Similar documents

OKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 04/16/15 AWARD DATE = 05/04/15

OKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 06/18/15 AWARD DATE = 07/06/15

OKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 03/16/17 AWARD DATE = 04/10/17


OKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 11/16/17 AWARD DATE = 12/04/17

*REVISED-AWARDED CALL ORDER /09/13



OKLAHOMA DEPARTMENT OF TRANSPORTATION



OKLAHOMA DEPARTMENT OF TRANSPORTATION DATE : October 18, 2000 BID OPENING OF October 19, 2000

OKLAHOMA DEPARTMENT OF TRANSPORTATION DATE : October 20, 2000 BID OPENING OF October 19, 2000



OKLAHOMA DEPARTMENT OF TRANSPORTATION. FFY-2018 through FFY-2021 Asset Preservation Plan

Bowhunter Observation Survey

Bowhunter Observation Survey

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FFY 2018

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FFY 2019

OKLAHOMA DEPARTMENT OF WILDLIFE CONSERVATION FISHERIES DIVISION

OKLAHOMA DEPARTMENT OF WILDLIFE CONSERVATION FISHERIES DIVISION

Estimated 2014 ARC-CO Wheat Payments Kansas and Oklahoma 1

Asphalt Concrete Plants With Expired or Nearly Expired Scale Certifications (Scales must be recertified every six months)

Club County Steer Heifer Total Stall Space Barn Column Stall # Stilwell FFA Adair 9 7 Total Adair F-150 E Alfalfa County 4-H Alfalfa

DAVID JAMESON 2014 BIG-GAME REPORT. By Erik Bartholomew, Big-Game Biologist and Emily Clark, Big-Game Technician OUTDOOR OKLAHOMA

Apparent Bids for Letting of January 20, 2017

2017 DIVISIONS 1ST GRADE

FDOT Treasure Coast Traffic Report

Southeast Volusia Coastal Projects Update

Check Out the Discounts for OU Employees at These Participating Fitness Centers!

LOCAL ASSOCIATIONS 23-Aug-16 Page 1 of 2 Sport Last First Name of Local City/Area of State

DIVISION /16 BD-5114AC TRANSYLVANIA Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR 1143

LINE ITEM REPORT 9/18/2009

Highway Construction

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.

FDOT Treasure Coast Traffic Report

2011 BIG GAME REPORT

FDOT Treasure Coast Traffic Impact Report

HIR on Oklahoma Turnpikes

Deck Rehabilitation and Steel Repairs Maurice J. Tobin Memorial Bridge

Decreasing Distribution and Current Status of the Arkansas River Shiner, Notropis girardi, in the Rivers of Oklahoma and Kansas

ODOT Major Construction, Bikeways and Enhancements Report for Clermont County. (State Fiscal Years 2007 to 2010)

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

RADCLIFF/ELIZABETHTOWN METROPOLITAN PLANNING ORGANIZATION FISCAL YEAR 2016 OBLIGATIONS REPORT JULY 1, JUNE 30, 2016

ODOT DISTRICT CONSTRUCTION PROGRAM MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT DEPUTY DIRECTOR

UPCOMING CLUB EVENTS:

2018 ROAD MAINTENANCE PROGRAM

03/16 BD-5114AC 14 TRANSYLVANIA Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR 1143

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

ENERGY SECTOR ROADWAY REPAIR PROJECT. August 15, 2013 Industry Workshop

Weymouth - Abington Route 18 Widening and Reconstruction Project File No

FDOT Treasure Coast Traffic Impact Report

Taylor Road Resurfacing Project

2013 Oklahoma Class C Football playoffs

STAGE #3 TRANSITION 1 at Camp Keystone

SR 2108-A12 Forbes Avenue Betterment. March 1, 2018

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

The Richland County Transportation Penny Program. September 21, 2015

INCOG Board of Directors

Update January 4, 2016

information, please contact the District 9 Offices at or

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

OKLAHOMA SECONDARY SCHOOL ACTIVITIES ASSOCIATION P.O. Box 14590, Oklahoma City, Oklahoma

STIP Scoping and Design Projects November Administrative Amendment

A Publication of Central Oklahoma Classic Chevy Club May 2017

2019 Federal Transportation Improvement Program

Culpeper District. Albemarle County Monthly Report October, 2011

HIGHWAY CAPITAL IMPROVEMENT PLAN

Advanced Construction Techniques. Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

GOAL: Collect product flowing over Onalaska spillway to protect downstream resources C&C 250 Y Y. Looking upstream at spillway

M E M O R A N D U M. The Bicycle - Pedestrian Advisory Committee will hold a regular meeting on WEDNESDAY, MARCH 16, 2016, AT 9:00 A.M.

