ACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments

Similar documents
ACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments

ACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments

Quantity Completed in FY 07/08 (e.g., bike lane miles, sidewalk sq. ft., bike parking spaces, etc. ) Project Status at the end of FY 07/08

ACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments

Other Measure B Funds Expended on Project in FY 07/08 (i.e., grants, etc.) Measure B Mass Transit Pass-through Funds Expended in FY 07/08

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

TRANSPORTATION TRAINING TOPICS. April 6, 2010

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

SFMTA s Services for Seniors and People with Disabilities. San Francisco Municipal Transportation Board July 17, 2018

City of Madison: 2017 Capital Budget Capital Improvement Plan

Engineering - Bicycle and Pedestrian

City of Oakland - Department of Transportation

Non-Motorized Transportation 7-1

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

Prince George s County Council Retreat January 5, 2017

Transportation Authority of Marin Renew Existing ½-cent Transportation Sales Tax

Polk Streetscape Project

SUMMARY OF TRANSPORTATION INVESTMENTS

BALBOA AREA: TRANSPORTATION PROJECTS & PLANNING

FUNDING SOURCES CHAPTER 6

Better Market Street. Engineering, Maintenance & Safety Committee (EMSC) February 28, 2018

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

Chapter 4: Funding and Implementation

5. RUNNINGWAY GUIDELINES

Prince George s County plans, policies, and projects

Project Status Update

PEDESTRIAN ACTION PLAN

Long Island Rail Road Expansion Project Floral Park to Hicksville

2. Vision & Goals. Vision. Santa Rosa is a community where walking and bicycling are comfortable and convenient for people of all ages and abilities.

Bicycle Network. Vision Zero San Francisco The City and County of San

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

Tunnel Reconstruction South 5 th Street Association October 16, 2018

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on

SRTS IMPLEMENTATION COSTS

Appendix D: Planning Level Cost Calculator

Complete Streets. Complete Streets and other City Initiatives. City & County Initiatives. Honolulu Complete Streets Program

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

RiNo Railroad Crossing Connectivity Analysis. Stakeholder Workshop June 29, 2017

Chapter 5. Complete Streets and Walkable Communities.

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

LANCASTER CITY BICYCLE NETWORK

San Rafael School District. Task Force Meeting Notes. November 5, 2012

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

COMPLETE STREETS FUNDING PROGRAM

Vallecito Elementary School. Travel Plan

Bicycle Facilities Planning

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Active Transportation Facility Glossary

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

INDOT Complete Streets Guideline & Policy

Improvements Infrastructure Gap Assessment and Improvements Street Striping

AMERICANS WITH DISABILITIES ACT TRANSITION PLAN LEON COUNTY FOR CURB RAMPS AND SIDEWALKS DEPARTMENT OF PUBLIC WORKS. 1 P age

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

Bicycle Master Plan Goals, Strategies, and Policies

Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. Project Type Capital Improvement

Omaha s Complete Streets Policy

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

CURBSIDE ACTIVITY DESIGN

M14A/D Select Bus Service

Complete Streets Funding Program Project Prioritization Plan

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Mission Bay Loop (MBL) Public Meeting

Pedestrian and Bicycle Conditions

Beyond First First Last Last Mile Strategies. APA National Conference April 3, 2016 Chelsea Richer, AICP Fehr & Peers

Physical Implications of Complete Streets Policies

Roosevelt Estates Neighborhood Improvements

CONCERNS / CHALLENGES

SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008

NJDOT Complete Streets Checklist

4 GENERIC COST ESTIMATING TOOL

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

ACTIVE TRANSPORTATION

City of Birmingham Draft Multi-modal Transportation Plan

PRESS RELEASE San Joaquin Council of Governments

May 12, 2016 Metro Potential Ballot Measure Issue Brief: Local Return

C/CAG. Sunnybrae Elementary School Walking and Bicycling Audit. San Mateo-Foster City School District JUNE 2013

TRANSPORTATION IMPROVEMENT STRATEGY

Hennepin County Transportation Department

New Orleans Complete Streets Experience CITY OF NEW ORLEANS. Louis Haywood Department of Public Works January 19, 2016

