Welcome. Public Meeting. Heading 1. Heading 2. DeMers Ave. Columbia Rd. Washington St. 42nd St. 32nd Ave. Heading 3 HEADING

Similar documents
We believe the following comments and suggestions can help the department meet those goals.

Tulsa Metropolitan Area LONG RANGE TRANSPORTATION PLAN

DES MOINES AREA MPO. Presentation to Iowa Commercial Real Estate Association. April 6, 2017

2045 Long Range Transportation Plan. Summary of Draft

Rhode Island Moving Forward Long-Range Transportation Plan 2040 Municipal Roundtable Newport County

Governor s Transportation Vision Panel

Basalt Creek Transportation Refinement Plan Recommendations

Living Streets Policy

Bus Rapid Transit Plans

APPENDIX C. Systems Performance Report C-1

STUDY ADVISORY COMMITTEE. October 8, 2015

Bike/Multipurpose Trail Study for Glynn County, Georgia MAY 16, 2016

FLORIDA STRATEGIC HIGHWAY SAFETY PLAN

Performance Criteria for 2035 Long Range Transportation Plan

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

SAFETY PERFORMANCE MEASURES AND TARGET SETTING. Transportation Subcommittee September 15, 2017

PRELIMINARY DRAFT FIRST AMENDMENT TO VISION 2050: A REGIONAL LAND USE AND TRANSPORTATION PLAN FOR SOUTHEASTERN WISCONSIN

ADOT Statewide Bicycle and Pedestrian Program Summary of Phase IV Activities APPENDIX B PEDESTRIAN DEMAND INDEX

AMATS Complete Streets Policy

Bicycle Master Plan Goals, Strategies, and Policies

Vision Public Workshop: Findings

MnDOT Implementation of Complete Streets Policy. January 2014

City of Jacksonville Mobility Fee Update

Memorandum. Purpose: To update the MPO CTAC on the status of the LRTP scenario evaluation process.

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Bicycle Lanes Planning, Design, Funding South Mountain Partnership Trails Workshop Roy Gothie PennDOT Statewide Bicycle Pedestrian Coordinator

7/28/2017. Safety Performance Management: Target Setting and Coordination. Agenda. Safety Performance Management (SPM)

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

City of Ottawa s Complete Streets Approach to Transportation Projects

Transportation in Washoe County. Lee Gibson, Executive Director February 15, 2011

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Congress Avenue. Palm Beach MPO Subcommittee Meetings December 2017

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Planning and Programming Committee Meeting April 14,

Prepared For: DIRECTION 2035 SHAPING OUR FUTURE SUMMARY REPORT JULY Prepared By: Staff to Bay County TPO

Clackamas County Comprehensive Plan

Welcome. Background. Goals. Vision

Executive Summary June 2015

Route 7 Corridor Study

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another.

SMART 1 Public Meeting #1. February 24, 2016

Philip Schaffner Minnesota Department of Transportation October 22, 2013

Environment and Public Works Committee Presentation

Regional Transportation Needs Within Southeastern Wisconsin

Welcome to Laredo Metropolitan Transportation Plan First Public Meeting. February 27 th, :30 PM to 7:30 PM. We value your opinion!

Rhode Island Moving Forward Long-Range Transportation Plan 2040 Municipal Roundtable Providence County

CITY OF SPOKANE VALLEY Request for Council Action

MPO Staff Report Technical Advisory Committee: May 10, 2017 MPO Executive Board: May 17, 2017

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

Attachment One. Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program

PEDESTRIAN ACTION PLAN

Transportation Master Plan Advisory Task Force

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Washington DC Section of ITE Project Briefing

2040 RTP. Chapter 6: Investments in our Transportation Future

STREET AND HIGHWAY PLAN

REGIONAL PRIORITIES Presentation to the Tampa Bay Regional Collaboration Committee September 10, 2012

May 12, 2016 Metro Potential Ballot Measure Issue Brief: Local Return

SUMMARY OF TRANSPORTATION INVESTMENTS

Most Important Part of any Plan

Bicycle and Pedestrian Plans and Improvements

BD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1

Shenango Valley MPO. State Transportation Commission 2015 Twelve Year Program Development

Transportation Day at the Capitol. Charlie Zelle Commissioner, MnDOT Feb. 16, 2017

TRANSIT & NON-MOTORIZED PLAN DRAFT FINAL REPORT Butte County Association of Governments

San Jose Transportation Policy

Executive Summary. September 3, 2014

WELCOME. Blueprint Long Range Transportation Plan. Thursday, May 15, :00-7:00 p.m.