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

TO: CHEER COACHES FROM: Amy J. Cassell RE: STATE CHAMPIONSHIP CHEER COMPETITION FACILITY INFORMATION DATE: SEPTEMBER 22, 2018

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

Chickasaw Nation Subsurface Database March 2019

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

SFY Transportation Improvement Program Highway and Bikeway Element Amendments

Distribution of Spring Diaptomids (Copepoda: in Oklahoma

TO: CHEER COACHES FROM: Amy J. Cassell RE: STATE CHAMPIONSHIP CHEER COMPETITION FACILITY INFORMATION DATE: SEPTEMBER 22, 2014

Mid America Youth Basketball Oklahoma City March 12-13, 2005

FY Regional Transportation Improvement Program

COUNTY OF HUNTERDON DEPARTMENT OF PUBLIC WORKS ROADS, BRIDGES & ENGINEERING PROJECT SUMMARY

TITLE 800. DEPARTENT OF WILDLIFE CONSERVATION CHAPTER 10. SPORT FISHING RULES SUBCHAPTER 1. HARVEST AND POSSESSION LIMITS

Project Status Update

EXHIBIT A. Revised List of Projects Originally Approved by the Commission in Minute Order Dated November 19, 2009.

ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement.

FDOT Treasure Coast Traffic Impact Report

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR VAUGH WILSON, P.E., DISTRICT DEPUTY DIRECTOR

Mileage One-Way (Remember, river left is the left side of the river headed downstream.)

McAlester Athletic News 4/15/17 BASEBALL VS PRYOR H 7-13 L

Non-Motorized Overpass at SR 5/US1

City of Conway Mayor s Office 1201 Oak Street Conway, AR Invitation and Bid

Buckeye Mountaineer Conference Directions

RIDE III PROPOSED PROJECTS. April 2015

ROAD CLOSURES!! JACK JONES ROAD, from Boyd Cowart Road to N. Hollandtown Road. Closed due to bridge down. Road is open to local traffic only.

Transcription:

AWARDED: CALL ORDER: 015 PROJECT NO.:STP-205C(038)3P J.P. NUMBER:3110804 BAMS NO: 150045 CALENDAR DAYS ALLOTTED: 30 COUNTY: BECKHAM HIGHWAY NO.: I-40B LENGTH: 1.6200 MILES LOCATION : I-40B: FROM THE NORTH I-40 JUNCTION, EXTEND WEST. CONTRACT AMOUNT : $ 570,519.01 CONTRACTOR : CASWELL CONTRACTING, INC. ELK CITY OK AWARDED: CALL ORDER: 020 PROJECT NO.:STP-209C(027)3P J.P. NUMBER:2961704 BAMS NO: 150005 CALENDAR DAYS ALLOTTED: 60 COUNTY: CANADIAN HIGHWAY NO.: SH-66 LENGTH: 4.0800 MILES LOCATION : SH-66: FROM 6.0 MILES EAST OF US-81, EXTEND EAST. CONTRACT AMOUNT : $ 1,234,567.00 CONTRACTOR : T.J. CAMPBELL CONSTRUCTION. CO. AWARDED: CALL ORDER: 030 PROJECT NO.:SBR-210C(026)SB J.P. NUMBER:2958304 BAMS NO: 150084 CALENDAR DAYS ALLOTTED: 120 COUNTY: CARTER HIGHWAY NO.: SH-53 LENGTH: 0.0000 MILES DESCRIPTION : BRIDGE REHABILITATION LOCATION : SH-53: OVER THE WASHITA RIVER, 8.93 MILES EAST OF I-35. CONTRACT AMOUNT : $ 1,345,186.98 CONTRACTOR : PBX CORPORATION SAPULPA OK