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

San Francisco County Transportation Authority Proposition K Sales Tax Program Allocation Request Form

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation

Bridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment

Moraga Pedestrian and Bicycle Master Plan Update and Wayfinding Plan. Citizens Advisory Committee Meeting July 21, 2015

Outreach Approach RENEW SF served as the primary liaison with the North Beach community; the Chinatown. Executive Summary

Existing Pedestrian Conditions. PSAC February 8, 2011

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Welcome! Thank you for joining us today for a Geary Rapid project open house. Geary Rapid Project. SFMTA.com/GearyRapid

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Bicycle and Pedestrian Connectivity Study. Old Colony Planning Council

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

AGENDA ITEM NO. 5b HCAOG TAC meeting of May 8, 2014

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

EMPHASIS AREA 1: PEDESTRIANS

Transcription:

Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments Note: Definitions for each drop down menu appear as Comments (scroll over the column title or in the Review mode, choose "Show All Comments"). The document is set up to print Comments at the end. Status Deliverables Expenditures Approvals and Plans Column A Column B Column C Column D Column E Column F Column G Column H Column I Column J Column K* Column L* Column M Column N Column O Column P Column Q Category Phase Type Name Benefits (describe how the project improvements benefit the implementation area) Status (at the end of ) Completed in FY 10 11 (total number of bike lane miles, sidewalk sq. ft., bike parking spaces, etc.) Units for (other details about unit or quantity) Bike/Ped Pass through Expenditures in Other Funds Expended on in (grants, local streets roads funds, etc.) Other Non Funds Expended on in Total Cost in (columns K+L+M = N) Was Over $50K of This on an Individual Contract? (if yes, list contract amount) Did Governing Board Approve the? Is the in a Countywide Plan? If So, Which Plan? Pedestrian Construction (includes Sidewalks and Ramps New Sidewalks: D St., Cypress St., and Western Blvd. ( 5109) Installation of new sidewalks along portions of D St., Cypress St., and Western Blvd. will provide increased pedestrian safety on this route, which passes by nearby schools Closed Out in FY 10,462 Square Feet Sidewalk $354,900.11 $354,900.11 $344,476.55 Yes Neither Plan Pedestrian Construction (includes Sidewalks and Ramps New Sidewalks: Berry Avenue from Soto to Whitman ( 5173) Installation of new sidewalks along portions of Berry Avenue from Soto to Whitman will provide increased pedestrian safety on this route, which passes by nearby schools Closed Out in FY 6,894 Square Feet Sidewalk $1,386.01 $1,386.01 Yes Neither Plan Pedestrian Other Pedestrian Crossing Improvements Pedestrian Traffic Signal Improvements ( 5175) Installation of countdown will provide timers and ADA compliant increased pedestrian push buttons as well as safety and greater audible traffic signals accommodation for nonvehicular modes of travel 1 Other (describe in Column J) Audiable traffic signal installed $9,343.99 $9,343.99 Yes Neither Plan Pedestrian Construction (includes Sidewalks and Ramps New Sidewalks: Bellina Avenue from Second to Third St ( 5163) Installation of new sidewalks along portions of Bellina Avenue from Second to Third St will provide increased pedestrian safety on this route, which passes by nearby schools $58,962.79 $58,962.79 Yes Neither Plan Pedestrian Construction (includes Pedestrian Crossing Improvements Relocation of the City's Pedestrian Bridge ( 5130) Relocation of the City's will remove Planning in FY Pedestrian Bridge as a part commericial and industrial of the County's Floodwall Impovement properties from the floodplain in areas on both sides of the channel and residential properties on the north side $10,808.47 $10,808.47 Yes Neither Plan TOTALS: 17,357 $435,401.37 $435,401.37 $344,476.55 *The dollar figures in columns K and L must be consistent with your agency's audit.

Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments Cell: A5 Comment: Category: Bicycle: Primarily a bicycle project. Bike and Ped: intended for both bicyclists and pedestrians. Pedestrian: Primarily a pedestrian project. Cell: B5 Comment: Phase: Construction (includes : Construction of a new capital project, including development of the preliminary engineering and construction documents: the plans, specifications, and estimates. Environmental: Preparation of environmental documents, such as those related to the California Environmental Quality Act (CEQA) or the National Environmental Policy Act (NEPA). :, repairs, renovation, or upgrade of existing facility or infrastructure. Operations: Operations such as for bike stations. Completion/Closeout: Inspection/project acceptance, final invoicing, final reporting, and processes for closing out project. Scoping, Feasibility, Planning: Early capital project phases, such as project scoping, feasibility studies, and planning. Other: Use if none of the above apply, and define the project phase by selecting Type (Column C) and describe the phase under (Column E). Cell: C5 Comment: Type: Bike Parking: Bike racks and lockers, bike shelters, attended bike parking facilities, and bike parking infrastructure. Bikeways (non Class I): Bike lanes (Class II), bike boulevards, sidepaths, bike routes (Class III), at grade bike crossings. Includes bikeway maintenance. Bridges and Tunnels: Bicycle pedestrian crossings above or below grade. Education and Promotion: Marketing, education, information, outreach, promotional campaigns, and programs. Master Plan: Bicycle and/or pedestrian master plan development. Multiuse Paths (Class I): Pathways (Class I) for bicyclists, pedestrians, and other non motorized modes. Includes maintenance of multiuse paths. Pedestrian Crossing Improvements: At grade pedestrian crossing improvements such as crosswalks, roadway/geometric changes, or reconfiguration specifically benefiting pedestrians. Safety Improvements: Infrastructure improvements for bicyclists and pedestrians not covered by other project types on the list. Sidewalks and Ramps: New sidewalks, sidewalk maintenance, curb ramps, stairs/ramps for pedestrian and Americans with Disabilities Act access. Signage: Warning, regulatory, wayfinding, or informational signage. Includes signage maintenance. Signals: New traffic signals or crossing signals for pedestrians and/or bicyclits, signal upgrades, countdown signals, audible signals, and video detection. Staffing: Salary and benefits for staff to support projects, programs, or services. Traffic Calming: Infrastructure primarily aimed at slowing down motor vehicle traffic. Other: Use if none of the Types apply or for projects that consist of multiple types of improvements. Describe the type under (Column E). Cell: G5 Comment: Status: Choose project status on June 30, 2010: Planning in FY 09/10, Initiated in FY 09/10,, or Closed Out in FY 09/10. Cell: I5 Comment: Units for : Select from the drop down menu and add any details about the unit or quantity in Column J. Cell: P5 Comment: Governing Board: Answer Yes or No. Cell: Q5 Comment: Countywide Plan(s): Choose one of: Bike Plan, Ped Plan, Both Plans, or Neither Plan.

