Multi-Modal Transportation Improvement Projects Identified by Neighborhood for the 20-year Planning Period

Similar documents
Supplemental Information for DRAFT TIP

Samish-Maple-Ellis Corridor Pedestrian & Bicycle Safety Improvements. Bellingham City Council March 26, 2018

Appendix B: Prioritized Projects List

Changing the Climate of Mobility: Bellingham s Multimodal Transportation Networks

2018 Pedestrian and Bicycle and Safe Routes to School Application for Funding Page 1 of 31

Chapter 3: Bicycle Network Recommendations

Alabama Street Corridor. Road Diet Feasibility Study & Safety Improvements

Transportation Report on Annual Mobility

Transportation Report on Annual Mobility

5. Automobile Circulation, Wayfinding and Signage

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Transportation Report on Annual Mobility

Chapter 3: Bicycle Network Recommendations

TRANSPORTATION BENEFIT DISTRICT NO. 1 MINUTES OF THE BOARD OF DIRECTORS MEETING

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Chapter 5 Future Transportation

Lynchburg District Update

PRESS RELEASE San Joaquin Council of Governments

Bellingham Bicycle Master Plan Public Open House #1 Comments from Maps

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

UNIVERSITY RIDGE STUDENT HOUSING

In November 2015, the City of Bellingham, WA, USA completed $4.3 million in safety

Plant City Walk-Bike Plan

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

This chapter describes the proposed circulation system and transportation alternatives associated with

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Clackamas County Comprehensive Plan

TRANSPORTATION & MOBILITY

Appendix A: Public Engagement

Physical Implications of Complete Streets Policies

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

Bay to Bay Boulevard Complete Streets Project

5. RUNNINGWAY GUIDELINES

Non-Motorized Transportation 7-1

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

This page intentionally left blank.

CITY OF PORTSMOUTH PLANNING DEPARTMENT

C C C

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Six-Year ( ) Transportation Improvement Program (TIP)

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Appendix A: Public Engagement

Prince George s County plans, policies, and projects

Bicycle Transportation Budget Plan: Lawrence, KS

San Jose Transportation Policy

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Road Diets FDOT Process

5 CIRCULATION AND STREET DESIGN

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

City of Birmingham Draft Multi-modal Transportation Plan

Duwamish Way-finding and CTR Report

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

This page intentionally left blank.

Complete Streets. Designing Streets for Everyone. Sarnia

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

10A. DATE: October 5, Pedestrian and Bicycle Advisory Committee. Kevin Colin, Deputy Planning Manager Curt Bates, City Engineer

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

6/22/2018 VIA . Darcy Goulart, Planning Manager City of Rancho Cordova Planning Department 2729 Prospect Park Drive Rancho Cordova, CA 95670

Rochester Downtown Bicycle Study 2009

What Is a Complete Street?

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013

Bicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)

Basalt Creek Transportation Refinement Plan Recommendations

MOBILITY WORKSHOP. Joint City Council and Transportation Commission May 5, 2014

WELCOME. Thank you for joining us at the Second Public Workshop for the Carlsbad Pedestrian Master Plan. We look forward to receiving your feedback.

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

Six-Year ( ) Transportation Improvement Program (TIP)

See Figure 38, Existing Nonmotorized Connections.

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

SAFE ROUTES TO SCHOOL

Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014

Dear Mayor Murray, Top SR-520 Design Innovations and Remaining Opportunities

NEWMARKET UPHAM S CORNER

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

STREET AND HIGHWAY PLAN

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

section 4 Existing Conditions, Issues, and Options

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. Project Type Capital Improvement

Polk Streetscape Project

Complete Streets Needs. Complete Streets Project Origin (planning documentation or supporting analysis)

Chapter 4: Funding and Implementation

Broadway Complete Streets Project

STONY PLAIN ROAD STREETSCAPE

3.9 Recreational Trails and Natural Areas

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Lincoln Neighborhood Corridor Plan The LiNC

RZC Appendix 8A Marymoor Subarea Street Requirements

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

Transcription:

