Swamp calculations or swamp tests for open or partially-decked boats

Similar documents
Egress and means of escape from passenger spaces

Means of escape from crew spaces on fishing ships

Maritime Rules Part 40A: Design, Construction and Equipment Passenger Ships which are not SOLAS Ships

ISO NON-SAILING BOATS OF LENGTH GREATER THAN OR EQUAL TO 6 m CALCULATION WORKSHEET No. 1 Design:

SOUTH AFRICAN MARITIME SAFETY AUTHORITY. Marine Notice 26 of 2011

Modified Level Flotation

PART 1 GENERAL REQUIREMENTS

Definitions 13 FREE SURFACE EFFECT

AS (Incorporating Amendment Nos 1 and 2) AS Australian Standard. Small craft. Part 1: General requirements for power boats

MSC Guidelines for Review of Stability for Sailing Catamaran Small Passenger Vessels (T)

Flotation Introduction

Developing an industry training plan

Small craft Stability and buoyancy assessment and categorization. Part 3: Boats of hull length less than 6 m

RESOLUTION MSC.235(82) (adopted on 1 December 2006) ADOPTION OF THE GUIDELINES FOR THE DESIGN AND CONSTRUCTION OF OFFSHORE SUPPLY VESSELS, 2006

MSC Guidelines for Review of Cargo and Miscellaneous Vessel Stability (Subchapter I)

PART 3 HULL INTEGRITY AND ARRANGEMENT

AUSTRALIAN BUILDERS PLATE Frequently Asked Questions General Public

REGULATION on life boats operated from land, No 123/1999 CHAPTER I. General provisions Article 1

Fishing Vessel Stability

ICOMIA Global Conformity Guideline for ISO and ABYC Standards. Guideline Number 5 Powering

SECTION 11 ADVENTUROUS ACTIVITIES BOATING: SAILING

MSC Guidelines for Review of General Arrangement Plans for Small Passenger Vessels (T)

PART 3 HULL INTEGRITY AND ARRANGEMENT

MSC Guidelines for Review of Passenger Vessel Stability (Subchapters K & H)

GUIDANCE NOTICE. Unpowered Barges. Definition. General. Risk assessment. Application. Safety Management. Compliance

STABILITY AND WATERTIGHT INTEGRITY, CLOSING APPLIANCES

2. The reference depth is an important measurement for basic flotation testing?

CLASS 1E 8 SMOOTH WATERS OPERATIONS 8

Technical Documentation

RULES FOR THE CLASSIFICATION AND CONSTRUCTION OF SEA-GOING SHIPS

National Standard for Commercial Vessels. Part C Design and construction Subsection 7A Safety equipment. NSCV C7A compil z.

Developing a. Guidance for operators who need to develop a. specified limits plan

ICOMIA Global Conformity Guideline for ISO and ABYC Standards. Guideline Number 5 Powering

Demonstrate basic knowledge of the operation of pleasure/small craft by day

MSC Guidelines for Commercial Fishing Vessel Stability Procedure Number: H2-20 Revision Date: 06/17/2013

RULES FOR THE CONSTRUCTION AND CLASSIFICATION OF SHIPS IDENTIFIED BY THEIR MISSIONS CHAPTERS SCOPE

ANNEX 2 RESOLUTION MEPC.124(53) Adopted on 22 July 2005 GUIDELINES FOR BALLAST WATER EXCHANGE (G6) THE MARINE ENVIRONMENT PROTECTION COMMITTEE,

1. For the purposes of this standard, the maximum weight capacity of a boat is:

Maritime Rules Part 40E: Design, Construction and Equipment Sailing Ships

SEAFARER TRAINING RECORD BOOK

ISAF OFFSHORE SPECIAL REGULATIONS Appendix J

Yamba Welding and Engineering Pty Ltd Ph: Angourie Rd ( PO Box 135 ) Fx:

MSC Guidelines for Engine Cooling Systems

Part 81: Commercial Rafting Operations

10 December 2010 GUIDANCE FOR WATERTIGHT DOORS ON PASSENGER SHIPS WHICH MAY BE OPENED DURING NAVIGATION

VENTURE CANOES RECREATIONAL CANOES A BETTER BOAT TO PADDLE, A BETTER DAY ON THE WATER

RULES PUBLICATION NO. 86/P EXPLANATORY NOTES TO SOLAS CONVENTION AND DIRECTIVE 2003/25/EC STABILITY AND SUBDIVISION REQUIREMENTS

