New Jersey Department of Transportation. Safety Impact Teams. May 22, 2007 Patricia Ott, P. E. Director, Traffic Engineering & Safety

Similar documents
FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

Everyone is a Pedestrian

Route 7 Corridor Study

RSTF Measurements and Status

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

Iowa Highway 58 Corridor Improvement Study

Cincinnati Dayton Rd Widening

New Jersey Department of Transportation. Complete Streets Summit Shukri Abuhuzeima NJDOT-Local Aid

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St.

Advancing Transportation Choices in Des Moines. MPO Environmental Roundtable January 9, 2018

We believe the following comments and suggestions can help the department meet those goals.

Road Diets FDOT Process

PERFORMANCE ACTIVITY 613 IMPACT ATTENUATOR WORK DESCRIPTION 3

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Military Road Safety Improvements

NJDOT Complete Streets Checklist

STANLEY STREET December 19, 2017

ROAD SAFETY AUDIT (RSA) Barbur Blvd: SW Capitol Hwy to SW Naito Parkway (M.P to M.P. 1.95)

CTDOT Pedestrian and Bicycle Safety Initiatives

Safety Corridors a Synthesis. Charlie Nemmers / Derek Vap University of Missouri

What are Managed Lanes?

Toward Zero Deaths. Regional SHSP Road Show Meeting. Virginia Strategic Highway Safety Plan. presented by

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

CITY OF FRANKLIN, TENNESSEE. Columbia Avenue. Widening & Improvements Project. Public Meeting May 16, 2017

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

10.0 CURB EXTENSIONS GUIDELINE

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Washington St. Corridor Study

PERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 4

Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

SR/CR A1A PEDESTRIAN SAFETY & MOBILITY STUDY RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION

This page intentionally left blank.

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

FY 2005 TRANSPORTATION CAPITAL PROGRAM

Most Dangerous Roads for Walking And How States Can Make them Safer. Route 110, Long Island, New York Image by Dougtone

CONTRA COSTA. Countywide Bicycle and Pedestrian Plan. Executive Summary. July Contra Costa Countywide Bicycle & Pedestrian Plan

Chapter 6: Transportation

Chapter 2: Standards for Access, Non-Motorized, and Transit

Transportation Planning Division

RSA Efforts in the Tampa Bay Area

Pedestrian Road Safety Audit

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Goodlettsville Bicycle and Pedestrian Plan Executive Summary

Perryville TOD and Greenway Plan

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN

Overview of Pinellas County Pedestrian Safety Programs and Initiatives

ALLEY 24 TRAFFIC STUDY

Zlatko Krstulich, P.Eng. City of O9awa

Evaluation of Pavement Markings within the Dynamic Envelope

Defining Purpose and Need

Bay to Bay Boulevard Complete Streets Project

LANE ELIMINATION PROJECTS

ROAD SAFETY AUDIT. State Road (Route 6) Corridor Town of Dartmouth. March Prepared For: MassDOT

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

HYANNIS, MASSACHUSETTS TRANSPORTATION IMPROVEMENT PROGRAM

Project Description Form 8EE

Route 29 Corridor Assessment Update. Development of Possible Solutions

Draft North Industrial Area-Wide Traffic Plan

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

Hennepin County Transportation Department

2.0 LANE WIDTHS GUIDELINE

Overview of FDOT District 7 Safety Programs and Initiatives in Tampa Bay, FL

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

Pinellas County Safety Initiatives

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Prince Albert Statement of POLICY and PROCEDURE. Department: Public Works Policy No. 66. Section: Transportation Issued: July 14, 2014

Project Overview. Rolling Road Widening Fairfax County. Get Involved. Design Public Hearing. Contact Information

Ottawa Beach Road Study

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Roundabouts. By: Nezamuddin, Valparaiso University. February 19, 2015

North Shore Transportation Improvement Strategy

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

TRAFFIC SIGNAL WARRANT STUDY

Glenn Avenue Corridor Traffic Operational Evaluation

State Highway 16/McDermott Road Kuna-Mora Road to Ada/Gem County Line

SECTION 7 INVENTORY OF SELECTED INTERSECTIONS AND RECOMMENDATIONS FOR FURTHER STUDY

Closing Plenary Session

6.0 PEDESTRIAN AND BICYCLE FACILITIES 6.1 INTRODUCTION 6.2 BICYCLE DEMAND AND SUITABILITY Bicycle Demand

Lynchburg District Update

PROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access

E Grand Complete Street Pilot Project

Access Management in the Vicinity of Intersections

SD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN By Josh Larson McLaury Engineering Inc.

Funding Sources Appendix I. Appendix I. Funding Sources. Virginia Beach Bikeways and Trails Plan 2011 Page I-1

How would you like it if people drove their cars thru your office?

