DPW Order No:

Similar documents
AMERICANS WITH DISABILITIES ACT TRANSITION PLAN LEON COUNTY FOR CURB RAMPS AND SIDEWALKS DEPARTMENT OF PUBLIC WORKS. 1 P age

ADA TRANSITION PLAN 2013

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

ADA Transition Plan. City of Gainesville FY19-FY28. Date: November 5, Prepared by: City Of Gainesville Department of Mobility

Restoration Requirements

R A M P U P! - City of Tacoma's Curb Ramp Installation Matrix

ADA Technical Frequently Asked Questions

ADA PRESENTATION (CURB RAMPS)

CITY MANUALS AND STANDARDS REVIEW

Americans with Disabilities Act and Curb Ramps

Marshall County. Americans with Disabilities Act Transition Plan: Pedestrian Facilities in the Public Right-of-Way

Complete Streets Funding Program Project Prioritization Plan

Designing Pedestrian Facilities for Accessibility. Module 8 Maintenance of Pedestrian Facilities and Alternate Pedestrian Access Routes in Work Zones

Town of Wakarusa. Americans with Disabilities Act Transition Plan: Pedestrian Facilities in the Public Right-of-Way

Accessible Sidewalk Requirements

Scenarios. The following slides will show existing pictures that deny access, followed by a retrofitted picture that provides access.

Town of Roseland. Americans with Disabilities Act Transition Plan: Pedestrian Facilities in the Public Right-of-Way

Town of Bourbon. Americans with Disabilities Act Transition Plan: Pedestrian Facilities in the Public Right-of-Way

ADA Retrofits Triggered by Paving: What, When, and Why

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

APPROVE A RESOLUTION ADOPTING A COMPLETE STREETS POLICY

CITY OF PAPILLION, NEBRASKA

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

PEDESTRIAN CROSSING TREATMENTS

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

RESOLUTION NO A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MENLO PARK ADOPTING A COMPLETE STREETS POLICY

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

New Planning Code Summary: Better Streets Plan and Curb Cut Restrictions

ADA TRANSITION PLAN. For

IMPLEMENTATION STRATEGIES

PROCEDURE FOR ACCOMMODATING PEDESTRIANS IN WORK ZONES FOR CONSTRUCTION AND MAINTENANCE

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

Paul Vraney Bureau of Project Development 02/11/2016

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No

CURBSIDE ACTIVITY DESIGN

City of Memphis On-Street Parking Modification Guidelines

12A Accessible Sidewalk Requirements. 12A Protruding Objects

APPENDIX A BICYCLE, PEDESTRIAN, AND TRANSIT ASSESSMENT WORKSHEET. B. Subdivision/Site Development Plan/Grading Permit Name and Number:

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Kalamazoo Area Transportation Study (KATS) Complete Streets Policy Approved: Effective: FY 2018 Projects

Michael Parmer, Management Aide, City Manager's Office

ADA Operations Contact Info

Design Overview. Section 4 Standard Plans for Design. Pedestrian Access Routes. Pedestrian Access Routes. Overview. Cross Slope

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

ADA Self Evaluation and Transition Plan for Public Rights-of-Way

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

ADA Operations Contact Info

Draft. Lecompton. Table of Contents. Background

ACTIVE TRANSPORTATION

Chapter 4: Funding and Implementation

Preparing a Curb Ramp Project. December 15, 2010

Traffic Calming Policy

CHAPTER 10 ADA / Public Right of Way. Overview

TEMPORARY OCCUPANCY PERMITS. Street Space, Additional Street Space and Temporary Occupancy Permits PUBLIC WORKS CODE : ARTICLE 15, SEC.

Lincoln Way Multimodal Safety and Operations Study. City and University Summary Presentation

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Designing Accessible Traffic Signals

EMPHASIS AREA 1: PEDESTRIANS

Village of Lyons. Americans with Disabilities Act Transition Plan: Pedestrian Facilities in the Public Right-of-Way.

ADA TRANSITION PLAN. TOWN OF DeMOTTE

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

Complete Streets and the Americans with Disabilities Act (ADA) Jennifer E. Ruley, PE Active Transportation Engineer Louisiana Public Health Institute

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

DRAFT. Lecompton. Table of Contents. Background

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

DOWNTOWN MIAMI PEDESTRIAN PRIORITY ZONE

St. Francis Drive through the City of Santa Fe Corridor Study

Pedestrian Project List and Prioritization

Street Paving and Sidewalk Policy


Citywide Sidewalk and Crosswalk Programs

Improvements within the Route 107 study area were developed in accordance with the MassDOT Project Development and Design Guide of 2006.