AWARDED: CALL ORDER: 040 PROJECT NO.:HSIPG-214B(030)AG J.P. NUMBER:2929204 BAMS NO: 150085 CALENDAR DAYS ALLOTTED: 90 COUNTY: CLEVELAND HIGHWAY NO.: CITY STREET LENGTH: 0.0000 MILES DESCRIPTION : TRAFFIC SIGNAL LOCATION : CITY STREETS: AT THE INTERSECTION OF ALAMEDA STREET AND FINDLAY AVENUE IN NORMAN. CONTRACT AMOUNT : $ 423,800.42 CONTRACTOR : TRAFFIC SIGNALS, INC. EDMOND OK AWARDED: CALL ORDER: 070 PROJECT NO.:SSP-219C(039)RW J.P. NUMBER:2707507 BAMS NO: 150088 CALENDAR DAYS ALLOTTED: 180 COUNTY: CREEK HIGHWAY NO.: US-75A LENGTH: 0.0000 MILES DESCRIPTION : RIGHT-OF-WAY CLEARANCE LOCATION : US-75A: FROM 1.9 MILES NORTH OF THE OKMULGEE COUNTY LINE, EXTEND NORTH. CONTRACT AMOUNT : $ 33,474.40 CONTRACTOR : ROBIN HAUSNER HOUSE MOVERS & DEMOLITION, SPERRY OK AWARDED: CALL ORDER: 080 PROJECT NO.:NHPP-017N(225)SS J.P. NUMBER:1767132 BAMS NO: 150089 CALENDAR DAYS ALLOTTED: 210 COUNTY: DEWEY HIGHWAY NO.: US-270 LENGTH: 3.9200 MILES DESCRIPTION : GRADE, DRAIN, AND SURFACE LOCATION : US-270: FROM 1.7 MILES SOUTHEAST OF SH-51, EXTEND SOUTHEAST. CONTRACT AMOUNT : $ 8,009,586.69 CONTRACTOR : CORNELL CONST. CO., INC. CLINTON OK

AWARDED: CALL ORDER: 090 PROJECT NO.:CIRB-124C(113)RB J.P. NUMBER:2486804 BAMS NO: 150090 CALENDAR DAYS ALLOTTED: 140 COUNTY: GARFIELD HIGHWAY NO.: COUNTY ROAD LENGTH: 5.9840 MILES DESCRIPTION : GRADE, DRAIN, AND SURFACE LOCATION : COUNTY ROAD (EW-40): FROM 78TH ST (NS-294) IN BRECKINRIDGE, EXTEND EAST. CONTRACT AMOUNT : $ 5,120,090.80 CONTRACTOR : THE CUMMINS CONSTRUCTION CO., INC. ENID OK AWARDED: CALL ORDER: 100 PROJECT NO.:STP-125C(209)SS J.P. NUMBER:2706104 BAMS NO: 150091 CALENDAR DAYS ALLOTTED: 180 COUNTY: GARVIN HIGHWAY NO.: US-77 LENGTH: 0.2830 MILES LOCATION : US-77: OVER OWL CREEK, 0.50 MILES SOUTH OF SH-145. CONTRACT AMOUNT : $ 2,601,501.30 CONTRACTOR : OBC, INC. EDMOND OK AWARDED: CALL ORDER: 120 PROJECT NO.:STP-226D(017)CI J.P. NUMBER:2934304 BAMS NO: 150093 CALENDAR DAYS ALLOTTED: 120 COUNTY: GRADY HIGHWAY NO.: COUNTY ROAD LENGTH: 0.2360 MILES LOCATION : COUNTY ROAD (NS-296): OVER ROARING CREEK, 0.50 MILES NORTH OF SH-19. CONTRACT AMOUNT : $ 954,248.90 CONTRACTOR : SEWELL BROS., INC.

