Form MMS 123A1123S Electronic Version. Application. We have incorrect pressure tests for the annulars on subject ABP The ABP shows we

Similar documents
BLACK HILLS PLATEAU PRODUCTION COMPANY

APPENDIX A1 - Drilling and completion work programme

SUBSEA KILL SHEET EXERCISE No. 5

30 C.F.R. Subpart D Oil and Gas Drilling Operations

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

INTERPRETATION NOTE ISSUED UNDER THE PETROLEUM DRILLING REGULATIONS (CNR 1150/96)

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

Oil Well Potential Test, Completion or Recompletion Report, and Log

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

New generation of solid expandable liners help give operators a jump on trouble zones

MIA Training Example (Catalano 2H)

Oil Well Potential Test, Completion or Recompletion Report, and Log

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

Why Do Not Disturb Is a Safety Message for Well Integrity

Deepwater Horizon Incident Internal Investigation

Railroad Commission of Texas

Oil Well Potential Test, Completion or Recompletion Report, and Log

1. The well has been shut in on a kick and the kill operation has not started.

DEPARTMENT OF ENVIRONMENTAL PROTECTION Office of Oil and Gas Management

Offshore Managed Pressure Drilling Experiences in Asia Pacific. SPE paper

Worked Questions and Answers

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS

Texas Administrative Code

INTERMEDIATE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE

DEPARTMENT OF ENVIRONMENTAL PROTECTION Office of Oil and Gas Management

SURFACE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE

PHE KE30-A8 WORKOVER PROGRAM

RPSEA UDW Forum June 22 & 23, Secure Energy for America

Understanding pressure and pressure

Casing Design. Casing Design. By Dr. Khaled El-shreef

Chapter 4 Key Findings. 4 Key Findings

Frequently Asked Questions (FAQ s)

A New and Simplified Method for Determination of Conductor Surface Casing Setting Depths in Shallow Marine Sediments (SMS)

DAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure?

NOT TO COPY -- NO DISSEMINATE WITHOUT WRITTEN AGREEMENT. Presentation JB AG JCN JR 1

August 21, Deepwater MPD / PMCD

NORSOK STANDARD SYSTEM REQUIREMENTS BOP, DIVERTER AND DRILLING RISER SYSTEM (SYSTEM NO.: 12-30, 12-40)

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack)

Practice Exam IADC WellSharp Driller and Supervisor

Investigation of Blowout and Fire Eugene Island Block 284 OCS-G 0991 Well A-13 March 1, 2001

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas

Chapter 5 HORIZONTAL DRILLING

IWCF Equipment Sample Questions (Surface Stack)

Evaluation of deepwater kicks and future countermeasures

Extended leak off testing

ECD Reduction Tool. R. K. Bansal, Brian Grayson, Jim Stanley Control Pressure Drilling & Testing

Introduction. DEEPWATER DRILLING RISER INTEGRITY - FATIGUE, WEAR, INSPECTION AND MONITORING by Dr Hugh Howells and Dave Walters 2H Offshore Inc

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD

The Alberta Energy Regulator (AER) has approved this directive on January 31, Introduction Purpose of This Directive...

Drilling Morning Report

BP SIT Testing Franks Facility Lafayette

MIA Training Example (Beattie No. 99)

Appendix K Appendix K

Oil, Gas and Salt Resources of Ontario

Solid Expandable Tubular Technology: The Value of Planned Installation vs. Contingency

A Novel Approach to Capitalize WITSML Data in Geospatial Platform for Realtime Monitoring and Risk Assessment

Casing! 07 An Overview!

BANDAR PANJI-1 WELL CONTROL INCIDENT REPORT

Tibor Szabó DRILLING THROUGH SHALLOW GAS ZONES IN HUNGARY

W I L D W E L L C O N T R O L SHUT-IN PROCEDURES

Subsea Safety Systems

International Well Control Forum. IWCF Drilling Well Control Syllabus Level 3 and 4 March 2017 Version 7.0

Railroad Commission of Texas. Chairman Barry T. Smitherman Commissioner David Porter Commissioner Christi Craddick

Appendix M Structural Analysis of the Macondo #252 Work String. Appendix M Structural Analysis of the Macondo #252 Work String

Well Control Drill Guide Example Only. Drill Guide is the list of drills, questions and attributes that are in DrillPad.

