Chart 1: DfT Pothole Action Fund Productivity and Spend Chart 2017/18 Accumulative Information by Month.

Similar documents
Department of Internal Affairs Mandatory Non-Financial Performance Measures 2013 Roads and Footpaths

Progress with the Road Investment Strategy

2018 ROAD MAINTENANCE PROGRAM

Road Condition Statistics: Notes and definitions

POTHOLES IN EDMONTON. Updated: April 4, 2013

Advantages & Specifications for the Use of Perma-Patch for the Repair of Potholes

Greater Cambridge City Deal Executive Board & Joint Assembly

Local Highway Panels Members Guide. 9 Public Rights of Way

London Organising Committee of the Olympic Games and Paralympic Games. 14 June 2010

ANNUAL LOCAL AUTHORITY ROAD MAINTENANCE (ALARM) SURVEY 2002

Planning for tennis in your Local Government Area. A resource from Tennis Australia

land transport road assets

Amendments to Essex Highway Maintenance Strategy Maintenance Policy and Standards April 2008

Toronto Public Library

Paving for Progress Municipal Streets Seminar

land transport road assets

Managing Leakage and Preparing for the 2012 Olympics

Active Transportation Infrastructure Investment A Business Case

Use of Performance Metrics on The Pennsylvania Turnpike. Pamela Hatalowich, Penn Turnpike Commission Paul Wilke, Applied Research Associates, Inc.

Adjustment of the Night Time Quiet Period (NTQP) - Dec 2016

A guide to how local communities can change local speed limits

Report to Cabinet. 18 May 2016

Capital and Strategic Planning Committee. Item III - B. April 12, WMATA s Transit-Oriented Development Objectives

Municipality of Sofia Traffic Master Plan. Intelligent Transport Systems Strategy Andrew Walsh

GAS PIPELINE SAFETY GUIDE.

2016 FACT SHEET ENGINEERING STREET OPERATIONS. Engineering Street Operations net 2016 budget is $5,199,900 WHAT IS ENGINEERING STREET OPERATIONS?

Speed Limit Policy Isle of Wight Council

Road Maintenance Standards Portfolio Committee on Transport

London Cycle Network Annual Report 2000

Why We do Preventive Maintenance

Skid Resistance Policy. July 2008

Lake Waterford Community Association Meeting. November 15, 2016

INTERIM ADVICE NOTE 171/12. Risk Based Principal Inspection Intervals

Local Highway Panels Members Guide. 2 Speed and Traffic Management

Appendix 12 Parking on footways and verges

Capital Beltway HOT Lanes - Frequently Asked Questions

ENFIELD TOWN THE REVISED DESIGN

ASSET MANAGEMENT & SCRIM: A TARGETED APPROACH TO THE MANAGEMENT OF SKIDDING RESISTANCE

CHAPTER 7.0 IMPLEMENTATION

GUIDE TO RUNNING A BIKE SHARE. h o w t o p l a n a n d o p e r a t e a s u c c e s s f u l b i k e s h a r e p r o g r a m

Pavement Management Report. City Council Meeting of May 21, 2013

Best Practice RBI Technology Process by SVT-PP SIMTECH

City of Davis Pavement Management Program

Pavement Management Program

Water System Assessment User s Guide

TRANSPORT PUBLIC SAFETY SERVICES THAT SUPPORT COMMUNITIES. Provide access to, from and for emergency services

Implementation Report # False Creek Bridges

May 12, 2016 Metro Potential Ballot Measure Issue Brief: Local Return

Temporary Equipment Fails After 20 Years of Use Worker Gets Sandblasted

CLEAR COLLISION LEAD EVALUATE ACT RE-OPEN KEEPING TRAFFIC MOVING. CFOATechRescue ConfJuly2013v0.1

City of Coquitlam. Pavement Management Technology. Profile/GPS/Videolog Vehicle. Pavement Management System. SUBSURFACE PROFILING - Road Radar

Roads Maintenance Municipal Services Roads Programme Footpath Programme

18.1 Introduction Maintaining pedestrian-related Problems arising in the long term. infrastructure

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017

C ITY OF B EDFORD H EIGHTS

Developing a Birmingham Transport Space Allocation policy. David Harris Transport Policy Manager Economy Directorate Birmingham City Council

Secondary Road Program

INTERIM ADVICE NOTE 150/12. Guidance for Alternative Temporary Traffic Management Techniques for Relaxation Schemes on Dual Carriageways.

PUBLISHED PROJECT REPORT PPR850. Optimisation of water flow depth for SCRIM. S Brittain, P Sanders and H Viner

REGULATION 22. STANDARD RELATING TO THE USE OF ARTIFICIAL RUGBY TURF

Kentucky s Surface Transportation System

STRATEGIC PLAN

PONTELAND RUGBY FOOTBALL CLUB

The expenditure exceeds the income generated, creating an annual shortfall of around 17,447 per annum.

