OKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 06/18/15 AWARD DATE = 07/06/15

Similar documents

OKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 04/16/15 AWARD DATE = 05/04/15


OKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 03/16/17 AWARD DATE = 04/10/17


*REVISED-AWARDED CALL ORDER /09/13



OKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 11/16/17 AWARD DATE = 12/04/17

OKLAHOMA DEPARTMENT OF TRANSPORTATION





OKLAHOMA DEPARTMENT OF TRANSPORTATION DATE : October 20, 2000 BID OPENING OF October 19, 2000

OKLAHOMA DEPARTMENT OF TRANSPORTATION DATE : October 18, 2000 BID OPENING OF October 19, 2000

Bowhunter Observation Survey

OKLAHOMA DEPARTMENT OF TRANSPORTATION. FFY-2018 through FFY-2021 Asset Preservation Plan

Bowhunter Observation Survey

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FFY 2018

Asphalt Concrete Plants With Expired or Nearly Expired Scale Certifications (Scales must be recertified every six months)

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FFY 2019

Club County Steer Heifer Total Stall Space Barn Column Stall # Stilwell FFA Adair 9 7 Total Adair F-150 E Alfalfa County 4-H Alfalfa

OKLAHOMA DEPARTMENT OF WILDLIFE CONSERVATION FISHERIES DIVISION

Estimated 2014 ARC-CO Wheat Payments Kansas and Oklahoma 1

OKLAHOMA DEPARTMENT OF WILDLIFE CONSERVATION FISHERIES DIVISION

DAVID JAMESON 2014 BIG-GAME REPORT. By Erik Bartholomew, Big-Game Biologist and Emily Clark, Big-Game Technician OUTDOOR OKLAHOMA

2017 DIVISIONS 1ST GRADE

HIR on Oklahoma Turnpikes

OKLAHOMA SECONDARY SCHOOL ACTIVITIES ASSOCIATION P.O. Box 14590, Oklahoma City, Oklahoma

Affordable Housing Needs.

LINE ITEM REPORT 9/18/2009

EASTBOUND AND WESTBOUND ROADWAYS MILEPOST TO MILEPOST OTTAWA AND SANDUSKY COUNTIES, OHIO

On The Road Again CLAREMORE INDUSTRIAL PARK COMMUTING STUDY

2013 Oklahoma Class C Football playoffs

Apparent Bids for Letting of January 20, 2017

RADCLIFF/ELIZABETHTOWN METROPOLITAN PLANNING ORGANIZATION FISCAL YEAR 2016 OBLIGATIONS REPORT JULY 1, JUNE 30, 2016

Please send corrections/changes to

2011 BIG GAME REPORT

Big. Game. Report BIG GAME REPORT

Weymouth - Abington Route 18 Widening and Reconstruction Project File No

TOPS NE Oklahoma Area Newsletter- February 2016 Chatting with Kathy

U Missouri Valley Smashers Tournaments

U Missouri Valley Smashers Tournaments

Quiet Waters Rule Proposal. No changes proposed. No Listed Restrictions Closed to motorized watercraft Closed to motorized watercraft

FDOT Treasure Coast Traffic Report

TO: CHEER COACHES FROM: Amy J. Cassell RE: STATE CHAMPIONSHIP CHEER COMPETITION FACILITY INFORMATION DATE: SEPTEMBER 22, 2018

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Flood Insurance Study

LOCAL ASSOCIATIONS 23-Aug-16 Page 1 of 2 Sport Last First Name of Local City/Area of State

2018 OKLAHOMA BOYS CLASS 3A BASKETBALL

Downtown Redevelopment Project Update

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)

TRANSPORTATION COMMISSION OF WYOMING

Culpeper District. Albemarle County Monthly Report October, 2011

Welcome! CHICAGO TO ST. LOUIS HIGH-SPEED RAIL Public Meeting.

