The Sample Company Pty Ltd

AIR DISTRIBUTOR. PART NUMBER (Including, but not inclusive) AD28483-_ALB, AD28563-_ALB, AD36097-_ALB, AD36098-_ALB, AD28485-_ALB

SAFE WORK METHOD STATEMENT Part B

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH M ABN

Risk Assessment for: Fume cupboards

Code AWC20HP Air Compressor

SAFE WORK METHOD STATEMENT SWMS No Version

SAFE WORK METHOD STATEMENT

JOB SAFETY ENVIRONMENT ANALYSIS (JSEA) Working With In Situ Testing Rigs

SAFE WORK METHOD STATEMENT

Procedure: Work health and safety hazard management

SAFE WORK METHOD STATEMENT Part 1

Prevention of Falls and Working at Heights

Garbex Drum Crusher Safe Work Procedure PTES_HSE_SWP_028. Name Date Signature. Author Jarred Hearle 30/11/2014. Reviewed John Nulty 30/11/2014

Safe Work Method Statement

How severely could the risk hurt someone? Low/Insignificant First aid

WH&S Act 2011 & Regulations 2011, Environmental Protection Act and Regulations

Job Safety & Environment Analysis

Hazards Requiring Attention: AS AT Friday, 29 January Next Review Saturday, 28 January Total Hazards Recorded 39. Critical Risk Hazards 0

Wheeler Cranes 6 McIntyre Rd Tomago NSW 2324

INSTRUCTION MANUAL FOR UNDERWATER OPERATION

ERI Safety Videos Videos for Safety Meetings POWER SAW SAFETY. Leader s Guide 2001, SAFETY SOURCE PRODUCTIONS

COMMISSIONING TESTS FOR NEW HV CABLES (UP TO 33 KV) JOB SAFETY ANALYSIS

VERTICAL AIR COMPRESSORS

SA Control Valve types: BM, BMF, BX, SB, NS, KA, KB, KC (Normally open) BMRA, BMFRA, BXRA, SBRA, NSRA, KX, KY (Normally closed)

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

EHS Workplace Inspection Checklist (Ref. SOP QMS-080; EHS-010)

170-CG Feed Unit SPONGE-JET USER MANUAL. Sponge-Jet, Inc. (USA) 14 Patterson Lane Newington, NH

INSTRUCTION MANUAL FOR UNDERWATER OPERATION

Safe Work Method Statement (SWMS)

P-03 MAINTENANCE MECHANIC TRAINING SKILL DEVELOPMENT GUIDE

Instruction Manual. Alfa Laval SB Membrane Sample Valve ESE02963-EN Original manual

Date Issued: November 2011 Revision Date: December 2012 Review Date: December 2015 Revision #

Specific Safety Legislation/Codes of Practice/Australian Standards applicable to this JSA (Tick those applicable).

CUT OFF TOOL MODEL: CAT113

JOB SAFETY ANALYSIS. How to use the Risk Assessment Charts. Likelihood A (Almost Certain) B (Likely) C (Possible)

INSTRUCTION MANUAL FOR UNDERWATER OPERATION

How severely could the risk hurt someone?

WORK METHOD STATEMENT CARPET LAYING

SAFETY MANAGEMENT SYSTEM

Date Issued: January 2012 Revision Date: December 2012 Review Date: December 2015 Revision #

Installation, Operation and Maintenance Manual for Back Pressure Regulator

VERTICAL AIR COMPRESSORS

Example of an Occupational Health Risk Assessment

Potable Water Truck Safe Work Procedure PTES_HSE_SWP_041. Name Date Signature. Author Geoff Selfe 25/01/2016. Reviewed Solomon Site 25/01/

High Pressure Washer Safe Work Procedure PTES_HSE_SWP_006. Name Date Signature. Author John Nulty 12/05/2015. Reviewed Jarred Hearle 12/05/2015