E4 Cycle Route Exeter University to Redhayes Bridge. - Recommendations from Exeter Cycling Campaign

Delivering the. Strategy 7.0

Linking Land Use & Transportation in Minneapolis

21. CHRISTCHURCH CYCLE LANES: PROPOSED COLOURED SURFACING CHANGE

ROAD SLOPE MANAGEMENT IN MALAYSIA

Bristol City Council has produced a draft Bristol Transport Strategy document.

Seal Extension Guidelines. Asset Management and Systems

CITY OF WEST KELOWNA COUNCIL POLICY MANUAL

Walking in Traffic Violence. The pervasiveness of motor vehicle crashes with pedestrians in New York City

CONCLUSIONS AND RECOMMENDATIONS

Report to COUNCIL for decision

CYCLING CHARTER ACTION PLAN EXECUTIVE SUMMARY

LADDERS FIXED AND PORTABLE

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

Tacoma Streets 101. City of Tacoma - Citizen Neighborhood Street Improvement and Safety Task Force

CONTENTS 03 AMBITION 04 MISSION 05 GROW THE GAME 07 SERVE MEMBERS 09 SUCCEED INTERNATIONALLY 11 EFFECTIVE SPORT LEADER 13 SUMMARY

Nottingham, the great cycle city

Bringing Pressure Under Control: Harnessing Control Valves for Intelligent Water Networks. A Report on Best Practice from TALIS

Managed Motorways Experience from the UK

ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025

Reliability Engineering. Module 3. Proactive Techniques - Definitions

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

Project Update May 2018

Highways England Road Safety Ambition. David Stones PACTS Autumn 2015 Conference 3 nd November 2015

PRESSURE SYSTEMS POLICY

Community Development and Recreation Committee. General Manager, Parks, Forestry and Recreation. P:\2015\Cluster A\PFR\CD AFS#22685

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

DRAFT. Table of Contents. Background

Prevention of Falls and Working at Heights

SWIMMING POOL WATERPROOFED AND RETURNED TO GLORY WITH SIKA

9. Parking Supporting Statement

PROVINCIAL MAINTENANCE STANDARDS FOR MUNICIPAL HIGHWAYS AMENDMENTS 2018 RECOMMENDATION

QLDC Council 24 July Report for Agenda Item: Fergburger Proposed Shotover Street Footpath Upgrade

Executive Summary. Introduction

Hennepin County Bicycle and Pedestrian Planning

Cycling and Walking Investment Strategy & Local Cycling and Walking Infrastructure Plans

Transcription:

March 2018 Pothole Action Fund Around 10,000 road potholes had been repaired to end of February and this figure expected to rise to around 11,000 by end of March. This includes around 3,000 potholes addressed through the robust capital road resurfacing programme. Pothole repair funding in Essex combines Essex County Council (ECC) funding with the Department for Transport (DfT) Pothole Action Fund, resulting in approximately 6.8M for pothole repairs in 2017/18. The Department for Transport (DfT) provided 1.869 million to ECC to tackle road potholes in 2017/2018. Essex then received an additional 1.3M for pothole repairs from the DfT in February 2018, making a total of 3.173M DfT funding for 2017/18. Whilst the DfT anticipated Local Authorities carrying forward this additional 1.3M funding to spend in 2018/19, Essex has seized the opportunity to deploy more repair gangs on the network. As a result, a significant amount of this additional funding will now be spent in 2017/18 - benefitting road users sooner rather than later. The DfT funding enhances the existing ECC funding which is estimated at over 3.6M for similar road repairs in 2017/18, which makes a combined total of approximately 6.8 million. The DfT funding has facilitated additional road pothole repairs to be undertaken on all road hierarchies across the County. The most appropriate treatments have been selected on a site by site basis, but predominantly the treatment selected has been traditional patching for quality, long lasting repairs. Essex Highways complies with best practice in its road repairs, and therefore invests in right first time value for money permanent repairs. This approach reflects the Highways Maintenance Efficiency Programme (HMEP) guidance, which is an industry led but government promoted initiative to encourage good asset management practice. Chart 1 below shows the accumulative number of potholes repaired by month using the DfT funding over 4,000 potholes had been repaired to the end of February, and this is expected to rise to over 4,500 by the end of March.

Chart 1: DfT Pothole Action Fund Productivity and Spend Chart 2017/18 Accumulative Information by Month. The ECC funding for pothole repairs has focused on higher priority, safety related repairs, although lower priority repairs have also been undertaken. This is shown in Chart 2 below, where over 1,500 potholes had been repaired by the end of February; a figure which is expected to rise to nearly 1,700 by the end of March. In addition, potholes have been addressed through other ECC funded surface course repairs such as patching. Chart 3 below shows the productivity and spend profile for potholes addressed through other surface course repairs, where over 1,700 potholes had been repaired by the end of February; a figure which is expected to rise to nearly 1,900 by the end of March.