Cased-Hole Logging Environment

The SPE Foundation through member donations and a contribution from Offshore Europe

PROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION

OIL/GAS WELL COMPLETION REPORT. Well Name and Number Surveyed elevation (feet): KB GL

PTRT 1471: Exploration and Production I. Chapter 6: Drilling and Well Completion

Rig Math. Page 1.

Abandonment Program for Paramount Fort Liard F 36

Marine Technology Society

MASTER S THESIS. A Discussion of Well Control Methods. Faculty of Science and Technology. Study program/ Specialization: Spring semester, 2013

Dilution-Based Dual Gradient Well Control. Presented at the 2011 IADC Dual Gradient Workshop, 5 May 2011 by Paul Boudreau, Dual Gradient Systems LLC

Investigation of Loss of Well Control Eugene Island Block 277 OCS-G Well A-2 Off the Louisiana Coast July 6, 2001

W I L D W E L L C O N T R O L CIRCULATION & WELL CONTROL

DRILLING HOSE SOLUTIONS

Monte Besler Consultant FracN8R Consulting LLC UNITED STATES

Study Guide IADC WellSharp Driller and Supervisor

Coal and Water Protection. PADEP: Well Plugging & Subsurface Activities Division Bureau of Oil and Gas Planning & Program Management

Learn more at

BUCCANEER ALASKA OPERATIONS, LLC. BUCCANEER ALASKA OPERATIONS, LLC Cook Inlet Exploratory Drilling Program. Community Outreach: KPB Assembly

Chapter 5 Drilling and Well Testing Practices

Safety and Risk Engineering. HSE Case Implementation Clive Rawson

Niko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent

Abstract Objective Scope of Study Introduction Procedures

Performance and Value of the invision System : Offshore in Coiled Tubing Operations

Kicks Controlling Techniques Efficiency in Term of Time

Faculty of Science and Technology. Master Thesis. Writer: Audun Tufte Veisene (Writer s signatures)

The Developing Design of the Blowout Preventer in Deep Water

Commentary on the book by Andrew Hopkins. By Graham Dalzell

Casing Design for High Pressure/High Temperature Wells

Development of a Subsurface Mudline Packer to Reduce Risk of Flow after Cementing and Sustained Casing Pressure, While Providing a Platform for P&A.

5. INSPECTION AND TESTING PROCEDURES

NORSOK Standard D-010 Rev 4, August 2012

RIH intermediate section casing in Bazian-1 exploration oil well

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM

Transcription:

U.S Department of the Interior 0MB Control Number 1010-0141 Minerals Management Service MMS 0MB Approval Expires 08/31/2008 Form MMS 123A1123S Electronic Version Lease Area/Block Well Name ST 01 BP 00 Well Type Exploration Status Approved Operator 00689 Shell Offshore Inc Pay.gov Amount Pay.gov Amount Tracking ID Tracking ID 01/14/10 Currently drilling with 15.1 ppg mud weight Expect to be able to drill down to the revised casing point with this same mud weight Leak off on the window is 16.5 ppg Request to set 11 3/4 liner deeper Please see attached revised Drilling Prog Engineering CaIc 123S sheet and Weilbore Schematic Thank you Jane 10/21/09 Email approval received Frank Patton/Jane chady for below change in test pressures on each DP size We have incorrect pressure tests for the annulars on subject ABP The ABP shows we will test to 10000 psi The rated working pressure for the annular preventer varies with drill pipe size and we cannot test all the sizes of drill pipe we plan to run to this pressure We request to test the annulars to 70% of their rated working pressure Thank you for your assistance Jane On 5/8 drill pipe the working pressure is 10000 psi Test to 7000 psi On 7/8 drill pipe the working pressure is 7500 psi Test to 5250 psi On 1/2 drill pipe the working pressure is 5000 psi Test to 3500 psi Revision 7/16/2009 Request to set 9.375 liner set at 30300MD 29737 TVD Liner top is 25800MD/ 25379 TVD Attachments 123S Schematic 3.PPFGMW Drillers request to set liner without cementing pressure testing or shoe testing Anadarko also requests an an exception that the blind shear rams will also not be tested in association with the setting of the liner Plans are to begin this weekend Revision 6/1 0/2009 Per request of Frank Patton 6/10/2009 Anadarko notifies of change of the directional plan and associated bottom hole location change now planned for MC 984 STOO BPO1 OCS-G-22919 Last Casing 11-7/8 Liner set at 25662 TVD /26100 MD Top of Liner 18597 TVD 18620 MD Shoe Test 16.5 ppge FIT Current Depth 27958 TVD /28516 MD Mud Weight 14.7 ppg The original directional plan/profile was to maintain the current /- 19 degree of hole inclination to Total Depth Sands being encountered are wet and the well trajectory direction is downdip on structure In an attempt to remain as high on the structure as possible and increase chances of encountering hydrocarbons from this point forward we are now planning to drop angle from 19 degrees back to vertical The original proposed directional plan targeted bottom hole location coordinates at Total Depth of 31214 TVD /32000 MD of 946340 10167622 The proposed directional plan change of dropping the inclination back to vertical and maintaining same through Total Depth of 31214 TVD 31772 MD would now give proposed bottom hole location of 945157 10167817 Electronically generated on 01/15/2010 Page of TREX-047846.001 77

