DYNAMIC AIR RELEASE VALVES

Similar documents
lead water to the next level NEEDLE VALVES

APCO ARV CLEAN WATER AIR RELEASE VALVES. Model 50A

Combination Air Valve

INSTALLATION, OPERATION & MAINTENANCE MANUAL

BUTTERFLY VALVES Series 800

WW-730. Pressure Sustaining/Relief Control Valve

RHPS Series RD(H)F40 User Manual. Read the complete manual before installing and using the regulator.

WW-720. Pressure Reducing Control Valve

ROTATING DISK VALVES INSTALLATION AND MAINTENANCE 1. SCOPE 3 2. INFORMATION ON USAGE 3 3. VALVE TYPES 3 4. OPERATORS 5 5. VALVE CONSTRUCTION 6

Installation, Operation, and Maintenance Manual

WHEATLEY WHEATLEY SERIES 500 SWING CHECK VALVE. Installation, Operation and Maintenance Manual

RS(H)10,15 USER MANUAL. Read the complete manual before installing and using the regulator.

Installation, Operation, and Maintenance Manual

Model GPR Primary Pressure Regulating Valve. Instruction Manual

Needle valve. Contents. User s Manual. (1) Be sure to read the following warranty clauses of our product 1. (2) General operating instructions 2

WW-720. Pressure Reducing Control Valve

Installation & Operation Manual Proven Quality since 1892

APCO ASU-SCAV & ASU-CAV SINGLE BODY COMBINATION AIR VALVES

WHEATLEY Series 500 Swing Check Valve

Apollo Standard Port, Full Port & One Piece Flanged Ball Valves Installation, Operation, & Maintenance Manual

Installation, Operation and Maintenance Manual for Back Pressure Regulator

INSTALLATION, MAINTENANCE & OPERATING INSTRUCTIONS 2-4 REDUCED PORT/ FULL PORT (5700/6700) ANSI CLASS 150/300/600/900/1500/2500 TRUNNION BALL VALVES

APP pumps APP and APP Disassembling and assembling

Type FEQ Slam-Shut Valve

KTM V-PORT CONTROL BALL VALVES INSTALLATION AND OPERATION MANUAL

1800C and 1800C-HC Series Service Regulators

Model PIV UL/FM Post Indicator Valve. Maintenance and Operation Manual UL/FM Post Indicator Valve Configuration AWWA C515

MUELLER. Xp, & Lineseal 350 Butterfly Valves

INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS TYPE BV2-LD

CARTRIDGE FILTERS TECHNICAL MANUAL MT 080. Installation, commissioning and maintenance instructions. 08/02 Edition

Installation Operation Maintenance. Bermad Level Control Valve with Modulating Horizontal Float Pilot valve One Way Flow IOM.

APCO ARV CLEAN WATER AIR RELEASE VALVES. Model 50A

Disassembling and assembling APP and APP 16-22

KENNEDY VALVE OPERATION & MAINTENANCE MANUAL

Description. Functions. Technical data. Applications. Tests. On-Off 2 levels float control valve, closing at high level and opening at low level.

3-PIECE BALL VALVE, 3600 PSI/ PN 248, WITH ISO DIRECT MOUNTING PAD 306M SERIES/ PED Category II

DelVal Flow Controls Private limited

Combination Air Valve Model

Welker Sampler. Model GSS-1. Installation, Operation, and Maintenance Manual

Bermad Model:

Bray/ VAAS O-Ported Series Knife Gate Valve 770/780 Series Operation and Maintenance Manual

VAG DUOJET Automatic Air Valve

Eaton Filtration, LLC

TITAN FLOW CONTROL, INC.

CA10S, CA14 and CA14S Air and Gas Traps

End Connection. Thread x Thread N/A N/A N/A N/A Flange x Flange N/A

Model: 43T. Bermad Pressure Relief Valve

MODEL 200 KNIFE GATE VALVES INSTALLATION & MAINTENANCE MANUAL

PRS(TC)4,8 USER MANUAL. Read the complete manual before installing and using the regulator.

English. Introduction. Safety Instructions. All Products. Inspection and Maintenance Schedules. Parts Ordering. Specifications WARNING WARNING

Model: 720-UL INSTALLATION OPERATION MAINTENANCE. Bermad Pressure Reducing Valve IOM. Model: FP -720-UL Sizes: 2"-12" BERMAD. Application Engineering

DAV Series. DAV-MH Air Release & Vacuum Break Valves

FLANGED MULTI-PORT BALL VALVES

KENNEDY VALVE RESILIENT WEDGE GATE VALVE MAINTENANCE MANUAL

Pressure Reducing Valve for Air A-COS-10

Serie ECO 3F. Flanged back flow preventer with controllable reduced pressure zone. made in. Application fields. Protection

PC3_ and PC4_ Pipeline Connectors

Instructions for Installation, Operating and Maintenance

Constant Pressure Crude Oil Container Model CPCCP

INSTALLATION, OPERATING & MAINTENANCE MANUAL WATER DRAIN VALVE

INSTALLATION COMMISSIONING, OPERATION & MAINTENANCE MANUAL

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax:

KTM METALTITE BALL VALVES - FLOATING TYPE INSTALLATION AND OPERATION MANUAL

P5513. Users Manual. Pneumatic Comparison Test Pump. Test Equipment Depot Washington Street Melrose, MA TestEquipmentDepot.