Making Phoenix Streets Complete. City of Phoenix Complete Streets Initiative

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

ACTIVE TRANSPORTATION

Thank you for this opportunity to discuss with you how we can work together to make our streets more complete.

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

CTDOT Pedestrian and Bicycle Safety Initiatives

Outreach Approach RENEW SF served as the primary liaison with the North Beach community; the Chinatown. Executive Summary

MnPASS System Today and the Future

HIGHWAY 11 CORRIDOR STUDY

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

Long Range Transportation Plan and Bicycle Mobility Plan

Moving Towards Complete Streets MMLOS Applications

Chapter 7: Bicycle And Pedestrian Investment Direction

TRASBURG RANSPORTATION

Appendix A-2: Screen 1 Alternatives Report

Final Sidewalk Feasibility Study

Purpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation

Bellevue Transportation: Challenges, Opportunities and Priorities Bellevue Downtown Association September 20, 2018

Chapter 6: Transportation


CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

Arterial Management Plan for US Route 250 and State Route 623

MOBILITY RESULTS AREA. Budgeting For Outcomes Council Presentation January 12, 2007

APPENDIX D. May 22, 2002 Open House Summary and Materials

Attachment A: Columbus Area Metropolitan Transportation Plan Objectives, Performance Measures, and Targets

Transcription:

Heading 1 Heading 2 Heading 3 HADING Welcome 4 Heading 5 Normal Normal Less Spacing Public Meeting Normal No Spacing Strong mphasis Intense mphasis To Do List ullet List ullet Last List ullet 2 CÞ List ullet 2 Last List ullet 3 List ullet 4 DeMers Ave s Caption Callout Text 42nd St Columbia Rd -ast Metropolitan Planning Organization Washington St 32nd Ave

Overview What is a Long-Range Transportation Plan (LRTP)? Sets a direction and strategies to help shape a region s transportation network Includes three elements: Streets and highways Transit Pedestrians and bicycles The MPO is required to update its LRTP every 5 years the last update for -ast was completed in 2013 What s an MPO? Federal law requires that all urbanized areas in the US with populations over 50,000 people establish Metropolitan Planning Organizations (MPO) responsible for area transportation planning and programming services. What is the Street and Highway Plan Update? This part of the LRTP will develop a performance-based investment decision framework for the streets and highways in the MPO area that is consistent with requirements of the FAST Act Who is Involved? North Dakota Department of Transportation Minnesota Department of Transportation City of City of ast County Polk County Federal Highway Administration Federal Transit Administration Residents and regional stakeholders YOUR INPUT IS IMPORTANT TO US

Schedule Summer Fall Winter Spring Summer Fall December 2017 2017 2017-2018 2018 2018 2018 2018 IN PRSON NGAGMNT PULIC MTING 1 August 30, 2017 PULIC MTING 2 December 14, 2017 PULIC MTING 3 April 2018 PULIC MTING 4 July 2018 AST GRAND FORKS AND GRAND FORKS CITY COUNCIL MTINGS October 2018 ONLIN NGAGMNT PROJCT WSIT INTRACTIV ONLIN ACTIVITIS FINAL STRT AND HIGHWAY PLAN UPDAT PLAN UPDAT PROCSS DVLOP GOALS, OJCTIVS, PRPAR RCOMMNDATIONS AND PRFORMANC MASURS AND IMPLMNTATION RPORT IDNTIFY ISSUS AND ALTRNATIVS ANALYZ XISTING AND FUTUR CONDITIONS

Forecast Average Daily Traffic "#$ 29 "#$ 29 International Airport Z Gateway Dr Central Ave usiness US 2 ast Minnesota International Airport Z Gateway Dr Central Ave usiness US 2 ast Minnesota CÞ DeMers Ave CÞ DeMers Ave 42nd St Columbia Rd 32nd Ave Washington St ygland Rd 42nd St Columbia Rd 32nd Ave Washington St ygland Rd North Dakota 47th Ave North Dakota 47th Ave "#$ 29 "#$ 29 Merrifield Rd / CR 6 Merrifield Rd / CR 6 2030 Forecasted Traffic > 32,000 22,001-32,000 17,001-22,000 12,001-17,000 < 12,000 2012 Urbanized Area MPO oundary 0 2 Miles 2045 Forecasted Traffic > 32,000 22,001-32,000 17,001-22,000 12,001-17,000 < 12,000 2012 Urbanized Area MPO oundary 0 2 Miles 2030 2045

