BUDE CANAL REGENERATION

Similar documents
THE TUB BOAT. Newsletter of the Bude Canal & Harbour Society No. 83 Spring 2018

THE TUB BOAT. Newsletter of the Bude Canal & Harbour Society

THE TUB BOAT. Newsletter of the Bude Canal & Harbour Society No. 80 Summer 2017

The group discussed the draft proposal and agreed the following recommendations.

Parks Canada + Boating = A Beautiful Thing! Darlene Upton Parks Canada

Your views are important. Please fill in a form before you leave. Or alternatively

CHRISTCHURCH AND EAST DORSET Local Plan Review Options Consultation Response Form

DEFRA RIGHTS OF WAY IMPROVEMENT PLANS OF THE FUTURE

GRISI PLUS Networking Seminar. WRA - Synopsis of Good Practices from an International Perspective

14 NOISE AND VIBRATION

The Berwick-upon-Tweed Conservation Areas Advisory Group (CAAG)

21st International Conference of The Coastal Society

SANTA MONICA BOULEVARD CORRIDOR

National Cycle Network Funding Scheme 2012/2012 Application Form. Waterford City Council. Paul Cleary, Executive Engineer. 3.2km 289, ,000

WINDING HOLES towards a specification for the ideal turning place

Section 11: The Medina Estuary

Tall Ships deliver a multi-million pound economic boost

Part 3: Active travel and public transport planning in new housing developments

TxDOT Bicycle Tourism Trails Study Update. April 2017 BAC Meeting April 10, 2017

VISITING BOATS INFORMATION

RECOMMENDATION. POLICY The Park Board approves all use of lands under its jurisdiction.

3 FRAMEWORK FOR IMPLEMENTATION OF LAKE-TO-LAKE CYCLING ROUTE

MEDIA RELEASE. Cornwall Marine Network Seeks Crew for 2014 Tall Ships Regatta

THE TUB BOAT. Newsletter of the Bude Canal & Harbour Society

THE TUB BOAT. Newsletter of the Bude Canal & Harbour Society

NUMBER PROJECT TITLE ESTIMATED COST

COMMUNITY LIFESAVING PLAN

A future cycle route network for North Staffordshire mb/08/16 Need for a strategy. Existing cycle route network

Topics covered. File location/file Name (including version)/author Initials/Support Initials/Date

CONSULTATION ON TOWPATH MOORING PLAN FOR THE KENNET & AVON CANAL WEST OF DEVIZES

BETWEEN A ROCK AND A HARD PLACE

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

THE PLANNING AND. Transport and the law Integrated transport planning Strategies Responsibilities of local government and road controlling authorities

City Manager General Manager Parks, Recreation and Culture Services. Coquitlam Craft Beer Festival - Special Event Permit Exemption

ATTENDEES. Consultant Team Theresa Carr, VHB Mark Jewell, VHB Geoffrey Morrison-Logan, VHB

Application for seed funding for the North Roscommon Greenway

Perryville TOD and Greenway Plan

BYRES ROAD: PUBLIC REALM Public Consultation

Implementation Matrix

The New Zealand Cycle Trail. Official Partner Programme 2016/17. Application form & agreement

The magazine of the Furness Vale Boat Club. February 2017

Section 2 Strategic Alignment. Contents

Pennsylvania Avenue (CR 484) Design Alternatives Study

Southcote Road Improvements Class Environmental Assessment Study

SINGLE LONG TERM MOORING AGAINST PRIVATE RESIDENTIAL LAND

connectivity through walking and cycling

3 Both charities warmly welcome the proposal to reopen this line and look forward to the early complementation of the project.

Draft Greater Sydney Region Plan


UPPER THAMES WW GUIDE TO THE

Focus. Cumberland Whitewater Park. Cumberland Whitewater Park. Read 20 point Comic Sans MS from rear of room. A free flowing natural artificial course

Active Travel Strategy Dumfries and Galloway

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Coast And Castles Cycle Route (National Cycle Network Route)

9. Parking Supporting Statement

STRATEGIC PLANNING FOR DEVELOPMENT OF THE OREGON SHORT LINE TERMINUS HISTORIC DISTRICT

ST. JOHNS GOLF CLUB PHASE II FINDINGS, PHASE III RECOMMENDATION, AND POTENTIAL PARTNERSHIP OPPORTUNITY

THE TUB BOAT. Newsletter of the Bude Canal & Harbour Society

Sevenways Roundabout, and the need for a Road Safety Scheme:

THE CARTERET COUNTY SHELLFISH FARMING PROGRAM A proposal to create jobs and encourage local small business ownership in the shellfish farming industry

Marine Tourism and Angling Development Facilities

ABERDEEN: CITY OF THE FUTURE

PUBLIC EXHIBITION OF COASTAL ZONE MANAGEMENT PLAN FOR COLLAROY-NARRABEEN BEACH AND FISHERMANS BEACH

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

SARASOTA COUNTY GOVERNMENT Parks and Recreation

Table of Contents Introduction. 2 Purpose of the Plan...2 The Benefits of Walking and Bicycling...3 Vision and Goals of the Plan...