Chart 2: ECC Funded Pothole Repair Productivity and Spend Chart 2017/18

Chart 3: ECC Funded Surface Course Repairs (Pothole Repairs) Productivity and Spend Chart 2017/18 Discouraging potholes forming through a balanced capital road resurfacing programme of preventative and strengthening treatments in 2017/18 Note that the information above relates to general maintenance. Works to address potholes do not begin and end with these localised repairs, however, as Essex undertakes a comprehensive programme of capital road resurfacing works each year. Capital road resurfacing works are more substantive treatments which discourage potholes forming. Essex is an advocate of the Preventative Approach, whereby generous applications of capital funded, low cost, value for money preventative treatments such as Surface Dressing and Micro Surfacing are applied to seal the road surface to prevent the ingress of water. Water is a major contributor to road condition deterioration and the subsequent formation of potholes, especially during the winter months with the action of freeze/thaw. Preventative treatments also address the effect of oxidation. Oxidation causes the surface to become brittle over time and susceptible to cracking, especially in Essex where a significant composition of clay soils contributes to ground movement through expansion and contraction.

Strengthening treatments, such as machine surfacing, recycling and reconstruction, strengthen road surfaces, making them more resilient to the formation of potholes in the first instance, but these are more expensive treatments. The tables below show the amount of capital road works programmed for 2017/18 and already largely completed. This includes well over 3M square metres in total of Surface Dressing plus Micro Surfacing. Indeed these treatments account for 74% of the total area of works this delivers great value for the residents of Essex. Capital Roads Maintenance Treatment Type 20017-18 length km % Joints 31 4% Machine Surfacing 126 15% Major Reconstruction 2 0.2% Micro 44 5% Recycling 19 2.3% Skid Resistance 2 0.2% Surface Dressing 604 73% Total 827 100% Capital Roads Maintenance Treatment Type 20017-18 Area % Square Metres Joints 225,735 5% Machine Surfacing 767,802 18% Major Reconstruction 11,124 0.3% Micro 236,892 6% Recycling 65,371 1.5% Skid Resistance 11,298 0.3% Surface Dressing 2,919,196 69% Total 4,237,419 100% Total programmed length of works is over 800 km (over 500 miles) which is further than from London to Edinburgh. Or for international travellers it is further than from London to Frankfurt in Germany. Overall the county has just over 5,000 miles of roads. This is about the road distance from London to Oman on the Arabian Peninsular. It is estimated that these resurfacing works had included repairs to an additional 2,500 potholes by the end of February; a figure which is expected to rise to 2,800 by the end of March. Why minor defects such as potholes are unlikely ever to be eradicated completely We can all be proud of the programmes of works being undertaken on roads across Essex throughout 2017/2018, including minor repair works such as fixing potholes as well as

more substantive works such as resurfacing. Whilst these will make a significant contribution to addressing road condition, however, they will not solve the problem of the occurrence of potholes entirely. Why not? It can sometimes seem a mystery as to why potholes form at all. Why after extensive minor repairs have been carried out more potholes eventually reappear. There are a number of factors which create this phenomenon. The penetration of water is a major cause of road deterioration, but another major cause is oxidisation. Exposure to the air over time causes the road surface to harden and become brittle, and this makes the surface prone to cracking, which then allows the penetration of water. Regrettably we have an ageing road network. This is not peculiar to Essex but merely describes the roads across the entire country. New and extensive resurfacing can be expected to remove any significant incidence of potholes for a number of years, but generally the older the network becomes then the more it will reveal the effects of ageing such as the occurrence of potholes. The other contributor to the occurrence of potholes is the actual construction of the roads. Roads of modern construction are less prone to the formation of potholes, but the majority of our roads have evolved over time and have not been constructed to the standards that would be expected of a newly built road today. These evolved roads are more prone to the occurrence of potholes, not least as they provide much less resilience to the effects of extreme weather (expansion through freezing in the winter, and contraction due to drying out in the summer). For more information about potholes please refer to the HMEP report Pothole Review: Prevention and a Better Cure accessed via the link below http://www.highwaysefficiency.org.uk/efficiency-resources/asset-management/thepotholes-review.html At the heart of the HMEP recommendations for addressing potholes are practices which have long been adopted by Essex Highways: Intervening at the right time with preventative treatments (such as Surface Dressing and Micro Surfacing) to reduce the amount of potholes forming, thereby preventing bigger problems later Getting it Right first time with permanent, high quality repairs to reduce the cost of revisits Providing clarity to the public through communicating to the public what is being done and how it is being done. Not only is Essex Highways providing this information through its website and press releases but it has recently launched a twitter account. The continued occurrence of potholes is acknowledged by the DfT, and we anticipate receiving further Pothole Action funding in future years funding which will enhance not displace our spending plans. This is good news for all road users.