Stability Guidance Booklet

MSC/Circular.649 International Convention for the Safety of Life at Sea, 1974, as amended (Adopted on 8 June 1994)

Completing a Certificate of Survey

Accident Report. Para 1 & Lightning One Collision on Lake Wakatipu on 14 July 2004

Understanding How Excessive Loading Lead to a Capsize with Loss of Life Can Help Avoid Future Tragedies

RULES PUBLICATION NO. 94/P SUBDIVISION AND DAMAGE STABILITY OF NEW OIL TANKERS, CHEMICAL TANKERS AND GAS CARRIERS January

SHIP DESIGN AND EQUIPMENT

CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY MARINE ENGINEER OFFICER

O K D I A MEASUREMENT FORM INTERNATIONAL OK DINGHY CLASS

Mechanical. Inboard. Volvo D4. Stern Drive. 3500kg Location. 600L Hull Type 300 HP. Manson Supreme. Alloy roof extension into cockpit Berths 4

SHIP SAFETY BULLETIN. Subject: Bulletin No.: 06/2012 RDIMS No.: Date: Y - M - D

Marine Kit 4 Marine Kit 4 Sail Smooth, Sail Safe

ANNEX 5 IMO MARINE CASULATY AND INCIDENT REPORT DAMAGE CARDS* AND INTACT STABILITY CASUALTY RECORDS

Part 40E Design, Construction and Equipment Sailing Ships

RULES FOR CLASSIFICATION Ships. Part 3 Hull Chapter 15 Stability. Edition October 2015 DNV GL AS

NAUTICAL TERMINOLOGY

CHAPTER II-1 B. Construction subdivision and stability, machinery and electrical installations

Chapter 1 Boat systems

Maritime and Coastguard Agency. LONDON; The Stationery Office

Small craft Stability and buoyancy assessment and categorization. Part 2: Sailing boats of hull length greater than or equal to 6 m

ADMINISTRATIVE INSTRUCTION No. STCW-14 QUALIFICATION / CERTIFICATION REQUIRED FOR OPERATION OF A DOMESTIC VESSESL

Marine Safety Center Technical Note

OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE SA MARITIME QUALIFICATIONS CODE

Doors in watertight bulkheads of cargo ships and passenger ships

Translation: Only the Danish version is authentic. The Danish Maritime Authority s Technical Regulation no. 2 of 3 March 1998

part ten hire boats & safety features

ProKat 2860 Cuddy Cabin My Kitty Kat

Developing an operator plan Guidance for operators who need to develop a Maritime Transport Operator Plan

MSC Guidelines for Sanitary & Sewage Systems

Yacht Register Information

AUSTRALIAN SAILING SPECIAL REGULATIONS

boating handbook

35 ' 1999 Carver 356 Motor

RULES FOR THE CLASSIFICATION AND CONSTRUCTION OF SMALL SEA-GOING SHIPS

IMO DEVELOPMENT OF EXPLANATORY NOTES FOR HARMONIZED SOLAS CHAPTER II-1

New Vessel Fuel Efficient Design and Construction Considerations Medium and Long-Term Options

ANNEX 4 ALTERNATIVE TEXT FOR OPERATIONAL GUIDELINES FOR VERIFICATION OF DAMAGE STABILITY REQUIREMENTS FOR TANKERS

PASSENGER VESSEL OPERATIONS AND DAMAGED STABILITY STANDARDS

Maritime and Coastguard Agency LogMARINE GUIDANCE NOTE. Safety during Transfers of Persons to and from Ships

SOLAS requirements for nonpassenger ships 300 or above but less than 500 gross tonnage

APPENDIX IV DEVELOPMENT AND MEASUREMENT RULES OF THE INTERNATIONAL TEN SQUARE METRE SAILING CANOE (JANUARY 2008) 1 GENERAL