2011 CITY CENTER MASTER PLAN UPDATE ADOPTED TRANSPORTATION ELEMENT PROJECT LIST FOR THE CBD, WATERFRONT, AND YORK, SEHOME, AND LETTERED STREETS NEIGHBORHOODS IMMEDIATELY ADJACENT TO CITY CENTER TRANSPORTATION ELEMENT PART 4: PLANNING FOR TRANSPORTATION PROJECTS Multi-Modal Transportation Improvement Projects Identified by Neighborhood for the 20-year Planning Period The transportation network is a city-wide system to move people, freight, and goods in a safe and efficient manner throughout the City with a variety of transportation modes. The Transportation Element of the Comprehensive Plan is the guiding transportation policy document for City transportation priorities, projects, and multi-modal improvement requirements. New development proposed in various portions of the City, should be required to provide transportation improvements that provide benefit consistent with city-wide transportation goals and policies rather than site-specific preferences. The list of multi-modal transportation improvement projects, below, identified for the 20-year planning period, has been compiled from the following sources: 1995 Bellingham Transportation Element; 1997 Whatcom County Transportation Element; 1980-2005 Bellingham Neighborhood Plans; 2001 Whatcom Transportation Plan (WCOG); 2003-2022 Washington State Transportation Plan; 2004 Final Environmental Impact Statement; 2004 WTA 6-Year Strategic Plan; 2004 Bicycle Pedestrian Advisory Committee Work; 2006-2011 Bellingham and Whatcom County 6-Year Transportation Improvement Programs (TIPs). The list of multi-modal transportation improvement projects does not represent a definitive, prioritized project list, but rather a comprehensive list of perceived and/or recommended needs as of January 2006. Over time projects may need to be added to or removed from this list. The Public Works Department will refer to this list of multi-modal transportation improvement projects during the annual development of the 6-year

Transportation Improvement Program (TIP) to seek multi-modal projects where mitigation is needed, or where finances permit. Other unanticipated projects may not appear on this list. The list of multi-modal transportation improvement projects is presented by Neighborhood and UGA region for geographic reference only. The transportation arterial street network is a City-wide and regional system and must be monitored, analyzed, maintained, and improved as such. Public Works staff will seek input from Bellingham Neighborhoods for projects placed on the 6-Year TIP and will work with affected Neighborhoods to explore transportation capacity alternatives on arterial streets. Any proposal to remove on-street parking from a neighborhood arterial must be reviewed by the City Council. Prerequisite considerations are listed in bold lettering. Central Business District Holly Street corridor between Broadway Street and Lakeway Drive State Street needs rehabilitation of existing street with safety and efficiency improvements for all modes, including pedestrian and bicycle. [Ellis to State completed 2008. Bicycle lanes not possible on Holly between Bay and Broadway without removal of on-street parking. Bike lanes not possible on Holly between Ellis and Bay without road diet travel lane reduction from 3 to 2. Bike lanes on Holly could be very challenging with multiple right-turn movements along corridor, conflicts with on-street parking maneuvers, and door-swing into bike lane.] Consider shoulders on Wharf Street between State and Cornwall, if feasible. [Feasible at great cost; not part of Waterfront District Plan at this point] Design and construct improvements to enhance the streetscape along upper Holly Street between Lakeway Drive and Railroad Avenue. The remaining years are intended to improve existing streets and sidewalks in the downtown area to enhance multi-modal activities and create a more bicycle and pedestrian friendly environment. [Constructed 2008] Roeder Ave. Bridge at Whatcom Creek Replace timber piles, adjust grade, improve pedestrian facilities. Improve bicycle safety and efficiency on Northwest/Elm/Dupont/Prospect/Bay corridor, including bike lanes or shoulders. Design 2011, bicycle lanes to be installed on both sides of Northwest/Elm/Dupont from Whatcom Creek to Interstate 5 in 2012.

