The topics I will briefly cover, are; Stack Configurations Wellhead Connector Considerations Control Systems Tensioning Systems will be discussed by

Similar documents
Completion Workover Riser System. Enabling efficient operations by reducing interface complexities and minimizes operational risk

Learn more at

RPSEA UDW Forum June 22 & 23, Secure Energy for America

List of Well Control and Spill Response Equipment on Rigs as of March 25, 2015

Appendix K Appendix K

Subsea Safety Systems

The Developing Design of the Blowout Preventer in Deep Water

Deepwater Horizon Incident Internal Investigation

API Std 53 - Blowout Prevention Equipment Systems for Drilling Wells Standard Edition Section Inquiry # Question Reply

Learn more at

5k Slickline Lightweight Pressure Control Equipment 4 ID

Marine Technology Society

API Std 53 - Blowout Prevention Equipment Systems for Drilling Wells

Case studies from classes led by Dr. Ron Fulbright, University of South Carolina Upstate. IMPROVED BLOWOUT PREVENTER

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack)

IWCF Equipment Sample Questions (Surface Stack)

NORSOK STANDARD SYSTEM REQUIREMENTS BOP, DIVERTER AND DRILLING RISER SYSTEM (SYSTEM NO.: 12-30, 12-40)

Last Updated: April 19, 2018

API Std 53 - Blowout Prevention Equipment Systems for Drilling Wells

Offshore Managed Pressure Drilling Experiences in Asia Pacific. SPE paper

Casing Design. Casing Design. By Dr. Khaled El-shreef

Subsea Tooling Services Range of Dredgers

Subsea Wellhead and Conductor Fatigue

RIGID RISERS FOR TANKER FPSOs

Subsea Tooling Services Range of Dredgers

W I L D W E L L C O N T R O L SNUBBING OPERATIONS

On-Off Connector Skirt

Safety and Risk Engineering. HSE Case Implementation Clive Rawson

Operating Procedure TITON SUBSEA BOLT TENSIONER

NORSOK standard D-010 Rev. 3, August 2004

A practical solution for managing risk during locked to bottom operations

1. The well has been shut in on a kick and the kill operation has not started.

IMCA Competence Assessment Portfolio June 2013

Development of a New Deep-Water Riser System. Daniel Karunakaran Subsea 7

valves and actuators SUBSEA ACTUATION

Casing! 07 An Overview!

Cost-efficient polymer solutions

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

En-Tegrity. A step change in subsea well control safety

Cameron MBS Multi-Bowl Wellhead System

2/15/06 Nora Ghobrial

Module No. # 04 Lecture No. # 3.1 Case studies (continued) (Refer Slide Time: 00:10)

All information correct as of 25 th September 2013 and subject to change without notice. 6 inch HURRICANE modular dredge equipment operations manual.

TURBINE SEAL: AXIAL TYPE DESIGN

NOT TO COPY -- NO DISSEMINATE WITHOUT WRITTEN AGREEMENT. Presentation JB AG JCN JR 1

Autonomous Shutdown Valve

DRILLING HOSE SOLUTIONS

NORSOK STANDARD D-002 Edition 2 (2013)

Successful Deployment of a Long Gun String Via Intelligent Coiled Tubing

Wellhead, Conductor and Casing Fatigue Causes and Mitigation Tze King Lim, Elizabeth Tellier, Hugh Howells 2H Offshore Engineering

International Well Control Forum. Well Intervention Pressure Control Level 2 Syllabus July 2015 Version 7.0

Introduction. DEEPWATER DRILLING RISER INTEGRITY - FATIGUE, WEAR, INSPECTION AND MONITORING by Dr Hugh Howells and Dave Walters 2H Offshore Inc

DIVERLESS SUBSEA HOT TAPPING OF PRODUCTION PIPELINES


Commentary on the book by Andrew Hopkins. By Graham Dalzell

Why Do Not Disturb Is a Safety Message for Well Integrity

OCEAN DRILLING PROGRAM

Protecting People and the Environment during Stimulation Treatments in Offshore Settings

Incident Investigation Report. Shelburne Basin Venture Cheshire L-97. LMRP & Riser Loss to Seabed. Report version 4.0. Restricted August 9, 2016

RPSEA PROJECT April 19, 2011

IMCA Competence Assessment Portfolio June 2013

Development of Self-Installing Deepwater Spar. Ashit Jadav February 2017

APPLICATIONS ROV & AUV SEISMIC PRODUCTION SYSTEMS DOWNHOLE JUMPER & CABLE SYSTEMS DRILLING CONTROL

Live well deployment of long perforating gun system using combined CT technologies

SPE Coiled Tubing in High-pressure Wells. Well Control Considerations. Introduction

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

Flexible Engineered Solutions International CALM Buoy Swivels

Marine Technology Society

Engineered solutions for complex pressure situations

CHE Well Testing Package/Service:

Success Paths: A Risk Informed Approach to Oil & Gas Well Control

Subsea Heave Compensators. Bob Wilde - InterMoor Jake Ormond- InterMoor. Deep Offshore Technology

An Ocean of Possibility

PROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION

Permanent buoyancy systems. matrix composites & engineering

Development of a Subsurface Mudline Packer to Reduce Risk of Flow after Cementing and Sustained Casing Pressure, While Providing a Platform for P&A.