Local Streets and Roads Table 1: Summary of Expenditures and Accomplishments Note: Definitions for each drop down menu appear as Comments (scroll over the column title or in the Review mode, choose "Show All Comments"). The document is set up to print Comments at the end. Status Deliverables Expenditures Column A Column B Column C Column D Column E Column F Column G Column H Column I Column J Column K Column L Column M Column N Column O Other Status Completed in FY 10 Was Over $50K Local Benefits (at the end of 11 Units for Other Non Total of This Streets and Funds Expended Category (describe how the Phase Type ) (total number of Cost in on an Individual Roads on in Name project improvements street lane miles, (other details about Funds Expended Contract? Pass through benefit the intersections, unit or quantity) on in (columns K+L+M (if yes, list Expenditures in (grants, implementation area) signal = N) contract bike/ped improvements, amount) funds, etc.) etc.) Streets and Roads Construction (includes Streets and Roads Construction (includes Streets and Roads Construction (includes Streets and Roads Construction (includes Streets and Roads Scoping, Feasibility, Planning Traffic Calming Pavement Reconstruction FY 2011 ( 5111) Pavement Rehabilitation FY 2011 ( 5112) Pavement Reconstruction FY 2012 ( 5127) Pavement Rehabilitation FY 2012 ( 5129) Speed Monitoring Devices ( 5166) Reconstruction or major repair to severely deteriorated streets Structural repair of streets, including repair of deteriorating pavement Reconstruction or major repair to severely deteriorated streets Structural repair of streets, including repair of deteriorating pavement Several solar powered speed monitoring devices were placed at highpriority locations throughout the City The reconstruction of severely deteriorated The rehabilitation of the The reconstruction of severely deteriorated The rehabilitation of the The speed monitoring devices will remind motorists of their speed and will assist with pedestrian safety near highly traveled streets Closed Out in FY Planning in FY Planning in FY 201,156 Square Feet Asphalt $664,832.49 $664,832.49 $644,444.44 29,061 Square Feet Asphalt $631,830.40 $631,830.40 $532,528.04 3 Other (describe in Column J) Radar Speed Monitor Sign Installation $71,153.45 $71,153.45 $76,510.48 $76,510.48 $52,726.04 $52,726.04 Streets and Roads Completion/Closeout Streets and Roads Completion/Closeout Pavement Reconstruction FY 2009 ( 5169) Pavement Rehabilitation FY 2010 ( 5171) Reconstruction or major repair to severely deteriorated streets Structural repair of streets, including repair of deteriorating pavement The reconstruction of Closed Out in FY severely deteriorated The rehabilitation of the Closed Out in FY $484.63 $484.63 825,754 Square Feet Asphalt $1,805,600.74 $1,805,600.74 $1,706,558.14 00 TOTALS: 1,055,974 $3,303,138.23 $3,303,138.23 $2,883,530.62

Local Streets and Roads Table 1: Summary of Expenditures and Accomplishments *The dollar figures in columns K and L must be consistent with your agency's audit.

Local Streets and Roads Table 1: Summary of Expenditures and Accomplishments Cell: A5 Comment: Category: Bike/Ped: Bicycle and pedestrian project, program, plan, or staffing. Mass Transit: Bus, ferry, rail, or shuttle project. Paratransit: Paratransit services for seniors and or people with disabilities. Streets and Roads: Streets, roads, or highways project. Other: Use if none of the above apply, and define category by selecting Type (Column C) and providing (Column E). Cell: B5 Comment: Phase: Construction (includes : Construction of a new capital project, including development of the preliminary engineering and construction documents: the plans, specifications, and estimates. Environmental: Preparation of environmental documents, such as those related to the California Environmental Quality Act (CEQA) or the National Environmental Policy Act (NEPA). :, repairs, renovation, or upgrade of existing facility or infrastructure. Operations: Operations such as transit, which may include routine maintenance and procurement, or lease of vehicles/equipment; intelligent transportation systems; or corridor system management. Completion/Closeout: Inspection/project acceptance, final invoicing, final reporting, and processes for closing out project. Scoping, Feasibility, Planning: Early capital project phases, such as project scoping, feasibility studies, and planning. Other: Use if none of the above apply, and define the project phase by selecting Type (Column C) and describe the phase under (Column E). Cell: C5 Comment: Type: Bike Parking: Bike racks and lockers, bike shelters, attended bike parking facilities, and bike parking infrastructure. Bikeways and Multiuse Paths: Bike lanes, bike boulevards, sidepaths, bike routes, multiuse pathways, at grade bike crossings. Includes maintenance of bikeway facilities. Bridges and Tunnels: Crossings above or below grade for bicycles, pedestrians, and/or autos. Education and Promotion: Marketing, education, information, outreach, and promotional campaigns and programs. Equipment and New Vehicles: Purchase or lease of vehicles. Equipment for service improvements, such as informaiton dissemination, fare collection, etc. Operations: Operations including traffic signal system controls/interconnection, corridor monitoring and management, and transit system operations. Pedestrian Crossing Improvements: At grade pedestrian crossing improvements such as crosswalks, roadway/geometric changes or reconfiguration specifically benefiting pedestrians. Sidewalks and Ramps: New sidewalks, sidewalk maintenance, curb ramps, stairs/ramps for pedestrian and Americans with Disabilities Act access. Signage: Warning, regulatory, wayfinding, or informational signage. Signals: New traffic signals or crossing signals, signal upgrades, countdown signals, audible signals, or signal timing improvements. Staffing: Salary and benefits for staff to support projects, programs, or services. : Repaving and resurfacing of on street surfaces, including striping. Traffic Calming: Infrastructure primarily aimed at slowing down motor vehicle traffic. Welfare to Work: Transit services to enhance transportation opportunities for persons making the transition from welfare to work. Other: Use if none of the Types apply or for projects that consist of multiple types of improvements. Describe the type under (Column E). Cell: G5 Comment: Status: Choose project status on June 30, 2010: Planning in FY 09/10, Initiated in FY 09/10,, or Closed Out in FY 09/10. Cell: I5 Comment: Units for : Select from the drop down menu and add any details about the unit or quantity in Column J.

