MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

Similar documents
MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

ACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments

City of Oakland - Department of Transportation

ACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments

ACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments

Quantity Completed in FY 07/08 (e.g., bike lane miles, sidewalk sq. ft., bike parking spaces, etc. ) Project Status at the end of FY 07/08

Other Measure B Funds Expended on Project in FY 07/08 (i.e., grants, etc.) Measure B Mass Transit Pass-through Funds Expended in FY 07/08

Background Planning Committee STAFF REPORT March 7, 2018 Page 2 of 2 On June 21, 2017, the Authority approved the programming of second cycle One Bay

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

AMERICANS WITH DISABILITIES ACT TRANSITION PLAN LEON COUNTY FOR CURB RAMPS AND SIDEWALKS DEPARTMENT OF PUBLIC WORKS. 1 P age

FUNDING SOURCES CHAPTER 6

Chapter 4: Funding and Implementation

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

ACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments

PRESS RELEASE San Joaquin Council of Governments

Pavement Management Report. City Council Meeting of May 21, 2013

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

Building Great Neighbourhoods QUEEN ALEXANDRA

TRANSPORTATION TRAINING TOPICS. April 6, 2010

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

Item No. 14 Town of Atherton

Incorporating Sidewalks into Transportation Asset Management. Presentation by Alan S. Kercher, P.E. Kercher Engineering, Inc.

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL

Project Status Update

IMPLEMENTATION STRATEGIES

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Building Great Neighbourhoods BONNIE DOON

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

APRIL 1, 2015 APWA CONFERENCE. TIM HANSEN, PE Chief Operating Officer AHBL, Inc. Project Designer

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

CITY OF PORTSMOUTH PLANNING DEPARTMENT

Citywide Sidewalk and Crosswalk Programs

Draft North Industrial Area-Wide Traffic Plan

4 GENERIC COST ESTIMATING TOOL

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Roadway Project Recommendations:

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

DISTRICT BICYCLE PROGRAM

AGENDA ITEM SUMMARY SPECIAL AGENDA ITEM NO. _1A_

Non-Motorized Transportation 7-1

Building Great Neighbourhoods LANSDOWNE

City of Jacksonville Mobility Fee Update

Lynchburg District Update

San Francisco County Transportation Authority Proposition K Sales Tax Program Allocation Request Form

OneBayArea Grant Application

APPROVE A RESOLUTION ADOPTING A COMPLETE STREETS POLICY

C/CAG. Sunnybrae Elementary School Walking and Bicycling Audit. San Mateo-Foster City School District JUNE 2013

Michael Parmer, Management Aide, City Manager's Office

San Francisco County Transportation Authority Proposition K Sales Tax Program Allocation Request Form

City of Moorhead Committee of the Whole Meeting

Linking Transportation and Health in Nashville & Middle Tennessee

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Engineering - Bicycle and Pedestrian

AUTHORIZE BID ADVERTISEMENT

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No

Transportation Development Act Grant Center Avenue Pedestrian Signal Project

Active Transportation Facility Glossary

Tacoma Streets 101. City of Tacoma - Citizen Neighborhood Street Improvement and Safety Task Force

Pre-Construction Meeting

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Transportation Development Act Grant Radar Check Speed Signs

Culpeper District. Albemarle County Monthly Report October, 2011

F L E T C H E R A V E N U E

Final Sidewalk Feasibility Study

TOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019

CITY MANUALS AND STANDARDS REVIEW

ADA Transition Plan. City of Gainesville FY19-FY28. Date: November 5, Prepared by: City Of Gainesville Department of Mobility

Grant Applications: Active Transportation Program for Safe Routes to School

Complete Streets Funding Program Project Prioritization Plan

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

SAN MATEO COUNTY TRANSPORTATION AUTHORITY STAFF REPORT

BD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Enhancing Downtown

CITY OF LANCASTER PROPOSED NEW PROJECTS

SUMMARY OF TRANSPORTATION INVESTMENTS

Memo. Introduction. Memphis STP Pedestrian Sidewalk Project

Promoting Active Communities Award Application

City of Scotts Valley CITY COUNCIL STAFF REPORT

Paving for Progress Municipal Streets Seminar

Executive Summary. September 3, 2014

Derby Street. Project Updates. Salem, Massachusetts

San Jose Transportation Policy

Access Routes from US 101 to the Richmond San Rafael Bridge

This page intentionally left blank.

MOBILITY WORKSHOP. Joint City Council and Transportation Commission May 5, 2014

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m.