U.S Department of the Interior 0MB Control Number 101 0-0141 Minerals Management Service MMS 0MB Approval Expires 08/31/2008 Form MMS 123N123S Electronic Version Lease Area/Block Well Name ST 01 BP 00 Well Type Exploration Status Approved Operator 00689 Shell Offshore Inc The proposed new bottom hole location is departure of 1199 from the original bottom hole location 1183 and 195 of the original bottom hole location Request for directional plan revision Plans are to start the directional revision /- 3/21/2009 In support of this request please find the following attachments dated 3/4/3009 that have been re attached MMS 123S and attachments Requested departures geological prognosis Evaluation program PP/MW/FG Proposed schematic Engineering Calculations Directional surveys BOP Plats pressures The bottom hole location moved 1-1323 from original BHL 07/01/2009 Request to deepen well to 33210MD/ 32647TVD Currently drilling at 31592MD/ 31028TVD Mud weight 14.7 Shoe test 16.6 @26100 MD 25662 TVD 11 7/8 set Revised Attachments include -MMS Form 123S -Proposed Schematic -PP MW FG Plot -Projection to TD survey supplemental Electronically generated on 01/15/2010 Page of

U.S Department of the Interior Minerals Management SenAce MMS 0MB Control Number 1010-0141 0MB Approval Expires 08/31/2008 Lease ArealBlock WelIName ST 01 BP 00 Well Type Exploration Status Approed Operator 00689 Shell 0fhore Inc General Well Information API Number Approval Date 01/15/2010 Approved By Frank Patton Date of Request 01/14/2010 Req Spud Date 12/20/2009 Kickoff Point Water Depth ft 4045 Drive Size in 36 Mineral Code Hydrocarbon RKB Elevation 82 Drive Depth ft 4465 Subsea BOP Yes Verbal Approval Date Verbal Approval By Proposed Well Location Surface Location LEASE OCS Area/Block lu Authority Federal Lease Entered NAD 27 Data Calculated NAD 27 Departures Calculated NAD 27 X-Y Coordinates Lat Lon Surface Plan Plan Lease OCS Area/Block Bottom Location LEASE OCS Area/Block Entered NAD 27 Data Calculated NAD 27 Departures Calculated NAD 27 X-Y Coordinates Lat Lon Bottom Plan Plan Lease OCS Area/Block Approval Comments Electronically generated on 01/1512010 Page of9

U.S Department of the Interior 0MB Control Number 1010-0141 Minerals Management SenAce MMS 0MB Approval Expires 08/31/2008 Lease ArealBlock Well Name ST 01 BP 00 Well Type Exploration Status Approed Operator 00689 Shell 0fhore Inc Geologic Information H2S Designation Absent H2S TVD Anticipated Geologic Markers Name Top MD Base Salt 23048 Lower Miocene 29697 Rig Information RIG SPECIFICATIONS ANCHORS Yes Rig Name NOBLE JIM THOMPSON Type SEMISUBMERSIBLE ID Number 91517 Function DRILLING Constucted Year 1982 Shipyard INGALLS Refurbished Year RATED DEPTHS Water Depth 6500 Drill Depth 35000 CERTIFICATES ABS/DNV 12/31/2009 Coast Guard 05/28/2010 SAFE WELDING AREA Approval Date 06/10/1999 District Remarks Electronically generated on 01/1512010 Page of