Mass Transit Table 1: Summary of Expenditures and Accomplishments Note: Definitions for each drop down menu appear as Comments (scroll over the column title or in the Review mode, choose "Show All Comments"). The document is set up to print Comments at the end. Status Deliverables Expenditures Column A Column B Column C Column D Column E Column F Column G Column H Column I Column J Column K* Column L Column M** Column N** Column O Column P Column Q Category Phase Type Name Benefits (describe how the project improvements benefit the implementation area) Status (at the end of ) Completed in FY 10 11 (total number of trips, new vehicles, service hours, etc.) Units for (other details about unit or quantity) Estimated Number of Funded by (type of trips or other details) Mass Transit Pass through Expenditures in Other Funds Expended on in (grants, etc.) Other Non Funds Expended on in Total Cost in (columns M+N+O = P) Was Over $50K of This on an Individual Contract? (if yes, list contract amount) TOTALS: 0 0 *Percentage of total dollars spent to funds is relative to percentage of trips provided. (Total $/ $) approx. = (Total trips provided/ funded trips provided). **The dollar figures in columns M and N must be consistent with your agency's audit.

Mass Transit Table 1: Summary of Expenditures and Accomplishments Cell: A5 Comment: Category: Bus: Bus and/or shuttle project. Ferry: Ferry project or service. Paratransit: Paratransit service for seniors and/or people with disabilities. Rail: Rail project/service. Other: Use if none of the above apply, and define the category by selecting Type (Column C) and providing a (Column E). Cell: B5 Comment: Phase: Construction (includes : Construction of a new capital project, including development of the preliminary engineering and construction documents: the plans, specifications, and estimates. Environmental: Preparation of environmental documents, such as those related to the California Environmental Quality Act (CEQA) or the National Environmental Policy Act (NEPA). :, repairs, renovation, or upgrade of existing facility or infrastructure. Operations: Operations such as transit, which may include routine maintenance and procurement, or lease of vehicles/equipment; intelligent transportation systems; or corridor system management. Completion/Closeout: Inspection/project acceptance, final invoicing, final reporting, and processes for closing out project. Scoping, Feasibility, Planning: Early capital project phases, such as project scoping, feasibility studies, and planning. Other: Use if none of the above apply, and define the project phase by selecting Type (Column C) and describe the phase under (Column E). Cell: C5 Comment: Type: Education and Promotion: Marketing, education, information, outreach, and promotional campaigns and programs. Equipment and New Vehicles: Purchase or lease of vehicles. Equipment for service improvements, such as information dissemination, fare collection, etc. Operations: Vehicle operation, scheduling, dispatching, vehicle maintenance, supervision, and fare collection (including ticket or scrip printing and sales) for the purpose of carrying passengers. Includes actual operations cost and contracts to perform operations. Safety Improvements: Safety or security improvements for operators, passengers, service users, facilities, and infrastructure or property. Staffing: Salary and benefits for staff to support projects, programs, or services. Welfare to Work: Transit services to enhance transportation opportunities for persons making the transition from welfare to work. Other: Use if none of the Types apply or for projects that consist of multiple types of improvements. Describe type under (Column E). Cell: G5 Comment: Status: Choose project status on June 30, 2010: Planning in FY 09/10, Initiated in FY 09/10,, or Closed Out in FY 09/10. Cell: I5 Comment: Units for : Select from the drop down menu and add any details about the unit or quantity in Column J.