Get OUTDOOR ACTIVITIES TASTER AND DEVELOPMENT SESSIONS EUROPEAN REGIONAL DEVELOPMENT FUND

(Limited Edition of 100 Penguins)

THE TUB BOAT. Newsletter of the Bude Canal & Harbour Society No. 81 Autumn 2017

One major challenge in this objective was the fact that the Forth and Clyde Canal lay 35m (115ft) below the level of the Union Canal.

Lake to Lake LAKE YORK. CYCLING ROUTE and WALKING TRAIL FEASIBILITY and DESIGN STUDY LAKE. CITY of REGION ONTARIO SIMCOE TORONTO

Transportation Master Plan Advisory Task Force

Callander Mountain Bike Trails Feasibility Study Executive Summary January 2015

Community engagement guide May 2018

Voting should indicate preference to one option (Option 1, Option 2, or Option 3)

Tel: Karime Hassan Chief Executive Exeter City Council Civic Centre Paris Street Exeter EX1 1JN

Mornington Crescent Junction (Cobden Junction)

COASTAL RAIL TRAIL ROSE CREEK BIKEWAY PROJECT COMMUNITY WORKSHOP #2 AUGUST 15, 2013

DYNAMIC LANES FOR AUCKLAND

Community based management & Co-management in India. Workshop 1 Group Discussion Report

WELCOME TO THE MILLENNIUM RIBBLE LINK

MEDIA RELEASE. Top Live Music Acts announced for Falmouth Tall Ships Regatta

MEDIA RELEASE. Tower of London Launch for the BIG Art & Storytelling Tall Ships Project

SCOTTISH BORDERS WALKING FESTIVAL 2018 TO 2020

Wayfinding and Walking in London. Lilli Matson Transport for London May 2013

COMMENT CARD SUMMARY

HORNDEAN BREWERY, LONDON ROAD. The site has stood vacant since operations were. Homes, has now contracted to purchase the

London Cycle Network Annual Report 2000

Encouragement. Chapter 4. Education Encouragement Enforcement Engineering & Facilities Evaluation & Planning. Encouragement Chapter 4

2. THAT the Mayor and Corporate Officer be authorized to execute all documents related to this matter.

WHITE CLIFFS WALKING FESTIVAL (2015) - REVIEW. Not just a walk - an experience. healthy, interesting, sociable

Outer Cape Bicycle & Pedestrian Master Plan. PUBLIC WORKSHOP #2 March 26, 2015

One Truckee River Sparks City Council

RESPONSE from SPOKES to NPF3 Main Issues Report to: July 2013

Delivering the. Strategy 7.0

The primary purpose of the TFF is to help promote a healthy farm tenanted sector in Scotland. It aims to fulfil this purpose by:

Last Updated 11/10/16

Sandwich Pedestrian/Bicycle Planning

DREEMSKERRY MAENPORTH SOUTH CORNWALL

Warfield Neighbourhood Plan: 4.4 Infrastructure

Transcription:

BUDE CANAL REGENERATION Phase II Bude Canal & Harbour Society Registered Charity No.1086646 www.bude-canal.co.uk

Figs 1 to 4. The Lower Wharf after completion of Phase I clear evidence of a successful project which was due to the strong partnership which was forged during the regeneration process. The Bude Canal Regeneration Project (BCRP) was completed on 1 st April 2009 when the lead partner, North Cornwall District Council (NCDC) ceased to exist. The Bude Canal from the Sea Lock to Marhamchurch Inclined Plane, 2 miles of rejuvenated waterway, is now owned by Cornwall Council, the new Unitary Authority. Whilst this section of the Canal is a joy to behold and is available for use by residents and visitors alike, there are works that were NOT DONE in the Project. There are various reasons, including funding, why proposals were NOT carried out. The main works not done are:- Replacement of Rodds Bridge with a suitable bridge with sufficient clearance to allow navigation under the bridge. Ideally the headroom should be not less than 2.2m. (see fig 5) Provision of at least 1 slipway above Falcon Bridge to allow access to the canal for local and visiting trail-boats. Reconnection of Helebridge Basin to the canal at Helebridge, near Marhamchurch, Bude. (see fig 6) Fig 5. Rodds Bridge - Any new bridge must have sufficient headroom for navigation 2 Fig 6. Helebridge Reconnection of canal to canal basin

