M6 J7 Rushall Canal: Essential Repair Work Briefing

Similar documents
ETMS ADVISORY BOOKLET 1 GUIDANCE NOTES FOR ROAD CLOSURES AND DIVERSIONS

Upgrade to smart motorway Junctions 3 to 12

M23. Upgrade to smart motorway Junctions 8 to 10

M20. Upgrade to smart motorway Junctions 3 to 5

M1 Smart Motorways Junctions 32 to 35a

Know your smart motorways M60/M62, Greater Manchester

The Highways Agency is working to improve the M1 between junction 28 (near Alfreton) and junction 35a (the A616 Stocksbridge bypass).

Welcome. Knutsford to Bowdon Improvement. Start of works exhibition November An executive agency of the Department for Transport

Upgrade to smart motorway Junctions 13 to 16

M6 Junction 10 Public Consultation

Upgrade to smart motorway Junctions 2 to 4

Welcome. Smart motorway M1 junctions 13 to 16 public information exhibition. Highways England Creative [XXXXX_XXXX_XXX]

Welcome. Smart motorway M6 junctions 13 to 15 public information exhibition. Highways England Creative BHM18_0060_RHK

CAMBRIDGE SOUTH WEST PARK & RIDE

Commonwealth Heads of Government Meeting: London 2018

Commonwealth Heads of Government Meeting: London 2018

PERFORMANCE ACTIVITY 613 IMPACT ATTENUATOR WORK DESCRIPTION 3

Road to the future What road users want from Highways England s Route Strategies Summary report November 2016

Incidents and roadworks

Perne Rd / Radegund Rd Roundabout Cambridge

Chapter 4 Route Window C3 Hyde Park and Park Lane shafts. Transport for London

// RoWSaF Making roads safer for road workers rowsaf.org.uk. RoWSaF Strategy 2015

Proposed: Temporary Traffic Management Design Guidance

2 Months of road works in Port of Antwerp Severe traffic disruption expected

Traffic signs used, including signs giving orders, warning signs, direction signs, information signs and road works signs.

Parking. Signing. Appendix C Typical detail drawings. London Cycling Design Standards

Lincoln Half Marathon Sunday 1 October 2017

7.3 Traffic and Transport Impacts 15/10/2014

Proposed smart motorway Junctions 2 to 4

Tackling congestion by making better use of England s motorways and trunk roads

AD L T r a f f i c a n d H i g h w a y s E n g i n e e r i n g L t d BRIEFING NOTE B4219 COWLEIGH ROAD, STORRIDGE (ADL REF: 3409/09 NOVEMBER 2017)

Side Roads and Other Non-Signalised Junctions

Amendments to Essex Highway Maintenance Strategy Maintenance Policy and Standards April 2008

PUBLIC INFORMATION MEETING

Smart motorways: all lane running on the M25. Guidance for EEAST crews

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager

The Consultation has now ended.

Regulatory traffic signs

Accident Case Studies

APPENDIX F: TECHNICAL NOTE 22 (VICARAGE ROAD JUNCTION)

Highways England Creative GFD18_0125. Welcome. Upgrade to smart motorway junctions 3 to 12

Guide to travelling to and around Panmure April 2013

A52. Nottingham Junctions. Construction at Nottingham Road and Cropwell Road junctions commencing early January 2017

Highways England Creative M Welcome. Smart motorway M6 junctions 16 to 19 public information exhibition

Essential Standard No. 16. Streetworks - Short duration static works carried out from a vehicle

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

Safe roads, reliable journeys, informed travellers. The economic assessment of Managed Motorways - All lanes running Interim Advice Note 164/12

Draft letter to Designers and Managing Agents INTERIM ADVICE NOTE 43/02: CANTILEVER AND PORTAL GANTRY VMS

M6 junction 16 to 19 Smart motorway project newsletter

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017

A future cycle route network for North Staffordshire mb/08/16 Need for a strategy. Existing cycle route network

CLEAR COLLISION LEAD EVALUATE ACT RE-OPEN KEEPING TRAFFIC MOVING. CFOATechRescue ConfJuly2013v0.1

INTERIM ADVICE NOTE 188/16

Tunnel Reconstruction Brooklyn CB 1 August 14, 2018

February 2018 HIGHWAY 316 IMPROVEMENTS PROJECT

CYCLING TIME TRIALS The national governing body for CYCLING time trials

The Ten-T Regulation, the Core Network and Protected Roads

Public Consultation Report December M6 Junction 10 Improvements

How to find us Woolton Hill Argyle FC.

CONTROL AND COMMUNICATIONS PROVISION PART 1 TD 46/05 MOTORWAY SIGNALLING SUMMARY

DRAFT INTERIM ADVICE NOTE 150/17

Harris Driving School. Crossroads

M25 junction 28 improvement scheme. Have your say

B9 Junctions - Right of way

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation

INTERIM ADVICE NOTE 93/07 DRIVER LOCATION SIGNS INTERIM PERFORMANCE SPECIFICATION

Parade & Traffic Management Plan

INTERIM ADVICE NOTE 150/11. Temporary Traffic Management Signing: Simplification of lane change zone signing for relaxation schemes.