Item 08M 1 of 9

Environment and Public Works Committee Presentation

St. Francis Drive through the City of Santa Fe Corridor Study

83 AVENUE PRE-CONSTRUCTION MEETING

NJDOT Complete Streets Checklist

SBCAG STAFF REPORT Federal Transportation Improvement Program. MEETING DATE: January 19, 2017 AGENDA ITEM: 5E

RESOLUTION NO A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MENLO PARK ADOPTING A COMPLETE STREETS POLICY

Transportation in Washoe County. Lee Gibson, Executive Director February 15, 2011

Transcription:

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 2016-2017 AGENCY CONTACT INFORMATION Agency Name: City of Livermore Date: 12/4/2017 Primary Point of Contact Name: Debbie Bell Title: Associate Planner Phone: 925-960-4541 Email: dlbell@cityoflivermore.net Agency's Certification of True and Accurate Reporting by Submission By submitting this Compliance Report to the Alameda County Transportation Commission, the submitting agency certifies the compliance information reported is true and complete to the best of their knowledge, and the dollar figures in the agency's Audited Financial Statement matches exactly to the revenues and expenditures reported herein. Program Compliance Report Structure This Reporting Form is broken into the following sections for the and BB Direct Local Distribution Programs applicable to the recipient agency. * Cover - Agency Contact * General Compliance Reporting for all programs * Table 1 - Summary of Revenue, Expenditures, and Changes in Fund Balance * Table 2 - Detailed Summary of Expenditures and Accomplishments

DIRECTIONS: Complete the sections below based on the and BB Audited Financial Statements, for the applicable DLD programs for your agency. Values must match financial statements and total reported expenditures on Table 2. A. 2000 MEASURE B Direct Local Distribution Programs MEASURE B AND MEASURE BB Annual Program Compliance Report Fiscal Year 2016-2017 TABLE 1: SUMMARY OF REVENUE, EXPENDITURES, AND CHANGES IN FUND BALANCE Bicycle / Pedestrian Local Streets and Roads Mass Transit Paratransit Total Notes Beginning of Year Fund Balance $ 686,826 $ 1,425,355 $ - $ - $ 2,112,181 Revenue $ 270,228 $ 1,028,832 $ - $ - $ 1,299,060 Interest $ 1,936 $ 4,927 $ - $ - $ 6,863 Expenditures $ 348,236 $ 363,724 $ - $ - $ 711,960 Expenditures Matches Table 2? TRUE TRUE #REF! #REF! End of Year Fund Balance $ 610,754 $ 2,095,390 $ - $ - $ 2,706,144 B. 2014 MEASURE BB Direct Local Distribution Programs Bicycle / Pedestrian Local Streets and Roads Mass Transit Paratransit Total Notes Beginning of Year Fund Balance $ 252,847 $ 740,713 $ - $ - $ 993,560 Revenue $ 218,985 $ 916,998 $ - $ - $ 1,135,983 Interest $ 1,004 $ 2,612 $ - $ - $ 3,616 Expenditures $ 21,397 $ 331,693 $ - $ - $ 353,090 Expenditures Matches Table 2? TRUE TRUE #REF! #REF! End of Year Fund Balance $ 451,439 $ 1,328,630 $ - $ - $ 1,780,069

Bicycle and Pedestrian Direct Local Distribution Program GENERAL COMPLIANCE REPORTING 1. Indicate the adoption year of the most current Bicycle/Pedestrian Master Plans, as applicable. Adoption Year Bicycle Master Plan 2001 Pedestrian Master Plan Bike/Ped Master Plan Pending 2018 If the plans are over five-years past the last adoption year, specify when your agency's will perform its next update. Indicate, if not applicable. The City is currently developing a Bicycle, Pedestrian, and Trails Active Transportation Plan. TDA Article 3,, and funds are allocated for this effort. A final plan is anticipated in late spring 2018. 2. Specify any large planned uses of fund balances within this program and their status i.e. planned or underway. Title Trails, Bikeways, and Access to Transit - 2006-51 Trail Segment L19 Under Portola - 2006-55 Active Transportation Plan - 2010-24 W. Jack London Widening - 2015-28 Arroyo Road Path - 2017-23 Brief Description Preliminary engineering, environmental clearance, and grant applications for high Construct multi-use trail from Paseo Laguna Seco under I-580 to Shea property Update the City's Bikeways, Trails, and Pedestrian Active Transportation Plan Widen Jack London Blvd with a bike lane in the eastbound direction Correction of path location Anticipated DLD Status Expenditure $ 60,000.00 Planned $ 175,000.00 Underway $ 220,000.00 Underway $ 100,000.00 Planned $ 260,000.00 Underway Iron Horse Trail from Isabel to Murrieta - 2017-24 Annual Street Lighting - 2018-39 Downtown Street Lighting Enhancement - 2018-41 Design and construction of the western portion of the Iron Horse Trail Annual project to install, upgrade, relocate, and maintain street lighting Assess level of lighting in the Downtown area and develop lighting standards $ 230,000.00 Underway $ 100,000.00 Planned $ 250,000.00 Underway 3. Confirm the completion of the publicity requirements in the table below (/No). Copy of Article, website, signage Attached? Article If applicable, briefly explain why the publicity requirement wasn't completed. Website Signage