These unfortunate shortfalls were recognised by NCDC and BCRP and the idea of a Phase II is to achieve all of the above was agreed as the way forward in due course. Added to the above elements should be other opportunities to be considered for implementation. The re-development of Higher Wharf as a Waterways Centre for use by Budehaven School (a Sports School) and the community, in particular local water-sports groups (see fig 7) Fig 7. Higher Wharf - Waterfront edge Fig 8. Higher Wharf - Existing buildings Fig 9. Higher Wharf - Suitable location for slipway Fig 10. Higher Wharf - Adjacent plot of land The land at Higher Wharf is now owned by Cornwall Council. The buildings there are used by community groups, currently Bude Town Band and Bude Scouts and community use should continue (see fig 8). This site, with a redesign is the ideal location for a slipway as well as providing facilities as above (see fig 9). Interestingly, this area was where Stapleton s Shipyard operated in the 1800s to the early 1900s. 3

Cornwall Council, who own the Bude Canal and adjacent land (see fig 10) are also the Education Authority, so with some inspiration a joint use facility could be created with benefits for the community. In school time this could be used by Budehaven School and other schools in conjunction with using the canal and in non-school time by community groups, including community based water-sport groups providing a base and facilities for their activities. Community users would obviously have to pay for such use to contribute to the running costs. Cornwall Council has two departments which presumably would be the leaders of such a project i.e. Education Department and the Environment Department, who have control of the canal. It is possible that such a venture would attract funding from other sources, in a partnership with other community groups and users as in the Regeneration Project. It is recognised that the current economic climate will not make any of these elements easier. These ideas can wait, but must NOT be forgotten or abandoned. During the development of BCRP, another Project was developed and mainly achieved. This was a walking route project funded by EU Interreg Fund. This Project has given access to sections of the Canal not previously easily accessed, being in private ownership. By using public paths, minor roads and access over sections of the canal, three walks of about 10 miles were achieved, being The Planekeepers Path, The Aqueduct Trail and Canal and Coast Walk. There is an opportunity to make these three walks into a 20 mile circular walk subject to access to a short section of land to connect them. Additionally, a useful booklet Bude Canal Trails Bude Valley was also produced. This covers the valley from Bude to Helebridge, highlighting other walking routes off or after the valley. The Bude Valley has the potential to be a lateral country park defined by the canal, towpath, the local nature reserve, the cycle path and the walking routes through and leading off this lovely, basically unspoilt area. There is something for everyone to enjoy - a wonderful asset. The off road cycle route from Bude up the Bude Valley ends at Helebridge but meanwhile, Devon County Council and Torridge District Council are busily developing cycle and walking routes in Devon to boost tourism and local needs. One such route is to link Holsworthy with Bude by making use of the former railway line. Obviously, these councils can only take such an off road route to the Devon/Cornwall border which is about 5 miles from Bude. There would be then only 3 miles or so of cycle/walking route to be achieved from the border to Helebridge, to complete the whole route preferably using the off road former railway route. This would be a marvellous benefit, not only for this area, but for tourism and local needs. Cornwall Council are interested in achieving this final section. This cycle route is important for many reasons, including additional access to two important canal sites, Merrifield Wheelpit and Helebridge, thus adding to the overall understanding of our heritage and the concept of a Phase II and the opportunities that would come from such a plan. All of the former canal route including the Launceston Branch needs appropriate protection. 4

Fig 11. The Bude Valley showing Whalesborough Lock and Upton in the background If the expanded view was taken, when achieved there would be: A navigable canal A joint use community/water-sport centre and education facility The country park of the Bude Valley (see fig 11) A cycle route from Bude to Holsworthy and beyond A 20 mile circular walk The completion of BCRP was not the end, just the end of the beginning, with better facilities and opportunities through the expanded Phase II of the project as described above all of which is within the remit of Cornwall Council in partnership with appropriate bodies. For and on behalf of the Trustees of Bude Canal & Harbour Society Registered Charity No.1086646 Website: www.bude-canal.co.uk October 2009 5