University College Dublin Machinery/Equipment Risk Assessment Template

JORDAIR/BAUER Service Manual

How severely could the risk hurt someone? Low/Insignificant First aid

FLYING OBJECTS MANUAL HANDLING EXCESSIVE NOISE

USM21 Sealed Bimetallic Steam Trap for use with Pipeline Connectors Installation and Maintenance Instructions

Installation and Service Manual

COGPOLY39 Meet safety, health and environmental requirements in the workplace

SAFE WORK METHOD STATEMENT CARPENTER

Risk Assessment June Skirmish Paintball Games Exeter

Isolation Standard - Tags

Hazard Identification and Risk Assessment Form. Risk Assessment

Dri-Line Mk2 Spirax-Monnier Compressed Air Drain Trap

Risk assessment. Assessment details. Task. Introduction. Please complete the form as fully and accurately as you can. Assessors job title

air/hydraulic nut riveter heavy-duty vacuum system

INSTALLATION COMMISSIONING, OPERATION & MAINTENANCE MANUAL

SAFETY MANAGEMENT SYSTEM

Powerplay Paintball Brighouse Risk Assessment

USER MANUAL SAVE THESE INSTRUCTIONS. For the most current manual revision, please visit our Website:

CAST IRON SAFETY VALVE TYPE 6301

RASP RX3 Feed UnitTM SPONGE-JET USER MANUAL. Sponge-Jet, Inc. (USA) 14 Patterson Lane Newington, NH

AcornVac Vacuum Plumbing Systems - Trouble Shooting Guide

Halsey Taylor Owners Manual STOP!

PLANT/EQUIPMENT/ASSET HAZARD REPORT

User Information Sheet 013

INSTALLATION / OPERATION / MAINTENANCE INSTRUCTION

Service Call: Procedure for Bleeding the Hydraulic Leveling System. Tools Required: S-Wrench 1/2, 9/16, 5/8, 11/16, & 3/4 Drain Pan

Instruction Manual. Alfa Laval SB Pressure Exhaust Valve ESE02965-EN Original manual

Tech Tips. Service Call: Adjustable Hydraulic Valves Flow controls Pressure controls Sequence valves Holding valves

WORK METHOD STATEMENT STRUCTURAL STEEL

Pneumatic proportional controller Types M Types FM Function tested for use of the float in Ex-zone 0

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

THE CONTROLLED COPY OF THIS DOCUMENT IS ON THE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR THE DATE AT THE BOTTOM OF THE PAGE.

ACCUMULATOR OPERATING & MAINTENANCE INSTRUCTIONS

SAFETY MANAGEMENT SYSTEM

170-SJ Feed UnitTM 470-SJ Feed UnitTM

Safety instructions and operating manual

Contractor OHS Induction. AOHS-05-GUI September 2016

Risk Assessment for: Roaches Pyrotec dyeing machines

Product Bulletin No.: D99-RRV2015-PIB-001

Safe Work Method Statement. Set up and Use - Risk Assessment

Yoke Block Instruction Manual

80 Litre Suction Oil Drainer

SPECIFICATIONS Type: Twin stack, single phase Tank: 4 gallon Air Output: PSI; PSI Max PSI: 125 PSI HP: 1.

FV Flash Vessel Installation and Maintenance Instructions

Installation, Operation and Maintenance Instructions Buffer Vessel OM006

Safe Work Method Statement (SWMS) Worksheet

TABLE OF CONTENTS. INTRODUCTION to the AirVAC... 2 SAFETY INFORMATION... 3 DIMENSIONS & SPECIFICATIONS... 5 UNIT OVERVIEW... 6

How severely could the risk hurt someone? Low/Insignificant First aid

Meuangvang Development Co.LTD Standard Working Procedure 058 Use of Hydraulic Torqueing Devices

Troubleshooting Lift Cylinder Drift and Tilt Cylinder Drift

HAZARD RECOGNITION EVALUATION & CONTROL. Procedure No. HR-405-PR-2 Division Human Resources. Supersedes n/a Board Policy Ref.

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

Inverted Bucket Steam Trap IB 16A-7

Safe Work Method Statement LRB TREE SERVICES 6 Behland St, Kearneys Spring QLD, 4350 ABN

Transcription:

JSEA 1.16 TASK DESCRIPTION FREQUENCY WEIGHT Strangler valve test 250hrs and 2000 hrs ALL PERSONNEL MUST BE TRAINED AND AUTHORISED TO OPERATE THE ED7 OTHER RELEVANT JSEA DATE Issued Manager s Rules. JSEA ED7 1.01 20/04/2007 PERSONAL PROTECTIVE EQUIPMENT TOOLS/EQUIPMENT ENVIRONMENTAL CONTROLS Safety Glasses Dry sorb or other similar material to be at hand Danger Tags 7/16, 9/16, ¾ & 15/16 spanners Waste to be placed into controlled disposal bins Out Of Service Tags ½ drive ratchet & socket set Scrap metal to be placed in controlled recycle bins Standard issue personal protective equipment Tachometer Oily rags to be placed in controlled waste bins Hearing protection Saturated dry sorb is to be cleaned up and placed in Relevant material safety data sheets waste bins NOTE!! Specific Information Regarding Task Step. High Risk = 1 to 6 WARNING!! Safety Alert Regarding to Task Step Medium Risk = 7 to 15 INFO!! General Information Regarding to Task Step Low Risk = 16 to 25 Risk Ranking Table Probability Consequence A B C D E 1 1 2 4 7 11 2 3 5 8 12 16 3 6 9 13 17 20 4 10 14 18 21 23 5 15 19 22 24 25 PROBABILITY CONSEQUENCE A: Common or repeating occurrence 1 Fatality or permanent disability. B: Known to occur or has happened 2 Serious lost time or illness. C: Could occur or heard of it happening 3 Moderate lost time or illness. D: Not likely to occur. 4 Minor lost time or illness E: Practically impossible 5 No lost time NOTE!! The JSEA ED7 1.16 has been determined to be a low / medium risk task after the controls have been put into place. A.B.N. 38 070 973 330 1 Non Conformance Report or Incident Report to be Completed for Any Recognized Defect, Incident or Event. Rev. 02, 20/04/07

1. Position machine for maintenance in non As per manager s rules and regulations. Death or D1 7 hazardous zone. crush As per JSEA ED7 1.01. During test machine will be operated with safety shutdown system disabled. Test must be conducted in NON HAZARDOUS ZONE. 2. Isolate machine. As per manager s rules and regulations. As per JSEA ED7 1.01. 3. Close Low Water Make Up Test Valve Ensure all PPE is worn. 913 has no makeup tank so this step is not required. Refer Photos 4. Open Low Water Level Valve Ensure all PPE is worn. Allow water to run out until it has stopped running. DO NOT close valve until test is completed. Ensure that water running on ground does not create slip hazard. Refer Photos 5. Remove Exhaust gas test port plugs and adaptors on downpipe. 6. Disable all low water shutdown valves (Humphrey Valves) On machines fitted with Catalytic convertor remove raw gas and treated gas test points. Remove adaptors to increase size of hole. Disable Humphrey valves by plugging and capping exhaust ports on both valves. The exhaust port is the centre port on Humphrey valves Trip, slip, fall Trip, slip, fall Finger trap Finger trap A.B.N. 38 070 973 330 2 Non Conformance Report or Incident Report to be Completed for Any Recognized Defect, Incident or Event. Rev. 02, 20/04/07