Complete Coast Millenium Trail: South Bay trail to Railroad to Chestnut to Roeder with bike lanes and signs. Bicycle Route Way-finding Signs are a better solution for this connection, unless significant changes are envisioned in CCMP update for Railroad Avenue] Complete bike lanes/multi-use trail on Railroad to connect South Bay trail and Whatcom Creek bridge/ellis street trail. [Railroad is not an arterial, no dedicated bike lanes. Bike lanes on streets with diagonal parking create significant conflicts between bikers and drivers. Bicycle Route Wayfinding Signs are a better solution for this connection, unless significant changes are envisioned in CCMP update for Railroad Avenue] Improve bicycle safety and efficiency on Ohio between Cornwall Avenue and I-5 Ellis, including bike lanes or shoulders. [Identified on Transportation Benefit District improvement list requires removal of on-street parking requires further review by Public Works.] Other Downtown/CBD transportation improvements constructed between 2000 and 2012 that were/are not listed in the 2006 Transportation Element of the Comprehensive Plan. Pedestrian curb extensions (bulb-outs) and installation of marked crosswalks at State Street/Maple Street intersection. [Transportation Benefit District funding design in 2011, construct in 2012] Pedestrian crosswalk visibility enhancements at Pine Street/Boulevard [Transportation Benefit District funding design 2011, construct 2012.] Alley restoration/placement of utilities underground [Constructed 2010-2011] Full traffic signal at Railroad Avenue/Chestnut Street [Constructed 2009] Reconstruction of Holly/Bay/Dupont intersections with pedestrian plaza, crosswalks, and sidewalk improvements. [Constructed 2009] Downtown sidewalk improvements ($150,000 each year for a total of $1,200,000) [Constructed 2003-2010] Magnolia St Road Diet-Bicycle Lane (Cornwall to Ellis) [Constructed 2004] State Street Road Diet and Bicycle Lane (York to Wharf) [Constructed 2003] Conversion of West Champion from one-way to two-way between Commercial and Cornwall [Constructed 2009] Arts District streetscape improvements, including:

o Flora Street sidewalks, bus pull-out, pedestrian curb bulb-outs [2009] o Grand Avenue sidewalks, pedestrian curb bulb-outs, resurfacing [2010] o Lottie Street resurfacing [2010] o West Champion sidewalks, pedestrian curb bulb-outs [2009] o Bay Street sidewalks, pedestrian curb bulb-outs, crosswalks [2009] o Holly/Bay intersection reconstruction, pedestrian plaza [2009] o Prospect sidewalks, pedestrian curb bulb-outs, resurfacing [2011] o Commercial/Central pedestrian curb bulb-outs [2011] Downtown ADA Curb Ramp Replacements [Constructed 2000-2001] P INEWOOD AV CEDARWOOD AV P ATTON ST SQUALICUM PKWY LYNN ST NORTHWEST AV W ILLINOIS ST MONROE ST E LM ST M ERIDIAN ST W ILLINOIS ST B ROADWAY ST SUMMER ST SUNSET DR SQUALICUM P KWY SUNSET DR E LLIS ST E SUNSET DR.-, 5 WOODSTOCK WY JAMES ST ORLEANS ST E BARKLEY BLVD ALABAMA ST WOBURN ST E BARKLEY BLVD ELDRIDGE AV ROEDER AV B ROADWAY ST DUPONT ST F ST W HOLLY ST GIRARD ST PROSPECT ST GRAND AV N COMMERCIAL ST CORNWALL AV FLORA ST GRANT ST OHIO ST MEADOR AV KING ST OHIO ST P ACIFIC ST IOWA ST Y EW ST N BELLINGHAM BAY B OULEVARD ST C ORNWALL AV WHARF ST W CHAMPION ST B AY ST E MAPLE ST G ARDEN ST N FO REST ST N STATE ST I NDIAN ST N FO REST ST E HOLLY ST E CHESTNUT ST YORK ST E CHAMPION ST E LLIS ST E MAGNOLIA ST E LLIS ST LAKEWAY DR LINCOLN ST LAKEWAY DR FRASER ST LA K E W HATC OM FRASER ST HARRIS AV 10TH ST 11TH ST FINNEGAN WY 12TH ST DONOVAN AV 12TH ST S STATE ST 14TH ST HARRIS AV KNOX AV S GARDEN ST HIGHLAND DR N GARDEN ST 21ST ST W CAMPUS WY HIGHLAND DR W COLLEGE WY S COLLEGE DR 25TH ST H IGH ST DONOVAN AV BILL MCDONAL D PKWY 32ND ST 36TH AV.-, 5 E MAPLE ST N SAMISH WY S AMIS H WY SAMISH WY SAMISH WY LINCOL N WY ELWOOD AV 40TH ST 40TH ST P UGET ST CONSOLIDATION AV BLA KELY C T Y EW STREET R D Y EW ST SAN JUAN BLVD Curb Ramp Replacement Map Legend Curb Replacements HAWTHORN RD OLD FAIRHAV EN PKWY CONNELLY AV