Paratransit Table 1: Summary of Expenditures and Accomplishments Note: Definitions for each drop down menu appear as Comments (scroll over the column title or in the Review mode, choose "Show All Comments"). The document is set up to print Comments at the end. Status Deliverables Expenditures and Fare Revenue Column A Column B Column C Column D Column E Column F Column G Column H Column I Column J Column K Column L* Column M* Column N Column O Column P Column Q Category Phase Type Customer Service and Outreach Management Individual Demandresponse Group Other (describe in Column E) Name Hayward Door to Door and Group Trip Service Management of Hayward Paratransit Services Hayward Door to Door Service Hayward Paratransit Group Trip Program Alzheimer's Services Of the East Bay (ASEB) Transpiration Customer Service and Outreach included: distributing Paratransit information through the City's website and various community newsletters, to potential eligible riders and referral sources. Local seniors, 70 and over, and people who have disabilities were enrolled in Hayward's Paratransit program, which provided accessible, affordable, door to door and group transportation for enrolled riders, their attendants, and companions. Benefits (describe how the project improvements benefit the implementation area) Enrolled riders, their attendants, and companions used Hayward's accessible door todoor service to meet transportation needs within Hayward and the unincorporated areas of San Lorenzo, Castro Valley, San Leandro and Union City. Group trip services within the San Francisco Bay Area, were provided to enrolled paratransit riders, their attendants, and companions to offer the opportunity to be active in the community and maintain independence. Hayward Paratransit's door to door and group Accessible paratransit services were provided for trip programs provided independence to local local registered rider, their attendants, and seniors and people who have disabilities. companions. The City of Hayward's non ADA demand response Local seniors and people who have disabilities paratransit service was provided on lift equipped were offered door to door service on liftequipped vehicles, Monday through Saturday vans for registered riders who live in Hayward and the unincorporated areas of Castro Valley, from 8:00am 6:00pm. There were no trip limits San Lorenzo, and San Leandro. Service was to those who were unable to use EBP. There was provided to those 70 years old and over and a four week limit for all others, although those who were in the process of acquiring East exceptions were made on a case by case basis. Bay Paratransit (EBP) certification or who were unable to use the ADA service due to traveling outside of the EBP service area or service hours. Residents of Skilled Nursing Facilities, housing for seniors and people who have disabilities, and senior mobile home parks, were provided with affordable, accessible group trips, to provide opportunities to be involved within the community. The City contracted with ASEB to transport participants to and from ASEB's adult day program, which served people who have dementia. Familiar drivers were specially trained and participated in care plan meetings for program participants, serving as liaisons between their homes and the ASEB program. Meal Delivery SOS Meals on Wheels The City subsidized 90% of the transportation costs for the delivery of nutritious meals to isolated seniors, living in the Paratransit Program's service area, whose health issues prevented them from attending congregate meal sites. By using Hayward Paratransit's Group Trip Program, local residents traveled with attendants, companions, friends, and family Status (at the end of ) members to functions within the Bay Area, in the safety of a group. Local residents who have dementia and participate in the ASEB day program had access to safe and reliable transportation, with familiar drivers. The lift equipped transportation was coordinated with other services through the adult day program. Low income seniors were provided with 7 nutritious home delivered meals per week and a vital daily check in by a familiar driver. Completed in FY 10 11 (total number of one way passenger trips, tickets purchased, etc.) Trip Type (other details about trip service) Lift/ramp assisted 4,661 Lift/ramp assisted 299 Lift/ramp assisted 6,066 Lift/ramp assisted 3,143 Other (describe in Column K) Number of Funded by in * (other details about trip or program) In addition to marketing the Paratransit program, customer service and outreach included: responding to inquiries, enrolling riders, issuing transportation vouchers, record keeping, reporting, making referrals to other programs and services, and problem solving. Operating supply costs are also included in this category. Oversight, planning, and budgeting costs accounted for 15% of staff costs. Paratransit Pass through Expenditures in FY 10 11 Other Funds Expended on in (includes gap or MSL grants, stabilization) Other Non Funds Expended on in (includes the general fund) Fares (paid for travel including cash fares, scrip/voucher purchases, fares retained by vendors or paid by third party sponsors) Total Cost in (columns L+M+N+O = P) $129,388.39 $129,388.39 $18,252.36 $18,252.36 Was Over $50K of This on an Individual Contract? (if yes, list contract amount) 4,661 $259,132.95 $10,937.79 $270,070.74 $300,000.00 299 $4,938.57 $299.00 $5,237.57 6,066 $50,000.00 $50,000.00 $50,000.00 3,143 SOS Meals on Wheels drivers delivered seven meals each week. Five meals were delivered hot, one meal was a sack lunch for Saturday and one was frozen to be heated on Sunday. $32,000.00 $32,000.00 TOTALS: 14,169 14,169 $493,712.27 $11,236.79 $504,949.06 $350,000.00 *Percentage of total dollars spent to funds is relative to percentage of trips provided. (Total $/ $) approx. = (Total trips provided/ funded trips provided). **The dollar figures in columns L and M must be consistent with your agency's audit.