TO: CHEER COACHES FROM: Amy J. Cassell RE: STATE CHAMPIONSHIP CHEER COMPETITION FACILITY INFORMATION DATE: SEPTEMBER 22, 2014

Flood Insurance Study

General Notes. Project No /15/2018 Page 1 of 1

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

FDOT Treasure Coast Traffic Report

IH 20 RANGER HILL PUBLIC MEETING

BLACK JACK PEE WEE ENDURO CIRCUIT

2012 Payne County Economic Outlook

Highway Construction

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.

REPAIRS AND RESURFACING, VERMILION VALLEY SERVICE PLAZA, MILEPOST , LORAIN COUNTY, OHIO MAY 23, 2016 AT 2:00 P.M.

VDOT 2016 Road and Bridge Standards Section Traffic Control Devices

4-5 BOYS BRACKET. NW Wildcats G5 Northwest Elite. #3 Newkirk Blazers Loser G3. Waynoka Loser G2

Kentucky Highway District 7

S/TIP LIST OF PROJECTS

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR VAUGH WILSON, P.E., DISTRICT DEPUTY DIRECTOR

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

FOR SALE OR LEASE COMMERCIAL / INDUSTRIAL BUILDING

DECEMBER 2007 SIGNIFICANT FACTS AND TRENDS

KANSAS DEPARTM ENT OF TRANSPORTATION BUREAU OF TRANSPORTATION PLANNING JANUARY 2017 SIGNIFICANT FACTS AND TRENDS

Pushmataha County News Line

SR 53 Corridor Study. Final Report Presentation. Friday, October 3, :00 AM to noon

Golden s Plan. For the Highway 6 & 93 Corridor

Waterfall to Heathcote

Proposed FUL-SR 66 Relocation on to CR 24. Presentation to Archbold Village Council April 17, 2017

KANSAS DEPARTM ENT OF TRANSPORTATION BUREAU OF TRANSPORTATION PLANNING NOVEM BER 2018 SIGNIFICANT FACTS AND TRENDS

Sapulpa has always been nice size manufacturing center. On Dewey Street we next encountered a tribute to their transportation and rail development

KANSAS DEPARTM ENT OF TRANSPORTATION BUREAU OF TRANSPORTATION PLANNING DECEM BER 2018 SIGNIFICANT FACTS AND TRENDS

Plan Holders Listing October 19, 2018 Letting (1) CN McKinley County

ACTIVE PROJECTS DIRECTORY

ENERGY SECTOR ROADWAY REPAIR PROJECT. August 15, 2013 Industry Workshop

Oklahoma Unwanted Pesticide Disposal Program

Figure 1-1 STATE ROUTE 10

COUNTY OF HUNTERDON DEPARTMENT OF PUBLIC WORKS ROADS, BRIDGES & ENGINEERING PROJECT SUMMARY

JUNE 2007 SIGNIFICANT FACTS AND TRENDS

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

RECEIVED. Be it Enacted by the People of the State of Colorado: SECTION 1. In Colorado Revised Statutes, add part 11 to article 4 of title 43 as

ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement.

TABULATIONS SHOWING PROPOSALS ISSUED BY THE ALABAMA DEPARTMENT OF TRANSPORTATION TUESDAY, SEPTEMBER 16, 2014 FOR LETTING OF SEPTEMBER 26, 2014

Cotton Belt Corridor PE/EIS

City of Conway Mayor s Office 1201 Oak Street Conway, AR Invitation and Bid

09/28/2011 NEW/UPDATED ROAD CONSTRUCTION AND RESTRICTIONS:

Oklahoma Classic Day 1

Transcription:

AWARDED: CALL ORDER: 010 PROJECT NO.:NHPP-201N(014)RW J.P. NUMBER:1692823 BAMS NO: 150186 CALENDAR DAYS ALLOTTED: 180 COUNTY: ADAIR HIGHWAY NO.: US-59 LENGTH: 3.3140 MILES DESCRIPTION : RIGHT-OF-WAY CLEARANCE - DIVISION I LOCATION : US-59: FROM 6.95 MILES NORTH OF WESTVILLE, EXTEND NORTH. CONTRACT AMOUNT : $ 352,500.00 CONTRACTOR : J.E. DIRT WURX, LLC WAGONER OK AWARDED: CALL ORDER: 020 PROJECT NO.:CIRB-205D(037)RB J.P. NUMBER:3003204 BAMS NO: 150187 CALENDAR DAYS ALLOTTED: 75 COUNTY: BECKHAM HIGHWAY NO.: COUNTY ROAD (EW-120) LENGTH: 0.1610 MILES DESCRIPTION : BRIDGE AND APPROACHES - DIVISION V LOCATION : COUNTY ROAD (EW-120): OVER INDIAN CREEK, 0.50 MILES WEST OF THE SH-34 JUNCTION. CONTRACT AMOUNT : $ 422,169.00 CONTRACTOR : RRY SERVICES, LLC STILLWATER OK AWARDED: CALL ORDER: 050 PROJECT NO.:NHPP-219N(036)SS J.P. NUMBER:2709004 BAMS NO: 150190 CALENDAR DAYS ALLOTTED: 200 COUNTY: CREEK HIGHWAY NO.: US-75A LENGTH: 0.0640 MILES DESCRIPTION : BRIDGE REHABILITATION - DIVISION VIII LOCATION : US-75A: OVER ROCK CREEK, 0.30 MILES SOUTH OF THE SH-117 JUNCTION IN SAPULPA. CONTRACT AMOUNT : $ 1,875,233.80 CONTRACTOR : M.J. HUGHES CONSTRUCTION, INC. TULSA OK

AWARDED: CALL ORDER: 070 PROJECT NO.:SBR-220C(027)SB J.P. NUMBER:2927604 BAMS NO: 150192 CALENDAR DAYS ALLOTTED: 100 COUNTY: CUSTER HIGHWAY NO.: SH-44 LENGTH: 0.1750 MILES DESCRIPTION : BRIDGE REHABILITATION - DIVISION V LOCATION : SH-44: OVER OAK CREEK, 4.7 MILES NORTH OF THE I-40 JUNCTION. CONTRACT AMOUNT : $ 997,305.28 CONTRACTOR : HASKELL LEMON CONST. CO. AWARDED: CALL ORDER: 080 PROJECT NO.:NHPP-221N(020)SS J.P. NUMBER:2650604 BAMS NO: 150193 CALENDAR DAYS ALLOTTED: 120 COUNTY: DELAWARE HIGHWAY NO.: US-412 LENGTH: 0.0650 MILES DESCRIPTION : WIDEN AND RESURFACE - DIVISION VIII LOCATION : US-412: FROM THE ARKANSAS STATE LINE, EXTEND WEST. CONTRACT AMOUNT : $ 978,879.00 CONTRACTOR : PARAGON CONTRACTORS, LLC TULSA OK AWARDED: CALL ORDER: 090 PROJECT NO.:CIRB-222D(020)RB J.P. NUMBER:3002504 BAMS NO: 150194 CALENDAR DAYS ALLOTTED: 75 COUNTY: DEWEY HIGHWAY NO.: COUNTY ROAD LENGTH: 0.1320 MILES DESCRIPTION : BRIDGE AND APPROACHES - DIVISION V LOCATION : COUNTY ROAD (EW-62): OVER KIZER CREEK, 7.9 MILES EAST AND 2.0 MILES SOUTH OF VICI. CONTRACT AMOUNT : $ 530,316.30 CONTRACTOR : K & R BUILDERS, INC. WHEATLAND OK