Forecast Volume to Capacity Ratios "#$ 29 "#$ 29 International Airport Z Gateway Dr Central Ave usiness US 2 ast Minnesota International Airport Z Gateway Dr Central Ave usiness US 2 ast Minnesota CÞ DeMers Ave CÞ DeMers Ave 42nd St Columbia Rd 32nd Ave Washington St ygland Rd 42nd St Columbia Rd 32nd Ave Washington St ygland Rd North Dakota 47th Ave North Dakota 47th Ave "#$ 29 "#$ 29 Merrifield Rd / CR 6 Merrifield Rd / CR 6 2030 Volume/Capacity Ratio 0 to 0.6 = LOS A > 0.6 to 0.7 = LOS > 0.7 to 0.8 = LOS C > 0.8 to 0.85 = LOS D > 0.85 to 0.9 = LOS D- > 0.9 to 1.0 = LOS > 1.0 = LOS F 2012 Urbanized Area MPO oundary 0 2 Miles 2045 Volume/Capacity Ratio 0 to 0.6 = LOS A > 0.6 to 0.7 = LOS > 0.7 to 0.8 = LOC C > 0.8 to 0.85 = LOS D > 0.85 to 0.9 = LOS D- > 0.9 to 1.0 = LOS > 1.0 = LOS F 2012 Urbanized Area MPO oundary 0 2 Miles 2030 2045

Issues Identified Co Rd 11 I- 29 Co Hwy 65 INTRACTIV MAP INPUT Legend MPO oundary Urbanized Area Red River Roads Issue Category ( Access Co Hwy 64 Other 9% ( Congestion/Driving Conditions ( Other ( ( ( Pavement Conditions Safety Signs/Signals Co Hwy 19 Congestion/Driving Conditions 14% Safety 28% Co Rd 4 State Hwy 297 US Hwy 81 US Hwy 2 US Hwy 2 us State Hwy 220 Co Rd 73 Co Hwy 17 Co Hwy 76 Co Hwy 226 Signs/ Signals 15% Pavement Conditions 18% Access 16% Co Rd 5 RIDG ROAD north DMRS left-hand signal reduce ROUGH Co Rd 17 ygland intersection left turn Co Rd 6 Co Rd 225 SOUTH lanes TRAFFIC ± 0 0.5 1 Miles Co Rd 81 Co Rd 8 C o Hwy58 Co Hwy 59 CARS Grand drive help people going ramps WASHINGTON MRRIFILD Your Input Input received on bicycle and pedestrian issues will be reflected in the icycle/pedestrian Plan Update and is not shown here

2045 LRTP Vision Statement and Draft Goals Vision Statement: The -ast Long Range Transportation Plan (LRTP) envisions a community that provides a variety of complementary transportation choices for people and goods that is fiscally constrained. 1 GOAL conomic Vitality DSCRIPTION Support the economic vitality through enhancing the economic competitiveness of the metropolitan area by giving people access to jobs and education services as well as giving business access to markets 2 Security Increase the security of the transportation system for motorized and non-motorized uses 3 Accessibility and Mobility Increase the accessibility and mobility options for people and freight by providing more transportation choices 4 5 6 7 nvironmental/ nergy/quality of Life Integration and Connectivity fficient System Management System Preservation Protect and enhance the environment, promote energy conservation, and improve quality of life by valuing the unique qualities of all communities whether urban, suburban, or rural nhance the integration and connectivity of the transportation system across and between modes for people, freight, and housing, particularly affordable housing located close to transit Promote efficient system management and operation by increasing collaboration among federal, state, and local government to better target investments and improve accountability mphasize the preservation of the existing transportation system by first targeting federal funds towards existing infrastructure to spur revitalization, promote urban landscapes, and protect rural landscapes 8 Safety 9 Resiliency* Increase safety of the transportation system for motorized and non-motorized uses. Improve resiliency and reliability of the transportation system and reduce or mitigate storm water impacts of surface transportation 10 Tourism* nhance travel and tourism * A new goal for the 2045 LRTP (not included in 2040 LRTP)