Central Waterfront ( New Whatcom / Former G.P. Site) [Waterfront District] Public street connections will need to be made between the former Georgia Pacific industrial site, Downtown Bellingham, and Old Town area. Specific improvement requirements for the following streets will be developed as the master plan for this site is created. Bicycle and pedestrian facilities will be included wherever possible. South Cornwall Avenue [2012 TIP, unfunded] Beale Street Laurel Street Central Entry [Construction 2011-2012] Granary Bloedel Ave, Phase 1 [2012 TIP, Construction funded 2013] Bloedel Ave, Phase 2 [2012 TIP, unfunded] Commercial Green Loop [2012 TIP, unfunded] Wharf Roundabout [2012 TIP, unfunded] C Street [2012 TIP, Phases 1 & 2 unfunded] F Street [2012 TIP, unfunded] Hilton Street West Chestnut Street West Maple Street Mill Town Loop Laurel Connector G.P./B.S.T. Connector Pine Avenue Entry Mid Point Entry Cornwall Avenue Bridge [2012 TIP, unfunded] Railroad relocation [2012 TIP, unfunded] Commercial Street Bridge Bay-Chestnut Streets Bridge and Parking Garage Roeder Avenue Bridge replacement with sidewalk and bicycle lanes [Design 2011, Construction 2012] Lettered Streets Improve bicycle safety and efficiency on Northwest/Elm/Dupont/Prospect/Bay corridor, including bike lanes or shoulders. [Design 2011, bicycle lanes to be installed on both sides of Northwest from Whatcom Creek to Interstate 5 in 2012] Holly Street corridor between Broadway Street and Lakeway Drive State Street needs rehabilitation of existing street with safety and efficiency improvements for all modes, including pedestrian and bicycle. [Ellis to State completed 2008. Bicycle lanes not possible on Holly between Bay and

Broadway without removal of on-street parking. Bike lanes not possible on Holly between Ellis and Bay without road diet travel lane reduction from 3 to 2. Bike lanes on Holly could be very challenging with multiple right-turn movements along corridor, conflicts with on-street parking maneuvers, and door-swing into bike lane.] Broadway Avenue Bike Lanes (Holly to Meridian) [Constructed 2003] Broadway Avenue Road Diet/Median and Bike Lanes (Meridian to North Park Drive) [Constructed 2005] Complete Coast Millenium trail: South Bay trail to Railroad to Chestnut to Roeder with bike lanes and signs. Cornwall Avenue corridor between York Street and Illinois Street is a high priority for a bicycle lane on at least one side. Existing pedestrian facilities should be retained and enhanced, where possible. [Constructed 2008] Provide enhancements to Old Village Trail between Maritime Heritage Park and Elizabeth Park to improve wayfinding, pedestrian connectivity with perpendicular streets, and pedestrian/vehicular separation where private driveways intersect the trail. [Constructed 2008] Sehome Improve bicycle safety and efficiency on North Samish Way between Bill McDonald Pkwy. and Holly Street, including bike lanes. [Slower speed limit, shared travel lanes for bicycles and vehicles, and parallel bicycle route on 34 th Street adopted in North Samish Way Urban Village Master Plan 2009. Improve bicycle safety and access on Forest Street between North State Street and Holly Street by reducing travel lanes from 3 to 2 and adding a bike lane. [Constructed 2009-2010] East Maple Street/Newell Flashing Pedestrian Crosswalk [Constructed 2009] Indian Street bicycle lane and sidewalk improvements [Construction 2004] Indian Street Bicycle and Pedestrian Safety improvements [TBD overlay funds + WSDOT grant funds; Construction 2012] North Samish Way Urban Village Flashing Pedestrian Crosswalks at Abbott/Samish and Consolidation/Samish [TBD non-motorized funds + WSDOT grant funds; Construction 2012]

York Improve Meador to secondary arterial status between James and State Street. [Sidewalks, bicycle lanes, new pedestrian bridge over Whatcom Creek for Maedor/Kansas/Ellis project, constructed in 2011]. Meador Avenue Bridge Rehabilitaton at Whatcom Creek. Include sidewalks in improvements. [Sidewalks, bicycle lanes, new pedestrian bridge over Whatcom Creek for Meador/Kansas/Ellis project, constructed in 2011]. Ellis Street Bridge Rehabilitation at Whatcom Creek. Include sidewalks in repairs. Improve bicycle safety and efficiency at Lakeway/Interstate 5 interchange. [Flashing pedestrian crosswalk at Lakeway/Grant constructed 2009] Improve bicycle safety and efficiency on Ellis Street between Holly Street and York Street, including bike lanes.