RS(H)20, 25 USER MANUAL

Wafer Check Valve. Contents. User s Manual. (1) Be sure to read the following description of our product warranty 1

COMBINATION AIR RELEASE DEGASSING (CARD) VALVES INSTALLATION AND MAINTENANCE MANUAL

FT16 Ball Float Steam Trap Installation and Maintenance Instructions

1200B2 Series Service Regulators. Instruction Manual

LRS(H)4 USER MANUAL. Read the complete manual before installing and using the regulator.

Operating instruction

Cylinder Tilt Saddle Instruction Manual

Un-Pressurized Orefice Fittings FIO EZ. Parts List and Operation Instructions TECHNICAL MANUAL. Dn 2-6 Class Lbs

ARGUS MODEL C PIG VALVE

Sempell High Pressure Forged Check Valves Forged steel, swing check and tilting disc configuration

Regulator from 1800 B series

FLANGED TWO-PIECE BALL VALVES

S-COS-16 / S-COSR-16

Team Insert Valve Sample Specification The Insert Valve shall conform to the following:

INSTALLATION OPERATION MAINTENANCE

USER INSTRUCTIONS. NAF Duball DL Ball Valves. Installation Operation Maintenance. Experience In Motion. flowserve.com

BERMAD Waterworks. Combination Air Valve. Air Valves Series. Typical Applications. Features & Benefits. Additional Features.

BERMAD Waterworks. Level Control Valve with Altitude Pilot. 700 Series. Model X. Features and Benefits. Major Additional Features

Pressure Reducing Valve

VALVES & MEASUREMENT

Operation & Maintenance Manual Place this manual with valve or person responsible for maintenance of the valve

OPERATION AND MAINTENANCE MANUAL

PP-1, PP-1W, PP-2, & PP-3

1. Preface Important Safety Notes Brief Product Information Product Working Principle Installation Guidelines...

AIR COMPRESSOR OPERATING INSTRUCTION AND PARTS LIST

Engineering Data Sheet

Spilt body Flange ball valve. TC-205MFF-PN1640 User Manual English Version. Document No: TC-205MFF-PN1640.Ur-manual. Date: 2007/04/2617. Version: 1.

M45 ISO Ball Valve DN25 to 150 Installation and Maintenance Instructions

Model GP PRESSURE REDUCING VALVE Installation & Operation Manual

CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD. 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems.

Pressure Reducing Valve for Steam Type 2333 A

Bermad Pressure Reducing. Model: 42T

Differential Pressure Regulator Type Type 45-6 (0.1 to 1 bar, DN 15) Mounting and Operating Instructions EB 3226 EN

Summary of Accumulators These operating instructions apply to the accumulators listed in the table shown below.

Installation Troubleshooting Maintenance Instructions Installation / Start-up

Transcription:

lead water to the next level DYNAMIC AIR RELEASE VALVES

INDEX 1. GENERAL INFORMATION 1.1 Tips for Long Term operation 1.2 Instruction for Shipment &Werehousing 2. ASSEMBLY GUIDE &START UP INSTRUCTIONS 2.1 Assembyl Location 2.2 Installation Condiotions 2.3 Items Located Around the valve 2.4 Installation Positions 2.5 Assembly 3. OPERATION 4. MAINTENANCE &REPAIRS 5. SHUT DOWN &DISASSEBLY 6. SPARE PARTS 7. SERVICE STOPS 2

1. INTRODUCTION DYNAMIC AIR RELEASE VALVES ÖZ-KAN dynamic air release valves are designed for, pumping stations, water transmission lines and high level water reservoirs. These air release valves are not suitable for sewage and waste water lines. Dynamic air release valves are vital equipment for pipelines. These valves discharge air from the pipeline while an empty line is being filled and take in air to the pipeline while the pipeline is being discharged. Also they discharge the small air pockets that get stuck in the pipeline under pressure. 3