AWARDED: CALL ORDER: 095 PROJECT NO.:CIRB-126C(131)RB J.P. NUMBER:2494504 BAMS NO: 150163 CALENDAR DAYS ALLOTTED: 210 COUNTY: GRADY HIGHWAY NO.: COUNTY ROAD LENGTH: 4.0420 MILES DESCRIPTION : GRADE, DRAIN, AND SURFACE - DIVISION VII LOCATION : COUNTY ROAD (SARA ROAD): FROM 0.50 MILES NORTH OF I-44 NEAR NEWCASTLE, EXTEND NORTH. CONTRACT AMOUNT : $ 4,393,434.16 CONTRACTOR : SHELL CONSTRUCTION CO., INC/MARKWELL PAV AWARDED: CALL ORDER: 100 PROJECT NO.:STP-227C(016)CI J.P. NUMBER:2841304 BAMS NO: 150195 CALENDAR DAYS ALLOTTED: 120 COUNTY: GRANT HIGHWAY NO.: COUNTY ROAD (NS-296) LENGTH: 0.2360 MILES DESCRIPTION : BRIDGE AND APPROACHES - DIVISION IV LOCATION : COUNTY ROAD (NS-296): OVER UNNAMED CREEK, 6.5 MILES NORTH OF SH-11 IN MEDFORD. CONTRACT AMOUNT : $ 574,754.21 CONTRACTOR : L & M CONTRACTORS, INC. GREAT BEND KS AWARDED: CALL ORDER: 110 PROJECT NO.:SSR-227C(017)SR J.P. NUMBER:3137104 BAMS NO: 150196 CALENDAR DAYS ALLOTTED: 60 COUNTY: GRANT HIGHWAY NO.: SH-132 LENGTH: 5.1900 MILES DESCRIPTION : RESURFACE (ASPHALT) - DIVISION IV LOCATION : SH-132: FROM 0.10 MILES SOUTH OF THE GARFIELD COUNTY LINE, EXTEND NORTH NEAR PRAIRIE. CONTRACT AMOUNT : $ 1,459,500.00 CONTRACTOR : VENTURE CORP. DBA V. C. O. PAV. GREAT BEND KS

AWARDED: CALL ORDER: 120 PROJECT NO.:CIRB-133C(095)RB J.P. NUMBER:2497004 BAMS NO: 150197 CALENDAR DAYS ALLOTTED: 220 COUNTY: JACKSON HIGHWAY NO.: COUNTY ROAD (NS-210) LENGTH: 4.0130 MILES DESCRIPTION : GRADE, DRAIN, SURFACE, AND BRIDGE - DIVISION V LOCATION : COUNTY ROAD (NS-210): FROM SH-5, EXTEND NORTH NEAR ALTUS. CONTRACT AMOUNT : $ 4,150,099.34 CONTRACTOR : KLAVER CONSTRUCTION COMPANY, INC. KINGMAN KS AWARDED: CALL ORDER: 130 PROJECT NO.:STP-234D(022)CI J.P. NUMBER:2844304 BAMS NO: 150198 CALENDAR DAYS ALLOTTED: 120 COUNTY: JEFFERSON HIGHWAY NO.: COUNTY ROAD LENGTH: 0.2070 MILES DESCRIPTION : BRIDGE AND APPROACHES - DIVISION VII LOCATION : COUNTY ROAD (NS-296): OVER WEST MUD CREEK, 4.0 MILES NORTH OF SH-32 NEAR CORNISH. CONTRACT AMOUNT : $ 739,028.80 CONTRACTOR : RRY SERVICES, LLC STILLWATER OK AWARDED: CALL ORDER: 140 PROJECT NO.:NHPP-234N(015)SS J.P. NUMBER:2880004 BAMS NO: 150199 CALENDAR DAYS ALLOTTED: 180 COUNTY: JEFFERSON HIGHWAY NO.: US-81 LENGTH: 0.2080 MILES DESCRIPTION : BRIDGE AND APPROACHES - DIVISION VII LOCATION : US-81: OVER FLAT CREEK, 7.88 MILES NORTH OF THE TEXAS STATE LINE. CONTRACT AMOUNT : $ 2,516,112.74 CONTRACTOR : OBC, INC. EDMOND OK