M1-A1 Link Road ANNUAL REPORT

MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING

72 Crossrail Amendment of Provisions

PERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 4

CYCLING TIME TRIALS The national governing body for CYCLING time trials

Motorways (autobahns) Abandoned motorway projects. New roads schemes according to the 2030 Federal Transport Infrastructure Plan

Uptown West Neighbourhood Transportation Study

Important Lane Closures for Jan , 2012

M6 Junction 13 to 15 Smart Motorway Variable Mandatory Speed Limits (VMSL) Summary of Statutory Instrument consultation responses March 2018

FDOT Treasure Coast Traffic Report

Collision Site Investigation - Bodenham By-Pass Background

Marsden Jazz Festival Risk Assessment [07/18]

TRAFFIC ADVISORY LEAFLET

FDOT Treasure Coast Traffic Report

CYCLING TIME TRIALS The national governing body for CYCLING time trials P881/10R

BACCHER CERTIFICATES / CONTENTS CERTIFICATES / STATUS CONTENTS. l TRAFFIC ACCOMMODATION. ROAD SERVICES (PTY) LTD Your Vision Our Reality!

TRAFFIC INFORMATION Lincoln Half Marathon Traffic Information Summary Sunday 2 October, 2016

I-25 South Gap Project Monument to Castle Rock

1 This technical note considers the issues associated with the use of tidal flow bus lanes on key public transport corridors in Cambridge.

Temporary Vehicle Restraint System Policy

Marcus Jones, TRL. Presented by Name Here Job Title - Date

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

TRAFFIC CALMING REVIEW DAIMLER DRIVE INFORMATION PACKAGE AND PUBLIC COMMENT FORM

Appendix V1c - Bute Park Access Bridge Bollard Control Guidance for Event Traffic

4. Guided Bus Explained

Smart motorway. M6 junctions 16 to 19

Sandwell General Hospital Travel Plan 2014

TRAVEL GUIDE /1 2017/18

Walked Route Assessment

ASSOCIATION OF RUNNING CLUBS EVENT PLANNING AND RISK ASSESSMENT

Tunnel Reconstruction South 5 th Street Association October 16, 2018

Tackling congestion by making better use of England s motorways and trunk roads

Transcription:

M6 J7 Rushall Canal: Essential Repair Work Briefing Highways England need to carry out essential repair work to the M6 northbound carriageway between junctions 7 and 8 to keep it in a safe condition. From Wednesday, 21 to Tuesday, 27 February, it will be necessary to close parts of the northbound carriage at different times of the day and night as well as during the week and weekend with some overnight closures. From Tuesday, 27 February to Sunday, 4 March we will only need overnight closures. Background The condition of the carriageway surface has deteriorated as a result of one of the wettest years on record followed by a winter spell of falling temperatures. This has resulted in water finding its way into the carriageway, freezing and then lifting and breaking up the road surface above it as it thaws. We have recently carried out temporary repairs at this location but now need greater intervention to repair the structure. There will be significant disruption to the M6 while we carry out this work and local routes around this area will also be busier than usual. We recognise that there is a never a good time to carry out roadworks at such a critical point on our network. Safety is our top priority and we need to carry out these repairs to ensure drivers continue to have safe and reliable journeys along this key strategic route Please plan ahead and allow extra time for your journeys. You may also wish to consider using public transport alternatives for local journeys around Birmingham and the Black Country. A map of the location of the key area of work is below. 1 M6 J7 Briefing: V2.0

Traffic Management Information Date Time Closure Wednesday, 21 February (to complete the traffic management installation) M6 northbound carriageway and northbound entry slip roads closed from junction 6 Thursday, 22 February (to complete the traffic management installation) M6 north including slip roads will reopen M6 northbound carriageway and northbound on-slip roads closed from junction 6 Friday, 23 three narrow lanes in place northbound from junction 6 to junction 8 with a 40mph speed limit. M6 northbound carriageway and northbound entry slip roads closed from junction 6 2 M6 J7 Briefing: V2.0

Saturday, 24 Sunday, 25 February one lane in place northbound from junction 6 to junction 8 with a 40mph speed limit. M6 northbound carriageway and northbound entry slip roads closed from junction 7 three narrow lanes in place northbound from junction 6 to junction 8 with a 40mph speed limit. Monday, 26 February M6 northbound carriageway and northbound entry slip roads closed from junction 6 3 M6 J7 Briefing: V2.0

Tuesday, 27 February All daytime restrictions removed Tuesday, 27 February to Sunday, 4 March to M6 northbound from junction 7 to junction 8 closed the 4 M6 J7 Briefing: V2.0

Diversions For j6 to j8 closure: Traffic travelling north on the M6 will exit at j6 and follow the A38(m) / A34 / A4041 / A4031 / A41 to either join the M5 j1 or re-join the M6 north at j8. For j7 to j8 closure: Traffic travelling north on the M6 may wish to exit at j7 and then use the A34 diversion through Walsall (A34 / A4148 / A454) and re-join the M6 at j10. From Walsall Traffic travelling south along the A34 to j7 wishing to access the M5 will be diverted along the A34 at Scott Arms / A4041 / A4031 / A41 to M5 j1. Traffic that decides to return north along the A34 will be diverted along the A34 /A4148 / A454 to j10 of the M6. We will fully sign all the diversion routes. A repair we carried out at this location on 12 February. 5 M6 J7 Briefing: V2.0