e.g. due to a leak in a line downstream. The reactor may then explode. Empty all contents of the reactor before opening the cabinet. Press the Extract button. (water for extraction must be flowing) Keep full and empty chemical containers closed. Switch off the chlorine dioxide system throughout maintenance operations. Depressurise the discharge valve parts before disassembly. Open the ball check valve at the reactor outlet/bypass Never mix the contents of the component containers. This will cause a large quantity of toxic explosive ClO 2 gas to form. Never pour the contents of the ventilation bottles into the component containers. This will cause a large quantity of toxic explosive ClO 2 gas to form. Never place both suction lances into the same bucket together or one after another. This will cause a large quantity of toxic explosive ClO 2 gas to form. Do not adjust vent taps as chemicals could be drawn to these outlets. Corrosive chemicals could then leak out. CAUTION Even if the bypass line is at atmospheric pressure the area between the reactor intake valves and the discharge valve will be at a pressure of approx. 1.5 bar. Depressurise this area by slowly unscrewing the compression spring centre. Page 5

Information about Decommissioning the Chlorine Dioxide System NOTE The compression springs and the valve lifters of the discharge valve can be removed easily after unscrewing the compression spring centre, when the Bello Zon system and the bypass line are at atmospheric pressure. It is then almost impossible for liquid to escape and run through the system. 3.1.2 Decommissioning To replace the reactor you need to decomission the Bello Zon system. First, flush the entire system with water. If fitted, use the flushing assembly bypass line. If no flushing assembly is fitted, flush the system using an adapter on the discharge valve (upper cross piece outlet). 3.1.2.2 Required materials 1 Adapter for cross piece with approx. 3 m hose (systems with cross piece and no flushing valve) 3.1.3 Flushing 3.1.3.1 System without flushing assembly Depressurise bypass by opening the bypass ball check valve. Do not dismantle any parts prior to this. Press the START/STOP button to switch off the system STOP Slowly unscrew the compression spring centre (1). It is easy to remove the spring (2) and the valve lifter (3) of the discharge valve after unscrewing the compression spring centre (1) (see 1st step according to drawing). Screw adapter into cross piece. Connect a hose to the adapter. Insert the hose into a tank containing neutralising solution - the hose must be immersed below the liquid level. Remove each suction lance from the chemical tanks and place each one in a separate bucket filled with clean water. Close the stopcock upstream and downstream from the Bello Zon system. Open the configuration menu on the control display (only possible using access code 1000 ). In the Start menu set the start up parameters to a minimum of 60 minutes. Press the Startup button and set both metering pump stroke lengths to 100%. Run the Bello Zon system until the pump s liquid ends, reactor and lines up to the flushing assembly are completely filled with water (during disassembly this will prevent chlorine dioxide solution from flowing out of the reactor). Disconnect the system from the mains power supply. START. 3.1.3.2 System with flushing assembly In systems with purge valves the compression spring centre (1), compression spring (2) and the valve lifter (3) are only dismantled after rinsing! Switch off the system using the START/STOP button STOP Connect a hose to the purge valve of the flushing assembly. Insert the hose into a tank containing neutralising solution - the hose must be immersed below the liquid level. Depressurise the bypass if possible. Close the stopcock upstream from the Bello Zon system and downstream from the flushing assembly. START. Page 6

Information about Decommissioning the Chlorine Dioxide System / Replacing the Reactor Open the purge valve. Place each suction lance in a separate bucket filled with clean water. Press the Startup button and set both metering pump stroke lengths to 100%. Run the Bello Zon system until the pump s liquid ends, the reactor and lines up to the flushing assembly are completely filled with water (during disassembly this will prevent chlorine dioxide solution from flowing out of the reactor). Disconnect the system from the mains power supply. 4 Replacing the Reactor (only to be carried out by service technicians) 4.1 Safety requirements / safety instructions Personal protective equipment: Facial protection Rubber or plastic boots Protective gauntlets (ClO 2 - proof design) Protective apron Respirator - full mask 1 spare filter per respirator WARNING Wear suitable protective equipment for ClO 2 gas, ClO 2 solution, hydrochloric acid, sodium chlorite and caustic soda (protective goggles, rubber gauntlets, gas mask, rubber apron,... )! In the event of contact with one of these chemicals, rinse immediately with plenty of cold water, consult a doctor if necessary! Observe national and local directives! The disassembly of an unrinsed reactor is risky, because air can get into the solution as it drains out, which can quickly produce explosive ClO 2 gas. This measure is therefore acceptable only in an emergency and also only if the reactor volume does not exceed 3 litres. Only recommission the system and bypass line under pressure if the compression spring centre is tightly screwed into the stop. CAUTION If a reactor cabinet is present: before dismantling the intake valves on the bottom of the reactor, press the Suction button, to extract the remaining ClO 2 gas from the reactor cabinet! NOTE Always add alkaline flushing water to the neutralisation tank for neutralisation! Only ProMinent service technicians should carry out repairs to the Bello Zon system! 4.2 Materials required approx. 3m water hose 1 open tank for neutralising 1 bottle caustic soda 50%, 1 litre (C, irritant) 1 bottle hydrogen peroxide 30%, 1 litre (Xi, irritant) 1 ph meter (ideally ph paper, but is bleached by ClO 2 ) Potable water (see table) Page 7