Performance-ased Planning: Delivering Results This update of the long-range transportation plan is refining each goal area s objectives, standards, and performance measures. We are also adding performance targets for some goal areas to measure our region s progress toward delivering the transportation system we want. WHAT AR TH LMNTS OF A PRFORMANC-ASD PLAN? Goal and Goal Statement: Desired big picture future outcome for the metropolitan transportation system, broad statement of aspiration Objective: Specific outcome desired within a goal area, achievable by 2045 (plan timeframe) Standard: Specific technique for achieving an objective; identifies HOW objective will be met Performance Measure: Things that can be measured to evaluate if a standard is working Performance Target: Data point that defines success for a performance measure NOT: The safety performance Goal Statement Objectives Standards SAFTY Increase safety of the transportation system for motorized and non-motorized uses. See handout See handout measures and targets were adopted at the February 21, 2018 MPO meeting. These targets will be reviewed and adopted annually by the MPO. Performance Measures Number of traffic fatalities Number of fatalities per 100 million vehicle miles traveled Number of crash-related serious injuries Number of serious injuries per 100 million vehicle miles traveled Number of non-motorized fatalities and non-motorized serious injuries GOAL Local Target: 3 or fewer traffic fatalities by 2018 No change in trend Local Target: 0.673/mvmt or lower by 2018 No change in trend Local Target: 18 or fewer serious injuries by 2018 Decline in trend Local Target: 5.933/mvmt or lower by 2018 Decline in trend Local Target: 3 or fewer non-motorized fatal and serious injury crashes by 2018 Decline in trend Performance Targets State Targets: NORTH DAKOTA 138 traffic fatalities or fewer statewide 0.5% decline in trend MINNSOTA 375 traffic fatalities or fewer statewide 3% decline in trend State Targets: NORTH DAKOTA 1.336/mvmt 0.5% decline in trend MINNSOTA 0.62/mvmt No change in trend State Targets: NORTH DAKOTA 516 serious injuries or fewer statewide No change in trend MINNSOTA 1,935 serious injuries or fewer statewide Decline in trend State Targets: NORTH DAKOTA 5.088/mvmt MINNSOTA 3.15/mvmt State Targets: NORTH DAKOTA 34 fatalities and serious injuries or fewer statewide No change in trend MINNSOTA 348 fatalities and serious injuries or fewer statewide 5% decline in trend

What Is Our Financial Plan? A financial plan aligns revenues with eligible projects. WHAT AR OUR INVSTMNT PRIORITIS? Help us update the investment priorities that will inform the financial plan. INVSTMNT CATGORY Maintain and Rebuild xisting Infrastructure Safety Improvements Improve Traffic Signals and Technology uild New Freeway Interchanges uild New River Crossings Add General Lanes - Add Lanes or uild New Roads GRAND FORKS-AST GRAND FORKS GOAL ARA conomic Vitality Security Accessibility and Mobility nvironmental/nergy/ Quality of Life Integration and Connectivity fficient System Management System Preservation Safety Resiliency Tourism 2045 STRT AND HIGHWAY PLAN RVNU SOURCS ISSUS FDRAL Highway Safety Improvement Program (HSIP) Surface Transportation lock Grant Program (STPG) National Highway Performance Program (NHPP) National Highway Freight Program National Discretionary Programs (INFRA, TIGR, etc.) NORTH DAKOTA Urban Roads Program Main Street Urban Grant Program (NW) State Highways Tax Distribution Fund County Road Fund GRAND FORKS Sales tax (Current + NW) Special assessments General funds GRAND FORKS COUNTY MINNSOTA Area Transportation Partnership City Sub-Targets; County Sub-Target State Trunk Highway Fund Municipal State Aid Corridors of Commerce Program Transportation conomic Development (TD) Program AST GRAND FORKS Special assessment General funds POLK COUNTY Costs are rising faster than federal and state revenues Developing reasonably expected revenue estimates for new sources (ND HSIP, ND Main Street Program, sales tax) Identifying and positioning projects to successfully compete for grants Maintenance and operations costs are a significant part of overall costs

Financial Planning Activity What We Heard: Participants allocated $100 between six public investment categories Improve traffic signals and technology Received 69 responses in person and online Maintain and rebuild existing infrastructure 8% Add additional lanes or new roads 8% Safety improvements 30% 9% 16% 29% New river crossings New freeway interchanges