AWARDED: CALL ORDER: 150 PROJECT NO.:SSR-236C(027)SR J.P. NUMBER:2964004 BAMS NO: 150200 CALENDAR DAYS ALLOTTED: 60 COUNTY: KAY HIGHWAY NO.: US-177 LENGTH: 5.3100 MILES DESCRIPTION : RESURFACE (UTBWC) - DIVISION IV LOCATION : US-177: FROM I-35, EXTEND NORTHWEST TO THE KANSAS STATE LINE. CONTRACT AMOUNT : $ 679,607.00 CONTRACTOR : EVANS & ASSOCIATES CONST. CO., INC. PONCA CITY OK AWARDED: CALL ORDER: 160 PROJECT NO.:SSR-237N(025)SR J.P. NUMBER:3137004 BAMS NO: 150201 CALENDAR DAYS ALLOTTED: 45 COUNTY: KINGFISHER HIGHWAY NO.: US-81 LENGTH: 3.2200 MILES DESCRIPTION : RESURFACE (UTBWC) - DIVISION IV LOCATION : US-81: FROM 0.54 MILES NORTH OF THE CANADIAN COUNTY LINE, EXTEND NORTH. CONTRACT AMOUNT : $ 336,699.00 CONTRACTOR : HASKELL LEMON CONST. CO. AWARDED: CALL ORDER: 170 PROJECT NO.:SBR-238N(029)SB J.P. NUMBER:2927704 BAMS NO: 150202 CALENDAR DAYS ALLOTTED: 100 COUNTY: KIOWA HIGHWAY NO.: US-183 LENGTH: 0.0830 MILES DESCRIPTION : BRIDGE REHABILITATION - DIVISION V LOCATION : US-183: OVER US-62, 2.1 MILES EAST OF THE TILLMAN COUNTY LINE. CONTRACT AMOUNT : $ 1,041,349.13 CONTRACTOR : HASKELL LEMON CONST. CO.

AWARDED: CALL ORDER: 210 PROJECT NO.:HSIPIG-3500(007) J.P. NUMBER:3132504 BAMS NO: 150206 CALENDAR DAYS ALLOTTED: 30 COUNTY: MCCLAIN HIGHWAY NO.: I-35 LENGTH: 0.0000 MILES DESCRIPTION : SAFETY IMPROVEMENT (CABLE BARRIER) - DIVISION III LOCATION : I-35: FROM MILE MARKER 98.5 TO MILE MARKER 99.5, AND FROM MILE MARKER 104.5 TO MILE MARKER 105.5 IN GOLDSBY. CONTRACT AMOUNT : $ 234,479.25 CONTRACTOR : ACTION SAFETY SUPPLY CO. AWARDED: CALL ORDER: 215 PROJECT NO.:SBR-146N(134)SB J.P. NUMBER:2828604 BAMS NO: 150221 CALENDAR DAYS ALLOTTED: 90 COUNTY: MCINTOSH HIGHWAY NO.: I-40 LENGTH: 0.0000 MILES DESCRIPTION : BRIDGE REHABILITATION - DIVISION I LOCATION : I-40: OVER PIERCE ROAD, 9.31 MILES EAST OF THE OKMULGEE COUNTY LINE. CONTRACT AMOUNT : $ 625,648.66 CONTRACTOR : PBX CORPORATION SAPULPA OK AWARDED: CALL ORDER: 220 PROJECT NO.:STP-249C(023)CI J.P. NUMBER:2934604 BAMS NO: 150207 CALENDAR DAYS ALLOTTED: 120 COUNTY: MAYES HIGHWAY NO.: COUNTY ROAD LENGTH: 5.0380 MILES DESCRIPTION : RESURFACE (P.C. CONCRETE) - DIVISION VIII LOCATION : COUNTY ROAD (NS-435/TRUE ROAD): FROM NE 1ST STREET (EW-49) IN PRYOR CREEK, EXTEND NORTH. CONTRACT AMOUNT : $ 2,230,907.45 CONTRACTOR : DUIT CONST. CO, INC./TTK CONST. CO., INC EDMOND OK