CITY OF SAN JOSÉ, CALIFORNIA DETAILED ADA TRANSITION PLAN UPDATE FOR SIDEWALKS REVISED DRAFT - MARCH 20, 2008

Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities

Anne Arundel County BICYCLE, PEDESTRIAN, TRANSIT ASSESSMENT GUIDELINES

Pedestrian and Bicycle Improvements in Balboa Park Station Area

12A Accessible Sidewalk Requirements

ADA TRANSITION PLAN FOR ACCESSIBILITY OF PEDESTRIAN FACILITIES WITHIN THE PUBLIC RIGHT-OF-WAYS FRANKLIN COUNTY, FLORIDA

Designing Pedestrian Facilities for Accessibility

MONTCLAIR SAFE COMPLETE STREETS IMPLEMENTATION PLAN. Monday November 13, 2017 Michael Dannemiller, Principal Engineer NV5, Inc.

ADA Training Standard Plans

Montclair s Complete Streets Experience

Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan. January 18, 2011

Transportation Policy Manual

MEMORANDUM. Date: 9/13/2016. Citywide Crosswalk Policy

Road Alterations - Wellington Street East, Church Street, and Front Street Intersection

Derby Street. Project Updates. Salem, Massachusetts

Town of Osceola. Americans with Disabilities Act Transition Plan: Pedestrian Facilities in the Public Right-of-Way

77th OREGON LEGISLATIVE ASSEMBLY Regular Session. House Bill 2732 SUMMARY

Building Great Neighbourhoods STRATHEARN

CITY OF LANCASTER PROPOSED NEW PROJECTS

Implementation Maintenance 263

CITY OF SAINT JOHN TRAFFIC CALMING POLICY

Traffic Engineering and Highway Safety Bulletin Accessibility Compliance for Military Installations

ADA on Construction. Guidance for Section C Plan Preparers

Transcription:

DPW Order No: 184350 ESTABLISHING REGULATIONS AND GUIDELINES FOR THE EVALUATION AND CONSTRUCTION OF NEW CURB RAMPS OR RECONSTRUCTION/UPGRADE OF EXISTING CURB RAMPS AND ADDITIONAL PEDESTRIAN SAFETY IMPROVEMENTS WHEN STREET EXCAVATIONS OCCUR AT ANGULAR RETURNS OR IN THE CROSSWALK. This DPW Order Supersedes DPW Order No. 182,003: ESTABLISHING REGULATIONS AND GUIDELINES FOR THE CONSTRUCTION OF NEW CURB RAMPS OR RECONSTRUCTION/UPGRADE OF EXISTING CURB RAMPS AT ANGULAR RETURNS WHEN STREET EXCAVATION OCCURS AT THE ANGULAR RETURNS OR IN THE CROSSWALK. I. PURPOSE: A. The Federal Americans with Disabilities Act (ADA), and the 2010 ADA Standards (2010 ADAS) require curb ramp upgrades/replacements when there is new construction or alteration of the roadway adjacent to the intersection. Public Works policy requires that upon performing any excavation within a marked or unmarked crosswalk within the public right-of-way, all affected curb ramps shall be evaluated and/or reconstructed/upgraded per current DPW Standards. Section 98.1 of the San Francisco Administrative Code requires that, in accordance with the Better Streets Plan, all City departments shall prioritize pedestrian safety, enjoyment, and comfort when considering an approval or decision concerning any public and private project that impacts or is adjacent to a publicly-accessible right-of-way. This Public Works Order provides details on said guidelines. B. DPW has both anecdotal and actual information indicating that excavators in the public right-of-way were modifying the scope and physical location of their projects to avoid the curb ramp reconstruction requirements in DPW Order No. 179,254 (2011). DPW believes that this Order properly balances competing policy needs of private and public sector excavators and will enhance and support ADA compliance when there is new construction or alteration of the roadway adjacent to the intersection or in angular curb returns. II. DEFINITIONS: A. Crosswalk. A crosswalk includes any marked or unmarked pedestrian crossing between two (2) angular returns. The width of an unmarked crosswalk shall be defined as the arc of an angular return. B. A crosswalk also includes an MTA approved mid-block crosswalk; e.g. between public office buildings, schools, hospitals, and any other facility that serves the public. C. Angular return. An angular return is the portion of the sidewalk at an intersection, measured as a 90 degree arc from the corner of the adjacent private property to the constructed curb line. D. Technically infeasible. Per section 106.5 of the 2010 ADAS technically infeasible means, with respect to an alteration of a facility, that it has little likelihood of being accomplished because existing physical or site constraints prohibit modification or addition of elements, spaces, or features which are in full and strict compliance with the minimum requirements for new construction and which are necessary to provide accessibility. III. GUIDELINES Triggering Curb Ramp Construction: A. Excavation within the Crosswalk - Upon performing any excavation work within a crosswalk, an evaluation of the angular returns at each end of the affected crosswalk shall be conducted. If curb ramps do not exist or existing curb ramps are not