No. Provide a detailed summary of and BB Expenditures for the reporting fiscal year. - Expenditure total must correspond to your Audited Financial Statements, and Table 1 values. Category Phase Type Primarily Capital or Administrative Expenditure? Name Description/Benefits 1 Bike/Ped PS&E Multiuse Paths (Class I) Capital Trail Segment L19 Under Portola, No. 2006-55 will construct a new multiuse trail from Paseo Laguna Seco under I580 across the Arroyo Las Positas. 2 Bike/Ped project description column) 3 Bicycle Completion/Closeout 4 Bike/Ped Scoping, Feasibility, Completed in FY 16-17 Units for Administrative Financial Statements Independent Audit Report 1 Multiuse Paths (Class I) Administrative Livermore to Pleasanton Arroyo Trail, No. 2006-47 links the City of Livermore and City of Pleasanton trails system Multiuse Paths (Class I) Capital Trails and Bikeways Master Plan, No. 2006-51 Preliminary Engineering and environmental clearance for high priority trail projects identified in the City's Bikeways and Trails Master Plan. Multiuse Paths (Class I) Administrative Active Transportation Plan, No. 2010-24 Update existing 2001 Bicycle and Trails Master Plan to develop new Bicycle, Pedestrian, and Trails Active 5 Bike/Ped Scoping, Feasibility, Transportation Plan 6 Bike/Ped Maintenance Multiuse Paths (Class I) Capital Arroyo Las Positas Trail Repairs, No. 2010-29 On-going mitigation 7 Pedestrian Construction Safety Improvements Capital Annual Crosswalk Safety Improvements, No. 2015-06 Bicycle and Pedestrian Direct Local Distribution Program TABLE 2: DETAILED SUMMARY OF EXPENDITURES AND ACCOMPLISHMENTS includes design and installation of crosswalk safety improvements throughout the City, including in-pavement flashers, pedestrian activated flashing beacon, signing, and striping 7 Additional description on units or expanded detail on expenditures, performance, accomplishments Expenditures to secure Caltrans Permit Independent Audit Report - and Funds Governing Board Approved? $ 40,000 $ 20,000 $ 2,397 $ 1,397 Document Delivery fee $ 163 $ - Staff time to develop plans for the S. Livermore Valley Trail extension between Isabel Avenue and Vallecitos Road Staff time to develop Bicycle, Pedestrian, & Trails Active Transportation Plan, including extensive public outreach. $ 14,500 $ - $ 75,320 $ - On-going mitigation $ 6,726 $ - Install 4 Pedestrian Push Buttons, 2 Rectangular Rapid Flashing Beacons, and 1 Closed Circuit TV camera at various intersections. $ 96,400 $ - 8 Bike/Ped Construction Safety Improvements Capital Safe Routes to School - Marylin Avenue Elementary School, No. 2015-29 includes infrastructure improvements to common routes to Marylin Avenue Elementary School to increase the safety of the students. 9 Bike/Ped PS&E Multiuse Paths (Class I) Capital Multi-Use Trail Repair, No. 2016-20 includes base repair and reconstruction of damaged trail segments 10 Bike/Ped Scoping, Feasibility, Scoping, Feasibility, Administrative Bike and Pedestrian Studies Funds used to support Community Development Department efforts to improve bike and pedestrian facilities throughout the City 9,316 Square Feet 9,316 SF of sidewalk and ramps, solar powered vehicle speed feedback signs, solar powered bidirectional RRFB's, striping and other signage, bulbouts with new storm drain manholes, lines and inlets. Preliminary design of S. Livermore Valley Trail Extension and Emergency Permits and staff time to repair damaged trail segments from the January and February 2017 winter storms. Staff time to work on various projects in support of planning and preliminary engineering for bicycle and pedestrian facilities. Activities included advance planning, feasibility studies, and environmental studies. $ 46,250 $ - $ 16,480 $ - $ 50,000 $ - 11 $ - $ - 12 $ - $ - Total Percentage of Capital vs Administrative Costs 65% TOTAL $ 348,236 $ 21,397 a. Total Capital $ 240,356 Match to Table 1? TRUE TRUE b. Total Administrative $ 129,277 Is the total percentage of Capital vs Program Administration (outreach, staffing, administrative support) Costs GREATER THAN 50%? If not, explain how capital investments will increase in the future..