AWARDED: CALL ORDER: 225 PROJECT NO.:SBR-249N(022)SB J.P. NUMBER:3058904 BAMS NO: 150184 CALENDAR DAYS ALLOTTED: 350 COUNTY: MAYES HIGHWAY NO.: US-69 LENGTH: 0.1670 MILES DESCRIPTION : BRIDGE REHABILITATION - DIVISION VIII LOCATION : US-69: OVER THE UNION PACIFIC RAILROAD, 4.9 MILES NORTH OF SH-20. CONTRACT AMOUNT : $ 3,171,500.00 CONTRACTOR : BECCO CONTRACTORS, INC. TULSA OK AWARDED: CALL ORDER: 230 PROJECT NO.:HSIPIG-3500(010)TR J.P. NUMBER:3155804 BAMS NO: 150208 CALENDAR DAYS ALLOTTED: 90 COUNTY: MURRAY HIGHWAY NO.: I-35 LENGTH: 7.0800 MILES DESCRIPTION : SAFETY IMPROVEMENT (CABLE BARRIER) - DIVISION VII LOCATION : I-35: FROM MILE MARKER 44, EXTEND NORTH NEAR TURNER FALLS. CONTRACT AMOUNT : $ 1,386,375.12 CONTRACTOR : ACTION SAFETY SUPPLY CO. AWARDED: CALL ORDER: 240 PROJECT NO.:NHPPI-3500(012)RW J.P. NUMBER:0903219 BAMS NO: 150209 CALENDAR DAYS ALLOTTED: 180 COUNTY: OKLAHOMA HIGHWAY NO.: I-240 LENGTH: 0.9440 MILES DESCRIPTION : RIGHT-OF-WAY CLEARANCE - DIVISION IV LOCATION : I-240: AT THE I-35 INTERCHANGE IN OKLAHOMA CITY. CONTRACT AMOUNT : $ 56,750.00 CONTRACTOR : MIDWEST WRECKING, INC.

AWARDED: CALL ORDER: 270 PROJECT NO.:SSR-255A(344)SR J.P. NUMBER:2964204C BAMS NO: 150212 CALENDAR DAYS ALLOTTED: 75 SSR-255A(345)SR 2964205C COUNTY: OKLAHOMA HIGHWAY NO.: US-62 LENGTH: 3.4800 MILES DESCRIPTION : RESURFACE (ASPHALT) - DIVISION IV LOCATION : US-62: FROM THE I-35 JCT NEAR FOREST PARK, EXTEND EAST, AND FROM 0.05 MI WEST OF HIWASSEE ROAD, EXTEND EAST IN CHOCTAW. CONTRACT AMOUNT : $ 1,326,000.00 CONTRACTOR : HASKELL LEMON CONST. CO. AWARDED: CALL ORDER: 275 PROJECT NO.:STPY-255F(296)DC J.P. NUMBER:3098604 BAMS NO: 150222 CALENDAR DAYS ALLOTTED: 5 COUNTY: MAYES HIGHWAY NO.: SH-20 LENGTH: 0.1000 MILES DESCRIPTION : HIGH FRICTION SURFACE COURSE - DIVISION VIII LOCATION : SH-20: AT NS-442 NEAR SALINA. CONTRACT AMOUNT : $ 69,113.98 CONTRACTOR : ACTION SAFETY SUPPLY CO. AWARDED: CALL ORDER: 305 PROJECT NO.:STP-158B(122)SS J.P. NUMBER:2427404 BAMS NO: 150223 CALENDAR DAYS ALLOTTED: 180 COUNTY: OTTAWA HIGHWAY NO.: US-59 LENGTH: 0.2070 MILES DESCRIPTION : BRIDGE AND APPROACHES LOCATION : US-59: OVER LITTLE HORSE CREEK, 4.5 MILES NORTHWEST OF THE DELAWARE COUNTY LINE NEAR AFTON. CONTRACT AMOUNT : $ 2,039,439.95 CONTRACTOR : CROSSLAND CONSTRUCTION COMPANY, INC. COLUMBUS KS