constructed per current DPW Standards, then barring technical infeasibility, the excavator shall construct curb ramps necessary to complete the path of travel across the affected crosswalk. See Figure 1. Curb ramps shall be constructed to current DPW Standards (see DPW Standard Plans for current curb ramp design). B. Excavation at the Angular Return - Any excavation within the angular return of any street segment shall require an evaluation of the angular return. If curb ramps do not exist or existing curb ramps are not constructed to current DPW Standards, then barring technical infeasibility, the excavator shall construct curb ramps. In addition, the excavator shall evaluate the two connecting angular returns to complete the paths of travel. If connecting curb ramps exist on the connecting angular returns, then the excavator is not required to construct connecting curb ramps. If connecting curb ramps do not exist on the connecting angular returns, then barring technical infeasibility, the excavator shall construct connecting curb ramps necessary to complete the paths of travel across the crosswalk See Figure 2. Curb ramps shall be constructed to current DPW Standards (see DPW Standard Plans for current curb ramp design).

C. Building Construction Affecting the Angular Return - Any building construction that physically affects an angular return shall require an evaluation of the angular return. If curb ramps do not exist or existing curb ramps are not constructed to current DPW Standards, then barring technical infeasibility, the developer/property owner shall construct curb ramps. In addition, the developer/property owner shall also be required to evaluate the connecting angular returns to complete the paths of travel. If a compliant curb ramp does not exist on the connecting angular return, then barring technical infeasibility, the developer/property owner shall construct a compliant curb ramp necessary to complete the paths of travel and restripe the crosswalks. See Figure 3. Curb ramps shall be constructed to current DPW Standards (see DPW Standard Plans for current curb ramp design).

D. Coordination with the City s ADA Transition Plan for Curb Ramp Construction - When utility excavation or building construction work under III A, B, or C above triggers the construction of a single curb ramp at any angular return as shown in Figures 1, 2, or 3 then the excavator or the developer/property owner shall coordinate their design to allow the future construction of the second curb ramp at each return. The City will seek additional funding through the City s ADA Transition Plan to complete the path of travel for the entire intersection. IV. GUIDELINES Triggering Pedestrian Safety Evaluation: A. Excavation within the Crosswalk, Excavation at the Angular Return, and Building Construction Touching the Angular Return For any angular return where the City performs a curb ramp evaluation and determines that curb ramp construction is necessary, the City may also evaluate the intersection to assess the need for upgrades to improve pedestrian safety. V. EXCEPTIONS: A. In the evaluation of the angular returns, a request for exception to the installation of curb ramps requires a detailed identification of the existing conditions that could cause the design and construction of a complying curb ramp to be technically infeasible. In locations where a fully complying curb ramp is infeasible, evaluation will be made to determine if a non-compliant accessibility improvement is possible. The request for exception based upon technical infeasibility shall be in writing to the Director Public Works, identifying the nature of the infeasibility and evaluating construction alternatives. The Director of Public Works or his/her designee shall review this request for exception and provide written authorization or denial to the requested exception. B. Replacing surface facilities in place, within its existing footprint, as part of routine maintenance and repair are exempt from curb ramp construction. C. A declared emergency excavation that results in 1000 square feet or less of excavation. An emergency excavation is defined in the Public Works Code Sec.2.4.22 Emergency Excavation. D. Excavation that results in 50 square feet or less of excavation.

VI. IMPLEMENTATION: A. The Order establishes an effective date of January 1, 2016. All permits issued after this date shall comply with this DPW Order No. 184,350 for the evaluation, construction and upgrade of curb ramps and corresponding pedestrian safety improvements at angular returns. Permits issued before January 1, 2016 are subject to Public Works Order No. 182,003. 12/22/2015 12/22/2015 X Sanguinetti, Jerry Bureau Manager Signed by: Sanguinetti, Jerry 12/23/2015 X Sweiss, Fuad Deputy Director and City Engineer Signed by: Sweiss, Fuad X Mohammed Nuru Nuru, Mohammed Director, DPW Signed by: Nuru, Mohammed