Dynamic Air Release Valve prevents costly pipeline fractures by admitting air into the pipeline while the line is being discharged. These valves work with natural law for buoyancy and they do not need operators after the initial start up. 2. ASSEMBLY GUIDE & START UP INSTRUCTIONS Dynamic Air Release Valves are connected to the pipelines at special points where the pipelines change direction, on top of hills, on pump outlets and at certain lengths on straight pipelines. Usually these valves are installed on Tees that are on the top side of the pipes. Valves should be thoroughly checked before installations to the pipeline. Although all valves are tested carefully before leaving the manufacturing area, this control should be made incase there are problems due to faulty transport and handling. WARNING : Pipes both on the downstream and upstream sides of the valves should be carefully cleaned from all solid particles. Otherwise these particles will damage the resilient sealing ring on the initial filling of the pipeline. An isolation valve of the same diameter with the dynamic air release valve can be connected to the pipeline before connecting the air valve. This valve can be used isolate the dynamic air release valve from the pipeline for removals and maintenance while the pipeline is in operation. After installing the isolation valve, dynamic air release valve can be installed to the pipeline. Lift and place the dynamic air release valve on the isolation valve. Fasten the connection bolts and nuts. Only use the recommended size bolts and nuts for connection. Otherwise there may be leakage from flange connection. Open the isolation valve (if installed between the dynamic air release valve and the pipeline ). Dynamic air release valve is ready for operation. 3. OPERATION Dynamic air release valves do not require an operator. These valve work with natural law for buoyancy and they do not need operators after the initial start up. While an empty pipeline is being filled for the first time the dynamic air release valve floats are down at the bottom of the orifices. Valve discharges air freely at this moment. When water reaches and fills the orifice floats rise with the rising water in the orifice and close tightly on the sealing rings and stop water from coming out. 4

The small air pockets that get stuck in the pipeline are collected under the small orifice cylinder and when there is enough air in the chamber the small orifice cylinder falls down a little and lets the air out. Cylinder tightly seals the orifice with the rising water and does not let the water leak from the orifice. When discharging the pipeline floats fall down when the water leaves the valve chamber and admit air to the pipeline. This prevents the pipeline fractures. IMPORTANT NOTICE : Isolation valve of the dynamic air release valve must be in open position all time while the pipeline is in operation. Otherwise the dynamic air release valve will not perform its function and lead to costly pipe breaks in case the line is discharged. 4. MAINTENANCE & REPAIRS ÖZ-KAN Dynamic air release valves are designed for maintenance free service. In case there is leakage from air valve orifices, dust cover should be removed to detect the location of leakage. If the leakage is from main orifice seal, this might be because of a foreign object that got stuck between the seal element and the orifice or damaged o- ring. If the leakage is from the center of the anti-shock cylinder, this might be because of a damaged seal element or a foreign object that got stuck between the seal and the small orifice seat. In both cases, cover bolts must be removed and float cylinders must be removed from the chamber. Bolts that hold the bottom plate should be removed to access the damaged o-ring or sealing element. Floats must be installed as shown in drawings and bottom plate must be installed. Cover o-ring must be checked. Than float assembly should be installed and cover bolts must be tightened. WARNING : Never loosen any of the orifice cover bolts without closing the isolation valve of the air valve. Loosening the orifice cover bolts without closing the isolation valve may lead to serious injury and damage the valve. Pipeline must be cleaned from all foreign particles before start-up, in order to prevent foreign material damages on sealing elements. If the coating gets damaged, damaged coating can be mended with touch-up paint for fusion bonded powder epoxy. Damaged coating area should be cleaned from grease and rust before applying the touch-up paint. After 5

completely cleaning the area from rust, grease and dust touch-up paint can be applied. 5. DISASSEMBLY AND REMOVEL FROM PIPELINE Isolation valve must be closed from removing the dynamic air release valve from the pipeline. Bolts that connect the air valve to the pipeline flange must be removed. If the valve is going to be kept in stock for a while, it should be kept in a closed place and shielded from direct sun and hazardous environmental effects. Air valve should be kept on a wooden pallet. Valve should not be stocked on soil. 6. SPARE PARTS All necessary spare parts, such as sealing rings and o-rings can be supplied from ÖZ-KAN head office. ÖZ-KAN MAKİNA ELEMANLARI SAN. ve TİC. LTD. A.Ş. 10008 Sok. No.15 Atatürk Organize Sanayi Bölgesi Çiğli İZMİR Tel. + 90 232 3280600 (Pbx) Fax. + 90 232 328060 Web Site : www.oz-kan.com E-mail : info@oz-kan.com 7. SERVICE REQUIREMENTS In case maintenance personnel is required for maintenance and repairs please contact ÖZ-KAN Center Office in Turkey. Contact details given below. ÖZ-KAN MAKİNA ELEMANLARI SAN. ve TİC. LTD. A.Ş. 10008 Sok. No.15 Atatürk Organize Sanayi Bölgesi Çiğli İZMİR Tel. + 90 232 3280600 (Pbx) Fax. + 90 232 328060 Web Site : www.oz-kan.com E-mail : info@oz-kan.com 6