HUDSON, MA PUBLIC FEEDBACK SUMMARY Second Public Meeting October 26, :30pm Welcome and Rotary Trivia - 7:00-8:30pm Event

Similar documents
HUDSON, MA PUBLIC FEEDBACK SUMMARY First Public Meeting September 7, :30pm Registration - 7:00-8:30pm Event

Public Information Centre

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Bicycle Facilities Planning

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

WELCOME Public Information Centre

Memo. Ocean Avenue Corridor Design Project Public Workshop #2 Summary

El Centro Mobility Hub

York Boulevard Streetscape Master Plan

Intersection Improvement: Sturgeon Road, Silver Avenue and Murray Park Road Roundabout. Welcome. Public Information Session

City of Wausau Wausau Center Urban Design and Transportation Master Plan. Design Workshop // October 18, 2018

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Edenbrook Hill Drive Traffic Calming Study

Winnipeg Walk Bike Projects Downtown Tire Talk - Summary

CR 30 / CR 11 and CR 30 / CR 11C Intersection Improvement Project. What Should We Build?

Merrick and Memorial Neighborhood Study 5/14/2014 Public Meeting

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

EXECUTIVE SUMMARY. Vision

Introduction. North 12 th Complete Street Project Overview

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

City of Ann Arbor Pedestrian Safety & Access Task Force

Cycle Track Design Best Practices Cycle Track Sections

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

Design Public Hearing MassDOT Project # February 19, 2015 Chatham Town Hall Annex 7:00 P.M.

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

TRAFFIC CALMING TOOLBOX. For the residents of the City of Decatur, Georgia

Simulation Analysis of Intersection Treatments for Cycle Tracks

CTDOT Pedestrian and Bicycle Safety Initiatives

Eliminate on-street parking where it will allow for a dedicated bus only lane %

Public Workshop #2. September 14, 2016

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Observations and Ideas: Toomer s Corner Streetscape Improvements

CLOSED. Highlights of the Final Concept Design:

By: Bill Baranowski, PE TRAFFIC CALMING EXAMPLES IN SUGARHOUSE, DAYBREAK, AND WEST JORDAN CITY

Monterey Road Complete Streets

INTERSECTION DESIGN. Bicycle Facility Workshop Intersections 4-1

South Park Street Bicycle Lane Improvements. Public Engagement. November 2017

Frequently Asked Questions

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS

Community Task Force November 15, 2017

Thank you for attending

Raymond Avenue: Rightsizing Improved Safety and Pedestrian Experience

Kennedy Plaza and Providence Downtown Transit Connector PUBLIC MEETING. Stakeholder Meeting #1 October 24, 2016

Alternative Traffic Calming Methods

City of Wilsonville 5 th Street to Kinsman Road Extension Project

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010

CURBSIDE ACTIVITY DESIGN

Roundabouts A Case Study and Brief Overview

Major Bike Routes 102 Avenue Workshop April 21, 2015

Front and Myrtle Improvement Project

Route 7 Corridor Study

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

TRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project.

Dec 2, Dear Tri Ong, Sam Woods, and Scott Kubly,

Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017

Austin Avenue Bridges Project. Public Meeting Summary

Draft North Industrial Area-Wide Traffic Plan

ALBERTA AVENUE WHAT WE HEARD REPORT BUILDING GREAT NEIGHBOURHOODS

$ 12" $#&%$ 86.) *1! *1 /3 )00, , (1* Neighborhood Traffic Calming Part 3 Solutions Bradley William Yarger, P.E.

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

Palou Complete Street Project Barneveld Avenue to Crisp Road Project overview and concept design Community Meeting #2 May 13, 2015

North Shore Transportation Improvement Strategy

Cross Street Corridor Non-Motorized Enhancement Project Project Description

Sherwood Drive Traffic Circle

MARTIN LUTHER KING JR. WAY

Lessons Learned from Cycle Tracks (Class IV Bikeways) Design Practice

50 Avenue S.W. Corridor Study Glenmore Aquatic Centre Drop-In Event

Off-road Trails. Guidance

PEDESTRIAN ACTION PLAN

Albany Shaker Road Corridor Study Public Meeting # 2

Riverside Drive Complete Streets Project 3 rd Community Meeting. March 26, 2015

STREETSCAPE CONCEPT PLAN

The Wiggle Route in Context

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Meade Street Bridge Design Alternative Study

Tonight is for you. Learn everything you can. Share all your ideas.