Range of Alternatives 2030/2045 Plan Universe of Project Needs: ( "#$ 29 Project Type MPO Transportation Improvement Program xisting + Committed Network Current Cost Percent of Total $72,390,000 10.3% $64,830,000 9.2% Safety/Operations* $18,910,000 2.7% Multimodal Projects, Streetscape Projects, $2,000,000 0.3% ( ( International Airport Z ( ( ( North Dakota ((( ( ( ( ( ( ( 42nd St ( ( ( ( Gateway Dr ( CÞ ( ( DeMers Ave Columbia Rd ( ( ( ( ( 32nd Ave 47th Ave ( ( ( ( ( ( ( ( ( ( ( ( Washington St ( Central Ave ( ( ( ( ( ( ( ( ( ( ( usiness US 2 ( ast ( ( ( ygland Rd Minnesota ( and Studies "#$ 29 ( Merrifield Rd / CR 6 ( State of Good Repair $91,500,000 13.0% Discretionary $454,650,000 64.5% TOTAL $704,280,000 100% ( Universe of Project Intersections Universe of Projects Corridor 2012 Urbanized Area MPO oundary 0 2 Miles June 2017 *$14.1 million in TIP are safety/operations projects Alternatives

Alternatives valuation Framework ISSUS IDNTIFICATION MPO Transportation Improvement Program NDDOT and MnDOT State Transportation Improvement Programs City and County Capital Improvement Plans xisting conditions level of service Crash analysis ridge sufficiency Pavement condition 2030/2045 traffic demand forecasts Interactive mapping, open house, staff and elected official input MPO 2040 Long-Range Transportation Plan project list Recent MPO corridor studies Public meetings Online engagement MPO Transportation Improvement Program xisting + Committed Network Safety/ Operations Multimodal Projects, Streetscape Projects, and Studies State of Good Repair Discretionary Financial Forecast Travel Demand Modeling Public + Staff Input Range of Alternatives Goals, Objectives, + Performance Measures Financially Constrained Plan

River Crossing Analysis Scope of Work: Improve local traffic and connectivity Use 2045 travel demand model Review impacts on: xisting River Crossing Potential River Crossing Review transportation impacts of 4 river crossing locations Legend xisting crossings Neighborhoods Local and regional roadway network Compare impacts of each crossing 24th Ave S 32nd Ave S 47th Ave S Forecasts with 47th Avenue/I-29 interchange show no impact at proposed crossing Merrifield Rd Potential River Crossing Locations

River Crossing Analysis Intersection Level of Service: Most notable changes: Washington Street at 32nd Avenue elmont Road at 4th Avenue Gateway Drive D 5th Street Central Avenue DeMers Avenue A A A A A DeMers Avenue 4th Avenue usiness US 2 C D D D D D 42nd Street 17th Avenue C Columbia Road 32nd Avenue Washington Avenue elmont Road F C C C F ygland Road F F 47th Avenue Intersection Level of Service Summary 2015 xisting 2045 No uild 2045 24th Avenue Crossing 2045 32nd Avenue Crossing 2045 47th Avenue Crossing 2045 Merrifield Road Crossing 0 0.5 1 Miles Intersection Level of Service Summary

River Crossing Analysis Segment Level of Service and Change in Miles and Hours Traveled: Minnesota Avenue/ Segment Level of Service: 1st Street would improve under all proposed RIVR CROSSING LOCATION 2045 No uild 2045 with 24th Crossing 2045 with 32nd Avenue Crossing 2045 with 47th Avenue Crossing 2045 with Merrifield Road Crossing conditions except a crossing at Merrifield Road Northern river crossings serve more local trips Southern river crossings serve more regional trips US 2 D D D Demers Avenue F F F F F Minnesota Avenue / 1st Street C D 24th Avenue A 32nd Avenue A 47th Avenue A Merrifield Road A Change in Vehicle Miles Traveled and Vehicle Hours Traveled Compared to 2045 No uild: MTRIC 2045 No uild 24th Avenue River Crossing 32nd Avenue River Crossing 47th Avenue River Crossing Merrifield Road River Crossing Change in Daily Vehicle Miles Traveled Change in Daily Vehicle Hours Traveled 1,054,784-23,535-24,721-13,393-17,717 59,702-1,001-831 174-679