Replacing the Reactor 4.3 Chemicals required For neutralising and detoxifying reactor contents, approx. 70 ml caustic soda 50% and 20 ml hydrogen peroxide 30% (Perhydrol) per litre, is required. This requires use of the following individual components: System type Tank Water Caustic soda Hydrogen peroxide* Reactor contents with tower packing CDV 20 l 5 l 27 ml 8 ml 0.2/0.4 l 15...120 CDV 80 l 20 l 130 ml 37 ml 1.8 l 220...600 * instead of hydrogen peroxide 30% (H 2 O 2 ) you can use a dessert spoonful of sodium perborate, Na-BO 2.H 2 O 2.3 H 2 O 4.4 Disassembly of spent reactors Before screwing on the union nuts (429) and (5), switch on the suction to continuous operation Disassemble the 4 hexagonal nuts (10) (see step 2). Screw both union nuts (429) onto the reactor intake valves (see step 2). Detach the union nut (5) from the discharge valve (see step 2). Lift the reactor (6) out of the reactor housing and, using the appropriate protective equipment, lower it into the tank (fill this with as much water as is necessary to completely cover the reactor) and rapidly place both outdoors or at an exit. There you should unscrew the reactor intake valve under water and lift the reactor up and down to transfer the contents into the tank. 4.5 Detoxifying reactor contents First add caustic soda and then hydrogen peroxide to the tank contents, until the solution is colourless. Let the reactor empty out over the tank and if necessary, rinse again with water. When the reactor is completely empty, the contents must be diluted 10:1 in the neutralisation tank. Whilst stirring, add the quantity of caustic soda required for neutralising (protective equipment!). Then add the calculated quantity of hydrogen peroxide (overdose is uncritical) whilst stirring. If the yellow-green solution does not colour immediately, check the ph value: it must be more than 8 and can be corrected if necessary by adding more caustic soda. CAUTION Add the alkaline flushing water to the neutralisation tank for neutralisation! Unscrew the discharge valve holder (6) with ball seat disc (7), O ring (9) and valve ball (8) from the crosspiece (see step 3). 4.6 Installing a new reactor Carefully remove the protective cap, so that no components fall on the floor. Screw the union nut (325) for the adapter onto the spare assembly. Screw the discharge valve holder (324) with ball seat disc (367), O ring (840) and valve ball (454) onto the crosspiece (see step 5). Insert the valve lifter (3) from above into the crosspiece. Assemble the compression spring (2) and the compression spring centre (1) (see step 6)! Check whether the adapter (325) is screwed right up to the reactor. Page 8

Replacing the Reactor / Recommissioning / Technical Data O ring (862) in discharge valve holder (324) (see step 7). Assemble the new reactor (200) in the reactor housing and tighten the 4 hexagonal nuts(10) (see step 7). Push the reactor (200) upwards and lightly screw the union nut for the adapter (325) onto the discharge valve holder (324), then tighten (see step 7). Lightly screw the union nut (429) onto the valve body (344), then tighten. If hoses (11) are too long, adjust to the required length. Pull the union nut and clamping ring over the line, then push the hose end, extended as required, right over the nozzle, stretch the mouth of the hose if necessary. The clamping action is now achieved by tightening the nut whilst pressing against the hose. You will obtain a tight hose connection if you briefly pull the line connected to the reactor and then firmly twist the union nut again. WARNING Do not mix up the connections! IMPORTANT You should use only the appropriate hoses, pinch rings and hose sockets, otherwise durability and tightness of the connection is not guaranteed! 4.7 Disposal of spent parts WARNING First rinse the reactor thoroughly with water. Otherwise chlorine dioxide (ClO 2 ) could be left in the reactor! IMPORTANT Observe regulations applying to your own working area! 5 Recommissioning Recommissioning the system after work has finished. Check the system for leaks! Check safety features are functioning. Recommissioning takes place in accordance with the associated operating instructions manual. You should follow all safety requirements/safety instructions detailed here. 6 Technical Data In accordance with the relevant user manual/operating instructions manual. Page 9

What to do in an emergency / Appendix 7 What to do in an emergency If you have come into contact with the acid: see leaflet HCl If you have come into contact with the chlorite: see leaflet NaClO 2 If you have come into contact with the ClO 2 solution or with ClO 2 gas: see leaflet ClO 2 If orange-yellow ClO 2 gas is leaking out: empty the room immediately and disconnect the power supply (e.g. emergency stop switch)! Put on full protective gear and suppress the gas by spraying with water! Also see leaflet Characteristics of chlorine dioxide and notes... If orange-yellow ClO 2 -solution is leaking out: empty the room immediately and disconnect the power supply (e.g. emergency stop switch)! Put on full protective gear and pour sodium thiosulphate solution onto the ClO 2 solution, then dilute with plenty of water and rinse down the drain. Also see leaflet Characteristics of chlorine dioxide and notes... The Bello Zon system has been charged with concentrated chemicals and metering pumps have already pumped them to the reactor: empty the room immediately and disconnect the power supply (e.g. emergency stop switch)! Call the Fire Service and notify them of the risk of explosion due to concentrated ClO 2 gas! (ClO 2 gas can still explode after a few hours!) Also see leaflet Characteristics of chlorine dioxide and notes... The Bello Zon system has been charged with concentrated chemicals and metering pumps have not yet begun to pump: Switch the Bello Zon system immediately to Metering OFF (Start/Stop button)! Place each suction lance in a separate bucket filled with water and fill the chemical drum with dilute chemicals. Dispose of concentrated chemicals appropriately. Also see leaflet Characteristics of chlorine dioxide and notes... Appendix List of documentation drawings: Replace reactor 0.4l CDVa 81_01-401_00_18-04 Sheet 1+2 Page 10

Appendix Ausbau des alten Reaktors Disassembling of the old reaktor 1 2 3 10 5 5 6 10 429 1 2 8 7 9 6 4 3 Page 11

Appendix Ausbau des alten Reaktors Disassembling of the old reaktor 454 367 840 324 1 2 3 5 6 10 200 10 11 11 7 Page 12