Faculty of Science and Technology MASTER S THESIS

TRADITIONAL HIGH VIBRATION HOSE SYSTEM THE STANDARD FOR MANY AUTOMOTIVE APPLICATIONS

NOBLE REV 02 FPSO MOORING SYSTEM INTEGRITY STUDY

5. INSPECTION AND TESTING PROCEDURES

SODV - PAC REACTION PAPER SUBSEA VISUALIZATION SYSTEMS

Performance and Value of the invision System : Offshore in Coiled Tubing Operations

WELL CONTROL OISD RP 174

The Benefits Of Composite Materials In Deepwater Riser Applications. 26 th March 2015 Hassan Saleh Senior Engineer 2H Offshore Engineering Ltd

Blowout Prevention Equipment Systems for Drilling Wells

ISE Subsea Tools and Toolsleds

A LIFE OF THE WELL ARTIFICIAL LIFT STRATEGY FOR UNCONVENTIONAL WELLS

Top Tensioned Riser Challenges and Solutions for Dry Tree Facilities in Asia Pacific

From the Wellhead to the Tanker Offshore Production Systems. 28/03/2014 Instituto Superior Técnico

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

REVISION INDEX DESCRIPTION AND/OR PAGES MODIFIED

BUCCANEER ALASKA OPERATIONS, LLC. BUCCANEER ALASKA OPERATIONS, LLC Cook Inlet Exploratory Drilling Program. Community Outreach: KPB Assembly

Marine Technology Society

Polar Research Vessel Operational Requirements and Summary of Technical Studies

Fully Submersible Heavy Lift Vessel

API RP 2D sect C.4.1.2: 4-yearly load test of BOP crane to SWL +5 Ton and NDT inspection post load test.

Work Horses of the Breathing Air Industry

Grouped SLOR Deep Water Riser System and Installation Assessment

Instruction & Parts Manual

CLIENT NAME: LOCATION: CALM BUOY INSPECTION:

Transcription:

Thank you Greg. 1

The topics I will briefly cover, are; Stack Configurations Wellhead Connector Considerations Control Systems Tensioning Systems will be discussed by Mr. Muhammad Sadiq, however in short, I would like to discuss a few points that should be considered in the design of the system. All connecting points must be symmetrically positioned, providing equal distribution of the load. The tensioning ring may also be incorporated into the telescopic joint. In the case of DP operations, the tensioning arrangement must also allow for heading changes. In addition, top tensioning may be applied to the BOP stack frame. In this case the load is not transmitted directly through the BOP. The BOP frame is designed, in such a way, to withstand the tensioning load as the BOP rests on the frame assembly. Many older generation drilling units may not be capable of providing the minimum required tension. In order to satisfy the requirement, there are a few alternatives available: 1 Upgrade existing tensioning system 2 Use a purpose built buoyed riser in conjunction with the (casing) riser system 3 Combination of upgraded tensioning system and purpose built buoyed riser 4 Deploy an air can buoy in the riser string 2

Each of these alternatives have their advantages and disadvantages. And lastly, time permitting would like to touch on air gap considerations 2

Whilst both 13 5/8 and 18 3/4 and 10,000psi and 15,000psi BOP s can be and have been successfully used for surface stack operations from floating rigs, however, the smallest size BOP is preferable due to its lower weight and ease of handling. Although, in saying that, the use of the existing subsea BOP may be utilized as a surface type BOP. The size of the rig s moon pool, vessel motion and tensioning capacity are considerations in the selection of the BOP. 3

The Seabed Isolation Device serves as the second barrier, providing the capability to shut in the well in the event of an emergency such as a catastrophic failure of the riser. This device is operated via an acoustic control system and/or via ROV intervention. 4

A conventional style wellhead connector (Vetco H4/Cameron Collet or similar) installed below the surface BOP to connect to the riser through the upper riser mandrel/wellhead, with an upper riser mandrel/wellhead flanged to the top of the upper stress joint is the preferred method of connection. This use of a hydraulic connector provides a more efficient means to nipple up the BOP. The benefits of the upper riser mandrel/wellhead are; 1. Provides an efficient means to nipple up the BOP being capable of accepting the hydraulic connector. 2. Serves as the connection between the surface BOP and the riser. It has a profile to accept the connector in use below the BOP. If the drilling program requires surface casing tiebacks, then the mandrel/wellhead will be capable of accommodating conventional casing hangers and seal assemblies. 3. Allows for landing a test plug to facilitate testing the BOP while connected to the riser. Seabed Isolation Device Connectors The Seabed Isolation Device can be fitted with an Upper and Lower Hydraulic style such as Vetco H4/Cameron Collet. The upper connector is mounted to the Seabed Isolation Device in the inverted position to serve as the connection between the Seabed Isolation Device and the riser to allow for re entry into the well or changing to a higher pressure rated riser. 5

The rig s existing control system can be utilized The control pod can be mounted on the stack or a suitable termination point on the BOP frame. Jumper hoses are used to connect from this termination to a POD receptacle mounted on the deck. Functions can be operated the same as when in conventional subsea mode. The primary means of control for the Seabed Isolation Device as previously mentioned, is the acoustic control system, with the ROV serving as the back up control system. All functions on the Seabed Isolation Device can be operated by the ROV through use of the ROV intervention panel. In addition, the ROV must be capable of recharging the Seabed Isolation Device s accumulator bottles as well as deploying and recovering the acoustic control transducers. 6

The air gap considerations we refer to, is the height between the top of the BOP stack assembly and the bottom of the Diverter Ball/Flex Joint. This gap, is accommodated by means of a telescopic joint. The design of the telescopic joint must allow for sufficient stroke to withstand the maximum vessel excursion in the event of one mooring line failure in addition to accommodating maximum vessel heave and tidal changes. When selecting the style of connections for the telescopic joint we should consider the rig s existing equipment. The top connection needs to adapt to the existing diverter ball/flex joint connection. The bottom connection can be an API flange connection, to interface directly with the top of the annular preventer. Alternatively, a mandrel can be flanged to the top of the annular preventer to facilitate the use of a standard marine riser coupling that can be assembled much quicker than an API flange. 7

Does anyone have any questions on what we have just covered? 8