7. Start machine and run at Ensure all PPE is worn. Death or D1 7 - Idle for 250 hour or monthly service Make sure everyone is clear of the test area. crush - 1400 rpm for 2000 hour or yearly service Warning! Operating the emergency shutdown system whilst the engine is running may result in damage to engine components which may include the turbocharger, crackshaft seal, head gasket, and other seals and gaskets. In addition there is the risk of water ingress into the engine due to the potential vacuum created in the downpipe and exhaust conditioner. The test procedure outlined reduces the risk of water entry into the engine, however water may still enter the engine during the tests, and damage to the engine may still result even without water ingress. Due to the inherent risks associated with emergency shutoff valves, Sandvik are unable to warrant the engine package for damage caused by test or emergency operation of the emergency shutdown system 8. Operate Diesel Engine Shutdown System (Strangler Valve). Reset Diesel Engine Shutdown System (Strangler Valve) Ensure all PPE is worn. Make sure everyone is clear of the test area. 9. Close Low Water Level Valve Ensure all PPE is worn. Refer Photos Record time from operation of shutdown system to engine stopped. Visually check that Strangler Valve has reopened. (Actuation cylinder rod will be extended when open) 10. Open Low Water Make Up Test Valve Ensure all PPE is worn. 913 has no Makeup Tank. On 913 refill scrubber at this step. Refer Photos Death or crush Finger trap D1 7 A.B.N. 38 070 973 330 3 Non Conformance Report or Incident Report to be Completed for Any Recognized Defect, Incident or Event. Rev. 02, 20/04/07

11. Replace exhaust gas test port plugs and On machines fitted with Catalytic convertor replace raw gas and Finger trap adaptors. treated gas test point adaptors and plugs. Machine MUST NOT be operated with test points open 12. Reconnect 2 low water shutdown valves Machine MUST NOT be operated with low water shutdown valves Finger trap (Humphrey Valves). disabled. 13. Conduct low water shutdown test Refer operators manual for low water shutdown test procedure 14. Optional High Idle Test This test can be performed during Code D inspection Warning! Due to high risk of engine damage this test is not recommended. Warning! Operating the emergency shutdown system whilst the engine is running may result in damage to engine components which may include the turbocharger, crackshaft seal, head gasket, and other seals and gaskets. Due to the inherent risks associated with emergency shutoff valves, Sandvik are unable to warrant the engine package for damage caused by test or emergency operation of the emergency shutdown system 15. Set up for high idle test as per steps 1 and 2 of this JSEA Refer steps 1 and 2 of this JSEA 16. Remove exhaust downpipe This is removed as part of Code D inspection Finger trap 17. Run machine at high idle Wear hearing protection to protect against noise of unrestricted exhaust. Ensure area is clear of other personel when conducting test. Death or crush D1 7 A.B.N. 38 070 973 330 4 Non Conformance Report or Incident Report to be Completed for Any Recognized Defect, Incident or Event. Rev. 02, 20/04/07

18. Operate Diesel Engine Shutdown System (Strangler Valve) Damage to engine due to water ingress from exhaust coditioner may result if downpipe is not removed. Death or crush D1 7 Record time from Operation of Diesel Engine Shutdown system until engine stops. 19. Reset Diesel Engine Shutdown System Check Diesel Engine Shutdown actuating cylinder extends when reset. Person Name: Date: Comments or Problems: A.B.N. 38 070 973 330 5 Non Conformance Report or Incident Report to be Completed for Any Recognized Defect, Incident or Event. Rev. 02, 20/04/07

Raw Emission Gas Test Point Treated Gas Test Point Drain Valve Low Water Level Valve Water make up Test Valve 3126 Engine on ED7 and ED10 LHD A.B.N. 38 070 973 330 6 Non Conformance Report or Incident Report to be Completed for Any Recognized Defect, Incident or Event. Rev. 02, 20/04/07

Water Makeup Test Valve Low Water Level Valve Water fill point 3306 Engine on 913-6LHD, 130 LHD and 936 Chock Carrier Low water level valve Scrubber drain valve 3304 Engine on 913 LHD A.B.N. 38 070 973 330 7 Non Conformance Report or Incident Report to be Completed for Any Recognized Defect, Incident or Event. Rev. 02, 20/04/07