NCHRP Superelevation Criteria for Sharp Horizontal Curves on Steep Grades. Research Team: MRIGlobal Pennsylvania State University

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

I-10 Bypass Project Banning to Cabazon

Driveway Design Criteria

Living Streets Policy

TRAFFIC CALMING POLICY & PROCEDURES

City of Moorhead Committee of the Whole Meeting

Board of Supervisors February 27, 2017

City of Fairfax, Virginia City Council Work Session

Transcription:

New Jersey Department of Transportation Safety Impact Teams May 22, 2007 Patricia Ott, P. E. Director, Traffic Engineering & Safety

Safe Corridor Legislation Approved July 2003 Double Fines for Motor Vehicle Violations Corridors Designated Feb 2004 Highway Safety Fund Established

Identifying a Safe Corridor Fatalities: 6 or more in 3 years on State Roadways Total Crashes: 1000 or more in 3 years in any 10-mile segment from list of Fatalities Crash Rates: Crash Rate more than 50% above statewide avg for cross-section

Concept Multi-disciplinary team members 3E s + 3 Day Process Recommendations Follow Up & Evaluation

Partners NJDOT NJDHTS State & Local Law Enforcement MPOs FHWA AAA AARP Partners NJ Transit NHTSA Local Businesses Local Citizens Media Elected Officials Rutgers University

Day 1 Introductions SIT Materials Distribution Operational Characteristics Overall Crash Summary Proposed Roadway Projects/Planned Development Crash Review @ Select Locations

By: PJL Drawing Not To Scale 2004 Day 2 15 N #14 #15 661 Mile 3 8 5 #17 46 #18 Mile 3 9 #19 ROUTE 46 INTERSECTIONS #14. Pequannock St - (Ranked T3) #15. Sussex St - (Ranked 1) #16. Mt Hope St - Bergen St - (Ranked 4) #17. Locust Ave #18. Nelson St-McFarland St #19. Perry St - (Ranked 5) #20. Shopping Center #16 46 46 15 Mile 3 641 9 5 #20 6 7 NEW JERSEY DEPARTMENT OF TRANSPORTATION ROUTE U.S. 46 Safety Impact Team Review MP 38.1 to MP 39.6

Intersection (MP) Short Term Recommendation Responsibility Franklin Corner Road/Bakers Basin Road (MP 5.98) Increase the size of the existing lane designation signs and add a "RIGHT-LANE FOR EXIT ONLY" sign along the northbound approach to the signal. Provide two additional arrows and "ONLY" markings in the northbound right-turn lane prior to the two existing "ONLY" markings. TE&I to M.E. TE&I to M.E. Intersection/MP Franklin Corner Road/Bakers Basin Road (MP 5.98) Intermediate Term Recommendations Investigate installing a dynamic warning sign "BE PREPARED TO STOP" in advance of the northbound approach to the signal on Route 1. Initiate a study to determine how the raised pavement markers will be affected if the striping width is increased from 8" to 12". Based on the results of this study, increase the width of the striping between the right-turn lane and the adjacent through Day 3 Field view debrief Recommendations: short, medium, and long-term Install sidewalks that extend from the intersection to logical termini, as well as handicap ramps where the crosswalk is located for pedestrians. Intersection/MP Long Term Recommendations Franklin Corner Relocate the northbound jughandle to behind Mrs. G's. Road/Bakers Basin Road (MP 5.98) Nassau Park Boulevard (MP 8.50) Remove signal entirely. Assignment of roles and responsibilities Washington Road (MP 11.27) Implement Penns Neck EIS recommendations.

Improvements Short: signing, markings, signal modifications Medium: minor geometrics, new signals, minor utilities Long: major geometrics, right-of-way, historic, environmental

Funding $2 million for Safe Corridors in FY07 $2.5 million in FY08 $500K for Pedestrian Safe Corridors Senior Safety unfunded at this time

Senior Safety Pilot Program 3 Locations Completed Pedestrian Safe Corridor Program 3 Locations Completed Future: Truck Corridor Program

Observations Tendency to just look at engineering as the only solution Intermediate & Long Term solutions getting lost

SITs More participants Roadway Owner participates Above Avg. Crash Locations RSAs Independent Teams Performed in Design Stage Performed on Existing Roadways

RSA Program in NJ SJTPO South Jersey MPO County & Local Roadways Improvements thru Local Aid Grant Program

Future SIT Process expanded to other programs & jurisdictions Community Engagement & Ownership Education & Enforcement recommendations implemented Evaluation of Improvements

Thank You Patricia Ott Patricia.Ott@dot.state.nj.us 609-530-2488