Local Streets and Roads (LSR) Direct Local Distribution Program GENERAL COMPLIANCE REPORTING 1. What is agency's current Pavement Condition Index (PCI)? PCI = 76 Use PCI from the most recent MTC's VitalSigns linked here: http://www.vitalsigns.mtc.ca.gov/street-pavement-condition If your PCI falls below a score of 60 (fair condition), specify what actions are being implemented to increase the PCI. Indicate, if not applicable. 2. Were any DLD LSR funded improvements this year provided exemptions from the locally adopted complete street's policy? If so, which projects and why? No 3. Specify any large planned uses of fund balances within this program and their status i.e. planned or underway. Title Street Resurfacing 2017-2016-01 Sidewalk Repair Program 2016-17 - 2017-02 Street Resurfacing 2018-2018-01 Preston Road Reconstruction - 2017-14 Slurry Seal 2018-2018-04 Brief Description provides base repair and resurfacing of various City streets Annual repairs to existing City sidewalks including cug & gutter and street tree work provides base repair and resurfacing of various City streets Preston Road pavement reconstruction and roadway drainage improvements Slurry seal treatment of various City streets Anticipated DLD Status Expenditure $ 1,095,000 Underway $ 225,000 Underway $ 1,925,000 Planned $ 200,000 Planned $ 105,000 Planned Downtown Street Lighting Enhancement - 2018-41 Assess the existing level of lighting in the Downtown area and develop Downtown lighting standards and implement new lighting standards $ 300,000 Underway 2018 Arterial Street Rehab - 2018-46 Street Resurfacing 2019-2019-01 Base repairs and asphalt overlays of sections N. and S. Livermore Ave. provides base repair and resurfacing of various City streets $ 570,000 Planned $ 1,275,000 Planned 4. Confirm the completion of the publicity requirements in the table below (/No). Copy of Article, website, signage Attached? Article If applicable, briefly explain why the publicity requirement wasn't completed. Website Signage

Local Streets and Roads Direct Local Distribution Program TABLE 2: DETAILED SUMMARY OF EXPENDITURES AND ACCOMPLISHMENTS Provide a detailed summary of and BB Expenditures for the reporting fiscal year. - Expenditure total must correspond to your Audited Financial Statements and Table 1 values No. Category Phase Type 1 Bike/Pad Bikeways and Multiuse Paths Primarily Capital or Administrative Expenditure? Name Description/Benefits Administrative LAVTA and Enhanced Bike/Pad Facilities, preliminary engineering, and environmental analysis on emerging projects. Staff time to coordinate with local and regional agencies re: transit, bike, pedestrian, streets and roads issues. Staff time for compliance review/reporting. Improved safety, circulation, and communication/ cooperation. Completed in FY 16-17 Units for Additional description on units or expanded detail on expenditures, performance, accomplishments Staff time for planning, preliminary engineering, environmental analysis, interagency coordination, and expenditure compliance review/reporting for bicycle and pedestrian projects. Governing Board Approved? $ 145,000 $ - 2 Streets/Rds Construction Street Resurfacing/Maintena nce Capital Annual Slurry Seal, No. 2016-04 Slurry seal pavement treatment of various residential collector, and arterial roadways, and overcoat of public parking lots and other City owned facilities. 3 Bike/Pad PS&E Sidewalks and Ramps Capital Sidewalk Repair Program, No. 2016-02 will repair sidewalks in various locations throughout the City to improve pedestrian safety. 3,020,097 Square Feet Slurry seal, microsurfacing, crack seal and AC replacement. Restriping, replace curb and gutter, and installation of truncated domes. Staff time to identify, measure and mark sidewalk deficiencies and notify property owners. Develop a project for construction. $ 150,000 $ 330,000 $ 67,071 $ - 4 Bike/Pad Environmental Column H) 5 Column H) Capital Percentage of Capital vs Administrative Costs a. Total Capital 547,381 b. Total Administrative 148,036 Preston Road Pavement Reconstruction, No. 2017-14 will provide storm drain improvements, repair and resurfacing of Preston Road. 1 Geotechnical Report $ 310 $ - Administrative Financial Statements Independent Audit Report Independent Audit Report $ 1,343 $ 1,693 2 79% TOTAL $ 363,724 $ 331,693 $ Match to Table 1? TRUE TRUE $ If your agency did not expend greater than 50% of total costs on Capital Investments, explain how capital investments will increase in the future over Program Administration (outreach, staffing, administrative support). Indicate if not applicable. A minimum of 15% of LSR funds are required to be expended on bike/pedestrian Improvements. In this fiscal year, how much of LSR funds were expended on bike/pedestrian improvements? $ Percent of LSR funds expenditures on bike/pedestrian improvements: Meets minimum 81,149 15% threshold? 24.5% TRUE If your agency did not meet the 15% minimum expenditure requirement this fiscal year, explain why in the box below