AWARDED: CALL ORDER: 130 PROJECT NO.:CIRB-127C(187)RB J.P. NUMBER:2841904 BAMS NO: 150094 CALENDAR DAYS ALLOTTED: 120 COUNTY: GRANT HIGHWAY NO.: COUNTY ROAD (EW-09) LENGTH: 5.6150 MILES DESCRIPTION : GRADE, DRAIN, AND SURFACE LOCATION : COUNTY ROAD (EW-09): FROM 0.60 MILES EAST OF SH-132, EXTEND EAST. CONTRACT AMOUNT : $ 3,821,180.30 CONTRACTOR : THE CUMMINS CONSTRUCTION CO., INC. ENID OK AWARDED: CALL ORDER: 140 PROJECT NO.:SBR-227B(001)SB J.P. NUMBER:2914204 BAMS NO: 150095 CALENDAR DAYS ALLOTTED: 300 SBR-227B(013)SB 2914205 COUNTY: GRANT HIGHWAY NO.: US-81 LENGTH: 0.2520 MILES DESCRIPTION : BRIDGE REHABILITATION LOCATION : US-81: OVER POND CREEK 3.8 MILES NORTH OF US-60, AND OVER OSAGE CREEK 4.4 MILES NORTH OF US-60. CONTRACT AMOUNT : $ 2,487,956.55 CONTRACTOR : BRIDGES, INC. DBA SCUDDER BRIDGE CO. NEWTON KS AWARDED: CALL ORDER: 160 PROJECT NO.:SSP-231C(016)SS J.P. NUMBER:2310511 BAMS NO: 150097 CALENDAR DAYS ALLOTTED: 60 COUNTY: HASKELL HIGHWAY NO.: MULTIPLE LOCATIONS LENGTH: 0.0000 MILES DESCRIPTION : BRIDGE WATER PROOF SEAL LOCATION : US-69/SH-9/SH-53: AT MULTIPLE LOCATIONS IN DIVISION I. CONTRACT AMOUNT : $ 64,615.50 CONTRACTOR : GARY A. CRAIN, INC. PRAGUE OK

AWARDED: CALL ORDER: 165 PROJECT NO.:STP-233B(020)3P J.P. NUMBER:2965104 BAMS NO: 150061 CALENDAR DAYS ALLOTTED: 45 COUNTY: GREER HIGHWAY NO.: US-283 LENGTH: 3.8400 MILES LOCATION : US-283/SH-6: FROM 0.22 MILES NORTH SH-19, EXTEND NORTH. CONTRACT AMOUNT : $ 1,295,579.43 CONTRACTOR : CORNELL CONST. CO., INC. CLINTON OK AWARDED: CALL ORDER: 170 PROJECT NO.:STP-135C(135)SS J.P. NUMBER:2705804 BAMS NO: 150098 CALENDAR DAYS ALLOTTED: 210 COUNTY: JOHNSTON HIGHWAY NO.: SH-22 LENGTH: 0.3210 MILES LOCATION : SH-22: OVER BUTCHER PEN CREEK, 4.3 MILES WEST OF SH-78. CONTRACT AMOUNT : $ 2,489,951.32 CONTRACTOR : L & N BRIDGE, LLC ANTLERS OK AWARDED: CALL ORDER: 210 PROJECT NO.:NHPP-242N(036)RW J.P. NUMBER:2186009 BAMS NO: 150102 CALENDAR DAYS ALLOTTED: 180 COUNTY: LOGAN HIGHWAY NO.: SH-33 LENGTH: 0.0000 MILES DESCRIPTION : RIGHT-OF-WAY CLEARANCE LOCATION : SH-33 (NOBLE AVE): FROM 11TH STREET IN GUTHRIE, EXTEND EAST. CONTRACT AMOUNT : $ 339,534.00 CONTRACTOR : M & M WRECKING, INC. BLANCHARD OK