AWARDED: CALL ORDER: 310 PROJECT NO.:PLHD-261N(013)DC J.P. NUMBER:2899504 BAMS NO: 150213 CALENDAR DAYS ALLOTTED: 330 COUNTY: PITTSBURG HIGHWAY NO.: CITY STREET LENGTH: 0.2550 MILES DESCRIPTION : INTERCHANGE - DIVISION II LOCATION : CITY STREET (C-TREE ROAD): AT THE US-69 INTERCHANGE, IN SAVANNA. CONTRACT AMOUNT : $ 6,324,152.87 CONTRACTOR : L & N BRIDGE, LLC ANTLERS OK AWARDED: CALL ORDER: 320 PROJECT NO.:STP-164C(116)SS J.P. NUMBER:2433204 BAMS NO: 150214 CALENDAR DAYS ALLOTTED: 300 COUNTY: PUSHMATAHA HIGHWAY NO.: SH-93 LENGTH: 2.7910 MILES DESCRIPTION : GRADE, DRAIN, AND SURFACE - DIVISION II LOCATION : SH-93: FROM THE CHOCTAW COUNTY LINE, EXTEND NORTH. CONTRACT AMOUNT : $ 8,957,819.74 CONTRACTOR : THE CUMMINS CONSTRUCTION CO., INC. ENID OK AWARDED: CALL ORDER: 335 PROJECT NO.:SBR-272N(114)SB J.P. NUMBER:3059204 BAMS NO: 150219 CALENDAR DAYS ALLOTTED: 300 SSP-272N(123)SS 3148104 COUNTY: TULSA HIGHWAY NO.: US-75 LENGTH: 2.8810 MILES DESCRIPTION : PAVEMENT AND BRIDGE REHABILITATION - DIVISION VIII LOCATION : US-75: FROM SH-20, EXTEND NORTH NEAR COLLINSVILLE. CONTRACT AMOUNT : $ 7,094,095.90 CONTRACTOR : SHERWOOD CONSTRUCTION CO., INC. TULSA OK

AWARDED: CALL ORDER: 340 PROJECT NO.:HSIP-272B(087)TR J.P. NUMBER:3139804 BAMS NO: 150216 CALENDAR DAYS ALLOTTED: 45 COUNTY: TULSA HIGHWAY NO.: US-75 LENGTH: 0.0000 MILES DESCRIPTION : TRAFFIC SIGNALS - DIVISION VIII LOCATION : US-75: AT THE SH-117 JUNCTION IN GLENPOOL. CONTRACT AMOUNT : $ 139,365.60 CONTRACTOR : MIDSTATE TRAFFIC CONTROL, INC. AWARDED: CALL ORDER: 360 PROJECT NO.:HSIPG-277F(027)TR J.P. NUMBER:3073006 BAMS NO: 150218 CALENDAR DAYS ALLOTTED: 30 COUNTY: WOODWARD HIGHWAY NO.: MULTIPLE LENGTH: 0.0000 MILES DESCRIPTION : TRAFFIC SIGNAL BACKPLATE - DIVISION V AND VI LOCATION : US-183/US-283/US-412/SH-15/SH-34/CITY STREETS: AT MULTIPLE LOCATIONS IN DIVISION V AND VI. CONTRACT AMOUNT : $ 46,235.00 CONTRACTOR : MIDSTATE TRAFFIC CONTROL, INC.

LETTING DATE = 06/18/15 REJECTED: CALL ORDER: 030 PROJECT NO.:SSP-NBIP(489)SS J.P. NUMBER:2433605 BAMS NO: 150188 CALENDAR DAYS ALLOTTED: 70 COUNTY: CARTER HIGHWAY NO.: I-35/US-77/SH-49 LENGTH: 0.0000 MILES DESCRIPTION : BRIDGE PAINTING - DIVISION VII LOCATION : I-35/US-77/SH-49: AT MULTIPLE LOCATIONS IN DIVISION VII. CONTRACT AMOUNT : CONTRACTOR :

LETTING DATE = 06/18/15 THE TOTAL AMOUNT OF AWARDED CONTRACTS: $ 54,748,871.28 ================ THE TOTAL AMOUNT OF REJECTED CONTRACTS: $ 688,751.60 ================ THE TOTAL AMOUNT OF DEFERRED CONTRACTS: $ 0.00 ================