Queensboro Bridge Bus Priority Study: Summary of Recommendations. Presentation to Manhattan Community Board 8 May 4, 2011

Designing for Pedestrian Safety

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

Providence Downtown Transit Connector STAKEHOLDER MEETING #2. Stakeholder Meeting #1 October 24, 2016

Capital Metro Downtown Multimodal Station

Chapter 2: Standards for Access, Non-Motorized, and Transit

Monroe Street Reconstruction Business Focus Group Notes July 18, 2016, HotelRED

CHAPTER 3: Vision Statement and Goals

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

Advancing Transportation Choices in Des Moines. MPO Environmental Roundtable January 9, 2018

Community Task Force March 14, 2018

Active Transportation Facility Glossary

City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines

How to Develop a Pedestrian Safety Action Plan

League City Parkway at Brittany Lakes/Fennigan Intersection Evaluation/ Traffic Study. Second Public Meeting February 6, 2018

Las Tunas Downtown Revitalization City Council Study Session. December 1, :00 p.m. Live Oak Park Community Center

Plant City Walk-Bike Plan

Technical Working Group November 15, 2017

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

Transcription:

MAIN STREET ROTARY HUDSON, MA PUBLIC FEEDBACK SUMMARY Second Public Meeting October 26, 2016-6:30pm Welcome and Rotary Trivia - 7:00-8:30pm Event The Second Public Meeting for the redesign of the Main Street Rotary was held on Wednesday, October 26 th, 2016, from 7:00 8:00pm at the Hudson Senior Center (29 Church Street) Lower Level Meeting Room. Fifteen members of the public attended the event to review three concept designs for the rotary area. The main focus of the second public meeting was sharing the three design options generated from the solicited community feedback and analysis of site conditions of the area. Meeting Procedure Prior to the meeting, the public was welcomed with an entirely rotary themed trivia questions including designs, history and songs. A sign-in sheet and snacks was also available for the public to enjoy. Jack Hunter, Town of Hudson, opened the meeting with an overview of the project s development and Town expectations from the process. Jef Fasser and Ale Echandi, BSC Group, then provided an overview of the work completed to date including initiatives to solicit public input and how feedback from the public has informed the three concept design options, which includes: a T-Intersection, a Single Lane Option and a Double Lane Option. The concepts were presented by Jef Fasser who highlighted the important urban design features within each of the designs including parking counts, pedestrian improvements, potential green space area and connections to surrounding downtown areas. Ed Mayer from Kittelson & Associates, Inc., further provided details about the engineering and traffic flow for each of the three rotary designs. Guided by Daphne Politis, the public was engaged in reviewing and providing additional feedback on the design options. Three stations were set up for each design with an overview of the key features, advantages and disadvantages for each option. During the first step if the public engagement, the public was asked to carefully review each of the designs and provide any additional feedback they felt was absent from the provided feedback for each design options. Next, participant noted what feedback they would like to prioritize from each of the designs. Everyone was provided fifteen small dot stickers, five for each design, to note their feedback priorities. Concluding the meeting, each participant was asked to select their preferred design option noting it with a star sticker. The Single Lane Option was the favorite receiving nine of potentially fifteen stars.

The following is a summary of highlights of the public s response to the three design options. Participants preferred the Single Lane Option for a number reasons including the following: o maintains Rotary as a feature in the Downtown and provides opportunities to use the Rotary as a way to make the Downtown unique (including opportunities for landscaping and other attractive features) o improves automobile safety by reducing conflict points and crash severity o provision of on-street parking o increases pedestrian safety by increasing visibility, providing well-defined pedestrian spaces and additional traffic islands that will result in traffic calming In general, participants identified the following priorities: o Preserving the Rotary as a feature in the Downtown and increasing its aesthetic appeal (through landscaping and other attractive elements) o Improving automobile safety by reducing conflict types and crash severity o Pedestrian safety (crosswalks, increased pedestrian visibility, minimizing number of travel lanes, reducing overall traffic distance, traffic calming) o Bicycle accommodation (e.g. bike lanes) o Minimize sign pollution (e.g. need for multiple signs for pedestrian crossing and rotary directional signage) The following is a more detailed documentation of the public s on the three design options and preferences: Feedback on Design Options 1. T-Intersection Key Features Include: - 56 on-street parking spaces - 1 dots - Opportunities for an expanded sidewalk on both sides of the street - 5 dots - Opportunities for large, contiguous and enhanced public space - 3 dots - OTHER KEY FEATURES: (additional public input) Advantages: - creates opportunities for placemaking by providing public spaces for community gatherings, outdoor seating - 3 dots - landscaped areas on both sides of Main Street - 3 dots - enhances pedestrian access, safety, and visibility by reducing the overall crossing distance - 1 dot - conventional intersection treatment familiar to all drivers - 1 dot - OTHER ADVANTAGES: (additional public input) o Closest design to original traffic patterns in Hudson o east coast greenway recommends going through rotary this this would accommodate this use