AWARDED: CALL ORDER: 220 PROJECT NO.: STP-142C(179)AG J.P. NUMBER:2664504 BAMS NO: 150103 CALENDAR DAYS ALLOTTED: 30 COUNTY: LOGAN HIGHWAY NO.: COUNTY ROAD LENGTH: 1.0000 MILES LOCATION : COUNTY ROAD (EW-87/CHARTER OAK ROAD): FROM KELLY AVE, EXTEND EAST IN EDMOND. CONTRACT AMOUNT : $ 377,879.20 CONTRACTOR : ATLAS PAVING COMPANY AWARDED: CALL ORDER: 230 PROJECT NO.:NHPP-244N(032)3P J.P. NUMBER:3056404 BAMS NO: 150104 CALENDAR DAYS ALLOTTED: 30 COUNTY: MCCLAIN HIGHWAY NO.: SH-9 LENGTH: 1.7300 MILES LOCATION : SH-9: FROM US-277, EXTEND EAST. CONTRACT AMOUNT : $ 495,833.50 CONTRACTOR : T.J. CAMPBELL CONSTRUCTION. CO. AWARDED: CALL ORDER: 240 PROJECT NO.:STP-245C(029)CI J.P. NUMBER:2862504 BAMS NO: 150105 CALENDAR DAYS ALLOTTED: 120 COUNTY: MCCURTAIN HIGHWAY NO.: COUNTY ROAD (EW-209) LENGTH: 0.1610 MILES LOCATION : COUNTY ROAD (EW-209): OVER HOLLEY CREEK, 3.30 MILES WEST OF US-70. CONTRACT AMOUNT : $ 565,103.95 CONTRACTOR : HUB CONSTRUCTION, INC. BOSWELL OK

AWARDED: CALL ORDER: 260 PROJECT NO.:STP-248D(003)CI J.P. NUMBER:2930404 BAMS NO: 150107 CALENDAR DAYS ALLOTTED: 90 COUNTY: MARSHALL HIGHWAY NO.: COUNTY ROAD LENGTH: 0.2450 MILES LOCATION : COUNTY ROAD (NS-345): OVER A TRIBUTARY OF THE RED RIVER, 2.6 MILES SOUTH OF SH-32. CONTRACT AMOUNT : $ 675,444.08 CONTRACTOR : RRY SERVICES, LLC STILLWATER OK AWARDED: CALL ORDER: 270 PROJECT NO.:STP-155A(878)AG J.P. NUMBER:1782705 BAMS NO: 150108 CALENDAR DAYS ALLOTTED: 270 COUNTY: OKLAHOMA HIGHWAY NO.: CITY STREETS LENGTH: 0.2230 MILES DESCRIPTION : INTERSECTION MODIFICATION LOCATION : CITY STREETS: AT THE INTERSECTION OF MACARTHUR AVENUE AND N.W. 50TH STREET IN WARR ACRES. CONTRACT AMOUNT : $ 3,043,565.50 CONTRACTOR : SCHWARZ PAVING CO., INC. AWARDED: CALL ORDER: 290 PROJECT NO.:STPG-155F(723)AG J.P. NUMBER:2232107 BAMS NO: 150110 CALENDAR DAYS ALLOTTED: 85 COUNTY: OKLAHOMA HIGHWAY NO.: MULTIPLE LENGTH: 0.0000 MILES DESCRIPTION : TRAFFIC SIGNALS LOCATION : I-40/CITY STREETS: AT MULTIPLE LOCATIONS IN OKLAHOMA CITY. CONTRACT AMOUNT : $ 220,635.50 CONTRACTOR : TRAFFIC & LIGHTING SYSTEMS, LLC

AWARDED: CALL ORDER: 300 PROJECT NO.:STP-155A(646)AG J.P. NUMBER:2554704 BAMS NO: 150111 CALENDAR DAYS ALLOTTED: 330 COUNTY: OKLAHOMA HIGHWAY NO.: US-77 LENGTH: 0.6780 MILES DESCRIPTION : INTERSECTION MODIFICATION AND TRAFFIC SIGNAL LOCATION : US-77 (BROADWAY EXTENSION): AT THE INTERSECTION OF 33RD STREET IN EDMOND. CONTRACT AMOUNT : $ 5,144,114.00 CONTRACTOR : ALLEN CONTR., INC/SHELL CONST., INC (JV) AWARDED: CALL ORDER: 320 PROJECT NO.:STPG-255B(086)AG J.P. NUMBER:2929604 BAMS NO: 150113 CALENDAR DAYS ALLOTTED: 90 COUNTY: OKLAHOMA HIGHWAY NO.: CITY STREETS LENGTH: 5.0970 MILES DESCRIPTION : SAFETY IMPROVEMENT (GUARDRAIL) LOCATION : CITY STREETS: ON HEFNER ROAD, FROM THE BROADWAY EXTENSION, EXTEND EAST IN OKLAHOMA CITY. CONTRACT AMOUNT : $ 480,823.46 CONTRACTOR : ACTION SAFETY SUPPLY CO. AWARDED: CALL ORDER: 325 PROJECT NO.:HSIPG-255N(139) J.P. NUMBER:2985804 BAMS NO: 150153 CALENDAR DAYS ALLOTTED: 90 COUNTY: OKLAHOMA HIGHWAY NO.: CITY STREET (AIR DEP LENGTH: 1.0110 MILES DESCRIPTION : INTERSECTION MODIFICATION AND TRAFFIC SIGNAL LOCATION : CITY STREET (AIR DEPOT BLVD): AT THE INTERSECTION OF SE 29TH STREET AND I-40 IN MIDWEST CITY. CONTRACT AMOUNT : $ 2,608,230.00 CONTRACTOR : SILVER STAR CONSTRUCTION CO., INC. MOORE OK

AWARDED: CALL ORDER: 330 PROJECT NO.:STP-255A(133)AG J.P. NUMBER:3000204 BAMS NO: 150114 CALENDAR DAYS ALLOTTED: 120 COUNTY: OKLAHOMA HIGHWAY NO.: CITY STREETS LENGTH: 1.9200 MILES LOCATION : CITY STREETS: ON SOONER ROAD, FROM S.E. 29TH STREET EXTEND NORTH IN MIDWEST CITY AND DEL CITY. CONTRACT AMOUNT : $ 2,140,232.00 CONTRACTOR : T.J. CAMPBELL CONSTRUCTION. CO. AWARDED: CALL ORDER: 335 PROJECT NO.:HSIPIG-255N(269)TR J.P. NUMBER:3082804 BAMS NO: 150152 CALENDAR DAYS ALLOTTED: 180 STPY-255N(321)DC 3082805 COUNTY: OKLAHOMA HIGHWAY NO.: I-40/I-44 LENGTH: 0.0000 MILES DESCRIPTION : SIGNING AND HIGH FRICTION SURFACE COURSE LOCATION : I-40/I-44: I-40 AT TOWN CENTER DRIVE AND AIR DEPOT BLVD. I-44 AT SH-152. CONTRACT AMOUNT : $ 1,696,206.00 CONTRACTOR : PBX CORPORATION SAPULPA OK AWARDED: CALL ORDER: 340 PROJECT NO.:NHPPI-4000(004)SS J.P. NUMBER:2895204 BAMS NO: 150115 CALENDAR DAYS ALLOTTED: 45 STP-256B(021)SS 3065004 COUNTY: OKMULGEE HIGHWAY NO.: COUNTY ROAD LENGTH: 0.0000 MILES DESCRIPTION : BRIDGE PAINTING LOCATION : US-266/COUNTY RD (NS-399): NS-399 OVER I-40, 10 MI E. OF THE OKFUSKEE C/L. US-266, OVER COAL CREEK, 0.48 MI E. OF US-62. CONTRACT AMOUNT : $ 297,000.00 CONTRACTOR : POSEIDON CONSTRUCTION, INC. CLEARWATER FL