Paratransit Table 1: Summary of Expenditures and Accomplishments Cell: A5 Comment: Category: Disabled Services: Services primarily created for mobility for people with disabilities. Meals on Wheels: Delivery of meals. Senior & Disabled Services: Transportation services for seniors and people with disabilities. Senior Services: Services primarily created for senior mobility. Other: Use Other if none of the above apply, and define other by selecting Type (Column C) and providing (Column E). Cell: B5 Comment: Phase: Construction (includes : Construction of a new capital project, including development of the preliminary engineering and construction documents: the plans, specifications, and estimates. Environmental: Preparation of environmental documents, such as those related to the California Environmental Quality Act (CEQA) or the National Environmental Policy Act (NEPA). :, repairs, renovation, or upgrade of existing facility or infrastructure. Operations: Operations such as transit, which may include routine maintenance and procurement, or lease of vehicles/equipment. Completion/Closeout: Inspection/project acceptance, final invoicing, final reporting, and processes for closing out project. Scoping, Feasibility, Planning: Early capital project phases, such as project scoping, feasibility studies, and planning. Other: Use if none of the above apply, and define the project phase by selecting Type (Column C) and describe the phase under (Column E). Cell: C5 Comment: Type: Capital Purchase: Purchase of equipment, vehicles, or facilities. Customer Service and Outreach: Staffing and benefits for customer service as well as costs associated with marketing, education, outreach, and promotional campaigns and programs. EBP Ticket Purchase: Amounts paid to East Bay Paratransit for tickets plus associated costs, for example, distribution. Group : One way passenger trips considered group trips. Includes vehicle operation and contracts. See Individual Demand response. Individual Demand response : Taxi service, door to door trips, van trips, etc. Includes actual operation cost and contracts for vehicle operation, scheduling, dispatching, vehicle maintenance, supervision, and fare collection (including ticket or scrip printing and sales) for the purpose of carrying passengers. Management: Staffing and benefits to manage programs, projects, and services. Meal Delivery: Costs associated with vehicle operation, scheduling, dispatching, vehicle maintenance, and supervision for the purpose of delivering meals, whether provided in house, through contracts, via taxicab, or by grantees. Shuttle or Fixed route : Shuttle service or fixed route bus service, for example. Includes vehicle operation and contracts. See Individual Demand response. Other: Use if none of the above apply. Describe the Type under (Column E). Cell: G5 Comment: Status: Choose project status on June 30, 2010: Planning in FY 09/10, Initiated in FY 09/10,, or Closed Out in FY 09/10. Cell: I5 Comment: Trip Type : Lift/ramp Assisted: that include lift or ramp assistance. Taxi : Any type of taxi trip. Same day Lift/ramp assisted : that include lift or ramp assistance and are same day service. Same day : Same day service. Other: If Trip Type is not applicable to your program, choose Other and provide a description in Column K.