Disadvantages: - removes the rotary as an iconic feature of the downtown - 9 dots - results in decreased capacity and increased vehicle queues compared to existing conditions - 1 dot - increases vehicle delays as a result of restrictions to free flow movements - 2 dots - does not reduce conflict types or improve the crash severity - 8 dots - OTHER DISADVANTAGES: (additional public input) o Space for bike lanes - 4 dots o It wouldn t be much of a Rotary project within no rotary would it? o No o No traffic lights o Don t like to lose the Rotary o Bump outs maintenance nightmare o Too many lefts o What about Felton Street? 2 choices now/only one choice (with this option) o Most expensive option - 4 dots 2. Single Lane Option (R1) Key Features Include: - 53 on-street parking spaces - 5 dots - Opportunities for streetscape beautification and landscaping - 1 dot - Improved pedestrian conditions - Maintaining the Rotary within the Downtown - 7 dots - OTHER KEY FEATURES: (additional public input) o Does library crosswalk disappear? Should stay on all designs! Advantages: - enhances pedestrian safety by minimizing the number of travel lanes and reducing the overall crossing distance 5 dots - increases pedestrian visibility with raised crosswalks and well-defined pedestrian spaces - 3 dots - provides opportunities to use rotary as a way to make Downtown unique 4 dots - provides opportunities for landscaping and other attractive features 3 dots - reduces travel speeds through and into the intersection - improves intersection safety by reducing conflict points and crash severity 9 dots - reduces vehicle delay, even in night time conditions - additional traffic islands will result in traffic calming 3 dots - OTHER ADVANTAGES: (additional public input) o Yes best Disadvantages: - results in long queues during portions of the peak hour as a result of a single travel lane - queuing of vehicles extends past Fire Station in AM and PM - potential for sign pollution from pedestrian crossing signs and rotary directional signs 2 dots - no large contiguous pedestrian/green space

- OTHER DISADVANTAGES: (additional public input) o Should look at queuing with fully built out Highland Commons o Felton street not wide enough to park on both sides o Left turn on South Street o Bikes have to enter traffic lane as it narrows. How is that marked for traffic and bikes? o Retain rotary s simple design o Bump out prevents left on South St while 85 South continues o Felton street to narrow for parking on both sides to allow sire truck down 3. Dual Lane Option (R2) Key Features Include: - 52 on-street parking spaces - 1 dot - Opportunities for streetscape beautification and landscaping - 1 dot - Improved pedestrian conditions - 2 dots - Improved traffic operations - Preserving Rotary Design within the Downtown Hudson - 1 dot - OTHER KEY FEATURES: (additional public input) o On street parking should not be a consideration. Purchase (air-right?) vacant Land and build 2 level parking garage. Advantages: - enhances pedestrian safety by reducing the overall crossing distance - 1 dot - increases pedestrian visibility with raised crosswalks and well-defined pedestrian spaces - 5 dots - provides opportunities to use rotary as a way to make Downtown unique - provides opportunities for landscaping and other attractive features - 3 dots - reduces travel speeds through and into the intersection - 5 dots - improves intersection safety by altering conflict types and reducing crash severity - reduces vehicle delay, even in night time conditions - increases vehicle capacity and limits queues - OTHER ADVANTAGES: (additional public input) Disadvantages: - allows for slightly fewer on-street parking spaces compared to other options - results in long queues during peak hour (although shorter than Option R1) - 1 dot - potential for sign pollution from pedestrian crossing signs and rotary directional signs - 12 dots - no large contiguous pedestrian/green space - OTHER DISADVANTAGES: (additional public input) o Bump puts are a DPW nightmare and limits parking spaces in the winter (snow) o Not enough room 85 North and 62 West to move to left or right o Not intuitive to what will happen with land division - 1 dot o More about ground sign o Left turn on South Street! o No o Rotary should be used at current light South of McDonalds o Potential for sign

Preferred Design Option o People drive in the right turn lane, will not yield o 2 lanes enter, 1 lane leaves! o 2 side parking won t work on Felton (unless you re a smurf) o Lane change in Rotary o Bump out prevents lefts on to South Street o Felt Street to narrow for parking on both sides and to allow for fire trucks T-Intersection - 1 star Single Land Option (R1) 9 stars Dual Lane Option (R2) - 5 starts Media Coverage: Event Photos:

Sign-In Sheet: Feedback on Design Options:

Section of Favorite Concept Design: