Quantity Completed in FY 07/08 (e.g., bike lane miles, sidewalk sq. ft., bike parking spaces, etc. ) Project Status at the end of FY 07/08

Similar documents
Other Measure B Funds Expended on Project in FY 07/08 (i.e., grants, etc.) Measure B Mass Transit Pass-through Funds Expended in FY 07/08

ACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments

ACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments

ACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments

ACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

TRANSPORTATION TRAINING TOPICS. April 6, 2010

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Prince George s County plans, policies, and projects

FUNDING SOURCES CHAPTER 6

City of Oakland - Department of Transportation

Chapter 4: Funding and Implementation

City of Madison: 2017 Capital Budget Capital Improvement Plan

Engineering - Bicycle and Pedestrian

2. Vision & Goals. Vision. Santa Rosa is a community where walking and bicycling are comfortable and convenient for people of all ages and abilities.

Non-Motorized Transportation 7-1

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

Omaha s Complete Streets Policy

Bicycle Facilities Planning

NJDOT Complete Streets Checklist

CITY OF PORTSMOUTH PLANNING DEPARTMENT

Complete Streets. Complete Streets and other City Initiatives. City & County Initiatives. Honolulu Complete Streets Program

Appendix D: Planning Level Cost Calculator

Improvements Infrastructure Gap Assessment and Improvements Street Striping

INDOT Complete Streets Guideline & Policy

Long Island Rail Road Expansion Project Floral Park to Hicksville

Solana Beach Comprehensive Active Transportation Strategy (CATS)

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

6/22/2018 VIA . Darcy Goulart, Planning Manager City of Rancho Cordova Planning Department 2729 Prospect Park Drive Rancho Cordova, CA 95670

Project Status Update

5. RUNNINGWAY GUIDELINES

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

CTDOT Pedestrian and Bicycle Safety Initiatives

Bay to Bay Boulevard Complete Streets Project

Hennepin County Transportation Department

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

EMPHASIS AREA 1: PEDESTRIANS

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

4 GENERIC COST ESTIMATING TOOL

Polk Streetscape Project

Active Transportation Facility Glossary

El Centro Mobility Hub

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

Background Planning Committee STAFF REPORT March 7, 2018 Page 2 of 2 On June 21, 2017, the Authority approved the programming of second cycle One Bay

Anne Arundel County BICYCLE, PEDESTRIAN, TRANSIT ASSESSMENT GUIDELINES

PEDESTRIAN ACTION PLAN

Prince George s County Council Retreat January 5, 2017

Physical Implications of Complete Streets Policies

North Shore Transportation Improvement Strategy

9/21/2016 VIA . RE: The Knot (DR16-270)

Beyond First First Last Last Mile Strategies. APA National Conference April 3, 2016 Chelsea Richer, AICP Fehr & Peers

Morristown, NJ Complete Streets Policy

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

Bicycle Master Plan Goals, Strategies, and Policies

ACTIVE TRANSPORTATION

City of Birmingham Draft Multi-modal Transportation Plan

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

C/CAG. Sunnybrae Elementary School Walking and Bicycling Audit. San Mateo-Foster City School District JUNE 2013

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

Perryville TOD and Greenway Plan

Off-road Trails. Guidance

Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL

Appendix C 3. Bicycle / Pedestrian Planning

Roosevelt Estates Neighborhood Improvements

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

LANCASTER CITY BICYCLE NETWORK

Better Market Street. Engineering, Maintenance & Safety Committee (EMSC) February 28, 2018

TABLE OF CONTENTS. Executive Summary

Project Description Form 8AA

3/10/2016 VIA th Street, Suite 203 Sacramento, CA

Cycle Track Design Best Practices Cycle Track Sections

900 BICYCLE FACILITIES Traffic Engineering Manual

Bicycle Network. Vision Zero San Francisco The City and County of San

Transportation Authority of Marin Renew Existing ½-cent Transportation Sales Tax

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

Measure A Pedestrian & Bicycle Program Update. April 4, 2019 Board of Directors Agenda Item #10 (b)

The Transformation of Portland into a Two-Wheeled Mecca. Mia Birk, Principal, Alta Planning + Design

EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECT

12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)

15 April CAMPUS MASTER PLAN UPATE F o c us G r o up M o b ility

Double the amount of bicycle ridership while at the same time reducing the number of bicycle crashes by one-third.

Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014

St. Francis Drive through the City of Santa Fe Corridor Study

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Meade Street Bridge Design Alternative Study

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA

CONCERNS / CHALLENGES

Transcription:

ACTIA Programs Annual Compliance Report 2007/2008 Reporting Year Table 1 - Summary of Program Expenditure Accomplishments Measure B-Funded Bicycle and Pedestrian Safety Category Phase Type Name Description Benefits Status at the end of Quantity Completed in (e.g., bike lane miles, sidewalk sq. ft., bike parking spaces, etc. ) Units for Quantity Measure B Bike/Ped Pass-Through Funds Expended in Other Measure B Funds Expended on in (i.e., grants, etc.) Total Cost in Was Over $50K of This Work Contracted Out? (If yes, list contract amount) Was Approved by Governing Board? Is in a Countywide Plan? Is in MTC s Regional Bike Plan? Ped Maintenance Maintenance Sidewalk repair Sidewalk repair Sidewalk maintenance by property Completed 14800 Square Feet $ 22,260.00 $ - $ 22,260.00 no Yes Neither Plan No owners to reduce injuries and liability TOTALS: $ 22,260.00 $ - $ 22,260.00 $ - R:\Outreach\Website Update 2011\Downloads\Financial Website Download 81611\Alameda CTC Finances\2000 Measure B\Program Compliance Reports\FY07-08\ACPWA\Copy of ACPWA_Program_Compliance_Table1.xls 1 of 12

ACTIA Programs Annual Compliance Report 2007/2008 Reporting Year Table 1 - Summary of Program Expenditure Accomplishments Measure B-Funded Mass Transit Note: Definitions for each drop-down menu are included in the Mass Transit Glossary (see worksheet tab below). Category Phase Type Name Description Benefits Status at the End of Quantity Completed in (e.g., number of total trips, new vehicles, service hours, etc. ) Units for Quantity Measure B Mass Transit Pass-through Funds Expended in Other Measure B Funds Expended on in (i.e., grants, etc.) Total Cost in Was Over $50K of This Work Contracted Out? (If yes, list contract amount) Estimated Number of Trips Funded by Measure B * TOTALS: $ - $ - $ - $ - 0 *Percentage of total dollars spent to Measure B funds is relative to percentage of trips provided (Total $/Measure B $) approx. = (Total trips provided/measure B-funded trips provided). R:\Outreach\Website Update 2011\Downloads\Financial Website Download 81611\Alameda CTC Finances\2000 Measure B\Program Compliance Reports\FY07-08\ACPWA\Copy of ACPWA_Program_Compliance_Table1.xls 2 of 12

Mass Transit Glossary This glossary is intended as a guide to the project category, project phase, and project type drop-down menus. Use your discretion in selecting the most appropriate item, or select "other" and provide a description under Description. Bus: Ferry: Paratransit: Rail: Construction (new): Environmental: Maintenance: Operations: Plans, Specifications & Estimates: Completion/Closeout: Scoping/Feasibility/Planning: Education/Promotion: Equipment/New Vehicles: Category Bus and/or shuttle project. Ferry project/service. Paratransit service for seniors and/or disabled. Rail project/service. Use Other if none of the above apply, and define other by selecting Type and providing Description. Phase Construction of a new capital project. Preparation of environmental documents, such as those related to the California Environmental Quality Act (CEQA) or the National Environmental Policy Act (NEPA). Maintenance, repairs, renovation or upgrade of existing facility/infrastructure. Operations such as transit, which may include routine maintenance and procurement or lease of vehicles/equipment. PS&E documents include preliminary engineering and construction documents. Inspection/project acceptance, final invoicing, final reporting, processes for closing out project. Early capital project phases, such as project scoping, feasibility studies, planning. Use Other if none of the above apply, and define other by selecting Type and providing Description. Type Marketing, education, information, outreach, promotional campaigns and programs. Purchase or lease of vehicles. Equipment for service improvements, such as information dissemination, fare collection, etc.

Operations: Safety Improvements: Staffing: Welfare to Work: Vehicle operations, scheduling, dispatching, vehicle maintenance, supervision, and fare collection (including ticket or scrip printing and sales) for the purpose of carrying passengers, as well as the actual operations cost and contracts to perform operations. Safety or security improvements for operators, passengers, service users, facilities, infrastructure or property. Salary and benefits for staff to support projects/programs/services. Transit services to enhance transportation opportunities for persons making the transition from welfare to work. Use Other for anything the drop-down box does not cover or for projects that consist of multiple types of improvements; describe other under Description.

ACTIA Programs Annual Compliance Report 2007/2008 Reporting Year Table 1-4 - Summary of Program Expenditure Accomplishments Measure B-Funded Local Streets and Roads Category Phase Type Name Description Benefits Status at the end of Quantity Completed in (e.g., street lane miles, number of intersections, number of signal improvements, etc. ) Units for Quantity Measure B Local Streets and Roads Pass-through Funds Expended in Other Measure B Funds Expended on in (i.e., grants, etc.) Total Cost in Streets/Roads Maintenance Street 2007 Resurfacing and Resurfacing/Maintenan Overlay(2050) rehabilitating existing ce roadways Streets/Roads Maintenance Street 2007 Base Rehabilitating existing Resurfacing/Maintenan Repair (2070) roadways ce Streets/Roads Maintenance Signals Meekland/Ha Install sidewalks and mpton upgrade traffic signal sidewalk (2013) Extends pavement life, improves rideability Extends pavement life, improves rideability Provide continuous sidewalk for pedestrian access Completed 56,200 square meter $778,889 $364,111 $1,143,000 Completed 10,500 tonne $90,159 $1,754,841 $1,845,000 Completed 10,500 Square Feet $80,441 $1,261,559 $1,342,000 TOTALS: $ 949,489.00 $ 3,380,511.00 $ 4,330,000.00 R:\Outreach\Website Update 2011\Downloads\Financial Website Download 81611\Alameda CTC Finances\2000 Measure B\Program Compliance Reports\FY07-08\ACPWA\Copy of ACPWA_Program_Compliance_Table1.xls 5 of 12

Local Streets and Roads Glossary This glossary is intended as a guide to the project category, project phase, and project type drop-down menus. Use your discretion in selecting the most appropriate item, or select "other" and provide a description under Description. Bike/Ped: Facilities: Mass Transit: Paratransit: Streets/Roads: Environmental: Maintenance: New Construction: Operations: Plans, Specifications & Estimates: Completion/Closeout: Scoping/Feasibility/Planning: Bike Parking: Category Bike and pedestrian project/program/plan/staffing. Facility project. Bus, ferry, rail, shuttle project. Paratransit services for seniors and/or disabled. Streets, roads, highways project. Use Other if none of the above apply, and define other by selecting Type and providing Description. Phase Preparation of environmental documents, such as those related to the California Environmental Quality Act (CEQA) or the National Environmental Policy Act (NEPA). Maintenance, repairs, renovation or upgrade of existing facility/infrastructure. Construction of a new capital project. Operations such as transit, which may include routine maintenance and procurement or lease of vehicles/equipment. PS&E documents include preliminary engineering and construction documents. Inspection/project acceptance, final invoicing, final reporting, processes for closing out project. Early capital project phases, such as project scoping, feasibility studies, planning. Use Other if none of the above apply, and define other by selecting Type and providing Description. Type Bike racks and lockers, bike shelters, attended bike parking facilities, bike parking infrastructure.

Bikeways/Multi-use Paths: Bridges/Tunnels: Education/Promotion: Equipment/New Vehicles: Operations: Pedestrian Crossing Improvements: Sidewalks/Ramps: Signage: Signals: Staffing: Street Resurfacing/Maintenance: Traffic Calming: Welfare to Work: Bike lanes, bike boulevards, sidepaths, bike routes, multi-use pathways, at-grade bike crossings. Also, maintenance of bikeway facilities. Crossings above or below grade for bicycles, pedestrians and/or autos. Marketing, education, information, outreach, promotional campaigns and programs. Purchase or lease of vehicles. Equipment for service improvements, such as information dissemination, fare collection, etc. Operations include traffic signal system controls/interconnection, corridor monitoring and management, as well as transit system operations. At-grade pedestrian crossing improvements such as crosswalks, roadway/geometric changes or reconfiguration specifically benefiting pedestrians. New sidewalks, sidewalk maintenance, curb ramps, stairs/ramps for pedestrian and Americans with Disabilities Act access. Warning, regulatory, wayfinding, or informational signage. New traffic signals or crossing signals, signal upgrades, countdown signals, audible signals, signal timing improvements. Salary and benefits for staff to support projects/programs/services. Repaving and resurfacing of on-street surfaces, including striping. Infrastructure primarily aimed at slowing down motor vehicle traffic. Transit services to enhance transportation opportunities for persons making the transition from welfare to work. Use Other for anything the drop-down box does not cover or for projects that consist of multiple types of improvements; describe other under Description.

Bicycle and Pedestrian Safety Glossary This glossary is intended as a guide to the project category, project phase, and project type drop-down menus. Use your discretion in selecting the most appropriate item, or select "other" and provide a description under Description. Bike: Bike & Ped: Ped: Environmental: Maintenance: New Construction: Operations: Plans, Specifications & Estimates: Completion/Closeout: Scoping/Feasibility/Planning: Bike Parking: Bikeways: Bridges/Tunnels: Education/Promotion: Maintenance: Multi-use Paths: Category Primarily a bicycle project. intended for both bicyclists and pedestrians. Primarily a pedestrian project. Phase Preparation of environmental documents, such as those related to the California Environmental Quality Act (CEQA) or the National Environmental Policy Act (NEPA). Maintenance, repairs, renovation or upgrade of existing facility/infrastructure. Construction of a new capital project. Operations such as for bike stations. PS&E documents include preliminary engineering and construction documents. Inspection/project acceptance, final invoicing, final reporting, processes for closing out project. Early capital project phases, such as project scoping, feasibility studies, planning. Use Other if none of the above apply, and define other by selecting Type and providing Description. Type Bike racks and lockers, bike shelters, attended bike parking facilities, bike parking infrastructure. Bike lanes (Class II), bike boulevards, sidepaths, bike routes (Class (III), at-grade bike crossings. Bike-pedestrian crossings above or below grade. Marketing, education, information, outreach, promotional campaigns and programs. Repair or rehabilitation of bicycle and/or pedestrian infrastructure, including sidewalk maintenance, restriping, multi-use pathway maintenance, etc. Pathways (Class I) for bicyclists, pedestrians and other non-motorized modes.

Pedestrian Crossing Improvements: Safety Improvements: Sidewalks/Ramps: Signage: Signals: Staffing: Traffic Calming: At-grade pedestrian crossing improvements such as crosswalks, roadway/geometric changes or reconfiguration specifically benefiting pedestrians. Infrastructure improvements for bicyclists and pedestrians that are not covered by other project types on this list. New sidewalks, sidewalk maintenance, curb ramps, stairs/ramps for pedestrian and Americans with Disabilities Act access. Warning, regulatory, wayfinding, or informational signage. New traffic signals or crossing signals for pedestrians and/or bicyclists, signal upgrades, countdown signals, audible signals, and video detection. Salary and benefits for staff to support projects/programs/services. Infrastructure primarily aimed at slowing down motor vehicle traffic. Use Other for anything the drop-down box does not cover or for projects that consist of multiple types of improvements; describe other under Description.

ACTIA Programs Annual Compliance Report 2007/2008 Reporting Year Table 1-4 - Summary of Program Expenditure Accomplishments Measure B-Funded Paratransit Category Phase Type Name Description Benefits Status at the end of Quantity Completed in (e.g., number to total trips, number of tickets, etc.) Units for Quantity Measure B Paratransit Pass Through Expenditures in Other Measure B Funds Expended on in (i.e., grants, etc.) Total Cost in Was Over $50K of This Work Contracted Out? (If yes, list contract amount) Estimated Number of Trips Funded by Measure B * TOTALS: $ - $ - $ - $ - $ - *Percentage of total dollars spent to Measure B funds is relative to percentage of trips provided (Total $/Measure B $) approx. = (Total trips provided/measure B-funded trips provided). ` R:\Outreach\Website Update 2011\Downloads\Financial Website Download 81611\Alameda CTC Finances\2000 Measure B\Program Compliance Reports\FY07-08\ACPWA\Copy of ACPWA_Program_Compliance_Table1.xls 10 of 12

Paratransit Glossary This glossary is intended as a guide to the project category, project phase, and project type drop-down most appropriate item, or select "other" and provide a description under Description. Category Disabled Services: Meals on Wheels: Senior & Disabled Services: Senior Services: Environmental: Maintenance: New Construction: Operations: Plans, Specifications & Estimates: Completion/Closeout: Scoping/Feasibility/Planning: Education/Promotion: Equipment for Service Improvements: Meals Delivery: New Vehicle Acquisition: Operations/Trip Provisions: Purchase of EBP Tickets: Safety Improvements: Staffing: Services primarily created for mobility for people with di Delivery of meals. Transportation services for seniors and disabled. Services primarily created for senior mobility. Use Other if none of the above apply, and define other Description. Phase Preparation of environmental documents, such as those Quality Act (CEQA) or the National Environmental Polic Maintenance, repairs, renovation or upgrade of existing Construction of a new capital project. Operations such as transit, which may include routine m vehicles/equipment. PS&E documents include preliminary engineering and c Inspection/project acceptance, final invoicing, final repo Early capital project phases, such as project scoping, fe Use Other if none of the above apply, and define other Description. Type Marketing, education, information, outreach, promotiona Procurement/lease of equipment for service improveme Costs associated with vehicle operation, scheduling, dis supervision for the purpose of delivering meals, whethe taxicab, or by grantees. Procurement/lease of vehicles. Vehicle operation, scheduling, dispatching, vehicle main (including ticket or scrip printing and sales) for the purpo operations cost and contracts to perform operations. Amounts paid to East Bay Paratransit for tickets plus as Safety or security improvements for operators, passeng property. Salary and benefits for staff to support projects/program Use Other for anything the drop-down box does not cov types of improvements; describe other under De

menus. Use your discretion in selecting the isabilities. by selecting Type and providing e related to the California Environmental cy Act (NEPA). g facility/infrastructure. maintenance and procurement or lease of construction documents. orting, processes for closing out project. easibility studies, planning. by selecting Type and providing al campaigns and programs. ents. spatching, vehicle maintenance, and er provided in-house, through contracts, via ntenance, supervision, and fare collection ose of carrying passengers. Includes actual ssociated costs, e.g. distribution. gers, service users, facilities, infrastructure or ms/services. ver or for projects that consist of multiple escription.