U.S Department of the Interior 0MB Control Number 1010-0141 Minerals Management SenAce MMS 0MB Approval Expires 08/31/2008 Lease ArealBlock Well Name ST 01 BP 00 Well Type Exploration Status Approed Operator 00689 Shell 0fhore Inc Number Question IResponse Response Text Will you maintain quantities of mud and mud YES material including weight materials and additives sufficient to raise the entire system mud weight 1/2 If hydrocarbon-based drilling fluids were used is YES the drilling rig outfitted for zero discharge and will zero discharge procedures be followed If drilling the shallow casings strings nserless will N/A you maintain kill weight mud on the rig and monitor the weilbore with an ROV to ensure that it If requesting waier of the conductor casing hae N/A you submitted log to MMS GG that is with in 500 feet of the proposed bottom hole location for th Will the proposed operation be coered by an EPA YES GMG 290103 Discharge Permit please provide permit number in comments for this question Will all wells in the well bay and related production N/A Subsea well equipment be shut-in when moving on to or off of an offshore platform or from well to well on the plat Electronically generated on 01/1512010 Page of

U.S Department of the Interior Minerals Management SenAce MMS 0MB Control Number 1010-0141 0MB Approval Expires 08/31/2008 Lease Area/Block WelIName ST 01 BP 00 Well Type Exploration Status Approed Operator 00689 Shell 0fhore Inc Permit Attachments File Type File Description Status Required Attachments pdf Drilling prognosis and summary of drilling cementing and mud Attached processes pdf Directional Program Attached pdf Proposed Well Location Plat Attached pdf BOP Dierter Schematics with Operating Procedures Attached pdf Pore pressure PP Mud Weight MW and Fracture Gradient FG Plot Attached pdf Proposed Wellboi-e Schematic Attached pdf Engineenng Calculation Attached Optional/Supplemental Attachments pdf Departure List Attached pdf Loop Current Operating Practicespdf Attached pdf pay Attached Contacts Information Name Hardy Boudreaux Company 00689 Shell 0flhore Inc Phone Number 504 728 4622 E-mail Address hardyboudreauxshell.com Contact Description Permitting Name Hal Edwards Company 00689 Shell Offshore Inc Phone Number 504 728 7058 E-mail Address hal.edwards@shell.com Contact Description Sr Staff Well Engineer Electronically generated on 01/1512010 Page of9

U.S Department of the Interior 0MB Control Number 1010-0141 Minerals Management Sen4ce MMS 0MB ApproaI Expires 08/31/2008 Lease Area/Block Well Name ST 01 BP 00 Well Type Exploration Status Approed Operator 00689 Shell 0fhore Inc Name Jane Chady Company 00689 Shell Offshore Inc Phone Number 504 728 6183 E-mail Address jane.chadyshell.com Contact Description Permitting Name Randy Allen Company 00689 Shell Offshore Inc Phone Number 504 728 7427 E-mail Address randy.allenshell.com Contact Description Permitting Electronically generated on 01/1512010 Page of

U.S Department of the Interior 0MB Control Number 1010-0141 Minerals Management SenAce MMS 0MB Approval Expires 08/31/2008 Lease ArealBlock Well Name ST 01 BP 00 Well Type Exploration Status Approed Operator 00689 Shell 0fhore Inc Well Design Information Interval Number Type Casing Name Conductor Section Casing Size Casing Weight Casing Burst Rating Collapse Rating Depth if Pore Pressure Number in lb/if Grade psi MD TVD ppg 13.625 88.2 HCQ-125 10030 5930 17084 17080 12.9 GENERAL INFORMATION PREVENTER INFORMATION TEST INFORMATION Hole Size in 16.500 Type Blowout Annular Test psi 3500 Mud Weight ppg 14.6 Size in 18.75 BOPDiverter Test psi 7900 Mud Type Code Synthetic Base Welihead Rating psi 15000 Test Fluid Weight ppg 14.6 Fracture Gradient ppg 16.8 Annular Rating psi 10000 Casing/Liner Test psi 3600 Liner Top Depth ft 0.0 BOP/Diverter Rating psi 15000 Formation Test ppg 16.5 Cement Volume cuft 1515 Interval Nurther Type Liner Name Intermediate Section Casing Size Casing Weight Casing Burst Rating Collapse Rating Depth It Pore Pressure Number in lb/if Grade psi MD TVD ppg 11.750 65.0 P-hO 8750 4480 26951 26500 14.2 GENERAL INFORMATION PREVENTER INFORMATION TEST INFORMATION Hole Size in 14.000 Type Blowout Annular Test psi 3500 Mud Weight ppg 15.2 Size in 18.75 BOP/Diverter Test psi 8600 Mud Type Code Synthetic Base Wellhead Rating psi 15000 Test Fluid Weight ppg 15.2 Fracture Gradient ppg 16.4 Annular Rating psi 10000 Casing/Liner Test psi 1600 Liner Top Depth if 16784.0 BOP/Diverter Rating psi 15000 Formation Test ppg 16.4 Cement Volume cuff 216 Interval Number Type Liner Name Intermediate Section Casing Size Casing Weight Casing Burst Rating Collapse Rating Depth ft Pore Pressure Number in lb/if Grade psi MD TVD ppg 9.375 39.0 HCQ 125 9330 3960 30908 30021 15.0 GENERAL INFORMATION PREVENTER INFORMATION TEST INFORMATION Hole Size in 10.625 Type Blowout Annular Test psi 3500 Mud Weight ppg 15.5 Size in 18.75 BOP/Diverter Test psi 9300 Mud Type Code Synthetic Base Wellhead Rating psi 15000 Test Fluid Weight ppg 15.5 Fracture Gradient ppg 16.9 Annular Rating psi 10000 Casing/Liner Test psi 2200 Liner Top Depth if 24983.0 BOP/Diverter Rating psi 15000 Formation Test ppg 16.9 Cement Volume cuff 104 Electronically generated on 01/1512010 Page of

