Point LaBarbe/McGulpin Point Response April 2 May 8, 2018 Regional Response Team 3 Meeting November, 2018

Similar documents
CEPA Initiative: Response Time Guideline 2015 EMERGENCY SECURITY MANAGEMENT WORK GROUP

ARGO Incident. Marine Safety Unit Toledo, OH U.S. Coast Guard Sector Detroit, MI Ohio Environmental Protection Agency

Admiralty Inlet Pilot Tidal Project FERC No Appendix C. Derelict Gear Monitoring Plan

Barge MM 46 Response Natchez, MS Lower Mississippi River Mile Marker 363

Report to the State of Michigan Mitigating potential vessel anchor strike to Line 5 at the Straits of Mackinac. June 30, 2018

Section Decanting Response Tool

Protection for Vessels Engaged in Servicing Submarine Cables

Charlottetown Marine Terminal Pipeline Decommissioning Project Description

ROV Development ROV Function. ROV Crew Navigation IRATECH SUB SYSTEMS 2010

1.0 PURPOSE AND NEED

PRESTIGE OIL RECOVERY FROM THE SUNKEN PART OF THE WRECK Massimo Fontolan, Sonsub Ltd., Robin Galletti, SATE srl. Introduction

U.S. Coast Guard Regulatory & Response Framework

Scottish Hydro Electric Power Distribution Operation, Inspection, Maintenance and Decommissioning Strategy Bute Cumbrae Cable Replacement

Section Decanting Response Tool

NATURAL GAS MAINTENANCE. Part 192 Subpart "M"

OFFSHORE PATROL VESSEL OPERATIONS

Mentoring in the USCG Auxiliary Boat Crew Program Coxswain Mentoring Template

GLOSSARY. Contaminated Debris Disposal - the ability to directly dispose of contaminated material and/or contract for its disposal

API Study on Detection and Recovery of Sunken Oil. API Study Objectives

Oil Spill Incident Annex. Introduction [Link to the Oil and Hazardous Materials Incident Annex in the NRP]

Environmental Threats from Wrecks: The Point of View of the Environmental Authorities

3 CONSTRUCTION. 3.1 Construction Methods and Sequence. 3.2 Construction Sequence

DEVELOPMENT OF NATIONAL ABILITY TO RESPOND TO SPILLAGES OF OIL AND OTHER HARMFUL SUBSTANCES

1 The range of monitoring and ways of its performing

OFFSHORE SUPPORT VESSELS 2015

SECTION PRESSURE TESTING OF PIPING

Storage and Pre-planning Considerations

PIPELINE SAFETY. Darin Burk, Manager Pipeline Safety. January 28, 2014

Authors API Technical Report

Yakima County Fire District 12 Standard Operating Guidelines SOG 5-1 Hazardous Materials Operations

Endangered Species Emergency Consultation

National Oil Spill Contingency Plan. Chapter 2 Forms

Marine Safety Information Bulletin COAST GUARD GUIDANCE FOR DEAD SHIP MOVEMENT IN SECTOR HONOLULU CAPTAIN OF THE PORT ZONE.

Dive Operations Plan for Personal Submersibles. Revision

APPENDIX A. F107 & 380 Lines OYSTER RIVER DURHAM, NH

Introduction to Emergency Response & Contingency Planning

Restoration of Spawning Habitat for Native Fish in the Central Great Lakes

NOAA Marine Debris Program

HARBOR INFRASTRUCTURE INVENTORIES Cheboygan Harbor, Michigan

Nome Harbor Page 2 of 12

Galloper Wind Farm Project Response to Development Consent Order Part 3 Requirement 23 Temporary Fencing and other means of enclosure (Enabling

2. IMMEDIATE RESPONSE ACTIONS AND NOTIFICATION PROCEDURES

Comments and Requests for Additional Information. Regarding

Any active ERDI Emergency Response Diver Instructor may teach this course

IMPLEMENTING REGULATIONS OF THE WILDLIFE CONSERVATION LAW. Authorized by the Republic of China Wildlife Conservation Law, amended October 29, 1994.