GUIDELINES ON OPERATIONAL INFORMATION FOR MASTERS IN CASE OF FLOODING FOR PASSENGER SHIPS CONSTRUCTED BEFORE 1 JANUARY 2014 *

Pleasure Boat Inspection

ICOMIA Global Conformity Guideline for ISO and ABYC Standards. Guideline Number 7 ISO Builder s Plate/US Boat capacity labels

PLATE BOATS ENGINEERED EXCITEMENT

Small Ro/Pax Vessel Stability Study

Maritime Rules Part 42A: Safety Equipment Life-Saving Appliances Performance Maintenance and Servicing

MARINE INVESTIGATION REPORT M08M0062 CAPSIZING

NOTICE OF RACE. Laser SB3 Irish East Coast Championships Eastern Championship National Yacht Club 12 th to 13 th May 2012

RESOLUTION MSC.141(76) (adopted on 5 December 2002) REVISED MODEL TEST METHOD UNDER RESOLUTION 14 OF THE 1995 SOLAS CONFERENCE

OFFSHORE RACING CONGRESS World Leader in Rating Technology

03 Vessel Fitness and Safety

Merchant Shipping Act 57 of 1951 section 356

Transcription:

Swamp calculations or swamp tests for open or partially-decked boats July 2018 Maritime New Zealand Position Statement PS-07-18 This document is uncontrolled if printed. Please refer to the Maritime New Zealand website for the latest version. Purpose of this position statement This position statement sets out Maritime New Zealand s (Maritime NZ s) position on the requirement for swamp calculations or swamp tests for open or partially-decked boats to which either Maritime Rules Part 40A or 40C applies. It has been developed to inform operators and surveyors of these boats. Vessels it applies to This position statement applies to all open or partially-decked boats to which either Maritime Rules Part 40A or 40C applies. The following definitions of open and partially-decked boats are given in Rules 40A.2 and 40C.2. Open boat Partially decked boat A boat not protected from entry of water by means of a complete deck or by a combination of a partial weather deck and a weathertight superstructure or deckhouse Note that, as stated in Maritime Rules Part 40A.2 and 40C.2, if the freeboard to a well deck, measured from the designed load waterline, is less than 250 mm the vessel shall be considered as an open boat for the purposes of subdivision, stability, and drainage requirements. A boat in which at least two-thirds of the horizontal projection of the sheerline area is equipped with decking, cabins, shelters or rigid covers which are weathertight and designed to shed water overboard. The decked area must include all that area within one-third of the length from the bow plus the area 100 mm inboard from the periphery of the boat (excluding the transom) Page 1 of 6

Background Maritime Rules 40A.13 and 40C.13 make clear which vessels must have a swamp calculation or swamp test. These rules are shown here. Swamp test rule requirements Maritime Rule 40A.13 Stability (3) A monohull boat of less than 6 metres in length overall which is (a) an open boat; or (b) a partially decked boat that proceeds beyond enclosed waters; must meet the flotation and stability requirements of a swamp test or calculation approved by the Director in accordance with rule 40A.13(4). Maritime Rule 40C.13 Stability (2) For a post-27 May 2004 ship of less than 6 metres in length overall that is a monohulled open boat, it must be demonstrated by test or calculation that, when fully swamped, the ship has sufficient buoyancy distributed so that the boat will stay afloat and in good trim, without listing if flooded. The test or the calculation must include the full outfit of equipment, the total number of persons that is permitted to carry and a mass equivalent to its engine and full tank or tanks of fuel.1 Swamp test rule requirements The coverage of the Rules can be summarised as follows. Rule Ship Type Length (m) and Swamp Test Coverage Maritime Rules Part 40A (Passenger Ship) Open boat L < 6 Required Partially decked boat L < 6 Required Maritime Rules Part 40C (Non-passenger Ship) Open boat L < 6 Required Partially decked boat L < 6 As shown, the rules are silent about whether partially-decked non-passenger ships (defined in Maritime Rules Part 40C) under 6 metres, and open or partially-decked passenger ships (defined in Maritime Rules Part 40A) and non-passenger ships (defined in Maritime Rules Part 40C) equal to or greater than 6 metres must have a swamp calculation or swamp test. These boats are susceptable to being swamped, putting safety at risk. 1 For details of a recommended swamping calculation and test for open boats see the Advisory Circular to Part 40C of the Maritime Rules. Page 2 of 6