U.S Department of the Interior Minerals Management SenAce MMS 0MB Control Number 1010-0141 0MB ApproaI Expires 08/31/2008 Lease ArealBlock WeIlName ST 01 BP 00 Well Type Exploration Status Approed Operator 00689 Shell 0fhore Inc Open_Hole Depth ft Pore Pressure MD TVD ppg 32089 31082 15.5 GENERAL INFORMATION PREVENTER INFORMATION TEST INFORMATION Hole Size in 8.500 Type Blowout Annular Test psi 3500 Mud Weight ppg 15.6 Mud Type Code Synthetic Base Size in 18.75 Welihead Rating psi 15000 BOPDiverter Test psi 9300 Test Fluid Weight ppg 0.0 Fracture Gradient ppg 16.9 Annular Rating psi 10000 Casing/Liner Test psi Liner Top Depth ft 0.0 BOP/Diverter Rating psi 15000 Formation Test ppg 0.0 Cement Volume Cu ft PAPERWORK REDUC11ON ACT OF 1995 PRA STATEMENT The PRA 44 U.S.C 3501 et seq Requires us to inform you that we collect this information to obtain knomedge of equipment and procedures to be used in drilling operations MMS uses the information to ealuate and approe or disapproe the adequacy of the equipment and/or procedures to safely perform the proposed drilling operation Responses are mandatory 43 U.S.C 1334 Proprietary data are coered under 30 CFR 250.196 An agency may not conduct or sponsor and person is not required to respond to collection of information unless it displays currently lid 0MB Control Number Public reporting burden for this form is estimated to arage 27 hours per response including the time for reaewing instructions gathering and maintaining data and completing and rewewing the form Direct comments regarding the burden estimate or any other aspect of this form for the Information Collection Clearance Officer Mail Stop 4230 Minerals Management Senice 1849 Electronically generated on 01/1512010 Page of9

DATE OPERATOR LOCATION WELL NAME WATER DEPTH 25/8/2009 SHELL 4045 Ft NBLE RKB TO MUDLINE 4127 Ft RKB TO WELLHEAD 4117 Ft Ht ML to WELLHEAD Ft WELLHEAD TYPE FMC UWD-15 LB RLDS CONNECTOR TYPE H4 DRILLING to Waterline Riser Adapter Shoulder 47.815 4081 ITop of Element 36.015.J 4083 IBottom of Element 34.485 4088 hop of Adapter Spool 28.555 4093 ITop of Element 23.725.I 4095 IBottom of Element 22.195 4100 ITop of Ram Body 17.39 4101 ITop of Ram Body 15.724 4106 ITopof Ram Body 11.0575 4108 ITop of Ram Body 9.39 4112 ITop of Ram Body 4.645 27.5 SWALLOW STACK CONNECTOR H4 4117 ITopofWellhead DATUM NOTE Ram block thickness.1 4127 IRKBtoMudline