AWARDED: CALL ORDER: 350 PROJECT NO.:STP-261N(029)3P J.P. NUMBER:3133304 BAMS NO: 150036 CALENDAR DAYS ALLOTTED: 75 COUNTY: PITTSBURG HIGHWAY NO.: US-69 LENGTH: 3.2300 MILES LOCATION : US-69: FROM US-69B, EXTEND NORTH. CONTRACT AMOUNT : $ 859,702.00 CONTRACTOR : JOB CONSTRUCTION CO., INC. POTEAU OK AWARDED: CALL ORDER: 360 PROJECT NO.:MC-262B(021) J.P. NUMBER:3083404 BAMS NO: 140374 CALENDAR DAYS ALLOTTED: 90 COUNTY: PONTOTOC HIGHWAY NO.: SH-19 LENGTH: 0.5880 MILES DESCRIPTION : INTERSECTION MODIFICATION LOCATION : SH-19: AT THE INTERSECTION OF RANGELINE ROAD, 1.0 MILE WEST OF JUNCTION SH-19/SH-3 IN ADA. CONTRACT AMOUNT : $ 617,671.80 CONTRACTOR : SCHIRALLI CONSTRUCTION CORP. WILSON OK AWARDED: CALL ORDER: 370 PROJECT NO.:SSP-4400(002)SS J.P. NUMBER:3091404 BAMS NO: 150117 CALENDAR DAYS ALLOTTED: 120 SSP-272N(106)SS 3091504 SSP-272N(107)SS 3091604 SSP-272N(108)SS 3091804 COUNTY: ROGERS HIGHWAY NO.: MULTIPLE LOCATIONS LENGTH: 6.9590 MILES DESCRIPTION : RESURFACE (UTBWC) LOCATION : I-44/I-244/US-169/SH-51: AT MULTIPLE LOCATIONS IN DIVISON VIII. OTHERS CONTRACT AMOUNT : $ 5,195,474.88 CONTRACTOR : APAC-CENTRAL, INC. TULSA OK

AWARDED: CALL ORDER: 380 PROJECT NO.:SSR-168N(214)SR J.P. NUMBER:2827705 BAMS NO: 150118 CALENDAR DAYS ALLOTTED: 120 COUNTY: SEQUOYAH HIGHWAY NO.: I-40 LENGTH: 5.6330 MILES DESCRIPTION : PAVEMENT REHABILITATION (CONCRETE) LOCATION : I-40: FROM MILE MARKER 298, EXTEND EAST TO MILE MARKER 303. CONTRACT AMOUNT : $ 675,594.34 CONTRACTOR : TRI-STAR CONSTRUCTION ARKANSAS, LLC CATOOSA OK AWARDED: CALL ORDER: 390 PROJECT NO.:STP-169D(191)CI J.P. NUMBER:2835004 BAMS NO: 150119 CALENDAR DAYS ALLOTTED: 90 COUNTY: STEPHENS HIGHWAY NO.: COUNTY ROAD LENGTH: 0.3400 MILES LOCATION : COUNTY ROAD (NS-274): OVER ROCK CREEK, 5.5 MILES SOUTH OF SH-7 EAST. CONTRACT AMOUNT : $ 767,742.58 CONTRACTOR : RRY SERVICES, LLC STILLWATER OK AWARDED: CALL ORDER: 400 PROJECT NO.:NHPP-272N(077) SS J.P. NUMBER:2793904 BAMS NO: 140376 CALENDAR DAYS ALLOTTED: 580 COUNTY: TULSA HIGHWAY NO.: US-169 LENGTH: 1.2110 MILES LOCATION : US-169: OVER BIRD CREEK, BIRD CREEK OVERFLOW, AND N. 56TH STREET, 5.0 MILES NORTH OF I-244. CONTRACT AMOUNT : $ 32,753,940.32 CONTRACTOR : BECCO CONTRACTORS, INC. TULSA OK

LETTING DATE = 03/19/15 REJECTED: CALL ORDER: 250 PROJECT NO.:SBR-146N(134)SB J.P. NUMBER:2828604 BAMS NO: 150106 CALENDAR DAYS ALLOTTED: 90 COUNTY: MCINTOSH HIGHWAY NO.: I-40 LENGTH: 0.0000 MILES DESCRIPTION : BRIDGE REHABILITATION LOCATION : I-40: OVER PIERCE ROAD, 9.31 MILES EAST OF THE OKMULGEE COUNTY LINE. CONTRACT AMOUNT : CONTRACTOR :

LETTING DATE = 03/19/15 THE TOTAL AMOUNT OF AWARDED CONTRACTS: $ 89,406,985.71 ================ THE TOTAL AMOUNT OF REJECTED CONTRACTS: $ 637,708.50 ================ THE TOTAL AMOUNT OF DEFERRED CONTRACTS: $ 0.00 ================