4 th Annual Nadadores 2.4 Mile Rough Water Swim

IFE Level 3 Diploma in Fire Safety and Fire Science. Unit 6 Fire Service Operations and Incident Command

This training is intended to be educational and should not be construed as legal guidance. It is provided as a courtesy to our customers and others

APPENDIX Region 6 Inland Area Contingency Plan Compliance with Section 7 of the Endangered Species Act

Marine Mammal Mitigation Systems

Lockout/Tagout Training Overview. Safety Fest 2013

OFFSHORE SURVEY IN DEVELOPMENT PROJECTS. Ian Douglas Head, Offshore Surveys, Shell Projects & Technology Europe

Contents. 3) Construction Vessels ) Guard Vessels ) Crew Transfer Vessels ) Upcoming Operations (following 7 days)...

Focus on Operational Efficiency and Crew Safety - Introducing Advanced ROV Technology in Marine Towed Streamer Seismic

Incident Management Guidelines for Initial Actions and Communications

Plot the Path. Mary Anne Otten. lesson three

2017 LGA 191/192 & 195 Pipeline Safety Conference

APPLICANT: Pacific Northwest National Laboratory Attention: Mr. Charles Brandt 1529 West Sequim Bay Road Sequim, Washington 98382

Vessel Traffic in the Salish Sea Mitigating Risk... Captain Joe Raymond Coast Sector Puget Sound

2012 INDUSTRY DAY Society of American Military Engineers - Omaha Post

Charleston Area Contingency Plan January 2011 REVISION

Wind Energy 101 for Southeastern Policy Makers Overview of Wind Energy Development and Potential in the US

Contents. 3) Construction Vessels ) Guard Vessels ) Crew Transfer Vessels ) Upcoming Operations (following 7 days)...

Sensor Platform Project Marine Trials Bidders Conference. Fundy Ocean Research Center for Energy fundyforce.ca

Order no. 939 of 27 November 1992 on the protection of submarine cables and submarine pipelines (the Cable Order)

REC.CM-GFCM/40/2016/4

NT09-21 Cruise Report SURUGA-BAY Cable Laying Experiment / VBCS Function Test

Byelaws: Questions and answers

SPECIAL OPERATIONS COMMAND (SOC) SUPPORT LADDER COMPANIES

HARBOR INFRASTRUCTURE INVENTORIES Muskegon Harbor, Michigan

THE APPLICATION OF THE FUSION POSITIONING SYSTEM TO MARINE ARCHAEOLOGY

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, 12270, & 10422) Condition of Improvement 30 September 2012

Preliminary Survey Notification and Information for Fisheries Interests.

I. Monitoring and Adaptive Management Approach. Potential Effects, Monitoring Studies & Mitigation

OFFSHORE WIND: A CRASH COURSE

Vieques Underwater Demonstration Project

Shell Beaufort and Chukchi Sea Program Update

HELCOM Submerged and The Nairobi International Convention. HELCOM Submerged Expert Group meeting in Bonn, Germany, 22 nd of April 2015

The 2010 BP Oil Disaster Pacific States Marine Fisheries Commission 63 rd Annual Meeting August 24, 2010

Committee Input No. 35-NFPA [ Chapter 1 ] Submitter Information Verification. Committee Statement

SUCCESSFUL GEAR RECOVERY Lessons from Puget Sound

Pandemic / All Hazards Planning

U. S. COAST GUARD ENFORCEMENT REPORT (IPHC Areas 2A, 2C, 3A, 3B, 4A, 4B, 4C, 4D and 4E)

Northern Indiana Public Service Company Michigan City Generating Station Primary Settling Pond Number Annual RCRA CCR Unit Inspection Report

Oil Spill Incident from Drilling Operation East Java

USCG Development Proposal: Heavy Oil Tracking Tactics, Techniques and Procedures Presented to: Ms. Brenda M. Burke (RDC)

Township Of Jackson, Fire District 3, Station 55 Standard Operating Guidelines TWO IN TWO OUT

Annacis Island Wastewater Treatment Plant OUTFALL PROJECT

Implementation and Effect of Major Oil Recovery System Exercises

Pioneer Array Micro-siting Public Input Process Frequently Asked Questions

EFFECTIVENESS OF FLOATING WAVE ATTENUATORS FOR RESTORING AND PROTECTING COASTAL MARSH

Florida s Artificial Reef Monitoring Efforts

QUALIFICATIONS OF GRADUATES

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, & 10422) Condition of Improvement 30 September 2009

The purpose of this policy is to provide operational guidelines for San Diego County Fire Departments (FD) responses to natural gas incidents.