Maritime NZ s position Maritime Rules Parts 40A.13 and 40C.13 must be complied with for the vessels to which they apply. For open or partially-decked boats about which the rules are silent (ie partially-decked non-passenger ships (defined in Maritime Rules Part 40C) under 6 metres, and open or partially-decked passenger ships (defined in Maritime Rules Part 40A) and non-passenger ships (defined in Maritime Rules Part 40C) equal to or greater than 6 metres), Maritime NZ strongly recommends that they undergo a swamp calculation or swamp test to the specifications on page 3 of this document. The Maritime Rules may be considered as the minimum standard for maritime operators to achieve. Section 30 of the Health and Safety at Work Act 2015 (HSWA) requires duty holders to eliminate or minimise risks to health and safety, so far as is reasonably practicable. It may be reasonably practicable for an operator to achieve a higher standard under HSWA than the standard specified in the Maritime Rules. Simple compliance with the Maritime Rules may not absolve an operator of responsibility under HSWA if that higher standard is found to have been reasonably practicable. Maritime NZ considers that, under HSWA, swamp calculations or swamp tests on these boats could be interpreted as a reasonably practicable step for an operator to take to help minimise the risks associated with swamping. Recommended swamp calculation or swamp test specifications for partially-decked non-passenger ships (defined in Part 40C) under 6 metres, and open or partiallydecked passenger ships (defined in Part 40A) and non-passenger ships (defined in Part 40C) equal to or greater than 6 metres* 1. It is highly recommended that swamp calculations or swamp tests for these boats are carried out in accordance with the requirements of Part 40A.13(4) or Part 40C.13(2) according to whether they are passenger ships or non-passenger ships. 2. The determination of required volume and location of flotation material is given in the Advisory Circular Issue No. 40A-1. 3. The form in Appendix 1 of this document may be used for recording the swamp test. 4. The calculation sheet and figure in Appendix 2 of this document may be used for recording and marking the swamp calculation and distribution of flotation material. 5. Based on the Surveyor Recognition Framework, surveyors capable of undertaking swamp calculations or swamp tests are from the following categories: Swamp calculations: DA and IC Swamp tests: DA and IC. *Notes When undertaking swamp calculations, surveyors should ensure that level floatation can be achieved when the vessel is fully swamped. Additional calculations or analysis may be necessary to achieve a finding. More-accurate and realistic swamp simulation (e.g. by 3D modeling) is accepted to account for hull buoyancy other than that provided by flotation material and other features that may positively (or negatively) contribute to the swamp performance of the boat. Page 3 of 6

Appendix 1 Swamp Test Record 1 Ship Particulars Swamp Test Record Ship Name MNZ Number Building Material Length Overall (m) Beam (m) Freeboard (m) Capacity of Persons (kg) 2 Statement (Please clearly state the swamp test procedure) 3 Conclusion / Result Pass / Fail (Please circle) Date of Test Attending Surveyor Signature of Surveyor Page 4 of 6

Appendix 2 Swamp Calculation Record Calculation Swamp Calculation Vessel Particulars Input Submerged Weight Vessel Name Weight (W h ) kg MNZ Number Factor N/A Material Submerged (W b ) kg Capacity of Persons kg Volume of Flotation (V b ) m 3 Length Overall m Beam m Motor and Equipment Freeboard m Weight (W m ) kg Hull Weight kg Volume of Flotation (V m ) m 3 Maximum Engine Power hp Weight of Engine and Equipment kg Capacity of Persons Flotation Density kg/m 3 Weight (W p ) kg Equivalent Density (D) kg/m 3 Factor N/A Result Submerged (W b ) kg Total Volume of Flotation m 3 Volume of Flotation (V p ) m 3 Date Attending Surveyor Other Item Signature of Surveyor Weight (W o ) kg Factor N/A Submerged (W o ) kg Volume of Flotation (V o ) m 3 Page 5 of 6

Flotation Distribution Please summarise the flotation distribution based on the calculation above. Location 1 Location 6 Location 2 Location 7 Location 3 Location 4 Location 5 Page 6 of 6