How HSE regulates onshore oil and gas

Comparison of the Dispersant Mission Planner 2 (DMP2) and Estimated Dispersant System Potential (EDSP) Calculators

Procedure for Small Boat Operator Qualification

Document Owner: Name: Phil Langlois Position: Lead Electrical Engineer

Control Devices and Techniques

Transcription:

Point LaBarbe/McGulpin Point Response April 2 May 8, 2018 Regional Response Team 3 Meeting November, 2018 TJ Mangoni District Response Advisory Team Supervisor Ninth Coast Guard District 216-214-4285

Summary of incident On April 2, 2018, a release of approx. 600 gallons of dielectric fluid was reported in Straits of Mackinac Dielectric fluid is a liquid (typically mineral oil) used as electrical insulator in high-voltage cables to suppress arcing & serve as coolant Approximate location of discharge Source determined to be American Transmission Company (ATC) utility cables, approx. 11,000-12,000 feet offshore at depth of approx. 270 Spill response initiated April 2 in accordance with Northern Michigan Area Contingency Plan, USCG Sector Sault Ste. Marie serving as Federal On Scene Coordinator (FOSC)

Summary of incident Unified command established April 3: USCG, Michigan Department of Environmental Quality (MI DEQ), ATC, tribal representatives. Partners engaged: TransCanada, Enbridge, Consumers Energy, Pipeline & Hazardous Materials Safety Administration (PHMSA), NOAA Scientific Support Coordinator, US Fish & Wildlife, USDA, US EPA, et. al. Contracted oil spill removal organizations (OSRO) arrived & commenced response. Removal of residual fluid from lines took several weeks due to length of cables vs. diameter, arrival of specialized equipment Residual product removal from ATC cables completed April 29. Cables capped.

Summary of incident Multiple underwater assessments conducted via remotely operated vehicles (ROV) Enbridge reported three dents to pipeline, no product release reported TransCanada assessed their pipeline and found no damage Consumers Energy reported damage to permanently deactivated ( retired in place ) cables. No free-flowing fluid contained in lines Consumers Energy cables successfully capped & stabilized Spill response for LaBarbe/McGulpin concluded May 8

Underwater Assessment: Enbridge and TransCanada Enbridge and TransCanada entered into agreement to utilize an ROV for visual assessment of their respective utility infrastructure. They are working in close coordination with Pipeline and Hazardous Material Safety Administration (PHMSA) during the assessment phase. PHMSA will review any future plans to conduct remedial work identified by the damage assessment. Enbridge timeline will be similar to ATC timeline for ROV deployment.

Underwater Assessment: Enbridge and TransCanada ATC contracted T&T Marine Salvage to conduct underwater assessment of their utility cables. Initial actions are to deploy a side scanning sonar device for preliminary underwater assessment A second assessment will be done by T&T Marine Salvage. They will deploy an ROV to assess and mitigate damaged cables.

Summary of incident Daily patrols did not report any sheen or abnormal avian behavior to date. Conducted aerial and surface surveillance for sheen detection and wildlife reconnaissance. 2 CG helos, 4 CG Auxiliary flights and 8 contracted flights expended hours of aerial surveillance. 10 hours of vessel surface patrol have were conducted. USDA Animal and Plant Health Inspection Service (APHIS) conducted shore side and waterside assessment of waterfowl populations and behaviors

Summary of incident Cooperative effort resulted in response personnel completing removal of all residual product and capping of cables. Concrete mats were placed to stabilize remaining cables Final/actual spill quantity released was assessed as Coastal-Minor (less than 1,000 gallons) Assessments conducted on wildlife, habitat & environmental impacts from spill, deemed minimal

Investigation of cause Commercial vessel activity reported as possible cause of damage. USCG & NTSB investigations commenced NOAA Chart 14881: CAUTION SUBMARINE PIPELINES AND CABLES. Additional uncharted submarine pipelines and submarine cables may exist within the area of this chart. Not all submarine pipelines and submarine cables are required to be buried and those that were originally buried may have become exposed. Mariners should use extreme caution when operating vessels in depths of water comparable to their draft in areas where pipelines and cables may exist and when anchoring, dragging or trawling.

Way Ahead USCG and National Transportation Safety Board (NTSB) continue investigations into vessel activity that may have caused damaged to cables. USCG D9 no-anchor zone rule currently in process State of Michigan issued temporary no-anchor rule pending completion of USCG rule